Welcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming!

Theme Comment Response. All neighbours should be entitled to revenue sharing, not just those who have signed an option agreement with Suncor.

Bermingham Foundation Solutions:

Welcome to our Open House!

Oldman 2 Wind Farm Limited

Grand Valley Wind Farms Phase 3 Wind Project Wind Turbine Specification Report

C&B Alberta Solar Development ULC

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Request for Quotations Acoustic Consultant Services

Palm Beach County Project, LLC

Noise Impact Assessment

Ontario Corp. as general partner for and on behalf of Illumination LP 545 Speedvale Ave W Guelph, Ontario N1K 1E6

Sample Zoning for Wind Energy Systems April 16, 2008

SEWRPC Model Zoning Ordinance ZONING REGULATIONS FOR WIND ENERGY SYSTEMS

EPCOR Distribution & Transmission Inc.

Wind Power Regulatory Process Review

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

~ ~ #...>!---l! FILE NO. 46 V i c tor i a Street North Goderich, ON N7A 2R

Decision GTE Solar Inc. Brooks Solar Power Plant. January 31, 2013

Public Information Centre No. 2

C O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6

Question and Comment Table Project: Strong Breeze Wind Project Proponent: Strong Breeze Wind Power Partnership

WIND ENERGY CONVERSION SYSTEMS APPLICATION

NaturEner Wild Rose 1 Energy Inc.

Wind Turbine Zoning for CERTs

1 All global wind energy statistics are from the Global Wind Energy Outlook 2016.

KENT BREEZE WIND FARMS

Nance County Zoning Regulations for Wind Energy Conversion Systems

EXECUTIVE SUMMARY. Supplemental Environmental Impact Statement Jericho Rise Wind Farm

Strong Breeze Wind Project

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

City of Kitchener. Telecommunication Tower and Antenna Protocol. October 1, Table of Contents. Site Selection Design & Landscaping

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Content Copy Of Original

Cassadaga Wind Project Exhibit 6. Wind Power Facilities

PROPOSED PIPELINES TO SERVE THE COMMUNITY OF FENELON FALLS: ENVIRONMENTAL REPORT

NOISE IMPACT ASSESSMENT PROTOCOL. Number Three Wind Farm Lewis County, New York. Case 16-F-0328

OPERATION PHASE: ENVIRONMENTAL MANAGEMENT PROGRAMME

Wind Energy Facility Siting and Permitting in South Dakota

Summary Statement PLANNING REPORT & AGGREGATE RESOURCES ACT. Part of Lot 3, Concessions 1 and 2, Township of Clearview, County of Simcoe OSTER PIT

Cornwall Solar Project Renewable Energy Approval Modification Report

Canadian Niagara Power Inc. International Power Line Rebuild Project Fact Sheet

KENT BREEZE WIND FARMS

Addition to Section 4 - Special Use Regulations

Siting Guidelines for Windpower Projects in Kansas

Possible Impacts of Low Frequency Wind. Rita B. Messing, Ph.D. Carl Herbrandson, Ph.D. Risk Assessment Course, Feb. 2011

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

The New England Clean Power Link A powerful wind and hydro partnership for Massachusetts

Content Copy Of Original

U.S. DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE SERVICE OKLAHOMA ECOLOGICAL SERVICES FIELD OFFICE

YOUR LOCAL DEVELOPER

Eska Creek Preliminary Feasibility Analysis

ARTICLE X TRANSMISSION TOWER REGULATIONS

Law enforcement on proactive protection of noise and vibration pollution for

STAFF REPORT THE CORPORATION OF THE TOWN OF COBOURG. Mayor and Council Members. Brent Larmer By-law Enforcement/Policy Coordinator and Deputy Clerk

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

HYDRO AND ELECTRIC ENERGY REGULATION

H 6062 S T A T E O F R H O D E I S L A N D

RENEWABLE AND ALTERNATIVE ENERGIES

Murra Warra Wind Farm Project Environmental Management Plan

The Value of Customer Reliability to the Utility

Welcome. Windy Point. The WIND FARM. Thank you for coming to the Windy Point Wind Farm Open House. AGENDA WIND FARM

Proceedings of the 2013 International Conference on Ecology and Transportation (ICOET 2013)

APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION

Noise Control and Impact Assessment at Health Canada

MEASUREMENT AND LEVEL OF INFRASOUND FROM WIND FARMS AND OTHER SOURCES

TELECOMMUNICATION STRUCTURES

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

Aquatera Utilities Inc.

Barlow Solar Energy Centre Project Summary Report

Covanta Durham York Renewable Energy Limited Partnership. Acceptance Test Report. Executive Summary

Wind Energy Development Specialist Report

1.0 Purpose. 2.0 Scope

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of:

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

RENEWABLE ENERGY AND MIGRATORY SPECIES

E.L. Smith Solar Farm Project Open House. Lower Level

Wind Power. Jamie Eppolite

Notice of Availability of the Final Environmental Impact Statement for the Monument

South Australian Multiple Land Use Framework

Sacramento Valley Groundwater: An Approach to Better Understand and Manage the Lower Tuscan Groundwater Resources for Northern California

LAND USE INFORMATION SHEET

Cass County Soil Erosion & Sedimentation Control Program

WATERSHED. Maitland Valley. Report Card 201

Client File No.: October 16, Don Hodgson, Location Manager Delmar Commodities Ltd. Box 1236 Beausejour, MB ROE OCO. Dear Mr.

Canadian Solar Developers Ltd.

Lighthouse Wind Save Ontario Shores

Social Acceptance of Wind Energy Projects

Wind Development: Benefits and Constraints

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Environmental Guidelines Checklist

The Leader in Wind Energy

4 Desired Levels of Service (LOS)

Challenges to Wind Development Review of Representative Wind Projects & Wind Project Siting Concerns

The Idaho Power Company

THE LEGISLATIVE FRAMEWORK FOR MUNICIPAL PLANNING, SUBDIVISION, AND DEVELOPMENT CONTROL

ADMINISTRATIVE DESIGN REVIEW (ADR) An applicant s guide to the process

Transcription:

NIAGARA REGION WIND FARM PROJECT Community Liaison Committee Meeting 4 February 7, 2017

AGENDA Introductions & Meeting Structure Outline Review of Minutes CLC Meeting #3 Project Update Topics of Community Interest Moving Forward

REVIEW OF MINUTES CLC MEETING #3

PROJECT UPDATE Status - Operational Meet the Operations Team Guest experts

Project Status - Operational NRWF achieved its Commercial Operation Date (COD) on November 2, 2016 Intro of Operations team: Jason Weir, Site Manager Michael Gaudet, Wind Site Technician Stephanie Bujold, Environmental Manager Current activities on site Jason

Contacting NRWF To contact the Niagara Region Wind Farm: Phone: 1-844-363-6491 Email: info@nrwf.ca Website: www.nrwf.ca

Guest Presenters Natural Resource Solutions Inc. (NRSI) Charlotte Teat, Terrestrial and Wetland Biologist Aercoustics Payam Ashtiani, Principal Aercoustics, Acoustical Engineer

NRSI Natural Resource Solutions Inc. (NRSI) is an environmental consulting firm consisting of biologists specializing in aquatic, terrestrial, and wetland biology. NRSI has extensive environmental monitoring experience on wind power projects in all stages of development.

NRSI NRSI will be completing the following postconstruction surveys: Avian and bat mortality monitoring, Significant woodland and wetland hydrological monitoring, Amphibian woodland and wetland breeding habitat surveys, Migratory landbird stopover and staging area surveys, and Raptor wintering area surveys, including short-eared owl surveys.

NRSI Bird and bat mortality monitoring Monitoring is conducted in accordance with requirements of the REA and MNRF Guidelines Mortality monitoring began January 5 th, 2017 at 2 turbines (T01 and T58) These turbines will be monitored weekly from December 1 st to March 31 st A subset of 23 turbines will be selected for twiceweekly monitoring, from mid-april through October 31 st and once per week from November 1 st through November 30 th All turbines will be searched once per month from May 1 st through October 31 st

NRSI Correction factors are applied in order to calculate overall estimated mortality rates across the project An annual report will be prepared 3 years of monitoring is required Supplementary monitoring will be conducted at 10 of the subset of 23 turbines Search radius of 85m from the turbine base, instead of the typical 50m radius Twice-weekly monitoring from mid-april through October 31 st An annual report will be prepared

NRSI Post-construction behavior monitoring Pre-construction surveys completed by Stantec Based on significance, post-construction surveys are required to assess any potential changes in habitat use Amphibian woodland and wetland breeding habitat surveys (1 year) Migratory landbird stopover and staging area surveys (3 years) Raptor wintering area surveys, including shorteared owl surveys (3 years) Significant woodland and wetland hydrological monitoring (1 year) Inspections of culverts within 30m of access roads Ensure hydrological flows are maintained

NRSI Q&A

NIAGARA REGION WIND FARM

Who are Aercoustics? Experts in wind turbine acoustic measurement and monitoring Completed acoustic assessment and sound modelling for over 1 GW of wind energy. Logged more than 100,000 hours of post construction noise measurements from wind turbine facilities Accredited to measure wind turbine noise emissions as per CAN/CSA Standard C61400-11:07 standard Noise monitoring performed on behalf of Industry, Regulators and Residents Unbiased data and information

Acoustic Audit Agenda REA Requirements Acoustic Audit Immission Transformer Acoustic Audit Receptor Acoustic Audit Acoustic Audit Emission Turbine Acoustic Testing (IEC 61400-11:07)

REA Requirements Wind Turbine Receptor Audit Acoustic audit at five (5) receptor locations Two separate audit periods (one spring, one fall) Wind Turbine Noise Emission One test on each turbine type 3.0 MW 104.8 dba 2.9 MW 102.9 dba Transformer Substation Acoustic Audit of two (2) Transformers Sound Emissions Nearby Receptor measurements

Transformer Acoustic Audit Noise emission Testing in accordance with the IEEE Standard C57.12.90 and NPC-233 Transformer sound power levels reported and compared to maximum sound power levels specified in Schedule B of REA Tonal audibility of transformer assessed Nearby Receptor measurements Near field and receptor based measurements, compliance assessed at the receptor with regards to sound pressure level and tonal audibility

Receptor Acoustic Audit Five (5) locations to be monitored as required by the REA Receptor locations chosen based on worst case impact and prevailing downwind conditions Measurement procedure and analysis based on MOECC guideline - Compliance Protocol for Wind Turbine Noise Measurement during night-time (10pm to 5am) Data set 120 one-minute intervals for Turbine ON. Between 4-7m/s (10m height). Each bin (+/- 0.5m/s) 60 one-minute intervals for Background. Between 4-7m/s Placement of monitoring equipment (5 stations) for ~4 weeks

Noise Emission Audit (IEC 61400-11) Two (2) turbines to be tested as required by the REA One (1) test per each turbine type: 3.0 MW 104.8 dba T03 2.9 MW 102.9 dba T46 Acoustic emission measurements performed in accordance with the CAN/CSA-C61400-11:07 National Standard. Equivalent to IEC 61400-11 Edition 2.1

Schedule COD: November 2 nd, 2016 Wind Turbine Receptor Audit Audit 1 12 months from COD November 2, 2017 Planned start Spring 2017 Audit 2 18 months from COD May 2, 2018 Planned start Fall 2017 Wind Turbine Emission Audit 12 months from COD November 2, 2017 Start Spring 2017 Transformer Audit 12 months from COD November 2, 2017 Start Spring 2017

Thank You Comments or questions? Payam Ashtiani PayamA@Aercoustics.com 416-249-3361

NIAGARA REGION WIND FARM

Topics of Community Interest Questions & Concerns Who to contact Project Ownership & Community Investment Technical Turbine Questions Health-related Questions Water Wells Transmission Line Guiderail Installation Tree Replacement Plans

Contacting NRWF with Questions & Concerns Your Questions and Concerns are welcomed Complaints are logged and tracked NRWF must report all environmental complaints to the MOECC Complainants will receive an acknowledgement within 48 hours To contact the Niagara Region Wind Farm: Phone: 1-844-363-6491 Email: info@nrwf.ca Website: www.nrwf.ca

Project Ownership & Community Investment NRWF is owned & operated by Boralex Inc. As of January 18, Boralex Inc. completed the purchase of shares previously owned by ENERCON Canada. Six Nations of the Grand River Development Corporation is also a project owner but is not involved in operating the Wind Farm Community Investment NRWF will spend in excess of $80 million during the lifetime of the project on such items as taxes, local contractors, land lease agreements, etc. Community Fund Agreements exist with West Lincoln, Wainfleet, and Haldimand County and are payable annually on April 30 Long-term jobs are created through direct employment with the Operations team including maintenance, monitoring and other support roles and indirect employment opportunities including jobs created at three tower and component manufacturing facilities

Technical Turbine Questions The 230MW capacity of the Niagara Region Wind Farm is comprised of seventy seven (77) ENERCON E-101 turbines. The nominal power rating of this turbine model is 3MW. 66 turbines operate at 3MW and 11 are de-rated to 2.9MW (T18, 33, 34, 45, 46, 47, 53, 55, 60, 74) These turbines generate electricity at wind speeds of 2 metres per second or greater (up to 28-34m/s) Turbines are lit according to Transport Canada requirements. Not all turbines require lighting depending on their location/proximity to other turbines.

Health-related Questions Health-related information about Wind Farms Health Canada website www.hc-sc.gc.ca CanWEA Website http://canwea.ca/wind-facts/your-health/ Ontario s Chief Medical Officer of Health, CMOH Report, May 2010: the scientific evidence available to date does not demonstrate a direct causal link between wind turbine noise and adverse health effects. The sound level from wind turbines at common residential setbacks is not sufficient to cause hearing impairment or other direct health effects, although some people may find it annoying.

Water wells As per the project s REA approval, both pre- & postconstruction groundwater monitoring must be done and annual reports submitted to the MOECC District Manager Home owners in prescribed zones were approached by mail and door-to-door in 2015 and pre-construction samples taken and analyzed from those who elected to participate Post-construction sampling has been completed proximal to the T-line (and report submitted to and approved by NEC) Post-construction sampling will commence in 2017 for homes proximal to turbines. Final samples will be taken in 2018 and reports submitted to MOECC Any specific concerns or issues with water wells should be raised directly with NRWF please use email and phone contact information provided

Transmission Line Pole placement is closer to travelled road surface on some roads than others a multitude of factors determined the location of poles including: Sight lines & Clear zones Setbacks from private land Drainage Other infrastructure (hydro, telecommunications, pipelines) Section of underground T-line on Regional Road 45 is the result of the need to avoid interference with other infrastructure in the right-of-way

Transmission Line (continued) Several comments about whining or pinging noises from the transmission line were received prior to this meeting Any noise-related concerns about the Transmission line should be reported directly to NRWF please use email and phone contact information provided

Guiderail Installation Guiderail installation is a safety measure to protect motorists which is required by applicable guidelines and enforced by the Road Authority The guiderail installed by the project was designed, reviewed and stamped by a licensed Engineer in the province of Ontario Upper Canada Consultants (UCC) designed all installations and has reviewed and signed-off on the safety and completeness of the guiderail installed

Tree Replacement Plans Tree replacement commitments to each municipality and region are set out in individual Road Usage Agreements (RUAs) Implementation plans are being discussed with municipalities and once finalized, NRWF will share details via the project s website www.nrwf.ca

DISCUSSION & QUESTIONS

Moving forward Meeting minutes will be available online in Community Liaison Committee Documents http://www.nrwf.ca/project/ Next CLC meeting timeframe Boralex will continue to offer CLC meetings twice yearly for as long as there is interest

Thank you! Your attendance and participation is valuable and appreciated. To contact the Niagara Region Wind Farm: Phone: 1-844-363-6491 Email: info@nrwf.ca Website: www.nrwf.ca

NIAGARA REGION WIND FARM

APPENDIX Ad ran in Niagara This Week (2x) Grimsby Lincoln Pt Colborne Leader Dunnville Sachem NewsNow (1x)

APPENDIX - RE WATER WELLS underground T line testing: - Conclusions of the report are: 1) no decline or fluctuation in water level attributable to underground transmission line construction activities, 2) post-construction water quality were generally consistent with pre-construction quality with fluctuations of chemical parameters expected to be naturally occurring an dnot related to the construction of the underground transmission line, 3) no complaints received providing further evidence that construction activities have had no detrimental impact on the function of private wells located within 120 m of the underground transmission line.

CLC #3 Action Items - Debentur implication Letters from Upper Canada Consultants (UCC) confirming guiderails conform to design and standards in each municipality Site visit re: guiderails took place as requested Tree Replacement plans TBA Stump grinding completed 11 residents elected to participate in groundwater monitoring (of 420 landowners contacted) Maximum depth of turbine foundation piles is 47m, average depth is 33m (measured from bottom of foundation) Road surface quality on Highway 20 confirmed acceptable Legal implications of debentures? CLC meeting notification process improved per requests with direct contact to those who requested it and additional advertising