Construction Waste on Campus

Similar documents
CONSTRUCTION WASTE MANAGEMENT PLAN

Construction Waste Minimization and Reuse Management

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Construction & Demolition (C&D) Materials Management in the Northeast in 2013 December 7, 2017

Venable Hall Demolition recycling and waste management

Research Topic LEED Guide for Trade Contractors

Construction and Demolition Waste Used as Recycled Aggregates in Concrete: Solutions for Increasing the Marketability of Recycled Aggregate Concrete

HIGH PILED COMBUSTIBLE STORAGE CITY OF NOVI SUBMITTAL CHECKLIST In Accordance with Chapter 23 of the 2006 International Fire Code

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Presented by: Amy Stooksbury DENSO Manufacturing Tennessee, Inc. 10/17/2016

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

LEED Analysis of the Knight Management Center. Energy & Atmosphere. Materials & Resources

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates

Property Condition Assessment

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

A study on construction and demolition wastes from buildings in Seberang Perai

Construction and Demolition Material Recycling Program

APPENDIX G GUIDELINE FOR INTEGRATED MANAGEMENT OF CONSTRUCTION WASTE

Construction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016)

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

2018 British Columbia Building Code Public Review of Proposed Changes

CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Procedure for Department Managed Repair and Renewal Projects Under $15,000

C&D/wood debris management trends

GN18: BREEAM Recognised Responsible Sourcing Certification Schemes and BREEAM Scheme Applicability V3.1

STRUCTURAL CONDITION ASSESSMENT

Features & Amenities. EXTERIOR FINISHES COMMUNITY FEATURES

Davis Frame Co., Inc. Construction Budget Considerations

RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing

Tompkins County Solid Waste Management Plan Executive Summary

Cheldelin Middle School

BOMA BEST Sustainable Buildings 3.0 Waste Auditing Requirements

Beginning of the Course

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

ARCHITECTURE/ ENGINEERING

Thermasheath -3. Insulation for the Building Envelope ROOF WALL SPECIALTY

Waste benchmarking in Portfolio Manager for colleges and universities

Commercial and industrial waste in Sydney. Overview. Department of Environment, Climate Change and Water NSW

WATERPROOFING TAMKOWATERPROOFING.COM

Technical Bulletin. No. 21 : Insulating Basements and Crawl Spaces (Revised 7/04) hwinsulation CONTRACTORS ASSOCIATION OF AMERICA

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

LABORATORY 8: WASTE AND RECYCLING AT PLU Due November 7 th or 9 th

Building Inspection Report

MODULAR BUILDING SPECIFICATIONS

Waste Management Solutions. Canberra

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

Building Design Data

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

CENTRAL GREAT PLAINS SERIES

RSMeans Contractor s Pricing Guide Residential Repair & Remodeling Costs 2015

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

Arizona Department of Environmental Quality Annual Waste Reduction and Recycling Questionnaire

LEED-2009 Green Building Rating System. New Construction & Major Renovations

H 7033 SUBSTITUTE A AS AMENDED ======== LC003107/SUB A ======== S T A T E O F R H O D E I S L A N D

MICHIGAN WOOD WASTE A CIRCULAR ECONOMY OPPORTUNITY!

Homes at Pine Ridge - NEW CONSTRUCTION SPECS

CI/Sfb (2 ) Rn7 M2 Fourth Issue June Product Selector INSULATION FOR ROOFS, WALLS & FLOORS. Low Energy Low Carbon Buildings

New Homes Starting at $124,900

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Qualifying Process for Handyman Online Qualifying Questions. Name: Street Address: City: State: Zip Code. Home Phone: Cell Phone: Address:

Land Reclamation Site Siting and Application Guidelines

Ohio s Historic Courthouses

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

MANHATTAN COLLEGE STUDENT COMMONS

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

Seal Harbor Development 1 Nagog Park Acton, MA 01720

HERRON Enterprises USA, Inc.

SYLLABUS 8/14/2012 CONE- 231 Construction Estimating Fall, 2012 Rev. 0. Course Syllabus. Fall, 2012

ISO Types 1-6: Construction Code Descriptions

THE STRATA UNIT May 25, 2008

Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification

CAREERS. in the Construction TRADES

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

Concrete weighs about 150 pounds per cubic foot

Historic Preservation Commission

RECYCLING CONSTRUCTION AND DEMOLITION WASTES A Guide for Architects and Contractors

Table 11: Active C&D Debris Facilities in Florida (November 1998) DISTRICT C&D Disposal Land Clearing Debris Disposal

Three Great Steel Panels

JMU Capital Projects SWaM Outreach Event Presentations

Sustainability of Corrugated Cardboard Houses as Temporary Emergency Shelters

Limited Asbestos Demolition Survey

BUILDING YOUR HOME the right way

AN EXAMINATION OF WOOD RECYCLING PROVISIONS IN NORTH AMERICAN GREEN BUILDING PROGRAMS

Recycled Content & Certifications. Green Building Standards. Total 3 rd Party Recycled. Certifications Content

Residential Planning Guide Clear-Span Custom Design Post-Frame Efficient Low Maintenance

BuildingName The Description of the Project P DOCUMENTS

AVID Intelligent Home Plans

Zukunftsbau GmbH, Strelitzer Str. 60, D Berlin The European qualification passport has been developed in cooperation with

i. --==1 ~-=~ I... ~~~=-I .L._ -==dl F=..

PERFORMANCE PROGRESS REPORT SF-PPR. 2. Federal Grant or Other Identifying Number Assigned by Federal Agency 60NAN B

Table of Contents. Page Title

INFORMATION SHEET. To demolish the entire building to the foundation will require a demolition permit (Form 6).

Construction Management. Germantown Maryland Dr. David Riley

WOOD USE IN NONCOMBUSTIBLE BUILDINGS

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Transcription:

McClelland 1 Scott McClelland GEOS 206 Professors Dethier & Art Construction Waste Paper May 13, 2008 Construction Waste on Campus Figure 1. Construction and demolition waste. As concerns for climate change continue to gain attention, institutions are inclined to look into sustainable design. The creation of the Leadership in Energy and Environmental Design or LEED rating system for buildings and its growing popularity is a testament to this assertion. Consequently, many people have a gained a better understanding of the features of sustainable design; however, a few of these ideas remain hidden from the limelight of green building. The recycling and reuse of construction and demolition waste (C&D waste) is one of these less popular attributes. Version 2.2 of LEED for New Construction & Major Renovations has a section titled Materials & Resources that focuses for the most part on reducing waste that is

McClelland 2 produced on-site and hauled to landfills during building projects. The primary requirement for the Materials and Resources section is to provide an easily accessible area that serves the entire building and is dedicated to the collection and storage of non-hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics and metals 1. To gain one point toward LEED certification, this section requires that a construction project must recycle and/or salvage at least 50% of non-hazardous construction and demolition debris as well as developing and implementing a construction waste management plan that, at a minimum, identifies the materials to be diverted from disposal and whether the materials will be sorted onsite or co-mingled 2. Figure 2. Logo of Waste Management Recycle America, the facility that collects recyclable commodities from surrounding areas, including the College s C&D debris, then ships these materials in bulk to appropriate recycling facilities. If project managers are feeling particularly ambitious, they can recycle 25% more (75% overall) of the afore mentioned debris for an additional point in the rating system 3. Since it is possible to recycle up to 90% of C&D waste, this is not impossible. This goal becomes more complicated, however, once labor and energy cost efficiency are taken into consideration. Transporting waste large distances to recycling facilities can produce more pollution than transporting the waste to a landfill depending on the distance and the mode of transport. Fortunately, this is usually not the case, and the transport of waste to and disposal of waste in landfills often require more energy than does recycling waste. This is also true when comparing the energy required in using raw construction materials versus recycled ones. Using 1 U.S. Green Building Council, LEED for New Construction & Major Renovations, Version 2.2, 43, http://www.usgbc.org/displaypage.aspx?cmspageid=220 2 Ibid., 47. 3 Ibid., 48.

McClelland 3 recycled materials often demands less energy than purchasing new supplies. These facts coupled with reports stating that construction waste alone excluding demolition debris accounts for 8% of the College s total waste 4 and nearly 20% of the total municipal solid waste produced by the United States make waste management on the construction site imperative for environmental sustainability 5. Although Williams College has yet to complete a LEED certified building on campus, it has been practicing C&D waste management on a gradually increasing scale for some time now. It is not known when the College first began to manage and recycle waste from building projects, but it likely began in earnest with the parking garage in Greylock quad since that is the first building that Barr and Barr, a construction management firm, built for the college. Barr and Barr has committed to a level of environmental sustainability on Williams campus constructions, spurred by pressure from the College. Unfortunately, Barr and Barr did not begin documenting C&D waste until the demolition of Baxter Hall and the construction of Paresky Center --due to a change in mandates from Hopkins Hall and Facilities. Recently Barr and Barr has begun the North and South Academic building project which is to be LEED certified, ensuring that the C&D waste will be well taken care of and recorded by both the firm and the College (Figure 3). Since there is little demolition taking place in the North and South Academic building project (disregarding the Stetson Sawyer part of the project), this paper will focus on recycling and reuse of construction waste. 4 White, 3. 5 Ibid., 1.

McClelland 4 Figure 3. Rolloff dumpster for mixed C&D waste on the construction site of the North and South Academic Buildings. This is one example of how Barr and Barr has committed to managing its construction waste. Before analyzing what happens to the waste that leaves the North and South Academic building, it is crucial to understand its composition. On the whole, construction waste typically comes from scrap material and packaging. By scrap materials, I mean any left over pieces of material used to construct the building. To cover exactly what types of scraps come out of a construction site effectively, a level-by-level analysis of a building is ideal. 6 Beginning with the basement or the below-grade levels, the primary wall and floor components are concrete, steel rebar, and steel mesh. Steel rebar and steel mesh are reinforcement elements for the concrete. On the exterior of these basement walls tar and foam boards are applied for waterproofing and insulation respectively. The basement typically holds the mechanics of a building such as the furnace, hot water heater, fuse box, and so on. Although none of these appliances themselves produce construction waste, their attachments do. By attachments I mean piping and wiring. Piping is generally made of either metal or plastic. Copper, steel, and galvanized steel (steel covered with a zinc coat to prevent rust) make up the 6 See Table 1.

McClelland 5 bulk of the piping market but plastic piping made of PVC is widely used as well. Wiring is somewhat diverse in terms of materials since it may vary given the conditions under which it is required to operate. By and large however, wire is usually composed of the metals aluminum and copper with some sort of plastic or rubber sheathing. These are the most elemental basics of the sublevel floors. Figure 4. Photograph of the digging of the foundation for the South Academic Building. Possible materials that could be diverted from disposal in this photograph include concrete, wood beams, metal piping, copper wire, and plastic packaging. See Table 1 for a more comprehensive list of construction and demolition debris.

McClelland 6 Table 1. Breakdown of Construction and Demolition Waste for Williams College s North & South Academic Building Project: Scrap Materials and Packaging. Purpose of Scrap Materials Roofing Interior Exterior Structural Purpose of Packaging Materials Wrappings Packing Fill Pallets Containers Scrap Materials Used Metal, wood, slate, asphalt Plasterboards gypsym, paper Flooring tiles wood, plastic, rubber, slate Wiring metal, rubber, plastic Piping plastic, ceramic Brick, stone, lumber, vinyl Studs wood, metal Supports and Beams wood, steel Packaging Materials Used Plastic Styrofoam, Plastic Wood Wood, Cardboard, Plastic Some sublevels are used for other purposes other than housing the mechanics of the building; for instance, Paresky Center uses part of its sublevel area for a bar, recreation area, theater, and deli. If this is the case, then much of the material used to create these interior spaces are the same as those of the above ground interior spaces. Support for these upper levels usually comes from wood, steel I-beams, or reinforced concrete. Steel decking or plywood is then laid down over these supporting elements. Flooring is highly varied and can be made of anything from stone to synthetic polymers. More specifically flooring includes stone slates, hardwoods, ceramic tiles, carpeting, laminates, vinyl, and linoleum. The synthetic nature of vinyl flooring comes from its chlorinated petrochemical base, thus rendering it as very unfriendly to the environment 7. Contrary to belief however, linoleum flooring is not the same case. Since it is made of renewable all-natural ingredients, this flooring type is considered to be more environmentally friendly than both laminates and vinyl and in some cases hardwoods (depending 7 Cynthia Sanz, Linoleum Lives On, This Old House, 1, http://www.thisoldhouse.com/toh/article/0,,202857,00.html

McClelland 7 on whether the hardwoods are treated with some sort of chemical) 8. Moving from the floor to the interior walls, we encounter quite a different assortment of materials. Evenly spaced vertical posts that are called studs typically support these interior walls. These studs are either metal (aluminum or steel) or wood. To cover this framing, materials such as gypsum wallboard, wood, or some type of vinyl wallboard is used. This is very much the same for the ceiling as well. In addition, the interiors of both the wall and ceiling likely have wire and piping running through them. The construction of built-in furniture, counters, storage space, and so on are likely to produce scrap lumber in most cases. The exterior walls often produce scrap material in masonry, stone, brick, concrete, lumber, some types of metal, and in minimal cases vinyl siding. Insulation is another factor to be considered in exterior walling. While insulation is made of a variety of different materials, most of it is synthetic like fiberglass and polystyrene. The roof of a structure begins with steel or wooden supports that hold up either steel decking or plywood. Some sort of waterproofing material is then laid on top. This material is often tarpaper. It is often determined by whether the roof is flat or pitched as to what goes on top of the tarpaper. Flat roofs are generally covered in tar and gravel or some kind of synthetic rubber membrane. Pitched roofs however, have a much wider range of options. Metals such as copper and aluminum are popular as well as asphalt shingles, ceramic tiles, or wooden shakes. 8 Ibid, 1.

McClelland 8 Figure 5. Additional examples of both scrap materials and packaging waste from the North and South Academic Buildings construction site. Although I certainly haven t covered everything that might produce scrap material on a construction site, this is a fairly thorough overview. To sum it up in a more succinct manner, these materials include metals such as steel, galvanized steel, copper, aluminum or stone that may come in the form of slate flooring, slate roofing, countertops, bench tops, and so on. Other material scraps consist of lumber, ceramic tiles, laminates, linoleum, carpeting, vinyl wallboard, gypsum wallboard, insulation, rubber, plastic, synthetic membranes, asphalt shingles, and tar. Contrary to what facts may imply, leftover brick, masonry, concrete, and gravel do not make of the bulk of construction scraps or leftovers. Waste management currently measures C&D waste by weight and since masonry, concrete, etc. are heavy materials they may achieve high weight measurements with much less volume than, for instance, wood. It is true however the demolition waste can produce large quantities of concrete rubble and whatnot. Aside from construction scraps, building projects produce a surprising amount of packaging material waste.

McClelland 9 Packaging material used to protect glass windows, furniture, appliances, and utilities usually consist of cardboard, wood, or plastic. Some of this packaging can be returned to the appropriate company for reuse. For instance, some quarries will take back the wooden pallets on which they transport stack stones for further use. For the most part, the plastic and the cardboard are recycled. Figure 6. Allied Waste Services hauls the sorted waste from the North-South Academic Building construction. The collection of construction waste is a relatively simple enterprise. The difficulty comes in figuring out where to ship this waste and how to ship it efficiently. For the North and South academic building project, Barr and Barr has signed an agreement with Allied Waste Services concerning the collection and shipping of the waste. Allied Waste Services is a waste management company that specializes in the collection and transportation of solid waste. The collection system employed by the company is a fairly simple process that involves a series of dumpsters provided by Allied Waste. Each of the dumpsters is designated for a certain type of construction waste including plastic, clean metal, cardboard, and commingled construction and demolition debris (mixed C&D).

McClelland 10 Figure 7. Example of on-site sorting of recyclable C&D waste. Allied Waste designates dumpsters for different types of waste. Collecting scraps and packaging waste is both a less intensive and cleaner process than sorting demolition debris. When the rolloff dumpsters are full, Allied Waste Services picks them up to be taken to recycling centers such as the WM Recycle America facility in Springfield, MA. These recycling centers provide further collection and distribution allowing for the efficient transportation of waste. For example, the recycle centers ensure that a constant stream of fully loaded transportation containers is sent to facilities that reprocess or reuse the waste. This system of collection and distribution firms ensure that C&D waste is handled in an efficient and reasonable manner. As of March 2008, Allied Waste Services has collected 448.04 tons of construction waste from the North and South Academic building project 9. This figure does not include the 369 tons of brick and concrete waste produced by J.H. Maxymillian, Inc. s site work of road and sidewalk 9 Douglas Schlaefer from Barr and Barr, interview by author, Williamstown, MA, April, 2008.

McClelland 11 removal, all of which were recycled 10. Of the 448.04 tons of waste managed by Allied Waste Services, 251.01 tons came from commingled C&D (miscellaneous category of construction material), 126 tons from concrete and brick, 7.88 tons from plastic, 44.01 tons from steel, and 19.14 tons from cardboard 11. All of these, with the exception of commingled C&D waste, were recycled 100% 12. Only 25% of the commingled C&D waste was recycled since it probably contains materials such as synthetic membranes that are hard to recycle or hazardous materials 13. Barr and Barr categorizes and reports C&D recycling to the College on a monthly basis (Table 2). Table 2. Recycled materials from the construction of the Williams College North & South Academic Buildings (courtesy of Allied Waste Industries, Inc.). Type of Waste Tons % Recycled Tons Recycled Commingled C&D Totals 251.01 25.00% 62.75 Recycled Concrete/ Brick Totals 126.00 100.00% 126.00 Recycled Plastic Totals 7.88 100.00% 7.88 Recycled Steel Totals 44.01 100.00% 44.01 Recycled Cardboard (OCC) 19.14 100.00% 19.14 Totals PROJECT TOTALS 448.04 57.09% 259.78 With 57.98 percent of the C&D waste recycled, the project is on track to receive at least one point toward its LEED Certification. According to Barr and Barr the project is doing well since it was originally projected to recycle only 50% of its C&D waste. In addition to recycling and reusing C&D waste from the North and South Academic buildings, Barr and Barr has made efforts to reduce potential waste from even reaching the 10 Ibid. 11 Ibid. 12 Ibid. 13 Ibid.

McClelland 12 construction site. For instance, carpets are pre-ordered in the dimensions of the rooms that they will be used in, reducing the amount of scraps produced by cutting down carpets to fit certain rooms. Ordering materials as accurately as possible is crucial to reducing unnecessary waste from materials especially those that are difficult to recycle, such as paint, tar, lumber, etc. If planned carefully, reducing waste at the source is both practical and efficient and is the first logical step toward overall minimization of waste. Figure 8. Gypsum recycling center. As well as recycling C&D waste and feeding the supply market, the College is strengthening the demand as well by using recycled content material in the construction of the North and South Academic buildings. Recycled content material is typically material that is composed or partially composed of recycled material. Currently the college is using recycled content metal studs, rebar, lean concrete, bricks, bar steel, steel decks, copper roofing, fire proofing, wood doors, gypsum, and carpets 14. The use of these materials is critical in perpetuating recycling. Fortunately, Barr and Barr has no complaints concerning these materials. Hopefully this will remain the case in the future. The C&D waste stream coming out of the North and South Academic buildings is well documented by Barr and Barr and a fair amount of the debris is recycled. There is some ambiguity as to what comprises the commingled waste category, but it is likely that better measures could be taken toward recycling it. Aside from this, the project has a decent record in 14 Ibid.

McClelland 13 C&D waste management. With this in mind, it seems that the smaller projects on campus are the ones that need more attention in waste management. It is difficult to reduce land filled waste from small projects for several reasons. The lack of large firms to manage specialized areas leaves no one to focus solely on managing the waste from the project. Other problems include the lack of efficiency and feasibility in transporting small quantities of certain waste materials to distant and diverse locations. Although these loads may seem small individually, they build up significantly over time. To combat this problem, the College might hire an individual as a specialist of solid waste management on campus. This person could initiate a reduction in land filled construction waste coming from the college. One initiative could be closer monitoring of College dumpster bins. While rolloff dumpsters do exist at the campus Agway for different waste streams--including construction and demolition debris--, these bins often end up in landfills, because they are contaminated with non-recyclable materials due to poor labeling and supervision. On the whole Williams College does not fare badly when it comes to managing its construction waste; however, we could improve significantly if we give it greater priority. And the considerable volume and cost related to hauling and disposing and/or recycling of construction waste strongly suggests that we do so. Editor s note: David Dethier, Amy Johns and Katie White edited this paper.

McClelland 14 Bibliography Kincaid, Judith E., Cheryl Walker and Greg Flynn. Waste Spec. Model Specifications for Construction Waste Reduction, Reuse, and Recycling (Triangle Park, NC: Triangle J Council of Governments, 1995). http://www.recyclecddebris.com/rcdd/resources/documents/csnmodelspecwastered uction.pdf. Sanz, Cynthia. Linoleum Lives On. This Old House. http://www.thisoldhouse.com/toh/article/0,,202857,00.html Schlaefer, Douglas from Barr and Barr. Interview by author. Williamstown, MA, April, 2008. U.S. Green Building Council. LEED for New Construction & Major Renovations, Version 2.2. http://www.usgbc.org/displaypage.aspx?cmspageid=220 White, Katie. Solid Waste at Williams College: A Luce Foundation Report. September 2007.