CARES Technical Approval Report TA2 5034

Similar documents
Properties of Reinforcing Steels

KENYA STANDARD KS 574:2017. Steel fabric for reinforcement of concrete Specification

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1

TEST REPORT DIN Reinforcing steels Reinforcing steels bars

1. Cast-in-place concrete is specified in Section

HALFEN HLB LOOP BOX Z-HLB-M50 13-E CONCRETE

Lecture Retaining Wall Week 12

SECTION REINFORCING STEEL

HIGH PERFORMANCE REINFORCEMENT PRODUCTS. Product Catalogue.

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

How to calculate anchorage and lap lengths to Eurocode 2

CHAPTER 11: PRESTRESSED CONCRETE

EN REINFORCED MASONRY DESIGN EXAMPLE 1 (NOTE: THIS USES THE UK NATIONAL ANNEX NDP VALUES)

SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS

USE OF 500 GRADE STEEL IN THE DESIGN OF REINFORCED CONCRETE SLAB. Prof. M. Shafiul Bari, Ph.D Department of Civil Engg., BUET

HOT ROLLED STEEL FLAT PRODUCTS FOR STRUCTURAL FORMING AND FLANGING PURPOSES SPECIFICATION (Third Revision of IS 5986)

A Guide for the Interpretation of Structural Design Options for Residential Concrete Structures

In-plane testing of precast concrete wall panels with grouted sleeve

R-Group Finland Oy. RTA, RWTL and RWTS Lifting anchors Design instructions

HILTI HY 150 REBAR DESIGN GUIDE

VTU EDUSAT PROGRAMME Lecture Notes on Design of Stair cases

Construction. Tricosal Waterstops - Tricomer. Waterstops for joint sealing in watertight concrete construction according to DIN and DIN

Material Requirements for Steel and Concrete Structures

ISO Steels for the reinforcement of concrete Reinforcement couplers for mechanical splices of bars Requirements

Special Reinforced Concrete Structural Walls

HALFEN HBT REBEND CONNECTION HBT 13-US CONCRETE NEW! Complies with ACI

Modelling of RC moment resisting frames with precast-prestressed flooring system

DURABILITY AND SERVICEABILITY

The Development of Strain Penetration in Lightly Reinforced Concrete Shear Walls

HC-Omega (Sinus Slide ) armour joints

3. Bond, Anchorage and Shear This chapter will discuss the following topics:

STRENGTH OF MATERIALS laboratory manual

ISO INTERNATIONAL STANDARD. Steel for the reinforcement and prestressing of concrete Test methods Part 1: Reinforcing bars, wire rod and wire

REPORT HOLDER: MITEK USA, INC. (FORMERLY USP STRUCTURAL CONNECTORS) SOUTHCROSS DRIVE, SUITE 200 BURNSVILLE, MINNESOTA EVALUATION SUBJECT:

Evaluation of the Orientation of 90 and 180 Reinforcing Bar Hooks in Wide Members

BIS or used as Amendment to STANDARD comments is 15 Nov. 2008

Schöck Isokorb type CV

FIVE STAR PRODUCTS, INC. (800)

Design of Semi gravity Retaining Walls

R-Group Finland Oy. REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved

Method of Measurement for Road Works Series MM Structural Concrete

Standard Specification for Steel Welded Wire Fabric, Plain, for Concrete Reinforcement 1

INHERENT DUCTILITY OF REINFORCED CONCRETE SHEAR WALLS WITH NON-SEISMIC DETAILING

7.1 Transmission of Prestress (Part I)

PART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGINGS

Licensed Copy: Institute Of Technology Tallaght, Institute of Technology, Sat Dec 02 09:19:48 GMT+00: , Uncontrolled Copy, (c) BSI This British

Reinforcement. Fabrication and Site Handling of Reinforcing Bars. PRACTICE NOTE No.

BISON PRECAST FLOORING SPECIFICATION

DUCTILITY REQUIREMENTS FOR BUILDINGS

A PRODUCT FROM KANTAFLEX (INDIA) PVT LIMITED

Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for

Breaking Strength and Elongation of Pressure Sensitive Tapes

5.4 Analysis for Torsion

Adhesive Anchors SECTION CONTENTS. General Information. Installation Information Design Information Material Information Ordering Information

BEHAVIOR OF INFILL MASONRY WALLS STRENGTHENED WITH FRP MATERIALS

Section 906. STRUCTURAL STEEL

Reinforced concrete beam-column joints with lap splices under cyclic loading

POST-TENSIONING APPLICATION AND TECHNOLOGY. Moe Kyaw Aung

Cement grouted steel bars in glulam

NEW for high shearing forces REINFORCEMENT SYSTEMS

Nonlinear Finite Element Modeling & Simulation

European Technical Assessment ETA-16/0865 of 08/11/2016

Sika KAB combination joint waterbars waterstopping systems

IZODOM 2000 POLSKA Zduńska Wola, ul. Ceramiczna 2. tel , , tel./fax

Experimental Research of Bridges with Encased Beams

Safety Barrier Solutions

On detailing of reinforced-concrete frame structures for robustness and for earthquake resistance

Steel fibres Structural applications

PORTAL FRAMES 1.0 INTRODUCTION

Structural Design of Pergola with Airfoil Louvers

USE OF 500 GRADE STEEL IN THE DESIGN OF REINFORCED CONCRETE SLAB. Prof. M. Shafiul Bari, Ph.D Department of Civil Engg., BUET

Stremaform. Formwork elements. Edition International

ICC-ES Evaluation Report Issued July 1, 2011 This report is subject to renewal in one year.

Project Address: Name of Person Completing Form:

HYDRATHANE INTERIOR WATERPROOFING MEMBRANE. Product. Scope. Building Regulations. Appraisal No. 959 [2017] Appraisal No. 959 (2017) BRANZ Appraisals

Seismic Detailing of RC Structures (IS: )

REPORT HOLDER: FASTENING SPECIALISTS, INC. 726 CENTRAL FLORIDA PARKWAY ORLANDO, FLORIDA EVALUATION SUBJECT:

Technical Notes 39A - Testing for Engineered Brick Masonry - Determination of Allowable Design Stresses [July/Aug. 1981] (Reissued December 1987)

Strength Design of Reinforced Concrete Structures

European Technical Assessment. ETA 15/0226 of General Part TCM400PE, TCM600PE. Trade name of the construction product

Reinforced Concrete Design. A Fundamental Approach - Fifth Edition

> 0. 1 f, they are treated as beam-columns.

Flight of stairs. FRILO Software GmbH Version 1/2016 As of 28/07/2016

Improving Seismic Safety of RC Elements by Using Advantages of Rectangular Spiral Stirrups

THE DESIGN OF EXTERNALLY BONDED REINFORCEMENT (EBR) FOR REINFORCED CONCRETE STRUCTURES BY MEANS OF FIBRE REINFORCED POLYMERS (FRP)

Post installed rebar connections

Scientific Seminar Design of Steel and Timber Structures SPbU, May 21, 2015

ANCHOR BOLTS IN CLAY MASONRY WALLS

Comparative Study of R.C.C and Steel Concrete Composite Structures

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 2, No 2, 2011

Ribdeck AL STRUX 90/40. efficient designs. with. shallow slabs. fibre reinforced concrete

National technical approval Coupler

FORMDECK. constructions. constructions

Originally Issued: 11/24/2010 Revised: 01/20/2017 Valid Through: 11/30/ Design

Recommendations for additional fire protection of structural elements

Sabah Shawkat Cabinet of Structural Engineering 2017

Construction. Sarnafil G Felt. Polymeric membrane for roof waterproofing. Product Description

Specification for Road Works Series Waterproofing for Concrete Structures

Behaviour of Post-Installed GFRP Adhesive Anchors in Concrete

MAX FRANK EGCOBOX CANTILEVER CONNECTION SYSTEM EGCOBOX CANTILEVER CONNECTION SYSTEM

Transcription:

CARES Technical Approval Report TA2 5034 J&P Building Systems FERBOX Reinforcement Continuity System Assessment of the J&P Building Systems FERBOX Reinforcement Continuity System Product and Quality System for Production 5034

Product J&P Building Systems FERBOX reinforcement continuity system 1 Product Summary FERBOX is a reinforcement continuity system, designed to maintain structural continuity across construction joints in reinforced concrete structures. The FERBOX casing houses suitably proven reinforcement, which is factory pre-bent and factory-fitted. On the construction site, the FERBOX unit is secured inside the formwork at the front face of the structural member (often a wall), in advance of the concrete pour. The FERBOX casing is designed to remain embedded in the concrete, providing a useful rebate and key for the subsequent concrete pour. The galvanised and indented profile of the embedded casing obviates the need for traditional scabbling at the joint interface. After striking the formwork, the casing lid is revealed and removed, providing access to the connection legs (starter bars) which lay inside. These legs are bent outwards (at 90 degrees) by the contractor, then ordinarily lapped with loose reinforcement of the subsequent structural member/concrete pour. Produced by: J&P Building Systems Ltd A division of H-Bau Technik GmbH Thame Forty, Jane Morbey Road Thame, Oxon OX9 3RR Tel: (01844) 215200 Fax: (01844) 263257 Email: enquiries@jandpbuildingsystems.com www.jandpbuildingsystems.com 1.1 Scope of Application This approval covers use of the FERBOX reinforcement continuity system in reinforced concrete structures designed in accordance with Eurocode 2: BS EN 1992-1-1:2004 which are subject to static loading in non-cryogenic environments. 1.2 Design Considerations In general the recommendations of EC2 apply directly, but there are two areas in which some elucidation of them is needed. One is the design of the anchorages of continuity bars in walls, for which the intentions of EC2 are not very clear. The interpretation used in the present assessment is detailed in 6.3.1 of this report. The other is the longitudinal shear resistance of joints and in particular those within walls. EC2 treats such shear at concrete-to-concrete interfaces and a similar form of expression has been derived from test results for the interfaces between the galvanised casings and concrete. 1

CARES Technical Approval Report TA2 5034 1.3 Conclusion It is the opinion of CARES that the J&P FERBOX system is satisfactory for use within the limits stated in paragraph 1.1 when installed and used in accordance with the manufacturer s instructions and the requirements of this certificate. B. Bowsher Executive Director September 2011 5034 2

2 Technical Specification 2.1 General FERBOX consists of suitably proven reinforcement, factory pre-bent and factory-fitted into purpose designed carrier casings. The manufacturing processes are undertaken in a CARES quality assured environment in compliance with ISO 9001:2008. There are two types of carrier casing; the first is prefabricated from light-gauge galvanised steel sheet, which is indented to improve its bond when cast in concrete. This particular casing type (described as HD for heavy dimple ) provides scope to bespoke the casing to specific application requirements. The second casing style (described as LD for light dimple ) is automatically rolled from light-gauge galvanised steel coil and is available in a standardised range of widths and depths. The FERBOX product is available in bar diameters 10mm, 12mm and 16mm. Only ductility class B material is used. The reinforcement is grade B500B to BS4449:2005+A2:2009 and is manufactured by the hot rolled and cold stretched process route. Prior to fabrication, the maximum permissible yield strength Re is 570 MPa, and the minimum permissible elongation Agt is 7%. The material is CARES approved and is regularly tested and monitored for its continued compliance and suitability. Full traceability is maintained at all times. In all cases, the bends which are to be rebent on site, unless otherwise instructed, will be formed using 6f (minimum) mandrels in accordance with established mechanical performance testing and safe practice. Unless otherwise instructed, the anchorage bends (i.e. those embedded in the first concrete element and not rebent) will be formed using 4f (minimum) mandrels as required by EC2 clause 8.3 (and its effective cross-reference to the local UK bending standard BS8666) to avoid damage to the reinforcement. Regarding the performance requirements of anchorage bends, EC2 clauses 8.3 and 8.4 (particularly bond and bearing stress) should be considered by the structural designer, to determine whether a larger mandrel diameter should be specified to avoid damage to the concrete within the bends (6f is the normal practical limit). FERBOX is available in a wide range of customer-specified shape options as per the illustrations in Figure 1. The reinforcement and casing dimensions (particularly when in HD format) are almost infinitely variable according to application requirements, and normally only limited by the physical geometry of leg layouts within the casing. FERBOX sales literature offers scheduling advice and useful design consideration prompts for the engineer and contractor. 3

CARES Technical Approval Report TA1-B-5012 TA2 5034 Shape 21 Shape 11 Shape 11A Shape 11C Shape 13D SHAPE CODE Shape 11X Shape 11B Shape 21D Specified Required Angle Shape 13S Shape 13X Shape 00 SHAPE CODE Shape 00A Shape 00B Shape 00C Shape 44 Shape 77 First Pour Second Pour Shape 51 SHAP Shape 100 Shape 21R Figure 1 - Shapes 5034 4

3 Product Performance and Characteristics 3.1 Reinforcement Tensile Properties Mechanical tests on the reinforcement showed that the material, after bending and straightening, complied with the tensile requirements of BS4449 Grade B500B, exhibiting values for Total Elongation at Maximum Load (A gt ) of greater than 5%. 3.2 Structural Performance Structural tests of wall/floor sub-frames and push-off specimens simulating joints between adjacent parts of walls showed that: 1) The shear strengths of the slabs, which were without shear reinforcement, could be safely calculated in accordance with EC2 (eqn 6.2a). There were no shear failures associated with the joints. 2) The flexural strengths of the wall/floor connections could be safely calculated on the basis of EC2 s section 6.1 (Bending with or without axial force) and section 8 (Detailing of reinforcement) with the latter interpreted as in this report. 3) The widths of openings, that may develop at the rear faces of casings and between the ends of floor slabs and the faces of walls at the serviceability state, could be calculated as: w = (y x). s S2 f (d x) 4E S t where s S is the stress in the tension reinforcement of the slab at the face of the wall f is the bar diameter E S is the elastic modulus of steel (200 x 10 3 MPa) 2/3 2/3 t = 0.5 f ck for short-term loading or 0.4 f ck for long-term loading x d y is the cracked-elastic neutral axis depth is the effective depth of the reinforcement (measured from the underside of the slab) is the vertical distance from the underside of the slab to the level for which the width of the opening is calculated 4) The design resistance to shear at vertical joints between adjacent wall panels could be taken as: V Rd = 0.035 f ck 2/3 + 0.5 r f yd < 0.1 (1 f ck /250) f ck where V Rd is the design shear resistance (stress in MPa) and r is the ratio of continuity reinforcement, with both V Rd and r calculated with reference to the area of the back face of the casing f yd is the design yield stress of the reinforcement, which should be adequately anchored at both sides of the casing The upper limit is based on the range of test data and not on any known physical limitation. The equation applies to both types of casing, in view of limitations of the test data. It is probably rather conservative for the more heavily dimpled casings. 5

CARES Technical Approval Report TA1-B-5012 TA2 5034 4 Installation 4.1 Fixing Into Position On timber-faced formwork, proprietary wire nails can be driven directly through the FERBOX casing and into the timber. Additionally or alternatively (especially applicable to steel-faced formwork) the FERBOX unit can be secured by wiring the FERBOX anchorage reinforcement to adjacent main reinforcement. Whichever method is adopted, the FERBOX unit should ideally be tightly sandwiched between the formwork face and the main reinforcement cage (see Figures 1-2), providing maximum resistance to displacement during the concrete pouring and vibration processes. Once the formwork is struck, the FERBOX lid (which can be light-gauge steel or PVC) should be visible on the concrete surface. If it isn t (possibly because it may have become slightly displaced/set-back during the concrete pour) then the thin film of concrete can be tapped-off with a hammer. The lid is removed by cutting the tapes which secure it, then placing the claw of a hammer at one end (i.e. behind the lid and into the soft polystyrene stop-end) and pulling it away (i.e. separating it) from the embedded part of the casing. The lid can then be safely discarded. This process reveals the connection legs (see Figure 3). 1 2 Figure 2 - Installation 5034 6

3 4 5 Figure 2 - Installation Figure 3 - Lid removed revealing connection legs 4.2 Straightening of Bars Once the concrete is sufficiently cured (ideally no less than 7 days after pouring), and with the ambient and reinforcement temperature comfortably above freezing (occurring naturally or with use of indirect heat), a safe working area (platform) around the embedded FERBOX unit should be prepared. 7

CARES Technical Approval Report TA2 5034 Whereas it is impossible to create perfect straightness in a rebent bar, the FERBOX straightening tool (Figure 4) is a simply shaped and sized device which promotes best practice and straightness. The tool is manufactured from seamless cold drawn precision steel tube. It is available in two diameters; one to suit 10mm and 12mm bars, and the other to suit 16mm bars. The tube wall thickness is selected to ensure that the internal diameter is only slightly greater than the bar to be bent, as well as to ensure the tube itself will not flex under load. The tool/tube length is sized to provide adequate leverage for the operator. The working end of the tube is specially shaped to provide continuous support to the bend during the straightening process and to limit point contact on the bar. For reasons of identification and comfort in use, the tube is supplied in a white powder-coated finish and is fitted with a PVC handle grip. The tube should be placed over the bar and made to slide as close as possible to the start of the bend. The tube should be rotated to ensure that the longest part of the shaped end is ready to support the outside of the bend. After securing a good footing, the bar should be smoothly and progressively straightened until it projects 90 degrees from the concrete element. During this process, the tube should be made to slip progressively around the gradually straightened bend, to provide continuous support. When the bar is totally rebent, the end of the tool should be in actual contact with the embedded casing. After withdrawal of the tool, the bar should be checked for adequate alignment (with due regard for concrete cover) and adjusted (with the tool) if necessary. Once all the FERBOX bars have been bent outward and checked for alignment, the main reinforcement for the subsequent pour can then be lapped onto them. If there is likely to be an appreciable delay before the main reinforcement is lapped, and there is a perceived risk of injury from the now projecting FERBOX bars, then they should have proprietary safety caps placed over their ends. Note: For the bar straightening process, the use of scaffold tubes is not recommended, as the large internal diameter promotes an undesirable goose-neck effect in the rebent bar. Also, the hammering of bars is expressly condemned. Figure 4 - Straightening tool 4.3 Storage FERBOX units should be safely stored on site on pallets and protected from corrosion and mechanical deterioration by waterproof sheeting. 5034 8

5 Safety Considerations Protective gloves should be worn at all stages when handling FERBOX units. This is particularly important when removing sharp-edged steel lids. Safety glasses should also be worn when straightening the bars. Heavy units (i.e. those above 25 kg) should be handled by two operatives. As previously stated, if there is likely to be an appreciable delay between straightening the FERBOX bars and lapping the main reinforcement, and there is a perceived risk of injury from projecting FERBOX bars, then they should have proprietary safety caps placed over their ends. 6 Product Testing and Evaluation 6.1 General The FERBOX reinforcement continuity system was evaluated in two stages: 6.1.1. The reinforcement was subject to independent mechanical testing to establish its suitability for bending during the prefabrication process and rebending through 90 degrees during the straightening process on site without surface rupture and for subsequent compliance with the tensile requirements of BS4449. 6.1.2 FERBOX reinforcement continuity system samples were subject to a programme of full scale structural testing in concrete to evaluate the performance of the construction joints. 6.2 Mechanical Testing The selected reinforcement was tested to determine the appropriate bend radii. Reinforcement was subject to the CARES bendability test, which consisted of bending the reinforcement through 90 degrees over a steel former, straightening and examination of the inside of the bend for signs of fracture. The test was conducted twice on each sample. Reinforcement was also subjected to the CARES tensile test regime, which consisted of bending the reinforcement through 90 degrees over a steel former and straightening with the FERBOX tool prior to tensile testing to measure the Ultimate Tensile Strength, Yield Strength and Elongation at Maximum Load (A gt ). The selected reinforcement were found to comply with the tensile requirements of BS4449 Grade B500B. (Clause 7.2.3, Table 4). The products are subject to a programme of periodic testing to ensure that they remain within the performance limits of this technical approval. 9

CARES Technical Approval Report TA2 5034 6.3 Full Scale Structural Testing Construction joints formed using the FERBOX reinforcement continuity system samples were subject to a programme of structural testing. Several wall to floor slab joints were subjected to vertical shear and bending and several wall to wall joints were subjected to longitudinal shear. The tests were full scale in terms of bar sizes and member depths. In the wall/slab specimens the continuity reinforcement was 16mm diameter deformed bar, apart from one specimen where the continuity reinforcement was 12mm deformed bar. The 16mm bar was chosen for the majority of tests as being the largest bar size used in the FERBOX reinforcement continuity system and that which imposes the greatest stresses on the surrounding concrete and the most severe demands on the reinforcement in relation to bending and straightening. The main conclusions are given in section 3.2. Figure 5 - Structural testing 5034 10

6.3.1 Assessment of Anchorage In the evaluation of the results of tests the interpretation of the Eurocode used in this assessment is as follows in terms of design stresses. (In evaluations experimental stresses have been compared with values obtained from the expressions for characteristic stresses with actual values of f c and f y replacing f ck and f yk ) 1. The applied stress f s,ed at the loaded end of an anchorage is calculated from the design moment M Ed at the section at the inner face of the wall. 2. The anchorage is taken to begin at the rear face of the casing. 3. The stress f s,rd that can be resisted by an anchorage, of either of the types shown in Figure 6, is the lesser of two values, one corresponding to the limit on the compression stress in the concrete at the start of the bend (EC2 eqn 8.1) and the other corresponding to the bond capacity of the active anchorage length. 4. The bond resistance available throughout the active anchorage length is taken as f b,rd = f bd /a 1 a 2 Anchorage with double bend Anchorage with single bend 1 1 where σf bd is obtained from EC2 s equation (8.2) using the strength of the wall concrete a 1 = 0.7 for a bent anchorage with c d > 3f (EC2 table 8.2) a 2 = 1 0.15 [(c d /f) - 3] > 0.7 (EC2 table 8.2) where c d for bent bars is the lesser of half the clear bar spacing and the clear side cover m l 3 12 Figure 6 5. The bar force which can be resisted at the start of the bend follows from equation (8.1) as m 12 Transverse bar diameter f f F bt,rd = m f cd 0.5 + f / a b where σf is the bar diameter f m mandrel diameter (= 2 x internal radius of bend) a b lesser of distance from centre of bar to a concrete face parallel to the plane of the bend and half the centre to centre spacing of the bars 11

CARES Technical Approval Report TA2 5034 6. The additional force that can be developed between the rear face of the casing and the start of the bend is f b,rd x pf 1 1, where 1 1 is the length from the rear of the casing to the bend. Thus the resistance as governed by consideration of bearing stresses is F s,rd1 = F bt,rd + f b,rd. pf 1 1 7. The value of F s,rd2, the resistance determined by the overall bond capacity, is F s,rd2 = f b,rd. pf (1 1 + 1 2 + 1 3 ) where σ1 2 is the length within the bend (p/8)(f m + w) 1 3 is the effective length beyond the end of the bend or first bend For anchorages with two bends 1 3 can be taken as the length from the end of the first bend to the end of the second bend < 12f, provided that the lower straight section is not relied upon as compression reinforcement. For anchorages with single bends 1 3 can be taken as the actual length < 12f. The design resistance calculated as the lesser of F s,rd1 and F s,rd2 is the force that can be transferred from a bar to the concrete in contact with it and is specific to the details of the continuity reinforcement and the concrete surrounding it. The further transmission of this force and the others at the end of the slab to the parts of the wall above and below it depends on the distributions of these forces and on the wider detailing of the wall/floor joint, which may be approached by strut and tie modelling or other appropriate methods. 7 Quality Assurance The J&P FERBOX reinforcement continuity systems are produced under a BS EN ISO 9001 quality management system certified by CARES. The quality management system scheme monitors the production of the continuity system and ensures that materials and geometry remain within the limits of this technical approval. 5034 12

8 Building Regulations Eurocodes BS 8110 was withdrawn in April 2010 after its coexistence period with Eurocode 2 ended. Although not yet formally endorsed by the Secretary of State it is anticipated that under building regulations Eurocode 2 when used in conjunction with the national annex will be accepted in lieu of BS8110. 8.1 The Building Regulations (England and Wales) Structure, Approved Document A The J&P FERBOX reinforcement continuity system, when used in EC2 based designs in lieu of BS8110 designs within the limits of this technical approval, satisfies the relevant requirements of The Building Regulations (England and Wales), Approved Document A. Materials and Workmanship, Approved Document, to support regulation 7 This technical approval gives assurance that the J&P FERBOX reinforcement continuity system complies with the material requirements of BS8110. 8.2 The Building Regulations (Northern Ireland) Part B, Materials and Workmanship This technical approval gives assurance that the J&P FERBOX continuity system complies with the material requirements of BS8110 by virtue of regulation B3, Deemed to satisfy provisions regarding the fitness of materials and workmanship. 8.3 The Building Standards (Scotland) Regulations Part B, Fitness of Materials This technical approval gives assurance that the J&P FERBOX reinforcement continuity system complies with the material requirements of BS8110 by virtue of Clause B2.1. Part C, Structure The J&P FERBOX reinforcement continuity system, when used in EC2 based designs in lieu of BS8110 designs within the limits of this technical approval, satisfy the requirements of The Building Standards (Scotland) Regulations 1990, Part C, C2.1 clause b. construction,ii. 13

CARES Technical Approval Report TA2 5034 9 References BS 4449: 2005: Steel for the reinforcement of concrete - Weldable reinforcing steel - Bar, coil and decoiled product - Specification. BS 8666: 2005: Scheduling, dimensioning, bending and cutting of steel reinforcement for concrete - Specification. BS EN 1992-1-1:2004 Eurocode 2 Design of concrete structures - General rules for buildings. BS EN ISO 9001: 2008: Quality management systems - Requirements. CARES Appendix TA2 Quality and Operations Schedule for the Technical Approval of Reinforcement Continuity Systems. 5034 14

10 Conditions 1. The quality of the materials and method of manufacture have been examined by CARES and found to be satisfactory. This Technical Approval will remain valid provided that: a) The product design and specification are unchanged. b) The materials and method of manufacture are unchanged. c) The manufacturer complies with CARES regulations for Technical Approvals. d) The manufacturer holds a valid CARES Certificate of Product Assessment. e) The product is installed and used as described in this report. 2. CARES make no representation as to the presence or absence of patent rights subsisting in the product and/or the legal right of J&P to market the product. 3. Any references to standards, codes or legislation are those which are in force at the date of this certificate. 4. Any recommendations relating to the safe use of this product are the minimum standards required when the product is used. These requirements do not purport to satisfy the requirements of the Health and Safety at Work etc Act 1974 or any other relevant safety legislation. 5. CARES does not accept any responsibility for any loss or injury arising as a direct or indirect result of the use of this product. 6. This Technical Approval Report should be read in conjunction with CARES Certificate of Product Assessment No 5034. Confirmation that this technical approval is current can be obtained from UK CARES. 15

UK CARES Pembroke House 21 Pembroke Road Sevenoaks Kent TN13 1XR Phone: +44(0)1732 450000 Fax: +44(0)1732 455917 E-mail: general@ukcares.com URL: www.ukcares.com 002 Independent Product Assessments for the Construction Industry Copyright UK CARES