PREPARED BY: Demos Dracoulides. CAPE TOWN PO Box 60034, 7439 Table View, Cape Tel: Fax:

Similar documents
10.0 AIR QUALITY AND CLIMATIC FACTORS

The assessment is based upon the design ore production of 95 million tonnes / annum.

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes

A proposed new gas-fired power station on the Wilton International site

APPENDIX H AIR DISPERSION MODELLING REPORT BY PROJECT MANAGEMENT LTD. (REF. CHAPTER 11 AIR QUALITY AND CLIMATIC FACTORS)

Detailed Air Quality Modelling and Analysis

CONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5

(1) Site Suitability PURPOSE

CONTENTS 1. NOISE IMPACT ASSESSMENT 1

Pembina Nisku Oil Project. Three Well Exploration Program

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3

Excerpt of Thermal Power Guidelines for New Plants

FACILITY PROFILE. New Brunswick Power Corporation for the Belledune Thermal Generating Station

Request for Quotations Acoustic Consultant Services

Appendix VIII: Determination of chimney heights

Appendix B2. Air Dispersion Modeling

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

ROCK CRUSHING PLANT APPLICATIONS ADVICE

Comments on Draft Permit #12-POY-079. FTS International Proppants, LLC. Acadia, Trempealeau, Wisconsin. March 15, 2013

Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well

REPORT SURAT GAS PROJECT SUPPLEMENTARY AIR QUALITY ASSESSMENT. Coffey Environments

Air quality in the vicinity of a governmental school in Kuwait

Air Quality Assessment Report Paris Grand Development County of Brant, Ontario

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

Emergency Engine and Turbine Requirements

AIR QUALITY MANAGEMENT IN THE NORTH WEST PROVINCE OF SOUTH AFRICA A SUCCESSFUL PARTNERSHIP WITH INDUSTRY

AUSTAR COAL MINE AIR QUALITY MANAGEMENT AND MONITORING PLAN

APPENDIX 5 ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY

Environmental Guideline for Saskatchewan Asphalt Plants

Appendix 0 Air Dispersion Modelling Study Black Point Quarry Project Guysborough County, NS SLR Project No.:

Application of the AERMOD modeling system for air pollution dispersion in the South Pars oilfield

MEDUPI POWER STATION NEW RAW WATER RESERVOIR AND PIPELINES PROJECT VISUAL IMPACT ASSESSMENT

Hind Energy & Coal Beneficiation (India) Ltd.

ESKOM APPLICATION FOR EXEMPTION FROM THE MINIMUM EMISSIONS STANDARDS FOR THE KRIEL POWER STATION. DATE: 28 October 2013

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009

Bengalla Mining Company Pty Limited. Particulate Matter Control Best Practice Implementation Monitoring Programs

H. Dust Suppressant - water, hygroscopic materials, or non-toxic chemical stabilizers used

MAINE MEDICAL CENTER

Discipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9

STRATFORD MINING COMPLEX Air Quality and Greenhouse Gas Management Plan

MONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES

Welcome To Our Exhibition

6.1 INTRODUCTION 6.2 REGULATORY FRAMEWORK NATIONAL AMBIENT AIR QUALITY STANDARDS COMPLIANCE STATUS TRANSPORTATION CONFORMITY

Sand Mining and Transport: Potential Health Effects. Thomas M. Peters, PhD, CIH Associate Professor University of Iowa Iowa City, IA

Coal Mine Particulate Matter Control Best Practice Site-specific determination guideline. November 2011

New 790-Megawatt Unit. Council Bluffs Energy Center

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

CANADA-WIDE STANDARDS FOR PM & OZONE STATUS OF JURISDICTIONAL IMPLEMENTATION ACTIVITIES MANITOBA

AIR DISPERSION MODELLING IN COASTAL AREAS WITH ROUGH TERRAIN, USING CALPUFF PRIME

USE OF LONG TERM MONITORING DATA FOR DEFINING BASELINE SOUND LEVELS

Annex F Scoping Checklist

STATE OF THE AIR QUALITY IN THE MAIN REGIONS OF PEARL RIVER DELTA

SECTION 7: CLIMATE AND AIR QUALITY

AIR POLLUTION DISPERSION MODELING FOR DIESEL GENERATORS AT JAMIA UNIVERSITY CAMPUS, NEW DELHI, INDIA

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

Environmental Leadership Program Inspection Form Portable Asphalt Facility

Overview of the Clean Air Strategic Alliance (CASA) Project on Non-Point Air Emission Sources

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Ukraine Sustainable Energy Lending Facility (USELF) Strategic Environmental Review (SER) Ecoline EA Centre

Project & Environmental Review. Guidelines Environmental Air Assessment. Vancouver Fraser Port Authority

State of Utah. Department of Environmental Quality DAQE-AN October 26, 2009

I. Site Name and Location

EXPERIENCE OF SOURCE APPORTIONMENT STUDY IN INDIA

APPLICATION OF A LAGRANGIAN PARTICLE MODEL TO THE SOURCE APPORTIONMENT FOR PRIMARY MACROPOLLUTANTS IN THE TARANTO AREA (SOUTH ITALY)

Potential to Emit. Calculating your PTE Jenifer Dixon Public Affairs and Outreach

Particulate Matter Rules Update BAAQMD BACWA Meeting

Land at Penny Pot Lane, Killinghall

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

Environmental Information Worksheet

SiVEST ENVIRONMENTAL DIVISION Grootvlei Power Station Hydrogeological Investigation. Report. Version 1. September 11

ESTIMATING PRODUCTIVITY EMISSION RATES AND COST EMISSION RATES OF DIESEL CONSTRUCTION EQUIPMENT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

CONSTRUCTION PERMIT. DATE ISSUED: January 7, 2015 ISSUED TO: Martin Marietta Materials, Inc.

PROPOSED HAPPY VALLEY WIND ENERGY FACILITY ON A SITE NEAR HUMANSDORP, EASTERN CAPE VISUAL IMPACT ASSESSMENT

PV AND OTHER RENEWABLES THE FINANCIAL ADVANTAGE

WG1 discussion topic: Model s fitness-for-purpose in the context of exceedance modelling

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Transport of IGCT. The transportation of IGCT is classified according to IEC set IE22. Power and productivity for a better world

Ambient Air Monitoring

APPENDIX C NOISE STUDY TECHNICAL REPORT

Eastern Africa Regional Framework Agreement on Air Pollution (Nairobi Agreement-2008)

Testimony of Seyed Sadredin Executive Director/Air Pollution Control Officer San Joaquin Valley Air Pollution Control District

The role of light duty vehicles in future air pollution: a case study of Sacramento

4.12 AIR QUALITY INTRODUCTION

Air quality in the Mesogaia Plain in Eastern Attica before and after the opening of the Athens International Airport

Clean Air Act. Compliance

4.10 NOISE. A. Fundamental Concepts of Environmental Acoustics

Base Metal and Iron Ore Mining

7.0 EVALUATION OF REMEDIAL ALTERNATIVES

Eastern Kern Air Pollution Control District

Project & Environmental Review. Guidelines Air Emission Management Plan. July 2015

Monthly Environmental Monitoring Report

THE EGGBOROUGH CCGT PROJECT STAGE 1 CONSULTATION: PROJECT INFORMATION DOCUMENT

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Noise & air quality research in Amsterdam

South Coast Air Quality Management District

A Guide to Project Review

Air Dispersion Model Report. For. Boylan Group Ltd.

Application Number: SP Project Name: Novo Nordisk Bright Sky Major Site Plan (acting as a Master Plan)

SCHEDULE. FORM A (Rule 3(1)) THE CERTIFICATE OF ENVIRONMENTAL CLEARANCE RULES 2001 APPLICATION FOR A CERTIFICATE OF ENVIRONMENTAL CLEARANCE

Transcription:

Relocation of Acacia and Port Rex Gas Turbines to Ankerlig Power Station Air Quality Impact Assessment Summary Report PREPARED BY: Demos Dracoulides CAPE TOWN PO Box 60034, 7439 Table View, Cape Tel: 021 556 3837 Fax: 021 557 1078 Email: DemosD@xsinet.co.za JOHANNESBURG PO Box 1668, Northriding 2162 Tel:011 679 2342 Fax:011 679 2342 SUBMITTED TO: Savannah Environmental (Pty) Ltd September 2008 Report No:ACNA-021008

1. Impact Assessment and Recommendations 1.1 Air Pollution Impact Rating Based on the impact ranking described in the impact assessment methodology, the resulting rating and significant points for the Acacia and Port Rex relocations are as follows: Table 0-1. Construction: Air Pollution Impact Assessment Ranking and Environmental Significance Nature: Increase of air pollution levels and dust deposition around the power station construction area. Without mitigation With mitigation Extent Local (2) Local (2) Duration Short-term (2) Short-term (2) Magnitude Low (4) Minor (2) Probability Probable (3) Improbable (2) Significance Low (24) Low (12) Status (positive or Negative Negative negative) Reversibility Reversible Reversible Irreplaceable loss of No loss No loss resources? Can impacts be mitigated? Yes Yes Mitigation: Application of water suppression. Speed reduction to below 20 km/hr within and around the site. Paving of internal roads as soon as possible. Cumulative impacts: Cumulative impacts due to the existing Ankerlig power station units, industrial sources in the adjacent Atlantis Industrial area and vehicular traffic in the area. Residual Impacts: No residual impact after the activity ceases. Table 0-2. Acacia and Port Rex Relocation Cumulative Air Pollution Impact Assessment Ranking and Environmental Significance Nature: Increase of the air pollution levels around the power station site. Without Mitigation With Mitigation Extent Local (2) Local (2) Duration Long-term (4) Long-term (4) Magnitude High impact (10) Moderate (6) Probability Highly probable (4) Highly Probable (4) Significance High (64) Moderate (36) Status (positive or negative) Negative Negative 1

Reversibility Reversible Reversible Irreplaceable loss of No irreplaceable loss No irreplaceable loss resources? Can impacts be mitigated? Yes Yes Mitigation: The relocated units to utilise the better quality diesel, similar to the one used by the existing Ankerlig units. Cumulative impacts: Cumulative impacts due to emissions from existing Ankerlig Power Station units, industrial air pollution sources in the adjacent Atlantis Industrial area and vehicular traffic in the area. Residual Impacts: No residual impact after the activity ceases. 1.2 Conclusions Based on the air quality modelling results, the following can be concluded: During the relocation construction operations of the Acacia and Port Rex units, the impact is considered to be Low. For the operational phase, if the relocated units utilise the same type of diesel as they currently use, the resulting cumulative impacts will be of High significance. The number of the NO 2 200 µg/m 3 hourly guideline exceedances increased to above 15 instances. The annual guideline for this pollutant, however, was not exceeded at any of the sensitive receptors. The utilisation of the same cleaner diesel as the one used by the Ankerlig units, will result in cumulative impacts of Moderate significance. The number of the NO 2 hourly guideline exceedances reduced to below 10 per year. The other pollutants examined, i.e. sulphur dioxide, PM 10 and VOCs were well within their respective guidelines for all sensitive receptor locations. 1.3 Recommendations During construction the following is recommended: Emission Source Recommended Control Methods Material handling Wet suppression a Wind speed reduction screens b Truck transport Early paving of permanent access roads a Speed limit implementation (app. 20 km/hr) a Covering of all trucks transporting materials a Cleaning of trucks on exit a Traffic over exposed areas be kept to a minimum and temporary roads be chemically stabilised via chlorides, asphalt emulsions or petroleum resins b General Wet suppression a construction and Minimise drop heights a stock piles 2

a Essential b Optional For the operational phase of the relocated Acacia and Port Rex units, the following is recommended: Utilise the better quality diesel currently used by the Ankerlig units. Install in-stack monitoring equipment for NO 2. 1.4 Air Pollution Management Measures OBJECTIVE: The objective is to maintain the air quality levels around the power station site within guideline levels and minimise the impact on residential areas and communities. Project Component/s The components affecting the air pollution impact are the construction activities during the construction phase, and during the operational phase the emissions from the Acacia and Port Rex relocated units. The existing Ankerlig OCGTs are also affecting the ambient air quality in the area. Potential Impact Increased air pollution levels in the surrounding areas and affected communities. Activity/Risk Source Mitigation: Target/Objective The activities and equipment which could impact on achieving the objective are: Construction activities, i.e. excavating, loading and unloading of trucks, piling, material transport, general building activities, etc. During the operational phase, exhaust emissions from the relocated power station units. The measures required during the construction period are: Wet suppression of access roads, stock piles and general construction areas. Paving of permanent access roads. Covering of transport trucks and cleaning them at the site exit. The measure required for the operational phase of the relocated units: Utilise better quality diesel. 3

Mitigation: Action/Control Responsibility Timeframe Construction Phase Wet suppression on and off site Site engineer/ mine employees construction lifespan Early paving of permanent access roads Site engineer construction lifespan Covering of transport trucks and Site engineer/ cleaning them on exit. mine employees construction lifespan Operational Phase Utilise the same cleaner diesel as for the Ankerlig units ESKOM Proper maintenance of equipment Site engineer/ qualified power station employees In-stack monitoring of emissions Systems Engineer Monitoring of nitrogen oxides at local communities ESKOM / local authorities Performance Indicator Compliance with the South African ambient NO 2 air quality standards. 4