POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016

Similar documents
Written Post-Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

Closure and Post-Closure Care Plan NRG Indian River Generating Station Indian River Landfill Phase II

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Initial Closure Plan Slag Pond. Nelson Dewey Generating Station. Wisconsin Power and Light Company. Prepared for:

Annual Inspection Report

c. Sites subject to regulation under Subtitle D of RCRA. The following discharges are not authorized by this permit:

(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.)

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

Closure Plan Brame Fly Ash Pond

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

Design Specifications & Requirements Manual

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0

NAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

PART 1 GENERAL REQUIREMENTS

Applying landforming to reclamation: A case study in Central Appalachia

Erosion & Sedimentation Control Policy

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Application For Waste Regulation (Check all that apply)

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

INITIAL INSPECTION REPORT ASH LANDFILL AREA SPRINGERVILLE GENERATING STATION SPRINGERVILLE, ARIZONA

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Leachate Management Leachate Control and Collection

Coal Combustion Facility Assessment Report. October 20, 2010

Module 4 Regulatory requirements for Land Disturbing Activities

SPECIFICATION FOR ENGINEERED FILLS

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

8.0 CLOSURE AND DECOMMISSIONING

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Coal Ash Landfill Management and Ash Pond Closure

Annual Inspection Report Lawrence Energy Center

Richland County Department of Public Works Engineering (Land Development) Division

Factors affecting health of Ash Dyke and Preventive Measures. Kukreti RC Chowdhury Ujjwal Naresh D N

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

3.4 Harvest and Use BMPs

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

Stormwater Local Design Manual For Houston County, Georgia

MODEL Stormwater Local Design Manual. City of Centerville

LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO S3N AFIN:

Solid Waste Disposal Facility Closure Plan

Sediment Basin. Fe= (Depends on soil type)

Soil Erosion and Sedimentation Control 12 Items required on a SESC Plan pursuant to Rule 1702

Storm Drain Inlet Protection

Filter Tube Barriers (Instream)

Advances in Design of Landfills Over CCR Ponds and Landfills

BMP #: Infiltration Basin

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

W. Goodrich Jones State Forest. Best Management Practices Virtual Demonstration Tour

LANDFILL INSPECTION CHECKLIST

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

(1) All sanitary landfill facilities, at a minimum, shall include the following:

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

Section SNOW DISPOSAL SITE DESIGN CRITERIA

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS

Ch. 285 STORAGE AND TRANSPORTATION 25 CHAPTER 285. STORAGE, COLLECTION AND TRANSPORTATION OF MUNICIPAL WASTE

Code of Practice for Land Treatment of Soil Containing Hydrocarbons

POST-CLOSURE CARE PLAN

Class III Composting Facility Requirements

Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012

Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

C. This project shall be designed to meet LEED Silver design criteria. Construction activity pollution prevention is a mandatory requirement.

2008 ANNUAL ENGINEERING INSPECTION REPORT

Brush layering construction

Constructed Wetland Pond T-8

ENVIRONMENTAL ENGINEERING LAND SURVEYING

In-Situ Coal Combustion Products Impoundment Closure/Remediation Strategy

Hazardous Waste Management

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

1. Regulation Requirements

SECONDARY CONTAINMENT RAINWATER MANAGEMENT

OHIO ENVIRONMENTAL PROTECTION AGENCY L PE RMIT-TO4 N STALL t

SACHSE EROSION CONTROL GUIDELINES

Base Metal and Iron Ore Mining

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

SECTION TRENCHING & BACKFILLING

Industrial Solid Waste Landfill Daily Log of Operations {as required by O.A.C (E)(10)} Yearly Cover Sheet (Form 1)

RECLAMATION REGULATIONS

JEFFERSON COUNTY STORM WATER MANAGEMENT

VOTR Site Assessment Victoria on the River

Mechanical Site Preparation

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

Transcription:

POST CLOSURE PLAN CFR 257.104(d) Landfill Pirkey Plant Hallsville, Texas October, 2016 Prepared for : Southwest Electric Power Company Pirkey Power Plant Hallsville, Texas Prepared by: American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH 43215 GERS 16 099

Table of CONTENTS 1.0 OBJECTIVE... 4 2.0 DESCRIPTION OF THE CCR IMPOUNDMENT... 4 3.0 DESCRIPTION OF POST CLOSURE PLAN 257.104(d)(1)(i)... 4 4.0 POST-CLOSURE CONTACT 257.104 (d)(1)(ii)... 6 5.0 POST-CLOSURE PLANNED USE 257.104 (d)(1)(iii)... 6 Pages 3 of 6

1.0 OBJECTIVE This report was prepared by AEP Geotechnical Engineering Services (GES) section to fulfill requirements of CFR 257.104(d) for Post Closure Plans of CCR units. 2.0 DESCRIPTION OF THE CCR IMPOUNDMENT The Henry W. Pirkey Power Station is located at 2400 FM 3251 and south of Hallsville, Texas. It is owned and operated by Southwest Electric Power Company (SWEPCO). The facility operates a landfill for the disposal of CCR materials. The Pirkey Landfill is a Class 2, Industrial Solid Waste Facility per the Texas Commission on Environmental Quality, Industrial Solid Waste Management Technical Guideline No. 3. 3.0 DESCRIPTION OF POST CLOSURE PLAN 257.104(d)(1)(i) [A description of the monitoring and maintenance activities required in paragraph (b) of this section for the CCR unit, and the frequency at which these activities will be performed.] 3.1 SECTION 257.104(b)(1) [Maintaining the integrity and effectiveness of the final cover system including making repairs to the final cover as necessary to correct the effects of settlement, subsidence, erosion, or other events, and preventing run on and run off from eroding or otherwise damaging the final cover.] Inspections are performed for the items noted below. The inspection frequencies are scheduled to properly detect any issues so that repairs can be performed before significant harm occurs. Embankment: The entire waste embankment, including top surface and side slopes, will be inspected for slides, settlement, subsidence, displacement, and cover condition (see below). Soil Dike: The soil dike will be inspected for slides, displacement, seepage, and erosion. Cover: The final cover will be inspected for erosion and for the condition of the vegetated cover, i.e., gaps in vegetation or presence of undesirable trees or brush. The integrity of the cover drainage system will also be inspected. Final Cover Surface: The Final Cover surface will be inspected for any ponding of water or flat areas. Due to the design contours required to achieve the final cap grade, special attention will be focused to ensure that no settlement, subsidence, erosion, depressions or flat areas exist and that no water is allowed to pond above the cap system. Surface Drainage System: The surface drainage system, including channels, culverts, slope drains, etc., will be inspected for erosion, integrity of channel lining, ponding, and accumulated sediment. Leachate Collection Piping: The discharge pipes of the Leachate Collection System at the Leachate Collection Pond will be inspected for clogging or damage. Other exposed portions of the Leachate Collection System including cleanouts will be inspected for damage. Similarly, the Leachate Collection Pond will be inspected for general damage to the pond and perimeter berms, and for accumulation of sediment in the pond. Pages 4 of 6

Maintenance during the post-closure care period will be performed as discussed below, based upon the facility inspections described above. Erosion Damage Repair: Any areas exhibiting erosion will be repaired by replacing and compacting the material in-kind to design grade/specifications, and reseeding the area to the specifications. Applications of additional fertilizer, selective herbicides, rodent control measures, etc. will be implemented as necessary. In the selection of fertilizers and herbicides, ensure their use will not impact the groundwater negatively. Follow-up monitoring of the repaired area will be conducted to ascertain the integrity of the repair. Settlement, Subsidence, Displacement: Any areas at the closed site exhibiting evidence of settlement, subsidence, or displacement will be examined to determine the cause of the movement. If backfilling or placing additional fill material is needed to maintain the integrity of the closed structure, it will be performed in accordance with the site/closure specifications, including seeding. If the condition reoccurs or persists, or if the severity of the condition initially is judged to warrant it, a detailed investigation of the cause will be performed and remedial action will be performed. Similarly, any areas of the soil dike exhibiting sliding, displacement, or seepage will be investigated. Repairs will be made as necessary. Follow-up monitoring of the area will be performed to ascertain that the problem has been corrected. Closure Cap Surface: Any areas that show signs of ponding water or flat contours will be examined and rectified. Due to the design contours required to achieve the final cap grade, special attention will be focused on the cap surface to ensure that any areas that hold water are re-graded to promote drainage, re-seeded to promote vegetative growth, and maintained to ensure that the ponding of water does not persist. Surface Water Drainage System: The channel linings are designed to withstand the design velocities. Maintenance of the surface water drainage system will consist of removing sediment and/or undesirable vegetation from the surface water runoff control system (channels and culverts) as required. Eroded areas will be repaired by back-filling and reseeding according to the specifications. Damage to culverts will be repaired; structure replacement will be performed if needed. Leachate Collection System: Maintenance of the leachate collection system, collection sump, and leachate pumps will consist of repairing and/or replacing in-kind any damaged or eroded portions of the system and pond, cleaning pipes, and removing leachate and sediment from the collection sump and the Leachate Collection Pond, as needed. 3.1 SECTION 257.104(b)(3) [Maintaining the groundwater monitoring system and monitoring the groundwater in accordance with the requirements of 257.90 through 257.98.] The groundwater monitoring system will be inspected for the general integrity of the wells, well casings and well protective casings. Any damaged portions of the monitoring wells and/or their protective casings will be replaced in-kind. Pages 5 of 6

Monitoring the groundwater will be in accordance with the groundwater monitoring plan for this facility and in accordance with the requirements of 257.90 through 257.98. 4.0 POST-CLOSURE CONTACT 257.104 (d)(1)(ii) [The name, address, telephone number and email address of the person or office to contact about the facility during the post-closure care period.] The name, address, and telephone number of the person to contact about the Facility during the post closure period shall be provided upon notice of closure. 5.0 POST-CLOSURE PLANNED USE 257.104 (d)(1)(iii) [A description of the planned uses of the property during the post-closure period. Post-closure use of the property shall not disturb the integrity of the final cover, liner(s), or any other component of the containment system, or the function of the monitoring systems unless necessary to comply with the requirements in this subpart ] The post-closure use of the property will be undisturbed vacant land space. The only activities occurring on the closed CCR unit will be related to the Post-Closure care activities. All other activities will be prohibited. Pages 6 of 6