Framework for Developing Feasibility Assessments JULY 2017

Similar documents
Draft Final Clean Air Action Plan Update JULY 2017

PUBLIC WORKSHOP May 2017

Advanced Clean Trucks (ACT) Now Plan

ORDER NO. An Order of the Board of Harbor Commissioners of the City of Los Angeles amending the Port of Los Angeles Tariff No. 4.

Advanced Clean Transit. November 12, 2014 Erik White, Division Chief Mobile Source Control Division Air Resources Board

Natural Gas Pathways: Towards a Clean and Renewable Energy Future for California

Natural Gas Pathways: Towards a Clean and Renewable Energy Future for California

January 17th, Chair Mary Nichols California Air Resources Board 1001 I Street Sacramento, CA, 95814

San Joaquin Valley Unified Air Pollution Control District November 20, Chapter 10

PER13 PPP. Terms of Reference for consultancy on Public Private Partnerships in the Transport sector

Institutes of Technology Policy Statement

22nd Annual Decisionmakers Conference Bay Planning Coalition

Work Plan and IV&V Methodology

Appendix B2. Air Dispersion Modeling

City of Chicago TAX INCREMENT FINANCING POLICY GUIDELINES

ALTERNATIVE FUELS AND VEHICLES INFORMATION RESOURCES

MEMORANDUM OF UNDERSTANDING BETWEEN THE STATE OF HAWAII AND THE U.S. DEPARTMENT OF ENERGY

Re: Comments on ARB s Attachment A: Second 15-Day Modified Regulation Order (LCFS)

Greenhouse Gas Emission Factors Info Sheet

EXHIBIT 5: TRANSITION PLAN. Residential Recycling Collection Service Contract

REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS

MTEP18 Futures. Planning Advisory Committee June 14, 2017

Item 3A Meeting: 8/17/17. Adopt Policy Resolution - Greenhouse Gas Reduction Resolution PT

Strategic Sourcing Manager: Academic Services and Equipment

Fundamentals of Policy. Matt Clouse U.S. Environmental Protection Agency Renewable Energy Markets Conference September 16, 2009

DIRECTOR OF TRANSPORTATION. Reports to: Superintendent or Superintendent Designee

Alternative fuels for road transport

MARKETING INCENTIVE PROGRAM

SOCALGAS DIRECT TESTIMONY OF CARMEN L. HERRERA FLEET SERVICES & FACILITY OPERATIONS. November 2014

TABLE OF CONTENTS LIST OF TABLES TABLE 1: SUMMARY OF GOALS AND RANKING...6

Energy Efficiency in Sustainable Port Development and Operations

GRI Greenhouse Gas (GHG) Emissions Working Group

DCAS Energy Management. August 15, 2014 Ellen Ryan & Mike Dipple

Propane Autogas AmeriGas

III. Corrections and Additions

Table Energy Consumption in California by Sector, 2000 and 2004

LNG as a marine fuel in BC. West Coast Marine LNG Workshop 26 th June 2012

OVERVIEW OF BC HYDRO S ENERGY PROCUREMENT PRACTICES

West Coast -- Cabrillo Port: Cracking the California Code

Port Everglades. is South Florida s Powerhouse Port. Presented to American Association of Port Authorities Environment Committee. September 17, 2015

Local Government Partnerships

Transport Domain Plan. Draft list of Enduring Questions

Anchorage Port Modernization Concept for Seismic Resiliency

ES. EXECUTIVE SUMMARY FOR RESIDENTIAL MULTI-FAMILY PROGRAM AREA (R5)

INTERLOCAL AGREEMENT BETWEEN THE PORT OF TACOMA AND THE PUGET SOUND CLEAN AIR AGENCY FOR A MULTI-PORT DRAYAGE TRUCK REPLACEMENT PROGRAM

Self-Assessment for the CoSN Certified Education Technology Leader (CETL ) Certification Exam

MOTION ADOPTED DECEMBER 19, 2017 TEXT OF THE MOTION

Air Quality Challenges in Region 9: The Importance of Accurate, Reliable Data

6. Cross-Cutting Issues Indicators

Introduction: Jason Giffen, Assistant Vice President, Planning and Green Port

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES. Article 1. Subject matter

Capturing the Benefits of Energy Efficiency Through Target Setting

ASSISTANT DIRECTOR OF CONSTRUCTION MANAGEMENT

Greater Ottawa Region Local Advisory Committee Meeting #5. June 21, 2016

Renewable Energy Economics and Technology Status - Program 84

Los Angeles Area Chamber of Commerce, 08/05/14

COSO Internal Control Integrated Framework Proposed Update

PERC Third Thursday Webinar. Mark Denton Alliance AutoGas (251)

Country update: European Commission IPHE ILC/SC Meeting, Washington 1-3 Dec. 2009

US Naval Facilities Engineering Service Center Environmental Program on Climate Change

Pacific Northwest High Speed Rail Corridor Amtrak Cascades Passenger Service Update

Testimony of Seyed Sadredin Executive Director/Air Pollution Control Officer San Joaquin Valley Air Pollution Control District

Dokumentnamn/Name of document Utgåva/Issue Reg nr/reg. No. Sida/Page

SECTION SUMMARY. Section 3.6 Greenhouse Gas Emissions

Advanced Metering Infrastructure (AMI) Studies Update. Planning Committee February 9, 2016

Milan Malpensa Airport

Berth [China Shipping] Container Terminal Project - Environmental Review -

Template for ToR for Transaction Advisory Services

History and Control of Air Pollution in Los Angeles

Ethanol Provisions of the Energy Policy Act of 2005

Minnesota Licensing and

Table of Contents. Executive Summary...3. Overview of Division...5. Summary of Accomplishments...6

Climate Action Plan 2020 Public Consultation March 14 27

In the final EIR/EIS, FRWA commits to maintaining operational noise levels at or below existing background noise levels.

Washington State Ferries Liquefied Natural Gas Project

TEXAS MEXICO TRANSPORTATION BORDER MASTER PLAN UPDATE

Cultural Competency & Health Literacy Overview

COMMISSION AGENDA Item No:

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017

This page is intentionally blank.

Gas-Electric Infrastructure Challenges. WPUI Gas Program September 17, September 13, 2012 Madison, WI

Position Description C3 Port Manager- Timaru

Benefits of a Service Level Agreement with Upfitters

Alternative Fuels. August 23, EPA s Office of Transportation and Air Quality

Report of the Reliability Improvement Working Group (RIWG) Volume II - Appendices

Exam Duration: 2 hours and 30 minutes

Capital Markets: IPO Advisory

Emissions scenarios for international shipping from an energy technology perspective. Renske Schuitmaker Paris, 20 November 2017

Propane Autogas The Zero Compromise Alternative Fuel Solution

Response to Comments of Don and Tricia Nevis (Letter I25) See the master response to Public Outreach Process.

Request for Exemptive Relief from Certain Provisions of the CAT NMS Plan

Oregon Department of ENERGY

ISO New England - ISO New England Inc. Transmission, Markets and Services Tariff

The Benefits of a. PRO & CON ANALYSIS Service Level Agreement with an Upfitter BY MIKE ANTICH

Sustainably Growing Above-Ground Energy Reserves

Job Description. SmartGrowth Administrator. SmartGrowth Programme Manager

Promoting sustainable mobility: natural gas and biomethane as a fuel for transport

Scrum Alliance Certified Team Coach SM (CTC) Application SAMPLE

DOWNTOWN AUSTIN PARKING STRATEGY DETAILED IMPLEMENTATION PLAN

UPDATE OF THE AUTHORISATION OF A LNG CARRIER TO UNLOAD AT THE LNG TERMINAL IN PANIGAGLIA PANIGAGLIA LNG TERMINAL

Transcription:

2017 Framework for Developing Feasibility Assessments JULY 2017

July 2017

Framework for Clean Air Action Plan Feasibility Assessments A series of regular feasibility assessments have been established by the 2017 Clean Air Action Plan (CAAP) Update to help the Ports and CAAP stakeholders to evaluate the status of technology and supporting infrastructure that will be needed to achieve the following CAAP strategies: By 2030, up to 100% zero emissions requirement for cargo handling equipment; and By 2035, transitions to near zero emissions and zero emissions for drayage trucks. The feasibility assessments will evaluate the following parameters for zero emissions cargo handling equipment and on road drayage trucks: (i) technical viability, (ii) operational feasibility, (iii) availability of supporting infrastructure and fuels, (iv) key economic considerations such as total cost of acquisition and operation and (v) commercial availability. In addition, and where appropriate for certain equipment categories (e.g. on road drayage trucks), the feasibility assessments will also evaluate these same parameters for near zero emissions technologies where near term emissions benefits can be achieved with those technologies during the period of transition to the ultimate zero emissions goals set forth above. The framework set forth in this document provides a guide for carrying out the feasibility studies. Feasibility Assessment Process The regular feasibility assessments established by the CAAP are intended to be critical tools in assessing progress toward achieving the CAAP strategies. The process for carrying out the feasibility assessments will be as follows: Scope The assessments will consider the following issues: Characteristics of the existing fleet, including penetration of zero or near zero emissions vehicles or equipment by specific equipment type Projections of fleet characteristics and technology viability Current status of the technology by equipment type and equipment costs, including operational reliability, and results from demonstration projects in port related operations State of infrastructure and/or fueling availability and infrastructure costs Anticipated availability of funding assistance (e.g. grants, loans, etc.) Characterization of the likelihood of meeting the CAAP strategy deadlines Timeframe Comprehensive assessments are anticipated to be conducted every three years starting in 2018. More frequent updates to these assessments may be required for some strategies. 2

Stakeholder Engagement Stakeholder input will be critical for a successful outcome. Development of the feasibility assessments will be a public process with opportunity for review and comment on the draft document. In addition, the Ports, in developing the feasibility assessments, may consult with technical experts who bring unique knowledge or perspective to the evaluation process. These experts may include technology developers, regulatory agencies, academics, and end users with operations expertise. These experts may also provide assistance with outlining assessment scopes and reviewing final documents. Information Used To the extent possible, the Ports intend to reference and use data and trends from publicly available agency reports, duty cycle reports, and/or existing test protocols from agencies such as the California Air Resources Board (CARB), South Coast Air Quality Management District (SCAQMD), and California Energy Commission (CEC). Examples include the CARB Technology Assessments, SCAQMD s annual Clean Fuels Program Report, and final reports from technology demonstrations. Such an approach ensures consistency with previous studies that have already been publicly vetted and reviewed by technical experts. Public Review Process Draft assessments are anticipated to be released for a public comment period. Depending upon the results of public comments and TWG review, a revised assessment may be re released for a second public comment period. Upon the successful conclusion of the release of draft assessments, public comment periods and possible revised assessments, final feasibility assessments will be reported to the respective Boards of Harbor Commissioners and posted on the CAAP Web site. 3

Figure 1: CAAP Feasibility Assessment Process Scoping workshop Public Workshop(s) Technical Experts Technical Input and Development Draft Assessment Public Comment Period(s) Final Assessment Recommendations Defining Feasibility The assessments are intended to evaluate the current state of a technology, the factors necessary to successfully deploy the technology, such as infrastructure and cost, and to project future feasibility. This feasibility assessment will determine the likelihood of the technology availability to meet the CAAP implementation timeline. To do so, the Port may evaluate the following factors: Technical Viability For a technology to be considered ready for wide scale implementation, it must not only be able to meet the performance requirements, it must also be available in sufficient quantities to meet the demand. Based on reports and data from demonstration projects and technology assessments, and evaluations of the manufacturing capabilities and market forecasts, the feasibility assessment will evaluate whether a specific technology application is both technically viable and commercially available at the time of the writing, or if not, when it can be expected to reach those milestones. 4

Although there are no common agency definitions of technical viability and commercialization, the Ports generally use the following guidance: An advanced, clean technology is considered to be viable when its operational performance meets or exceeds the standard in use equipment (i.e. diesel equivalent) as demonstrated in real world port conditions. An advanced, clean technology vehicle, engine or emissions technology has been certified by an authorized regulatory agency (Environmental Protection Agency [EPA] or CARB) and complies with applicable standards and regulations, as appropriate. An advanced, clean technology is considered to be commercially available when (1) it can be manufactured in large quantities comparable to and within similar timeframes as the in use equipment (i.e. diesel equivalent), and (2) it has similar long term warranty, maintenance, and parts support. To determine whether the equipment can be manufactured in sufficient quantities and within similar timeframes as the standard equipment for the purposes of meeting CAAP deadlines, the Ports intend to consider the following: Involvement of a major equipment manufacturer with sufficient manufacturing capabilities to produce the equipment/vehicle Time to manufacture equipment to meet fleet needs Existing and future equipment orders Manufacturer warranty provisions and long term support for maintenance and parts replacement (equivalent to those offered for diesel equipment) Operational Feasibility To determine whether a technology meets or exceeds the operational performance necessary for a port environment, the Ports intend to review demonstration reports and technology assessments for the following: Ability of vehicle to meet minimum performance specifications Ability of vehicle to handle different types of duty cycles required for port related operations Dynamometer testing results, if applicable Maintenance needs, including necessary repairs and time out of service Operator feedback on drivability, range, refueling, and comfort Technology vendor s commitment to long term market support, including standard warranties, parts replacement, and maintenance and repairs. Infrastructure Availability The Ports intend to evaluate the availability of infrastructure to support the transition to zero emissions within the timeframes prescribed by the CAAP. This aspect of the assessment may look at the following: 5

Electric infrastructure on and off terminals Hydrogen fuel availability on and off terminals Natural gas fuel availability on and off terminals Other applicable fuel availability needs The Ports plan to provide a terminal by terminal status of the availability of such infrastructure, regional availability for trucks, and projections of infrastructure needs to meet the CAAP deadlines. Key Economic Considerations The assessments are expected to evaluate the economic factors associated with the CAAP deadlines, including direct costs of equipment, infrastructure for the industry end users and the Ports, as well as indirect costs on jobs and potential diversion of goods. For direct costs, the assessments may consider the following categories and the extent to which expenditures to meet the CAAP deadlines are achievable for private industry and the Ports. The assessments may characterize the incremental costs in relation to the standard equipment (i.e. diesel) baseline. Equipment o Upfront capital costs for equipment o Fuel and maintenance costs o Other applicable costs and fees Fueling and terminal infrastructure necessary to support zero emissions o Cost of installing electric infrastructure o Cost of energy o Cost of alternative fuel infrastructure (i.e., renewable natural gas and hydrogen) o Cost of fuel Additionally, the assessments may evaluate: Is It Feasible? Technical Viability: Is its operational performance equivalent to the in use equipment? Is it certified or approved by a regulatory agency, as appropriate? Is it commercially available? Infrastructure Availability: Is there sufficient infrastructure to support electric, fuel cell and/or natural gas equipment? Operational Feasibility: Does the technology meet or exceed the performance necessary for a port? Key Economic Considerations: Incentive funding provided to date and available in the future Whether the technology has the potential to be a costcompetitive purchase option that will lead to commercial adoption Potential workforce impacts and benefits Potential impacts on diversion of goods What is the cost of the new equipment for end users? What are the potential economic or workforce impacts of transitioning to the new equipment? 6

Outcomes Feasibility assessments are intended to consider whether the Ports are on track to meet CAAP timelines. These assessments will provide critical information on where challenges remain and where focused attention and support is needed. In addition, this information will also inform whether these timelines may need to be adjusted. As a result of these assessments, the Ports could: Determine what actions need to be taken to reach the deadlines specified for each strategy, for example, additional technology demonstrations, new funding programs, additional infrastructure installments Issue advisories or further guidance to the industry in order to provide additional flexibility as necessary to meet the CAAP deadlines Through the public process and in working with technical experts, the Ports will continue to refine the scope and content of these assessments. 7