Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

Similar documents
Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

VRE AT WORK PREPARING VIRGINIA RAILROADING FOR ITS NEXT QUARTER CENTURY

Project Overview. A Collaborative Effort

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

PUBLIC HEARING April 24, 2017

Project Purpose. Federal Railroad Administration

MEMORANDUM EXAMPLES FOR ILLUSTRATIVE PURPOSES NEXT STEPS. Item 3 Long-Range Plan Task Force May 17, 2017

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

Agency Scoping Meeting

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

TRANSPORTATION FACTS. OUR CUSTOMERS: Travel Patterns

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

A long-term, comprehensive solution

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES

Fairfax County Countywide Transit Network Study

Public Hearing for April 2018 Major Service Changes. January 4, 2018

DISTRICT OF COLUMBIA FREIGHT PLAN

TRANSMITTAL LETTER. Design Manual Part 1B Post-TIP NEPA Procedures November 2015 Edition

Central Phoenix Transportation Framework Study

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

LOCATION AND DESIGN DIVISION

TRANSPORTATION TRANSPORTATION 9-1

Executive Summary S.1 INTRODUCTION

State Route 8 Bridge Replacement Project

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan

Welcome and thank you for your interest in the proposed Baltimore-Washington Superconducting Maglev Project.

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

California High-Speed Train Program FEIR/EIS

Tier 1 Recommendations October 30, 2017

HUDSON TUNNEL PROJECT

Chapter 1: The 2035 Virginia Surface Transportation Plan 1. Challenges & Opportunities 2 VTrans2035: The Precursor 2 The VSTP and VTrans2035 2

Executive Summary. ES-1 Introduction. ES-2 Background

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

Indirect and Cumulative Effects

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

1.1 Purpose of the Project

TECHNICAL MEMORANDUM

Executive Summary October 2017

SH 35 Public Meeting

I-70 East ROD 1: Phase 1 (Central 70 Project) Air Quality Conformity Technical Report

All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL

6. The following paragraphs provide further interim guidance where the ACHP regulations are not specific to the Corps Regulatory Program:

COMPREHENSIVE TRANSPORTATION REVIEW THE WHARF PHASE 2 PUD

Green River Diversion Rehabilitation

CHAPTER 21: COMMITMENT OF RESOURCES

South Sounder Capital Improvements Program

Pacific Northwest High Speed Rail Corridor Amtrak Cascades Passenger Service Update

Connectivity along Amtrak s NEC. Emmanuel S. Bruce Horowitz

SEARs project justification and conclusion

APPENDIX A. Project Scoping

U.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority

TRANSPORTATION 101 Today and Tomorrow. Moving People and Goods

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

NEW JERSEY STATE RAIL PLAN NJ TRANSIT New Jersey Department of Transportation

Notice No Closing Date: May 12, 2017

Durham-Orange Light Rail Transit Project

Sounder Extension to DuPont

Metro Blue Line Improvements & Project Update

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT. 7. Affected Environment, Environmental Consequences, and Mitigation Strategies

Appendix B Highway 407 Interchange Review - Cochrane Street Area

Chapter 2: Alternatives

Downtown Estes Loop Project Frequently Asked Questions

Regional Transportation Studies Regional Council

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016

Passenger/Freight Railroad Projects in Michigan

ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016

WHEREAS, the VDOT anticipates receiving Federal financial assistance for the Project from the Federal Highway Administration (FHWA); and

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project

Project Steering Committee April 14, 2015

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

MDOT SHA s NEPA/MEPA, Agency and Public Involvement Processes. Presentation to BRTB s Technical Committee August 1, 2017

Liverpool City Region Candidate Major Schemes April 2013

CTA Blue Line Forest Park Branch Feasibility/Vision Study Village of Forest Park Board of Directors. Tuesday, October 13, 2015

Subpart C_Roadway Worker Protection

TAPPAN ZEE HUDSON RIVER CROSSING PROJECT

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT JULY 2013

HORIZON 2030: Plan Projects November 2005

METRA UP-W LINE. Locally Preferred Alternative Report

EXECUTIVE SUMMARY...V

Holyoke Station Feasibility Study and Site Analysis

6.2.2 Environmental Consequences and Mitigation Measures

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

Rapid City Area Metropolitan Planning Organization OPERATIONS PLAN

Technical Memorandum MULTIMODAL NEEDS. Prepared for: Oklahoma Department of Transportation. Prepared by:

LAND USE POLICIES BY COMMUNITY DESIGNATION

Southeast Florida Freight and Goods Movement Update Treasure Coast Regional Planning Council September 16, 2011

Route 670 Connector Road

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

Draft Decision Notice Maroon Bells - Snowmass Wilderness Overnight Visitor Use Management Plan

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

Peter Klitz Senior Planner Transit Network Management TransLink (Metro Vancouver)

ITEM 8 Action May 17, 2017

AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE

Transcription:

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives December 14, 2017

Today s Agenda Project Overview Project Schedule Purpose and Need Concept Screening Process Level 2 Concept Screening Results Proposed Action Alternatives for Draft EIS Bike-Pedestrian Crossing Options Next Steps 2

What is NEPA? The National Environmental Policy Act of 1969 (NEPA) requires Federal agencies to assess the environmental effects of their proposed actions prior to making decisions. NEPA encourages integrated compliance with other environmental laws so that a proposed project s impacts are comprehensively evaluated before implementation. To comply with NEPA, FRA and DDOT are preparing an EIS that will be made available for public review and comment. 3

What is Section 106? Section 106 of the National Historic Preservation Act of 1966 (NHPA) requires Federal agencies to: Consider and determine the direct AND indirect effects of a proposed undertaking on historic properties Consult with State Historic Preservation Offices, Tribes, and other consulting parties Avoid, resolve or mitigate adverse effects to historic properties See: 36 CFR Part 800 (Protection of Historic Properties) 4

The Long Bridge Two-track steel truss railroad bridge constructed in 1904 Owned by CSX Transportation (CSXT) Serves freight (CSXT), intercity passenger (Amtrak), and commuter rail (VRE) Only railroad bridge connecting Virginia to the District next closest crossing is at Harpers Ferry, WV Typically serves 76 weekday trains Three tracks approaching the bridge from the north and south Contributing element to the East and West Potomac Parks Historic District 5

Project Area Limits Update Previous Project Area Limits Updated Project Area Limits 6

Section 106 and NEPA Coordination Public Meeting #1 Pre-NEPA (Feb 2016) Public Meeting #2 Public Scoping Meeting Public Meeting #3 Level 1 Concept Screening TODAY Public Meeting #4 Alternatives to be Evaluated in Draft EIS Public Meeting #5 Recommend Preferred Alternative Public Meeting #6 Draft EIS Review and Public Hearing Section 106 Define Undertaking Initiate Consultation Identify and Invite Consulting Parties Define Area of Potential Effects (APE) Identify & Evaluate Historic Properties Determine Effects to Historic Properties Draft Memorandum of Agreement or Programmatic Agreement to Resolve Adverse Effects if necessary Execute Memorandum of Agreement or Programmatic Agreement if necessary NEPA Notice of Intent Scoping Scoping Purpose Purpose and Need and Need Project Alternatives Project Alternatives Environmental Environmental Studies and Studies Evaluation and Evaluation Draft Draft EIS EIS Final EIS EIS/ / ROD 2016 2017 2018 2019 8

Purpose and Need Railroad Capacity Network Connectivity Railroad Resiliency and Redundancy 9

Current and Future Operations Train Operator Current # Trains per Day 2040 # Trains per Day Percent Increase On-Time Performance* Current (Observed) No Action (2040) VRE 34* 92 171% MARC 0 8 -- Amtrak/DC2RVA 24 44 83% CSXT 18 42 133% Norfolk Southern 0 6 -- TOTAL 76 192 * The Fall 2016 public meeting materials stated that 32 VRE trains travel Long Bridge per day. This number did not account for one nonrevenue round-trip, which brings the total to 34 trains per day. Commuter 91% 25% Intercity Long Distance Intercity Regional 70% 12% 7% * The Fall 2016 public meeting materials reported different on-time performance from what is reported here for two reasons: (1) The Current percentage is now based on observed performance, while previously the percentage was based on modeling results; and (2) The No Action (2040) on-time performance has changed due to revisions in the model related to the tracks around L Enfant Plaza Station. 10

Screening Process Step 1 Step 2 Preliminary Concepts (without design) Purpose and Need CAPACITY CONNECTIVITY Retained Concepts (without design) Retained Concepts (with alignment options) Alternatives (conceptual engineering to allow assessment of impacts) RESILIENCY & REDUNDANCY Level 1 Screening Level 2 Screening WE ARE HERE Draft EIS *Feasibility of bike-pedestrian crossing opportunities continue to be evaluated, but were not screened as part of the Level 2 Screening using Purpose and Need. 11

Level 2 Concept Screening Considerations All concepts could be implemented and allow for safe railroad operations Environmental issues were considered during Level 2 Concept Screening, however they did not substantially differentiate among the concepts because they all occur within the same corridor For example: all concepts would have an impact to water resources and wildlife habitat (Potomac River, Roaches Run), 4(f) properties (NPS land, Roaches Run), traffic impacts (corridor crosses highways) Engineering will progress on the DEIS Alternatives and help inform environmental impact analysis Environmental impacts of the DEIS Alternatives will be documented in the Draft EIS which will be made available for public comment. 7

Level 2 Concept Screening Criteria Purpose and Need Capacity: Eliminates operational bottleneck and prevents development of future bottleneck Network Connectivity and Resiliency & Redundancy: Improves ability to maintain normal railroad operations and network connectivity during planned maintenance and unanticipated outages Feasibility Provides 25 feet clearance between bridges over the river Does not preclude future replacement or rehabilitation of existing bridge Does not require interlocking infrastructure over the river Avoids DoD Facility 12

Level 2, Step 1 Concept Screening Results Indicates fatal flaw Retained for further analysis *Feasibility of bikepedestrian crossing opportunities continue to be evaluated, but were not screened as part of the Level 2 Screening using Purpose and Need. 13

Proposed Action Alternatives for Draft EIS New 2-track bridge upstream of existing bridge Retain existing bridge Allows for safe railroad operations New 2-track bridge upstream of existing bridge Replace existing bridge Allows for safe railroad operations 14

4-Track Alignment Options A - C New 2-track bridge upstream of existing bridge Retain existing bridge New 2-track bridge upstream of existing bridge Replace existing bridge New 2-track bridge downstream of existing bridge Retain existing bridge 15

4-Track Alignment Options D - F New 2-track bridge downstream of existing bridge Replace existing bridge New 2-track bridge upstream of existing bridge Demolish or rehabilitate existing bridge Expand new bridge to 4 tracks, overlapping footprint of previous bridge New 2-track bridge downstream of existing bridge Demolish or rehabilitate existing bridge Expand new bridge to 4 tracks, overlapping footprint of previous bridge 16

4-Track Alignment Options G - I New 1-track bridge on either side of existing bridge Retain or replace existing bridge New 4-track bridge upstream of existing bridge Demolish existing bridge New 4-track bridge downstream of existing bridge Demolish existing bridge 17

Level 2, Step 2 Concept Screening Results Options advanced for evaluation as Proposed Action Alternatives for Draft EIS Indicates fatal flaw *Feasibility of bike-pedestrian crossing opportunities continue to be evaluated, but were not screened as part of the Level 2 Screening using Purpose and Need.

Proposed Action Alternatives for Draft EIS New 2-track bridge upstream of existing bridge Retain existing bridge New 2-track bridge upstream of existing bridge Replace existing bridge 19

Pedestrian/Bicycle Connectivity Although not part of the Proposed Action Purpose and Need, the Project will explore the potential opportunity to accommodate connections that follow the trajectory of the Long Bridge Corridor to the pedestrian and bicycle network. The feasibility of this opportunity will be assessed as the Project progresses, and will consider whether a path can be designed to be consistent with railroad operator plans and pursuant to railroad safety practices. Future efforts to accommodate connections to the pedestrian and bicycle network may be advanced as part of the Project, or as part of a separate project(s) sponsored by independent entities. 20

Feasibility of Bike-Pedestrian Crossings Feasibility of bike-pedestrian crossing opportunities continues to be evaluated Criteria for initial identification of opportunities for bikepedestrian crossings: Provides 25 feet clearance between bridges over the river Avoids DoD Facility Connects to existing bike-pedestrian network Ramps from crossing to existing connections cannot have more than a 5 percent slope (required by Americans with Disabilities Act regulations) The opportunity for a bike-pedestrian crossing could potentially be feasible with either of the Proposed Action Alternatives 21

Bike-Pedestrian Crossing Opportunities 22

Bike-Pedestrian Crossing Ramps Potential Landings in Virginia Upstream of Railroad Bridges Downstream of Railroad Bridges Landing with ramp over land Landing with ramp over land Landing with ramp over water Landing with ramp over water * Maximum 5 percent slope required by Americans with Disabilities Act regulations 23

Bike-Pedestrian Crossing Ramps Potential Landings in the District Upstream of Railroad Bridges Downstream of Railroad Bridges Landing with ramp over land Landing with ramp over land Landing with ramp over water Landing with ramp over water * Maximum 5 percent slope required by Americans with Disabilities Act regulations 24

Bike-Pedestrian Crossing Ramps Potential Ramp Types Landing with Ramp over Land Landing with Ramp over Water * Length of ramp dictated by maximum 5 percent slope required by Americans with Disabilities Act regulations 25

No Action Alternative Project Planned Completion Year L Enfant North and South Storage Tracks 2017 Virginia Avenue Tunnel (under construction) 2019 I-395 HOT Lanes 2020 Fourth Track Virginia (VA) to L Enfant (LE) Interlocking 2021 Crystal City-Potomac Yard Transitway Extension 2021 Project Journey (new commuter concourse and security checkpoint at the Ronald Reagan Washington National Airport) Boundary Channel Drive Interchange 2021 Crystal City Metro Station East Entrance 2022 VRE Crystal City Station Improvements 2023 L Enfant Station Improvements 2024 Fourth Track RO to AF Interlocking 2025 Arlington Complete Streets (Army Navy Drive, Crystal Drive, Clark Bell Street, 12 th Street South, 18 th Street South, 23 rd Street South, and 27 th Street South) Reconfigure Crystal City Street Network and Circulation Patterns 2040 2021 2037 26

Next Steps Accept comments on alternatives through January 16, 2018 Publish Alternatives Development and Analysis Report (Spring 2018) Document affected environment Develop engineering design for alternatives Evaluate environmental consequences of alternatives Determine effects to historic properties Recommend and select preferred alternative (Spring 2018) Develop Draft Memorandum of Agreement or Programmatic Agreement to resolve adverse effects to historic properties, if necessary (Fall 2018) Publish Draft EIS for public review and comment (Early 2019) Public Hearing on Draft EIS (Early 2019) 27

Thank You For more information visit: longbridgeproject.com or contact us at: info@longbridgeproject.com 28