Proponent s Name: REQUEST FOR PROPOSALS FOR WOOD AND ORGANIC WASTE REDUCTION. Evaluation Date: Evaluator: Step 1: YES NO

Similar documents
Request For Proposals Information Technology Services IT Health Check

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320

Attachment D: Cost Proposal, RFP Section 3.4

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

Architectural Services

Materials Recycling. Waste Wood Grinding Request for Proposal

Report on Contract Management Practices Review. Ministry of Finance. Internal Audit & Advisory Services Ministry of Finance

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

SH99 Grand Parkway Segments H, I1, and I2 Proposer RFQ Q&A Matrix No. 3 September 22, 2014

SECTION QUALITY REQUIREMENTS

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado


PRELIMINARY SCOPE OF SERVICES

Associate Transportation Planner

REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL

Ohio Public Employees Retirement System. Request for Proposal

REQUEST FOR PROPOSALS. RFP Strategic Planning Consultant. ISSUE DATE: July 31, 2015

Tompkins County Solid Waste Management Plan Executive Summary

Construction Management/Construction Inspection Services

Request for Proposal For: 2018 American Bar Association Temporary Services

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

W I N D A N D S O L A R R F Q / R F P P R O C E S S

REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES

Consultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III

1. Questions regarding the scoring methodologies developed by the IEP Rating Category teams.

Insert Client Name Request for Proposal for Security Risk Assessment Services Consulting

HRM. Human Resource Management Rapid Assessment Tool. A Guide for Strengthening HRM Systems. for Health Organizations. 2nd edition

ADDENDUM TO THE RFP TENDER DOCUMENT

BID THRESHOLD AND QUOTES

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

REQUEST FOR PROPOSALS

CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015

February Procurement Overview

St. Lucie Public Schools

Centerwide System Level Procedure

CAMP BUYING: PROVIDING EXCELLENCE

INTRODUCTION OF NEW EMPLOYMENT APPLICATION SYSTEM

Job Order Contracting (JOC) ITB JE Overview August 2016

1) Please share the last years expenditure under this contract. Answers: LIPA expects to spend approximately $1.2 million a year.

Asbestos Removal at Forest Blvd., Hugo, MN

TECHNICAL EVALUATION

Kirk W Buffington, CPFIM, CPPO, C.P.M.,

Nuclear Quality Standard Association General information about Quality Management System in the nuclear industry

REQUEST FOR QUALIFICATIONS

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

LOWER MANHATTAN DEVELOPMENT CORPORATION

Association of Consulting Engineering Companies British Columbia User Guide to Implementing Qualifications Based Selection

Appendix G - OPM's Job Analysis Methodology

Town of York, Maine Request for Qualifications

HOWEVER, IT S NOT THAT SIMPLE.

Project Executive Compensation Project - 2

REQUEST FOR PROPOSALS SOLID WASTE COLLECTION AND LANDFILL MANAGEMENT STUDY CRISP COUNTY GEORGIA

National Technical Advisor to Support the Development of the Action Plan to Implement the Child Protection Policy in Schools

REQUEST FOR PROPOSALS

Tech Services Requirements

INTERREG IVA Programme. Guidance Note on Procurement and Tendering G4/IIVA

CITY OF THREE RIVERS, MICHIGAN Specifications for Bids. Tree and/or Stump Removal Performance Bids

REQUEST FOR QUALIFICATIONS FOR Design-Build Services for the University of Washington Seismic Improvements

B. Related Sections: 1. Division 07 Section "Joint Sealants" for sealing of expansion, contraction, control, and isolation joints in tile surfaces.

Critical 0 Major 0 Minor 0. Certification Body name and address

How To Do Business with the Ontario Government. Supply Chain Management, Ontario Shared Services Ministry of Government Services January 2010

POSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT

REQUEST FOR QUALIFICATIONS. Design/Build Project Number CP Power Plant - Boiler 10 Gas Burner Replacement

Contracting for Architectural and Engineering (A/E) Services Webinar. August 30, AM to 11:30 AM

REQUEST FOR QUOTATIONS (RFQ)

REQUEST FOR PROPOSAL

PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM REQUEST FOR CONTRACTOR PREQUALIFICATION

Request for Proposal (RFP)

Application for Focus on Energy s Biogas Feasibility Study Grants for Anaerobic Pretreatment and Anaerobic Digester Facilities

Group Accountant (Children s Services)

BSA/AML Self-Assessment Tool. Overview and Instructions

Latest Technologies for Processing Organics

Solid Waste Disposal & Maintenance Manager

certificate in management practice financial skills

Mid-America Intergovernmental Audit Forum. Selecting an External Auditor. Guide for Making a Sound Decision

1.0 BASIS OF ESTIMATE (BOE) HOW TO

Competitive Procurement Evaluation Process Audit

STATEMENT OF SPECIAL INSPECTION FORM

PUBLIC HEALTH AGENCY OF CANADA MANITOBA/SASKATCHEWAN REGIONAL OFFICE REQUEST FOR PROPOSAL (RFP)

Request for Proposal Simulation-Based Learning Competition

SECTION EPOXY TERRAZZO

EMPLOYMENT APPLICATION

Application for Employment St. Charles Public Library

Social Procurement Policy

Manual. EUREKA Project Assessment Methodology [PAM]

1. Poor attitude toward any of the other students, instructors, or judges. 2. Failure to use personal protective equipment (PPE).

REQUEST FOR PROPOSAL Audit and Tax Services ISSUED April 24, 2015 RFP No

SPECIFICATIONS FOR DOUBLE CHIP SEAL

You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements

Tsawwassen First Nation Procurement Policy. February, 2010

CRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST

PREPARED BY ORGANIZATION DATE

AUTOMATIC METER READING SYSTEM DETAILED SPECIFICATION

Lodging Career Investigation

Application Guidelines. Request for Proposals (RFP) for Independent Contractor Opportunity for:

Dates/Times: p.m. Pacific Time.

ELECTORAL COMMISSION. Staff Appraisal Form for Officers

2 No GOVERNMENT GAZETTE, 11 OCTOBER 2017

STANDARD SPECIFICATION SECTIONS. November 2016 Physical Resources Design, Engineering and Construction

Procurement Guidelines

Transcription:

EVALUATION MATRIX Proponent s Name: Project Title: REQUEST FOR PROPOSALS FOR WOOD AND ORGANIC WASTE REDUCTION Evaluation Date: Evaluator: Criteria Step 1: YES NO Mandatories Proposal received prior to closing Provision of Staff Resumes Provision of Equipment List Provision of Sub-Contractors List Provision of References Sufficient number of proposal copies Acknowledgement of Addenda Step 2: TECHNICAL QUALIFICATIONS (40%) PROPOSAL (30%) Step 3: COST Max Qualifications of firm 5 Experience of firm 5 Past performance 10 Resources 20 Methodology 20 Scheduling 5 Innovation 5 Max PRICE (30%) TOTAL (100%) for Price = (lowest cost proposal divided by proposal being evaluated) x (30% weight) 30 EVALUATION MATRIX 1. Requests for Proposals (RFPs) will be reviewed by the Evaluation Team. 2. Each Evaluation Team member will complete the following RFP Evaluation Form for each proposal. 3. Upon completion, the Evaluation Team shall determine, by consensus, the score for each proposal and shall forward these scores to the Individual Corporate Board for consideration and award.

EVALUATION CRITERIA QUALIFICATIONS: (40%) (i) Qualifications of Company and Team Members Is the company and team members specialized and qualified in the nature of the work? (ii) Experience of Company and Team Members Has the Company conducted similar works during the last three (3) years? Do the proposed team members have experience with similar contracts? (iii) Past Performance Is the Company s record of past performance sound? Do reference checks reveal weaknesses? Was abnormal level of monitoring required? Does the Company consistently complete tasks on time and within specifications? (iv) Resources Does the Company have ample resources (e.g. staff, equipment, etc.) to apply to this contract? Has the Company provided financial statements including an auditor s report or a review report of a public accounting firm providing evidence that the Proponents financial strength and stability can support the anticipated project financing and long-term contractual commitments? PROPOSAL: (30%) (i) Methodology Do the proposal s, scope, work plan, equipment and prediction of results comply with the project requirements? Are the methodology and work plan clear and in sufficient detail to cover all necessary aspects? Does the proposal reflect the required understanding of the project? Is each task clearly outlined and in logical sequence? (ii) Scheduling Does the proposal indicate that the achievement of service objectives will be met according to an acceptable schedule? Is the Scheduling adequate to sustain acceptable stockpile volumes and product quality? Are alternatives or problems accounted for? (iii) Innovation Do proposed innovations reflect a unique grasp of conditions and a realistic appraisal of the tasks required to produce the desired results? PRICE: (30%) (i) Calculation (lowest cost proposal divided by proposal being evaluated) x (30% weight) 2

PROPOSAL FORM TECHNICAL PROPOSAL GENERAL As per 3.9.2 Proposal Instructions, Proponents shall provide a typewritten itemized response to all the requested information for the work on which a Proposal and price are being submitted. The requested information is based on the requirements for service set out in the proposal document. When responding to the proposal, proponents are requested to review the Evaluation Matrix and Evaluation Criteria and ensure that all requested information is supplied and thoroughly detailed and addresses all listed requirements. SPECIFIC Supplemental to the basic Evaluation Criteria please provide specific answers to the questions listed below: 1) Are there contaminant tolerances and if so, what are they? 2) Please provide your process capability for minimum and maximum dimensions (length and width) for chip sizing. (Detail in Table B) 3) As per PI 3.12 do you have an alternate Performance Security proposal? 4) As per PI 4.8 do you have an alternate Price Adjustment proposal? 5) Please describe the dust suppression system. 6) Please describe the metals removal system and a percent per m 3 residual ferrous metal remaining as per OS 4.5. Please include variations in metals removal percent based on chip size. 7) Please describe the method of on-site transportation and of loading for off-site transport and indicate if there is: - an additional cost to load materials for off-site transport; - a cost for loading materials off-site for a period after the chipping event. 8) Please provide details regarding the provision of adequate water at each site for fire and dust suppression. 9) Please provide specifications for machinery and describe grinding process. 3

COST PROPOSAL Table A) Please indicate the price per m3. Proposal #1 is the cost per m3 for award of a single Corporation If cost is variable dependent upon number or combinations of sites acquired, please note variations (if any) by indicating costs in each proposal column for example: a) if proponent is successful on all sites indicate cost per site in all rows of Column #2. b) if proponent can offer a cost reduction if awarded 2 or more Corporations indicate price in another Column, the unit cost in Proposal #1 will be the maximum cost per corporation. Table B) Please indicate the chip dimensions available and the additional cost if any to the basic price per m3. The Corporation may evaluate the cost proposal based upon chip size and suitability to end use e.g. Biosolids Compost (BC), Yard Waste Compost (YC) Animal Bedding (AB) and Co-generation (CG). Table A) Landfill Site(s) Estimated Annual Volume m3 Proposal #1 INDIVIDUAL Proposal #2 Proposal #3 Proposal #4 Proposal #5 RDOS *68,500 Summerland *18,500 Osoyoos *12,000 Princeton *12,000 Table B) NOTE: The above quantities are estimates only. The quantities reported above are only for evaluating proposals on a uniform basis, the Corporations in no way guarantee quantities of material actually received at the landfills Chip Size W x L Cost Adjustment Recommended Use 4

Table C) Equipment Description Equipment Force Account Rates Model / Year Hourly Rate 5