THE REPUBLIC OF AZERBAIJAN MINISTRY OF TRANSPORT REGIONAL SEMINAR ON DEVELOPMENT OF EFFICIENT AND EFFECTIVE LOGISTICS SYSTEMS TRANSPORT SYSTEM OF AZERBAIJAN: OPPORTUNITIES AND PERSPECTIVES FOR GLOBAL LOGISTICS MAY 7-8, 7 2013 / HANGZHOU, CHINA Haydar Turabov Senior Counselor Transport Policy and Economy Division
RUSSİAN FEDERATİON SCANDINAVIA, BALTIC & RUSSIA KAZAKHSTAN ROMANİA BULGARİA BLACK SEA TURKEY CASPIAN SEA EUROPE ASİA TURKMENİSTAN İRAN MEDİTERRANEAN SEA NEAR EAST CHINA
SCANDİNAVİA, BALTIC & RUSSIA NORTH CHINA EUROPE Black Sea ASIA Bosporus Caspian Sea Pan European transport corridor 4 Mersin Mediterranean Sea SOUTH NEAR EAST PERSİAN GULF
SEGMENT TO BE REHABILITATED: 503 KM CASPIAN SEA AKHALKALAKY BEYUK KYASIK MARABDA KARS NEW ALYAT SEA PORT MISSING SEGMENT TO BE CONSTRUCTED: 105 KM
Baku-Russia BEYUK KYASİK Baku-Geargia Bakı-YevlakhBalakan SEGMENT UNDER REHABILITATION: 503 KM BAKU Baku-YevlakhKhankandi ALYAT SEA PORT Baku-Iran
EAST WEST (TRACECA) TRANSPORT CORRIDOR Pan European transport corridor 4 Segment to be rehabilitated is 503 km CASPIAN SEA KAZAKHSTAN AKHALKALAKI ISTANBUL Bosporus KARS Missing segment to be constructed is 105 (km) ALYAT SEA PORT Mediterranean sea
EXPECTED AMOUNT OF FREIGHT TRANSPORT ON THE BAKU-TB TBILISI-KARS NEW RAILWAY LINE Million tons 16 14 12 10 8 6 4 2 3-5 8-10 15 AND MORE 0 5 10 15 YEARS
MAIN MARINE ROUTES Astrachan Aktau Mahachkala Existing Baku Sea Port Turkmanbashi NEW ALYAT SEA PORT Anzali Newshehr Neka
NEW BAKU INTERNATIONAL SEA TRADE PORT KOMPLEX
NEW BAKU INTERNATIONAL SEA TRADE PORT COMPLEX
GEORGİA BEYUK KESİK RUSSİAN FEDERATİON KAZAKHSTAN REPUBLİC OF AZERBAİJAN BAKU NEW ALYAT SEA PORT CASPIAN SEA COMBINATION OF THE FREIGHT TRANSPORT TURKMENİSTAN
ENLARGEMENT THROUGH ACCESSION TO VIKING PROJECT
MAIN HIGHWAY PROJECTS COMPLATED UNDER CONSTRUCTIO CONSIDERED
SHAMAKHI GUBA HIGHWAY PROJECT
TRANSPORT OPERATIONS INTELLIGENT MANAGEMENT SYSTEM
BAKU U BAY MARINE BRIDGE
NATIONAL ACADEMY OF CIVIL AVIATION IS THE FIRST EDUCATION CENTER IN THE REPUBLIC OF AZERBAIJAN THAT PREPARE THE SPECIALISTS ON LOGISTICS
AZERBAIJAN AIRLINES CJSC MINISTRY OF ECONOMIC DEVELOPMENT NATIONAL ACADEMY OF AVIATION INSTITUTE OF ECONOMIC REFORMS PROJECT ON ELABORATION OF THE EXPLANATORY DICTIONARY OF LOGISTICS TERMS
EXPLANATORY DICTIONARY OF LOGISTICS TERMS
MINISTRY OF TRANSPORT REPUBLIC OF AZERBAIJAN Haydar Turabov Senior Counselor Transport Policy and Economy Division
LAST 10 YEARS AVERAGE ANNUAL GROWTH OF TRANSPORT SECTOR FREIGHT TRANSPORT 3.8 % ; TRANSIT TRANSPORT - 8.6 %; PASSENGER TRANSPORT - 6.1 %. SHARE OF TRANSPORT SECTOR ON GDP CONSIST OF 5.6 % THE INVESTMENTS TO THE TRANSPORT SECTOR IN THE LAST 5 YEARS WERE 14.5 BILLION USD
STATE PROGRAM ON RAILWAY SYSTEM DEVELOPMENT IN THE REPUB LIC OF AZERBAIJAN IN 2010-2014 THE COMPLETE RECONSTRUCTION OF THE SURFACE OF RAILWAY; RECONSTRUCTION OF THE DIRECT POWER SUPPLY SYSTEM PASSING TO THE ALTERNATING POWER SUPPLY SYSTEM; RECONSTRUCTION OF SIGNALIZATION, COMMUNICATION AND AUTOBLOCKING SYSTEMS; RENOVATION OF ROLLING STOCK; ESTABLIHSMENT OF CENTRALIZED MANAGEMENT SYSTEM; INCREASING OF THE SPEED OF TRAINS UP TO 140 KM/H; INCREASING OF TRANSPORTATION CAPACITY UP TO 35 %/
Marmara Project Length including: Underwater part Tunnel maximum deepness Number of stations 40 Passenger transportation: Existing Considered Maximum speed Expected average speed 76,3 km 1,4 km 56,0 m 10 000 / hour 75 000 / hour 100 km/hour 45 km/hour Interval between two trains 120-600 seconds Expected number of trains 440 Number of railway lines Required time: At present, by the railway + ferry-boat + railway After implementation of the project Two lined 185 minutes 104 minutes 24
MEASURES CARRIED OUT IN THE FIELD OF MARITIME TRANSPORT CONSTRUCTION OF NEW INTERNATIONAL PORT COMPLEX; OBTAINED TANKERS : 43 TANKERS, INCLUDING : 11 TANKERS WITH 13 000 TONS CARRIAGE CAPACITY (NEW); OBTAINED FERRIES: 13 FERRIES, INCLUDING: 7 FERRIES WITH 28 WAGON CAPACITY, 6 FERRIES WITH 52 WAGON CAPACITY(NEW).
ТРАНСПОРТНО - ЛОГИСТИЧЕСКАЯ СИСТЕМА В ТУРИСТИЧЕСКОМ СЕКТОРЕ ЛОГИСТИЧЕСКОЕ ОРГАНИЗАЦИЯ ОБЕСПЕЧЕНИЕ ВИЗИТА прибытие трансферы пребывание обслуживан ие 26 ДО ПУТЕШЕСТВИЯ ВО ВРЕМЯ ПУТЕШЕСТВИЯ ОТПРАВЛЕНИЕ
NEW BAKU INTERNATIONAL SEA TRADE PORT COMPLEX I stage (up to 10 mln. tons, 50 thousand TEU) Terminals: 2 1 Dry cargo terminal 1 2 Ferry terminal 1 Berths: 8 Ferry berth: 2 Ro-Ro berth: 1 For dry cargo and containers: 4 Service berth: 1 II stage (up to 17 mln. tons, 150 thousand TEU) Terminals: 2 1 Dry cargo terminal 1 2 Ferry terminal 1 Berths: 6 Ferry berth: 2 For dry : 4 III stage (up to 25 mln., 1 mln. TEU) Terminal: 2 1 Container terminal: 1 2 Ferry terminal 1 Berths: 7 Ferry berth: 2 Dry cargo berth: 5