Feedback Loops. Effects (12) (13) Improve. (10) Visualize (4) (7) (12) (11) Lean. Improving Sustainably. See & Understand (WIP, Blocks, Queues)

Similar documents
Agile & Lean / Kanban

Lean Gold Certification Blueprint

"Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007

De-Mystifying Kanban:

10 Steps to become a Lean Enterprise. Level 2 Lean Practitioner In Manufacturing Training Course. Step 1 - Part 2

Lean Flow Enterprise Elements

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

Lean Construction Institute

Continuous Improvement

Monitoring Kanban Execution WHITE PAPER

WHITE PAPER. Assessing Kanban fitment in the Fluid and Fast-paced World of Software Development. Abstract

Introduction to Lean CAPTURE AND LEVERAGE THE LEAN ADVANTAGE. Introduction to Lean. Learning Objectives

Lean Silver Certification Essential Body of Work

Lean Production Management In Design

Fit For Purpose. Resilience & Agility in Modern Business. Presenter David J. Anderson CEO. Agile Business Conference London October 2014 Release 1.

Kanban Maturity Model: Why should you care about it? Teodora

Designing a (Pull) System Visual Control Board. February 2013 Vega Information System Services, Inc. Do Not Reproduce 1

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Continuous Improvement Toolkit

Kirill Klimov. Making Scrum more powerful with some Kanban

Quick Manufacturing Stencil

Certified Team Coach (SA-CTC) Application - SAMPLE

PMI Agile Certified Practitioner (PMI-ACP) Duration: 48 Hours

Lean Enterprise Portfolio Management

Standard Work and the Lean Enterprise Net Objectives Inc. All Rights Reserved.

Validation of NORM (Needs Oriented Framework for Producing Requirements Decision Material) Framework in Industry

1 This document was adapted from information from Center for Public Health Quality, Charlotte Area Health Education Center, NC State University

Portfolio Management In An Agile World

DASA DEVOPS PRACTITIONER

DETAILED COURSE AGENDA

CERTIFIED QUALITY IMPROVEMENT ASSOCIATE

SEMBIT SQA Unit Code F9JY 04 Developing visual management systems

Overview of Program Structure

Lean Project Delivery Operating System

Five Tips to Achieve a Lean Manufacturing Business

AGILE SOLUTIONS. Agile Basics

Pull Systems: Overview, Challenges and Success Factors

Continuous Improvement Toolkit. Value Analysis

The Definitive Buyer s Guide for a. Customer Success Platform

Finished goods available to meet Takt time when variations in customer demand exist.

Engaging All Employees to Eliminate the Eight Wastes

Sample Performance Review Supervisor Excelling

Optimization: The Next Frontier

Goal-Question-Kanban: Applying lean concepts to coordinate multi-level systems engineering in large enterprises

Exceptional customer service

The Celanese 6 s Dispute and Deduction Management Case:

How to Prepare for and Implement a Project Using Scrum

It s Not Easy Being Lean. C G Clark Consulting Group

Which is Best for Us? Top Down, Bottoms Up, or Middle Out

Getting to one button deploy using. Kanban. SeaSPIN Sept 6, by Dominica

Ingegneria del Software Corso di Laurea in Informatica per il Management. Scrum. Davide Rossi Dipartimento di Informatica Università di Bologna

Improving Scrum with. Lean Thinking Nuno Rafael SGMUN 2016

Value Stream Mapping

Scrum Alliance Certified Team Coach SM (CTC) Application SAMPLE

Materials Management. Implementation Process. Marek Piatkowski. December Marek Piatkowski FSP Consulting

Oracle Prime Projects Cloud Service

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)

Handling Product Management Across The Enterprise. copyright Net Objectives, Inc.

Maintenance Management Master Processes Learning Plan

In-House Agile Training Offerings

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

The Basics of ITIL Help Desk for SMB s

Dallas Center for Performance Excellence (CPE) Executive Summary

Using Simulation in the Process Industries. Bennett Foster Sr. Consultant, DuPont Co.

Introduction to Agile and Scrum

LEAN MANUFACTURING & TPM.

Achieving World Class Safety Performance Through Metrics

A Primer for the Project Management Process by David W. Larsen 1. Table of Contents

Production Activity Control

Just-In-Time (JIT) Manufacturing. Overview

Why Agile Transformations Fail. What You Need to Know to Transform Any Sized Organization into an Agile Enterprise

IBM Collaborative Lifecycle Management & SAFe

SEVEN (7) PRINCIPLES FOR IMPROVING WORKFLOW

Continuous Improvement Toolkit. Traffic Light Assessment. Continuous Improvement Toolkit.

An Introduction to Leanban. A Net Objectives White Paper

Presented by Only Agile. What is Agile?

Analytics Cloud Service Administration Guide

Goal-Driven Performance Measurement

GUIDE TO THE CHANGES IN PMP simpl learn i

General Platform Criterion Assessment Question. SLM-11-G-001 Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 N/A

POSSE System Review. January 30, Office of the City Auditor 1200, Scotia Place, Tower Jasper Avenue Edmonton, Alberta T5J 3R8

Customer Service in Microsoft Dynamics CRM 2013

AGILE BASICS. All slides copyright Philip Japikse

Chapter 27 Lean production

ISO 9001 Quality Management Systems

LEAN ADMINISTRATION.

Lean Transformations: The Emerging Role of S&OP

Hybrid Manufacturing Methods

PLUS VALUE STREAM MAPPING

Anatomy of a firm. Strategic Plan write-up and implementation. Role of systems. Strategy process

Risk Management User Guide

Strategies for Achieving Lean Despite Inherent Variability in Processes or Products

Designing the Lean Enterprise Performance Measurement System

An Introduction to Scrum

Agile Development Doesn t Have to Mean Fragile Enterprise Processes

Performance Leader Navigator Individual Feedback Report For: Chris Anderson

July 21, Jeff Nichols, PE, LEED AP, CEM, CPMP. Donn Young, CPMP, QCxP, LEED AP BD+C 7/28/2017. Vice President EEI Operations

Implementing Scrumban

Certified Manager of Quality/Organizational Excellence (CMQ/OE) Body of Knowledge (BOK) 2014

Training: RCA Root Cause Analysis

Transcription:

Improve continuously in a sustainable way Improve Effects () Visualize (1) See & Understand (WIP, Blocks, Queues) (1) 1 Generate actionable feedback (information) from stakeholders to improve Feedback Loops () Lean 5 Necessary for sustainable improvements Improving Sustainably 1 Improve Predictability Reduced Task Switching Reduced Lead times Reduced Overburding (quality, sustainability) Limit WIP () Set Standards to improve upon 8 Excellence Increase Liquidity Measure Flow / capability (WIP, throughput, Queues, lead time) Defer Commitment Explicit Policies (1) Manage Flow (11)

Visualize 1. Work (all, according to current policies). Work Types. Workflow ( process, way-of-working, value stream). Next & Done 5. Current Team Focus (avatars). Blocks. Current Policies (DoD, DoR, capacity allocations, etc.) 8. Ready for Pull ( done within the workflow/in columns) 9. Metrics (lead-times, local cycle times, SLA targets, etc.). WIP limits 11. Inter-work dependencies (hierarchical, parent-child, etc.) 1. Inter-workflow dependencies 1. Risk dimensions (cost-of-delay, technical risk, market risk) Make Policies Explicit - All Policies must be CURRENT (known & actually used) 1. Definition of Work Types and Work Item (template). How to pull work (selection from Next /prioritization of WIP). Who and when manages the Next and Done queues. Staff allocation / work assignment (individual focus) 5. Definition of Ready for Next. Who, when and how to estimate work size. Limit size of work items (work breakdown) 8. How to select & prepare work for the Next queue 9. Definition of Done at all steps (seen as a Target Condition). Knowledge spreading/sharing strategy 11. Class-of-Service 1. Capacity allocation Effects (seeing Evidence of ) 1. Team members are seeing and understanding the Big Picture (team-level vs. local situations). Better team spirit (helping each-others to complete work, respect). Focus on removing blocks. Focusing on finishing work rather than starting new work 5. Team is working on the right thing ( right prioritization). Limiting work to team s capacity (limited stress, optimal leadtimes). Team has motivation to drive improvements 8. Local process evolution (visualization, workflow, policies, WIP limits) 9. Increase depth of Kanban implementation. Process evolution was model-driven 11. Process or management policy evolution as a result of mentormentee 1. Inter-workflow or management policy evolution due to operations review Depth of Kanban Implementation Team: Date: Limit Work in Progress 1. No WIP limit, but commitment to finishing work over starting new (eventually reaching a WIP level that feels OK for the team). Some explicit WIP limits, at lower level than workflow (a.k.a Proto-Kanban): personal Kanban, WIP limit per person, WIP limits for some columns or swim-lanes, workflow with infinite limits on done queues, etc.. Explicit WIP limit at workflow level - Single workflow full pull. Multiple interdependent workflows with pull system Implement Feedback Loops 1. Daily Team standups. Key stakeholders (mngt, customers, other groups) are regularly updated on the current situation. Managers go and see (walk the gemba ) regularly. Regular discussions with upstream and downstream partners 5. Regular presentations and discussions about Financial performance. Regular presentations and discussions about Quality KPI (defect rate, customer satisfaction, etc.). Regularly means once per month or more often Feedback Loops () Manage Flow 1. Daily planning meetings (as daily as agreed by policies). Blocks out of team control are escalated for resolution. Next is re-prioritized continuously (no commitment in Next)- Deferred Pull decisions (dynamic prioritization). CFDs (updated at least once a week) 5. Control Charts (updated at least once a week). Size of ongoing work items is limited (large work is broken down). Flexible staff allocation (swarming) 8. Cadence is established (planning, delivering, retrospective) 9. Flow metrics (number of days blocked, lead-time efficiency). SLA expectations and forecasts (lead-time targets) 11. Capacity Allocations Improve 1. The group knows why it exists and its criteria for success. Regular Retrospectives / Kaizen events. The team knows its current condition (may require metrics). True North exists, is communicated and shared by the team 5. The team knows the current target condition (the challenge). There is a validation criteria (test) for the current target condition to know when the target condition is reached. The team knows what obstacles are preventing them from reaching the target condition 8. The team knows what obstacle is being currently addressed 9. The team knows what is the next step in resolving the current obstacle (PDCA). The team go and see what they have learned from taking that step Effects (1) Improve () Visualize(1) Lean 8 Explicit Policies(1) 5 Baseline Excellence 1 Necessary 1 Limit WIP () Manage Flow (11)

00 Current Score Improve Effects (1) () Visualize 1 (1) Trend Lean Feedback Loops () 5 Baseline Necessary 1 Limit WIP () 8 Excellence Explicit Policies (1) Manage Flow (11)

5 Current Score Trend Improve 015--11 () Visualize Lean Effects (1) 1 (1) 01-08-0 Feedback Loops () 5 Baseline Necessary 1 Limit WIP () Next Target Condition 8 Excellence Explicit Policies (1) Manage Flow (11)

Current Score Improve Effects (1) () Visualize 1 (1) Trend Lean Feedback Loops () 5 Baseline Necessary 1 Limit WIP () 8 Excellence Explicit Policies (1) Manage Flow (11)