S.No Description Unit Quantity Rate (Rs) Amount (Rs)

Similar documents
SCOPE OF WORK FOR PILING JOB

OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION

Combined Pile Foundation System for a Residential Complex

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

Florida Method of Test for NONREPETITIVE STATIC PLATE LOAD TEST OF SOILS AND FLEXIBLE PAVEMENT COMPONENTS

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

A PRODUCT FROM KANTAFLEX (INDIA) PVT LIMITED

DESIGN SPECIFICATION FOR FOUNDATIONS

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

Omega seals Trelleborg Ridderkerk BV

SECTION GRAVEL PACKED WATER WELL

THE STUDY OF t-z AND q-z CURVES ON BORED PILE BASED ON THE RESULTS OF INSTRUMENTED PILE LOAD TEST IN MEDIUM AND STIFF CLAYS

Estimate FOR THE SEPTIC TANK

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23


Redi Rock Specification and Installation Manual

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

REPORT STATUS: DATE: Report n :

Diaphragm wall Construction

Standard Test Method for Piles Under Lateral Loads 1

1. Cast-in-place concrete is specified in Section

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Method of Measurement for Road Works Series MM Structural Concrete

DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

UNDERPINNING A CRANE FOUNDATION

Project Address: Name of Person Completing Form:

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

Expert in Tunneling Systems & Trenchless Technology (HDD, Microtunneling, Pipe Jacking, Thrustboring, Sheet Piling)

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

Downloaded from Downloaded from /1

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

DISCUSSION ON UNDERPINNING (28/3/12)

***************************************************************************************************************

BISON PRECAST FLOORING SPECIFICATION

USE OF DIPP PILES FOR A NEW SUP BRIDGE IN WEST MELBOURNE

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

Aluminum Component Pipe Railings

TEST REPORT. Rendered to: KEYLINK FENCING & RAILING, INC. For: PRODUCT: Lancaster Series. TYPE: Aluminum Level Guardrail System

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

Bi-Directional Static Load Testing of Driven Piles

SECTION ROLLER GATES

Performance assessment of ground improvement with rapid impact compaction

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95

7/17/2017 Page 1 of 5

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF CEMENT WITH METAKAOLIN AND SAND WITH QUARRY DUST OF REINFORCED CONCRETE BEAM.

ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) PREFACE

In-situ Out-of-Plane Airbag Testing of Infill Masonry Cavity Walls

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

PART A: JOB PROCDRE FOR PLASTERING

APPENDIX R STRAWBALE CONSTRUCTION

Testing Methods of Driven Piles on INDOT Demonstration Projects

HOT ROLLED STEEL FLAT PRODUCTS FOR STRUCTURAL FORMING AND FLANGING PURPOSES SPECIFICATION (Third Revision of IS 5986)

CITY OF FARGO SPECIFICATIONS SIGNING

SECTION TRENCHING & BACKFILLING

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

Design Data 4M. Jacking Concrete Pipe

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

Standards for Testing and Rating Shoring Equipment

Silent Vibrationless. Technology. teel Sheet Piles. Vinyl Piling. etaining Walls. Piles. tory Piling. oundations. ite Piles. n Free Piling.

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

Trenchless Pipeline Crossings

Page 10-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LIGHTING AND SIGNS

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038)

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

TRENCHLESS INSTALLATION OF ROAD DRAINAGE & SERVICE DUCTS

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

Tender No. : GAIL/PA14/51603/ /RK [E-Tender Bid Invitation No ]

A. Product Data shall be provided for each type of product indicated.

SPECIFICATION GUIDELINE

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

LATERAL CAPACITY OF SKIRT FOUNDATION ON LOOSE SUBMERGED SAND

METHOD STATEMENT for INSTALLATION OF MICROPILE

PRISM TEST, FLAT JACK TEST, REBOUND HAMMER, & MECHANICAL PULSE VELOCITY

WELCOME TO THE PILE DRIVING INSPECTOR COURSE

Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome

STANDARD SPECIFICATIONS SECTION JACKED CASING

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

SPECIFICATION : BORING AND JACKING

STANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter.

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

Soil Mechanics Lateral Earth Pressures page Lateral Earth Pressures in case of inclined ground surface or friction at wall-ground interface

h Installation Manual

Transcription:

,

S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the per test 18 direction of Engineer in-charge. Single pile upto 50 tonne Safe capacity : Initial test (Test Load 2.5 times the Safe capacity Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). 450 mm dia piles at 10m depth. meter 3 450 mm dia piles at 12.5m depth meter 3 450 mm dia piles at 15m depth meter 3 600 mm dia pile at 10m depth meter 3 600 mm dia pile at 12.5m depth meter 3 600 mm dia pile at 15m depth meter 3 Amount in Words : Total (In Rs.)= Taxes as applicable @ = -----% Grand Total (In Rs.)

TENDER DOCUMENT TECHNICAL SPECIFICATION FOR PILE LOAD TEST WORK

20.5 LOAD TEST ON PILES 20.5.1 General The bearing capacity of a single or group of piles shall be determined from test loading. It is most direct method for determining safe load on pile and it is more reliable on account of its being in-situ test. The load test on a concrete pile shall not be carried out earlier than 28 days of its casting. Initial test shall be carried on test pile which is not used as working pile and Routine tests shall be carried out as a check on working pile. Routine test shall be one-half percent to two percent of total number of piles or as specified, applicable to vertical and lateral load. Load Test shall generally conform to provision made in IS 2911 (Part IV) which provides guidelines for determination of safe loads and conducting of different types of tests. 20.5.2 Types of loadings/tests (i) Vertical Load Test (Compression) (ii) Cyclic Vertical Load Test (iii) Lateral Load Test 20.5.3 Vertical Load Test 20.5.3.1 General: Compression load shall be applied to the pile top by means of a hydraulic jack against suitable load frame which is capable of providing reaction and settlement is recorded by suitable dial gauges. The contractor shall apprise of Engineer-in-Charge before test is conducted. 20.5.3.2 Preparation of Pile Head: Pile head shall be chipped off to horizontal plane, projecting steel shall be cut or bent and top finished smooth and leveled with plaster of Paris or similar synthetic material as specified to give a plane surface which is normal to the axis of the pile. A bearing plate with a hole at the centres shall be placed on the head of pile for the jacks to rest. 20.5.3.3 Loading Platform: A proper loading platform is installed as specified. Contractor shall ensure that when the hydraulic jack and load measuring devices are mounted on pile head the whole system will be stable on the maximum specified load. For single pile two dial gauges shall be fixed to the pile and bear on surfaces on reference frame. The dial gauges shall be placed in diametrically opposite positions and be equidistant from the pile axis. Four dial gauges are used for groups, having 0.01 mm sensitivity. The arrangement shall be approved by the Engineer-in-charge. 20.5.3.4 Application of Load: The test is carried out by applying a series of downward incremental load (20 per cent of safe loads on pile). In this method application of increment of test load and taking of measurement or displacement in each stage is maintained till the rate of displacement is either 0.1 mm in first 30 minutes or 0.2 mm in first one hour or 2 hours, whichever occurs first. The test load shall be maintained for 24 hours. This method is applicable for both initial and routine test. For testing of raker piles the loading shall be along its axis. Safe load on single pile for initial test is least of following:

(i) Two-thirds of the final load at which the total displacement attains a value of 12 mm unless otherwise stated, in such case the safe load should be corresponding to total displacement permissible. (ii) 50 per cent of the final load at which the total displacement equal 10 per cent of pile diameter and 7.5 per cent of bulb diameter in case of under-reamed piles. Routine test shall be carried for a test load of one and half times the working load, maximum settlement not to exceed 12 mm or as stated. Safe load on group of piles for initial test shall be least of the two (i) Final load at which total displacement is 25 mm or as stated. (ii) Two-thirds of final load at which the total displacement is 40 mm. Routine test shall be carried for a test load equal to not less than working load, the maximum settlement not to exceed 25 mm. 20.5.3.5 Maintained Load Method: This is applicable for both initial and routine test. In this method application of increment of test load and taking of measurement or displacement in each stage of loading is maintained till rate of displacement of the pile top is either 0.1 mm in first 30 minutes or 0.2 mm in first one hour or till 2 hours, whichever occurs first. If the limit of permissible displacement as given in 20.5.3.4 is not exceeded, testing of pile is not required to be continued further. The test load shall be maintained for 24 hours. Pile test data such as load, displacement and time shall be recorded in suitable prescribed tabular form. Results can be presented by suitable curves. Test shall be carried out in proper manner and to the entire satisfaction of the Engineer-in-charge. After the test is completed the test cap shall be dismantled and pile surface shall be resorted to original shape. 20.5.3.6 Measurement: Each completed test shall be enumerated for initial test, routine test separately. 20.5.3.7 Rate: The rate includes the cost of labour, material and all the operations described above such as preparatory work including installation of loading platform, applying load, preparing pile head for load test, trimming of pile head etc. complete. 20.5.4 Cyclic Vertical Load Testing 20.5.4.1 General: This process shall be used in case of initial test to find out separately skin friction and point bearing load on single piles of uniform diameter in conformity of provisions of IS Code 2911 (Part 4) for conducting of the test. 20.5.4.2 Preparatory Pile Head: As per clause 20.5.3.2. 20.5.4.3 Loading Platform: As per clause 20.5.3.3 20.5.4.4 Application of Load: Relevant provision as per clause 20.5.3.4 shall be applicable. The test may be continued up to 50 per cent over the safe load.

20.5.4.5 Test procedure given in Appendix E shall be followed. Test shall be carried out in proper manner and to the entire satisfaction of the Engineer-in-charge. After the test is completed, the test cap shall be dismantled and pile surface shall be restored to original shape. 20.5.4.6 Measurement: Each completed test shall be enumerated for different load ranges. 20.5.4.7 Rate: The rate includes the cost of labour, materials and all the operations described above such as preparatory work, trimming of pile head etc. complete. 20.5.5 Lateral Load Testing 20.5.5.1 Load Platform: A proper loading platform shall be installed as specified. Hydraulic jack is mounted with gauge between two piles or pile groups under test. Dial gauge tips shall rest on central portion of glass plate fixed on the side of pile. 20.5.5.2 Application of Load: Full load imposed by the jack shall be taken as lateral resistance on each pile or group. Load should be applied in increments of about 20 per cent of the estimated safe load. The next increment shall be applied after the rate of displacement is approximately equal to 0.1 mm per 30 minutes. 20.5.5.3 The safe lateral load on pile; is least of the following: (i) Fifty per cent of the final load at which total displacement increases to 12 mm. (ii) Final load when total displacement is 5 mm. (iii) Load corresponding to any other specified displacement as per requirement. Pile group shall be tested as per actual conditions as far as possible. 20.5.5.4 Displacements: Displacement is read by at least two dial gauges of 0.1 mm sensitivity spaced at 30 cm and kept horizontally one above the other and displacement is interpolated at cut off level. One dia gauge placed diametrically opposite to jack shall directly measure displacement. Where, it is not possible to locate one of the dial gauges in the line of the jack axes, then two dial gauge may be kept at a distance of 30 cm at a suitable height and the displacement interpolated at load point from similar triangles. Note: One of the methods of keeping dial gauge on pile surface is to chip off uneven concrete on the side of the pile and to fix a piece of glass 20 to 30 mm square. The dial gauge tips shall rest on the central portion of the glass plate. Arrangement and test procedure shall be duly approved by the Engineer-in- Charge. 20.5.5.5 Measurement: Each completed test shall be enumerated for different load ranges. 20.5.5.6 Rate: The rate includes the costs of labour, materials and all the operations described above.