State Product Approval, The Florida Building Code and the Florida Energy Conservation Code (6 th Edition)

Similar documents
COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT Prepared for: Boca Vista Condominium Association, Inc th Avenue Madeira Beach, FL 33708

Uniform Mitigation Verification Inspection Form Maintain a copy of this form with insurance policy

ARCHITECTURAL TESTING, Inc. Code Compliance Research Report #0774 CCRR-0131

COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT

Keri M. Rayborn Silver Rayborn Consultants P.O. Box 1565 Tallahassee, FL P F

ATI Evaluation Service A Division of Architectural Testing Certification Services

Product Evaluation Report of. JELD-WEN, inc. Energy Saver/Contour Wood Edge Opaque Steel Outswing Door w/ or w/o Sidelites

CRITERIA FOR TESTING IMPACT & NON IMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE

Code Requirements For Residential Windows & Doors

AQUARIUS CONDOMINIUM 40 YEAR RESTORATION PROJECT & RELATED WORK. Wind Pressure Drawings: Openings, Specs, NOA s / Product Approvals

Designation: TTU NWI DIF Air Bladder Standard Scope

Florida Building Energy Efficiency Goals Challenge. Rick Dixon Florida Building Commission

The following provides the original comments that were sent to us along with responses on behalf of Quick Tie Products, Inc.:

DIVISION: OPENINGS SECTION: VENTS/FOUNDATION FLOOD VENTS REPORT HOLDER: FLOOD FLAPS, LLC

Architectural Testing, Inc. 849 Western Avenue North Saint Paul, Minnesota Dan Johnson, Director - Regional Operations

MIAMI-DADE COUNTY PERFORMANCE TEST REPORT. Rendered to: BRICK-IT. SERIES/MODEL: Brick Veneer Panel Systems PRODUCT TYPE: Wall Panel Systems

technical bulletin ROOFING CORPORATION

Course Information. Title: Modular Building Foundations Advanced Module

CBUCK Engineering. Product: Zee-Lock Roof Panel Material: Steel Panel Thickness: 24 gauge Panel Width: 16 Support: Wood Deck

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM

NanaWall Matching Windows and Doors Table of Contents

CBUCK Engineering. Evaluation Report Englert Series 500 Metal Roof Assembly Manufacturer: Englert, Inc Amboy Avenue Perth Amboy, NJ

CBUCK Engineering. Evaluation Report Cee Lock Panel Metal Roof Assembly

SOFFIT SYSTEMS WORKGROUP MEETING I

Specifying Windows and Doors Using Performance Standards

EME6325D WIND-DRIVEN RAIN RESISTANT STATIONARY LOUVER

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: NAILS REPORT HOLDER: PASLODE, AN ILLINOIS TOOL WORKS COMPANY

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: PLASTIC SIDING REPORT HOLDER: KP BUILDING PRODUCTS

Energy Proposed Code Modifications Including Comments This document created by the Florida Department of Business and Professional Regulation -

Hurricane Impact Glazing Systems and Solutions

Chapter 1: Application and Administration

Title: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF)

DIVISION: METALS SECTION: METAL FASTENINGS REPORT HOLDER: CLARKDIETRICH BUILDING SYSTEMS LLC

Originally Issued: 05/03/2013 Revised: 06/06/2016 Valid Through: 05/31/2017

REPORT HOLDER: HILTI, INC DALLAS PARKWAY, SUITE 1000 PLANO, TEXAS EVALUATION SUBJECT: HILTI LOW-VELOCITY POWER-ACTUATED FASTENERS

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PLASTICS REPORT HOLDER: HB&G BUILDING PRODUCTS, INC.

JEFFERSON PARISH SHERIF S OFFICE

REPORT HOLDER: JAACO CORPORATION NE 68 TH STREET, SUITE C 130 REDMOND, WASHINGTON EVALUATION SUBJECT:

REPORT HOLDER: HILTI, INC DALLAS PARKWAY, SUITE 1000 PLANO, TEXAS EVALUATION SUBJECT:

Hurricane- Resistance. designations: WHY FORTIFIED? DESIGNATION PROCESS

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: CLAY ROOF TILES REPORT HOLDER: BORAL ROOFING LLC

REPORT HOLDER: BLUE POINT FASTENING, INC YORBA COURT CHINO, CALIFORNIA EVALUATION SUBJECT:

Trusted SECTION: 04 HILTI, INC. TULSA, Conformity! ICC-ES Evaluation. not specifically. Copyright 2015

Code Compliance Research Report CCRR-0194

PRODUCT CONTROL SECTION

DIVISION: OPENINGS SECTION: VENTS/FOUNDATION FLOOD VENTS REPORT HOLDER: SMARTVENT PRODUCTS, INC.

FRENCH DOOR VINYL SERIES 455 / 555

REPORT HOLDER: DEWALT 701 EAST JOPPA ROAD TOWSON, MARYLAND EVALUATION SUBJECT:

REPORT HOLDER: FASTENING SPECIALISTS, INC. 726 CENTRAL FLORIDA PARKWAY ORLANDO, FLORIDA EVALUATION SUBJECT:

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR

Originally Issued: 05/20/2013 Revised: 07/07/2017 Valid Through: 05/31/ Design

PRODUCT CONTROL SECTION

PRODUCT CONTROL SECTION

Administrative Changes

Slab edge insulation is one of

PRODUCT CONTROL SECTION

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

DIVISION: MASONRY SECTION: MASONRY ANCHORS REPORT HOLDER: HILTI, INC DALLAS PARKWAY, SUITE 1000 PLANO, TEXAS 75024

Handout. ICC-NSSA Storm Shelters. Presenter. ICC NSSA Storm Shelters Webinar. International Code Council 1. Ernst W. Kiesling, P.E.

REPORT HOLDER: CLARKDIETRICH BUILDING SYSTEMS 9050 CENTRE POINTE DRIVE, SUITE 400 WEST CHESTER, OHIO EVALUATION SUBJECT:

2012 IECC Cost Effectiveness Analysis

Evaluation Report SkylightTube Tubular Daylight Device

REPORT HOLDER: HILTI, INC DALLAS PARKWAY, SUITE 1000 PLANO, TEXAS EVALUATION SUBJECT:

DIVISION: METALS SECTION: METAL FASTENINGS REPORT HOLDER: HILTI, INC DALLAS PARKWAY, SUITE 1000 PLANO, TEXAS 75024

REPORT HOLDER: HILTI, INC DALLAS PARKWAY, SUITE 1000 PLANO, TEXAS EVALUATION SUBJECT: HILTI LOW-VELOCITY POWER-ACTUATED FASTENERS

technical bulletin ROOFING CORPORATION

WDMA TECHNICAL INTERPRETATION Approved: 5/15/07

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS

Section Sliding Aluminum Framed Glass Doors (2500 Model Specifications)

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

PANERA BREAD BAKERY-CAFE # EAST EAU GALLIE BLVD. INDIAN HARBOUR BEACH, FL BREVARD COUNTY

DIVISION: MASONRY SECTION: MANUFACTURED BRICK MASONRY SECTION: MANUFACTURED STONE MASONRY REPORT HOLDER:

City of Jacksonville Development Guide Building Permits

Signature Series 5 Lap SECTION ALUMINUM WINDOWS

EB15-13 RB EB (NEW), (NEW)

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

REPORT HOLDER: HUBER ENGINEERED WOODS, LLC ONE RESOURCE SQUARE DAVID TAYLOR DRIVE, SUITE 300 CHARLOTTE, NORTH CAROLINA 28262

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: PLASTIC SIDING REPORT HOLDER: KAYCAN LTD.

Questions and Answers about Madison Crescent and Noise Issues

Veka Evolutions Commercial Window Program

PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

AQUARIUS CONDOMINIUM 40 YEAR RESTORATION PROJECT & RELATED WORK. Wind Pressure Drawings: Openings, Specs, NOA s / Product Approvals

DIVISION: MASONRY SECTION: MASONRY ANCHORS REPORT HOLDER: DEWALT 701 EAST JOPPA ROAD TOWSON, MARYLAND EVALUATION SUBJECT:

PRODUCT CONTROL SECTION

APPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard.

REPORT HOLDER: GREENMAKER INDUSTRIES, LLC 697 OAKWOOD AVENUE WEST HARTFORD, CONNECTICUT EVALUATION SUBJECT: DECOPLAST DDARS NOTCHED

PIKES PEAK REGIONAL BUILDING DEPARTMENT

Combustible Exterior Wall Cladding Systems: An ICC Perspective

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: NATURAL POLYMERS, LLC

DIVISION: FINISHES SECTION: GYPSUM BOARD REPORT HOLDER: PANEL REY, S.A.

LP SmartSide Precision Series Soffit and Rated Sheathing/Ceiling Deck Louisiana-Pacific Corporation Revised November 20, 2013

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

TerraClad TM General Specifications

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

2. Does not require, involve or include any additions to, or repair or modification of, the existing foundation.

DRAFT NOTICE OF ACCEPTANCE (NOA)

ENERGY STAR Qualifying Criteria for Residential Windows, Doors, and Skylights Sold in Canada Version 3.0 October 1, 2010

Transcription:

State Product Approval, The Florida Building Code and the Florida Energy Conservation Code (6 th Edition) Codes and Standards Mo Madani, CBO, Technical Unit Director Joe Bigelow, Training Design 1

Contents Part 1 Organization Part 2 Local/State PA Review Process Part 3 6 th Edition FBC Process Part 4 Florida Energy Conservation Code Residential Commercial Part 5 Interpretation Process Overview 4/3/2017 2

Part 1 Organization 4/3/2017 3

Florida Product Approval System Department of Business and Professional Regulation Technical and Product Approval Team Mo Madani Technical Director mo.madani@myfloridalicense.com 850-717-1825 Zubeyde Binici Product Approval Lead Staff zubeyde.binici@myfloridalicense.com 850-717-1837 Marlita Peters marlita.peters@myfloridalicense.com 850-717-1831 Norman Bellamy norman.bellamy@myfloridalicense.com 850-717- 1834 Joe Bigelow joe.bigelow@myfloridalicense.com 850-717-1829 Robert Benbow robert.benbow@myfloridalicense.com 850-717-1828 Chip Sellers chip.sellers@myfloridalicense.com 850-717-1827 4/3/2017 4

Florida Building Commission Located within Florida Department of Business and Professional Regulation Composed of 27 members appointed by the governor Architects, engineers, contractors, fire protection, Building Officials, Product manufacturers, insurance industry representatives, public education representatives, green building representatives Chair Mr. Richard Browdy, President, Browdy & Browdy Inc., Jacksonville, FL Meets every 6 weeks Across the state 4/3/2017 5

6 4/3/2017 6

Part 2 Local / State PA Review Process 4/3/2017 7

4/3/2017 8 8

State Product Approval - Rule Administrator DBPR RULE 61G20-3 F.A.C. This rule applies to approval of products and systems which comprise the building envelope and structural frame, for compliance with the structural requirements of the Florida Building Code 4/3/2017 9

4 Methods for State Approval Method Approving Authority Certification Method DBPR Evaluation Report from an Evaluation Entity 1. The National Evaluation Service (NES/ICC) 2. Miami Dade 3. The International Association of Plumbing and Mechanical Officials Evaluation Service (IAPMO) Evaluation Report from a Florida licensed Architect or a Florida Professional Engineer DBPR Florida Building Commission Test Report Florida Building Commission 4/3/2017 10

Application Review Process Test report, Evaluation report (from an engineer) Certification Evaluation report (For Evaluation entities other than engineer or architect 4/3/2017 11

2014 FBC PA Statistics to Date 4/3/2017 12

Florida Building Code 2017 There are three ways to have your product comply with the new code Self-Affirmation of existing application Revision of existing application New application 4/3/2017 13

Self Affirmation FBC 2017 Application Self Affirmation Upon review of the new Code, if the standards and restrictions in the new Code applicable to your product have not changed, you can self-affirm that your product complies with applicable standards of the new Code. Please contact our offices before initiating a self-affirmation Self Affirmations cost $100. 4/3/2017 14

Self Affirmation FBC 2017 61G20-3.007 Product Approval by the Commission. As part of application for self-affirmation, if the evaluation report refers to the previous edition of the Code, the manufacturer of the approved product shall submit a statement from an approved evaluation or validation entity that the product complies with the subsequent code version via an attachment uploaded and submitted through the BCIS. 4/3/2017 15

Application Revision FBC 2017 If the standards or restrictions pertaining to your product in the 2017 Code have changed, then a product revision application must be submitted New evidence such as a test report or an evaluation report demonstrating compliance must also be submitted Revisions cost $500 4/3/2017 16

Florida Building Code 5 th Edition (2014) 6 th Edition (2017) 4/3/2017 17

Timeline for 2017 (application for submittal and Review) POC Meeting Date June 1, 10:00 A.M. July 27 10:00 A.M. September 28 10:00 A.M. November 30 10:00 A.M. Commission Meeting: Commission Meeting: June 13, 2017 Apr 13- Midnight - Deadline for Submittal/Validation Deadline Apr 21 - Midnight - Completion Deadline May 8 - Report Posted for public comment (Includes DBPR Approvals) May 16 - NOON - Deadline for public comments to be mailed to the Administrator May 25- Final Report Posted (Includes DBPR Approvals) Commission Meeting: August 8, 2017 Jun 16- Midnight - Deadline for Submittal/Validation Deadline June 26 - Midnight - Completion Deadline July 3 - Report Posted for public comment (Includes DBPR Approvals) July 10 - NOON -Deadline for public comments to be mailed to the Administrator July 19 - Final Report Posted (Includes DBPR Approvals) Commission Meeting: October 10, 2017 Aug 18 - Midnight - Deadline for Submittal/Validation Deadline Aug 28 - Midnight - Completion Deadline Sept. 5- Report Posted for public comment (Includes DBPR Approvals) Sept 12 - NOON - Deadline for public comments to be mailed to the Administrator Sept 20 - Final Report Posted (Includes DBPR Approvals) Commission Meeting: December 12, 2017 Oct 13 - Midnight - Deadline for Submittal/Validation Deadline Oct 27 - Midnight - Completion Deadline Nov 1 - Report Posted for public comment (Includes DBPR Approvals) Nov 7 - NOON - Deadline for public comments to be mailed to the Administrator Nov 20 - Final Report Posted (Includes DBPR Approvals) 4/3/2017 18

New Feature for Quality Assurance Entities This new module will implement a new feature to allow Quality Assurance Entities to update Quality Assurance Entity contract expiration dates. This new feature allows Quality Assurance Entities to update expiration fields and manage expiring contracts. The new field consists of a direct link to the manufacturers application from an updated manage tab inside your manage applications area. 4/3/2017 19

Part 3 6 th Edition (2017) Florida Building Code Development Process 4/3/2017 20

12. 6 TH EDITION (2017) UPDATE TO THE FLORIDA BUILDING CODE TASK Primary Code Development Phase: SCHEDULE 2014 NEC published and available to the public; 08/2013 2015 International Codes published and available to the public; Commission selects 2015 I Codes and 2014 NEC as foundation for 6 th Edition (2017) FBC (April 2015 Commission meeting) 05/2014 04/14/2015 2015 I Codes plus the Preliminary Supplement posted online Period for public to propose modifications to the 2015 I Codes and the Preliminary Supplement 1 st 45 day comment period ends (By law -45 day min before TAC review) 21 4/7/2017 6/30/2015 7/1/2015 1/3/2016 2/25/2016

Triennial Update 1 I-CODES PUBLISHED 8 9 45 days Chapter 120 Hearing File Rule 2 Supplement + I-Codes 7 TAC Review Commission Action 10 6-9 Months Published before effective date 2-years 3 3 Month Public Submits Modification Proposals 45-Day 6 Public Comment Period 4 45-Day 5 Public Comment Period TAC Review 4/3/2017 22

TACs consider proposed modifications including comments from the 1 st 45 day 4/1-15/2016 comment period and adopt recommendations TACs meetings - 4-day on-site meetings in conjunction with the April 2016 Commission meeting TACs recommendations posted to the website 5/6/2016 2 nd 45 day comment period ends (by law 45 day min before Commission review) 6/21/2016 TACs consider public comments on their actions and prepare public comment for 7/18-21/2016 consideration by the Commission. TACs meetings 4-day meetings [2-day on-site (Gainesville) and 2 day via conference/webinar] Commission considers TAC recommendations at Rule development Workshops - 8/16-17/2016 Commission 2-day meeting Draft 6 th Edition (2017) FBC (Florida Supplement plus I Codes) posted online 9/19/2016 Provide Supplements to ICC for integration into the 2015 I-Code Rule development Workshops 12/13/2016 2/7/2017 & April 4, 2017 Integrated Draft 6 th Edition (2017) FBC Posted online 4/21/2017 Final Rule Hearing on 6 th Edition (2017) FBC/Commission approves final version of 6/13/2017 Code 6 th Edition (2017) Florida Fire Prevention Code available in final format 2017 FBC (6 th edition) effective date (6 months after publication) Glitch Correction Phase: after effective date, if needed 23 4/7/2017 12/31/2017

Code development FROM THE BCIS HOMEPAGE 4/3/2017 24 4/7/2017 24

25 25 4/3/2017

2015 IBC FBC Florida specific requirements HVHZ (Miami-Dade and Broward counties) requirements Special Occupancy state rules and statutes Correlation requirements with the Florida Fire Prevention Code 3 Year Cycle 6 th Edition (2017) FBC 26 4/7/2017

4/3/2017 27 2010 FBC 4/7/2017 5 th Edition (2014) 27 Effective Date March 1, 2002 June 30, 2003 Original 2003 Supplement Oct 1, 2005 Original Dec 16, 2005 Dec 8, 2006 2005 Supplement 2006 Supplement July 1, 2007 2007 Supplement March 1, 2009 March 1, 2009 Oct 1, 2009 Original 1 st 2009 Supplement 2 nd 2009 Supplement March 15, 2012 Original April 15, 2012 2012 Supplement Original Tentative Date December 31, 2017 2001 FBC 2004 FBC 2007 FBC Current Version 6 th Edition (2017) June 30, 2015 July 1, 2016 October 8, 2016 Supplement 1 Supplement 2

Part 4 Florida Energy Conservation Code 6 th Edition (2017) 4/3/2017 28

General Fewer Florida specifics are integrated into the document. IECC are us. The base document is the 2015 International Energy Conservation Code (IECC) 4/3/2017 29

Residential 4/3/2017 30

TABLE R402.1.2 INSULATION AND FENESTRATION REQUIREMENTS BY COMPONENT a CLIMATE ZONE FENESTR ATION U- FACTOR bj SKYLIG HTb U- FACTO R GLAZED FENEST RATION SHGCb, e CEILING R-VALUE WOOD FRAME WALL R- VALUE MASS WALL R- VALUEi FLOOR R-VALUE BASEME NTc WALL R- VALUE SLABd R-VALUE & DEPTH 1 NR.65 0.75 0.25 30 13 3/4 13 0 0 0 2 0.40 0.65 0.25 38 13 4/6 13 0 0 0 3 0.35 0.55 0.25 38 20 or 13+5h 8/13 19 5/13f 0 5/13 CRAWL SPACEc WALL R- VALUE 4 except Marine 0.35 0.55 0.40 49 20 or 13+5h 8/13 19 10 /13 10, 2 ft 10/13 5 and Marine 4 0.32 0.55 NR 49 20 or 13+5h 13/17 30g 15/19 10, 2 ft 15/19 6 0.32 0.55 NR 49 20+5 or 13+10h 7 and 8 0.32 0.55 NR 49 20+5 or 13+10h 15/20 30g 15/19 10, 4 ft 15/19 19/21 38g 15/19 10, 4 ft 15/19 [No change to footnotes a i] j. For impact rated fenestration complying with Section R301.2.1.2 of the Florida Building Code, Residential or Section 1609.1.2 of the Florida Building Code, Building the maximum U-factor shall be 0.75 in Climate Zone 1 and 0.65 in Climate Zone 2. 4/3/2017 31

(HB 535) 4/3/2017 32

4/3/2017 33

4/3/2017 34

4/3/2017 35

4/3/2017 36

4/3/2017 37

Commercial 4/3/2017 38

4/3/2017 39

4/3/2017 40

4/3/2017 41

Changes to the Florida Building Code 6 th Edition (2017), Residential and Commercial 4/3/2017 42

Florida Building Code, 6 th Edition (2017), Residential 4/3/2017 43

Florida Building Code 6 th Edition (2017), Residential R609.2.1. Custom doors. Custom doors. Custom (one-of-a-kind) exterior door assemblies shall be tested by an approved testing laboratory or be designed and engineered in accordance with accepted engineering practices by a Florida Registered Design Professional. Signed and sealed copies of the rational analysis and calculations shall be provided to the building official upon permit application. (S6813 AM) 4/3/2017 44

Florida Building Code 6 th Edition (2017), Residential R609.3 Testing and labeling. Exterior windows and sliding doors shall be tested by an approved independent laboratory, and bear a label identifying manufacturer, performance characteristics and approved inspection agency to indicate compliance with AAMA/WDMA/CSA 101/I.S.2/A440 or TAS 202 (HVHZ shall comply with TAS 202 and ASTM E 1300). Exterior side-hinged doors shall be tested and labeled as conforming to AAMA/WDMA/CSA 101/I.S.2/A440 or AMD 100 ANSI/WMA 100, or comply with Section R609.5.Exterior windows and doors shall be labeled with a permanent label, marking, or etching providing traceability to the manufacturer and product. R609.8.2 Deflection. Mullions shall be capable of resisting the design pressure loads applied by the window and door assemblies to be supported without deflecting more than L/175, for spans up to and including 13 foot 6 inches, and L/240 + ¼ inch for spans over 13 foot 6 inches, where L is the span of the mullion in inches. R609.10 Door Components Substitution of door components shall comply with ANSI/WMA 100. (S6814 AM & S6896 AM) 4/3/2017 45

Florida Building Code 6 th Edition (2017), Building 449.4.2.5 Exterior unit standards Debris impact protection standards. 449.4.2.5.1 All exterior window units, skylights, exterior louvers and exterior door units including vision panels and their anchoring systems shall be impact resistant or protected with an impact-resistant covering meeting the requirements of the Testing Application Standards (TAS) 201, 202, and 203 of this code in accordance with the requirements of Sections 1626.2 thru 1626.4 of this code or the debris impact requirements of ASTM E 1996 as described in Section 1609.1.2.2 Application of ASTM E 1996 of the Florida Building Code. For the purpose of this requirement, facilities located in areas where the ultimate design wind speeds are 130 MPH or less as described in figure 1609B of this code, shall be meet the requirements for Wind Zone 1.The impact resistant coverings may be either permanently attached or may be removable if stored on site of the facility. Facilities located in the high velocity hurricane zone (HVHZ) shall comply with Section 1626.2. through 1626.4. 4/3/2017 46

450.4.2.5 Exterior unit standards. Debris impact protection standards. 450.4.2.5.1 All exterior window units, skylights, exterior louvers and exterior door units including vision panels and their anchoring systems shall be impact resistant or protected with an impact-resistant covering meeting the requirements of the Testing Application Standards (TAS) 201, 202, and 203 of this code in accordance with the requirements of Sections 1626.2 through 1626.4 of this code or the debris impact requirements of ASTM E 1996 as described in Section 1609.1.2.2 Application of ASTM E 1996 of the Florida Building Code. For the purpose of this requirement, facilities located where the ultimate design wind speeds are 130 MPH or less as described in figure 1609B of this code, shall meet the requirements for Wind Zone 1. The impact resistant coverings may be either permanently attached or may be removable if stored on site of the facility. Facilities located in the high velocity hurricane zone (HVHZ) shall comply with Section 1626.2. through 1626.4. 4/3/2017 47

Florida Building Code, 6 th Edition (2017), Building 4/3/2017 48

Florida Building Code, 6 th Edition (2017), Building 449.4.2.5/450.4.2.5 Exterior unit standards Debris impact protection standards. 449.4.2.5.1/450.4.2.5 All exterior window units, skylights, exterior louvers and exterior door units including vision panels and their anchoring systems shall be impact resistant or protected with an impact-resistant covering meeting the requirements of the Testing Application Standards (TAS) 201, 202, and 203 of this code in accordance with the requirements of Sections 1626.2 thru 1626.4 of this code or the debris impact requirements of ASTM E 1996 as described in Section 1609.1.2.2 Application of ASTM E 1996 of the Florida Building Code. For the purpose of this requirement, facilities located in areas where the ultimate design wind speeds are 130 MPH or less as described in figure 1609B of this code, shall be meet the requirements for Wind Zone 1.The impact resistant coverings may be either permanently attached or may be removable if stored on site of the facility. Facilities located in the high velocity hurricane zone (HVHZ) shall comply with Section 1626.2. through 1626.4. (SP6960 AM) 4/3/2017 49

State Requirements for Educational Facilities 453.25.4 Structural standard for wind loads. At a minimum, EHPAs shall be designed for hurricane wind loads in accordance with ASCE 7, Minimum Design Loads for Buildings and Other Structures, Risk Category IV (Essential Buildings) ICC 500-2014 Standard for the Design and Construction of Storm Shelters. Openings shall withstand the impact of wind-borne debris missiles in accordance with the impact and cyclic loading criteria per ASTM E-1886, and ASTM E-1996 or SBC/SSTD 12. Based on a research document, Emergency Shelter Design Criteria for Educational Facilities, by the University of Florida for the DOE, it is highly recommended by the department that the shelter be designed using the map wind speed plus 40 mph. 4/3/2017 50

Florida Building Code, 6 th Edition (2017), Building State Requirements for Educational Facilities 1709.5.3 Door components evaluated by an approved product evaluation entity, certification agency, testing laboratory or engineer may be interchangeable in exterior door assemblies provided that the door components provide equal or greater structural performance as demonstrated by accepted engineering practices. (S6815 AS) 4/3/2017 51

High Velocity Hurricane Zones 2411.3.2.4 Structural wind load design pressures for window and door units other than the size tested in accordance with Section 2411.3.2.1 shall be permitted to be different than the design value of the tested unit provided such different pressures are determined by accepted engineering analysis or validated by an additional test of the window or door unit to the different design pressure in accordance with section 2411.3.2.1. All components of the alternate size unit shall be the same as the tested or labeled unit. i. Operable windows and glass doors rated in this manner shall comply with the following: 1. The frame area of the alternate size unit shall not exceed the frame area of the tested approved unit. 1. For windows and doors (other than sliding or bi-fold), the frame area of the alternate size unit shall not exceed the frame area of the tested approved unit. 2. For sliding or bi-fold doors, the panel area of the alternate size unit shall not exceed the panel area of the tested approved unit and if the door stiles or interlocks do not meet 1616.3(5) the maximum allowed unitʼs frame area shall be limited to 1.5 times the tested frame area. 4/3/2017 52

Part 5 Interpretation Process Overview 53 4/3/2017 53

Interpretation Processes in place are working! 54 4/3/2017 54

Overview of Code Resolution Process A Purpose Provides clarification on issues pertaining to the Florida Building Code Technical Assistance DBPR ICC Advisory B Purpose Provides expedited resolution of Code issues by Committee of experts BOAF Non Binding Opinion C Purpose Legal Resolution to Code, Rule or Statute relating to questions on a specific case Declaratory Statement DEC Legal Documents D Purpose Appeal Local B.O. Interpretation of the Code to a panel of experts for a Binding Opinion BOAF Binding Interpretation Time Line: As time permits Cost- N/A Timeline: 21 Days Cost N/A Timeline: 90 Days Cost: N/A Timeline: 25 Business Days Cost: $250 Specific Process See Figure A Final Product: Clarification Specific Process: See Figure B Final Product: Written Advice Specific Process: See Figure C Final Product: Legal Document Specific Process: See Figure D Final Product: Legal Document Scope: Advisory Scope : Advisory Scope: Binding On the Petitioner Scope: Binding on Parties and All Jurisdictions Options B,C,D Options: A, C, D Options: Legal Appeal Appeal to 1 st District Court Options: Legal Appeal Appeal to Commission via DOAH 4/3/2017 55

Thank You!!! 4/3/2017 56