Approved for public release; distribution is unlimited.

Similar documents
Counterfeit Parts Prevention

The Counterfeit Parts Prevention procedure applies to all employees within the company and extends to our suppliers and outsourced services.

Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers.

Counterfeit Part Prevention & Mitigation Process

AMRDEC Counterfeit Risk Management Recommendations

Counterfeit Parts: A Lockheed Martin perspective

Counterfeit Electronic Parts Risk Management Plan

AEROSPACE AS6174 REV.

SUPPLIER QUALITY REQUIREMENTS (SQR S)

Review of US Air Force Parts, Materials and Processes (PMP) Requirements

Quality System Document DOC #

MIL System Overview EEE Parts

9100 revision Changes presentation clause-by-clause. IAQG 9100 Team November 2016

Counterfeit Mitigation

ALTA Precision Inc. Quality Procedure

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

PERFORMANCE SPECIFICATION HYBRID MICROCIRCUITS, GENERAL SPECIFICATION FOR

Parts Management Implementation Spring LMI. PSMC Spring

12. Inventory - Receiving & Shipping

2. GENERAL REQUIREMENTS

DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

Military Specifications Current and Future Trends Larry Harzstark Distinguished Engineer The Aerospace Corporation 1 November 2012

July 23, DNV Business Assurance. All rights reserved.

ECIA. Publication. Certificates of Conformance for Commercial Electronic Parts NIGP September Electronic Components Industry Association

Supplier Quality Requirements Q Clauses

SHELTON INDUSTRIAL PATTERN INC.

Mitigating risk of counterfeit parts in the electronic parts supply chain

SUPPLIER QUALITY CODES

Subcontractor Product Assurance Requirements L3-FOS

JEDEC s New JESD243: Is It an Industry Standard for Counterfeit Electronic Parts or Something Less?

GENERAL PRODUCT SPECIFICATION CONTROL DRAWING

QUANTUM IMAGING QUALITY ASSURANCE PROVISIONS

Quality Supplier Requirements for Beckwith Electric Co., Inc.

Gray Market Distributor Workshop

QSP Purchasing SUPPLIER QUALITY ASSURANCE REQUIREMENTS

Vol. 2 Management RFP No. QTA0015THA A2-2

Quality Management Manual

Results of Mitigation Effectiveness Survey

SOSi SUPPLIER CODE OF CONDUCT

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions

REFERENCES Overview Quality Assurance Engineering Program...5

Appendix QX Supplier Quality Requirements

Class 3 Threaded Fasteners Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions

Altech Machining, Inc. Terms and Conditions

DOW-KEY MICROWAVE CORPORATION PURCHASE ORDER QUALITY REQUIREMENTS

An updated Application-Specific Tin Whisker Risk Assessment Algorithm, and its use within a process compliant to GEIA-STD

QP-137. Unknown Issue Date 5/19/15. & Completeness. Notes:

Class 2 Threaded Fasteners Qualified Suppliers List (QSL) with Criteria and Provisions

Points of Contact GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM. GIDEP Program Office: GIDEP Operations Center:

DMSMS Orientation---

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. A Update drawing to the latest requirements of MIL-PRF gc Charles F.

DEPARTMENT OF DEFENSE STANDARD PRACTICE

QUALITY ASSURANCE PROCUREMENT PROVISIONS

ISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual

Counterfeit Parts in DoD s Supply Chain: TechAmerica Webinar on Section 818 of 2012 NDAA April 16, 2012

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Document Change Notice (DCN) Form

EEE COMPONENTS LONG TERM STORAGE Long Term Storage Workshop ESA / ESTEC (7 th June 2016)

Customizing Processes for Hermetic Assembly Of Devices Designed for Plastic Packages (1 of 3)

Support Services. Engineering solutions for operational excellence SERVING THE WORLD S RAILWAYS. Technical

QUALITY ASSURANCE PROVISIONS (QAP)

Manufacturing Management External Provider Requirements TABLE OF CONTENTS

A S D T R A N S L A T E D I N T O P L A I N E N G L I S H 8. O P E R A T I O N S

Electronic Components Basics

Delivering End-to-End Supply Chain Excellence

DETAIL SPECIFICATION WIRE ROPE ASSEMBLIES, AVIATION, SWAGED TYPE

REVISION RECORD AND DESCRIPTION CONTINUED ON NEXT PAGE.

logicom Your complete database of US military parts and logistics Your Privacy Ascot, Berks, SL5 7EU UK

RC-9000 Supplier Quality System Requirements

ISO Standards in Strengthening Organizational Resilience and Mitigating Risk while Addressing Quality and Sustainability

IMMEDIATE POLICY CHANGE

Supplier Quality Standard

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

SUPPLIER QUALITY PROCUREMENT REQUIREMENTS

Plan QAQ Supplier Quality Requirements (Rev 17)

QUALITY SYSTEM MANUAL

RESOLUTION COST METRICS FOR DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES

General Supplier Requirements and Expectations

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Nondestructive Internal Inspection. The World s Leading Acoustic Micro Imaging Lab

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

C-TPAT Minimum Security Requirements Importers

Understanding Supply Chain Risks

Organized Chaos 2012 ERAI Executive Conference Mark Northrup ( VP Advanced Technical Operations & Strategy )

Oversight and Monitoring in Public Procurement in the Republic of Serbia

SQ-100 Supplier Quality System Requirements Revision H, Dated October 2, 2017

REVISION RECORD AND DESCRIPTION CONTINUED ON NEXT PAGE.

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

The leading parts and logistics management system.

CORPORATE QUALITY MANUAL

HP Standard Supplier Requirements for Safe and Legal Products

Summary of TL 9000 R4.0 Requirements Beyond ISO 9001:2000

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

APPENDIX B Corrosion Management System Framework and Guidance

Security Procedure - Participation / Certification in Foreign Customs Administrations Supply Chain Security Programs

Materion AMTS Supplier Quality Manual

AS9003A QUALITY MANUAL

Contract Risk and Compliance & Warranty Fraud. David Maberry Chief Risk Officer American Fidelity Assurance Company

Transcription:

Avoiding Counterfeit Electronic Components NASA Quality Leadership Forum, March 28 & 29, 2007 Counterfeit EEE Parts Panel Henry Livingston, BAE Systems

Definitions Counterfeit Electronic Component Equipment Manufacturing Industry Semiconductor Manufacturing Industry Independent Distributor Industry U. S. Government An Aerospace and Defense Equipment Manufacturer s View What is a counterfeit electronic component? What is not? 3/12/2007 H. Livingston 2

Electronics Manufacturing Industry Definition The following definition* was developed by the Electronics Manufacturing Productivity Facility (EMPF) of the American Competitiveness Institute (ACI) Counterfeit electronic components and boards are defined as: Substitutes or unauthorized copies of a product A product in which the materials used or the performance of the product has changed without notice A substandard component misrepresented by the supplier Per recent correspondence with the ACI/EMPF, the second item applies to changes in materials or performance made by the original part or material manufacturer without notifying the user before offering the part. * B. Partee, Counterfeit Components, (December 2003), http://www.empf.org/empfasis/archive/1203conterfeit.htm B. Partee, Empfasis article - Counterfeit Components (December 2003), bpartee@aciusa.org, e-mail received 1 November 2006 3/12/2007 H. Livingston 3

Semiconductor Manufacturing Industry Definition The following definition was provided by Anti-Counterfeiting Task Force (ACTF) of the Semiconductor Industries Association (SIA) * (derived from the ACI/EMPF definition) Counterfeit electronic components are defined as: Substitutes or unauthorized copies of a product A product as defined by the manufacturers part number ID, date code and Manufacturers ID in which the materials used or the performance of the product has changed without notice by someone other than the original manufacturer of the product. A substandard component misrepresented by the supplier * J. Stradley (chairman), Anti-Counterfeiting Task Force, December 05, 2006 3/12/2007 H. Livingston 4

Independent Distributor Industry Definition The following definitions* were developed by the Independent Distributors of Electronics Association (IDEA) Counterfeit Product: Items that are produced or distributed in violation of intellectual property rights, copyrights, or trademark laws. Fraudulent Product/Transaction: Items that are deliberately altered in such a way as to misrepresent the actual quality of the item with intent to defraud or deceive the purchaser. Any information omitted or means taken to mislead the purchaser to believe that such items are authentic or lawful. Using the Term "Counterfeit" Quality independent distributors do not typically use the term "counterfeit" unless the manufacturer of the product states that they have determined the product is counterfeit in writing. Instead independent distributors typically condition the term "counterfeit" with the word "suspect", meaning that based on the expertise that resides within that independent distributor's business that they suspect that the part may indeed be counterfeit. Additional definitions developed for Refurbished, used and unused parts Franchised Distributor, Independent Distributor, Broker * IDEA-STD-1010-A, Acceptability of Electronic Components Distributed in the Open Market. Copyright Independent Distributors of Electronics Association (IDEA) 2006 (http://www.idofea.org/) 3/12/2007 H. Livingston 5

U. S. Government Definition The following definition* was developed by the U.S. Department of Energy, Office of Environment, Safety and Health (Office of Corporate Performance Assessment) A counterfeit item is a suspect item that is a copy or substitute without legal right or authority to do so or one whose material, performance, or characteristics are knowingly misrepresented by the vendor, supplier, distributor, or manufacturer. A suspect item is one in which there is an indication by visual inspection, testing, or other information that it may not conform to established Government- or industry-accepted specifications or national consensus standards. Suspect items must be further investigated to determine whether they are counterfeit. When an item contains indications, but insufficient evidence, of irregularities such as noncompliance with agreed-upon specifications in the manufacturing process, it may be declared suspect. * DOE HS-32 Suspect/Counterfeit-Defective Items website (http://www.eh.doe.gov/sci)... S/CI-DI Process Guide (November 2004) S/CI Awareness Training Manual (October 2006) 3/12/2007 H. Livingston 6

Counterfeit Electronic Components An Aerospace and Defense Equipment Manufacturer s View A counterfeit item is one whose material, performance, or characteristics are knowingly misrepresented by the vendor, supplier, distributor, or manufacturer. (From a definition developed by the U.S. Department of Energy) Counterfeiting often involves cases where parts are offered that present a product substitution risk to the Government Equipment Manufacturer and to the Government user. Examples include Parts remarked to disguise parts differing from those offered by the original part manufacturer (e.g. original manufacturer, country of origin, specified performance) Defective parts scrapped by the original part manufacture Previously used parts salvaged from scrapped assemblies These are incidents that jeopardize the performance and reliability of electronics and are the subject of ongoing criminal investigations by the US Government 3/12/2007 H. Livingston 7

What is not a Counterfeit Electronic Component? An Aerospace and Defense Equipment Manufacturer s View The following methods are not associated with counterfeiting Refinishing parts to support assembly producibility and ensure equipment reliability Upscreening parts to satisfy customer requirements Uprating parts to assess their capability to meet the performance requirements of the application in which the part is used outside the manufacturer s specification range These are methods applied by Electronics Manufacturers and Government users to assure parts will fulfill equipment performance and reliability requirements 3/12/2007 H. Livingston 8

What is not a Counterfeit Electronic Component? An Aerospace and Defense Equipment Manufacturer s View Refinished parts Pure tin has been used by commercial industry for many years and has now become a popular Lead Free solution for part manufacturers who discontinued the use of a Tin-Lead (SnPb) terminal finish. As a result of the reliability issues presented by the use of pure tin and other lead-free components in high performance assemblies and systems, many manufacturers are looking for component level mitigation techniques to retain or increase the reliability of their products. One such method, known as solder dipping, involves replacing the unwanted finish of a component with a more desirable type. See GEIA-STD-0006 (draft), Requirements for Using Solder Dip to Replace the Finish on Electronic Components 3/12/2007 H. Livingston 9

What is not a Counterfeit Electronic Component? An Aerospace and Defense Equipment Manufacturer s View Upscreened parts Many Government customer requirements demand additional testing to ensure parts will meet equipment reliability demands. Examples include Particle Impact Noise Detection (PIND) testing to screen out parts containing free particles within the cavity of the package Sequential environment testing of plastic packaged parts that are not available as hermetic, military grade product offerings Radiation Hardness Assurance testing to meet space application requirements 3/12/2007 H. Livingston 10

What is not a Counterfeit Electronic Component? An Aerospace and Defense Equipment Manufacturer s View Uprated parts Uprating is a process to assess the capability of a device to meet the performance requirements of the application in which the device is used outside the manufacturer s specification range. Many device manufacturers have exited the military market in recent years, resulting in decreased availability of devices specified to operate over wide temperature ranges. If there are no reasonable or practical alternatives, then a potential response is for equipment manufacturers to use devices in temperature ranges that are wider than those specified by the device manufacturer. See EIA-4900, Use of Semiconductor Devices Outside Manufacturers Specified Temperature Ranges 3/12/2007 H. Livingston 11

Strategic & Proactive Approaches to Avoiding Counterfeit Electronic Components Distributor selection Franchised / Authorized Distributors Independent Distributors Risk Mitigation Methods to Avoid Counterfeit Electronic Components Outsourcing Electronic Component Procurement Aftermarket Supply Issues Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management 3/12/2007 H. Livingston 12

Franchised and Authorized Distributors The most effective approach to avoiding counterfeit electronic components is to purchase product Directly from the original manufacturer, or From a distributor, reseller or aftermarket supplier who is franchised or authorized by the original manufacturer Contractual bond between the original manufacturer and the distributor Original manufacturer warrantee Product integrity via proper handling, storage and shipping procedures Failure analysis and corrective action support Traceability via certificates of conformance and acquisition traceability Franchised distributors include large and small businesses, including Small Disadvantaged Businesses (SDB) Consult the original manufacturer for distributors, resellers or aftermarket suppliers who are franchised or authorized by the original manufacturer A substantial number of products, however, are no longer available through these channels. Independent distributors will continue fill this gap. 3/12/2007 H. Livingston 13

Independent Distributors Independent distributors purchase new excess inventories from end users with the intention to sell and redistribute back into the market. Independent distributors subsequently sell (re-distribute) the new parts from these excess inventories to fulfill inventory shortages with hard-to-find, obsolete, and competitively priced parts. End users are typically original equipment manufacturers (OEMs) and contract manufacturers (CMs) at locations all over the world. Independent distributors do not typically have limiting contractual agreements or obligations to the components manufacturers. From IDEA-STD-1010-A, Acceptability of Electronic Components Distributed in the Open Market. Copyright Independent Distributors of Electronics Association (IDEA) 2006 (http://www.idofea.org/) 3/12/2007 H. Livingston 14

A Case Study GIDEP Alert J5-A-07-01 (12/5/2006) BAE Systems expected to receive 5962-8768401QA with the QP Semiconductor manufacturer identification mark. BAE Systems received parts marked with Part Identifying Number (PIN) 5962-8768401QA, the Philips Semiconductor manufacturer identification and date code 0336. Philips Semiconductor discontinued producing all military grade products in 1997. Part marking did not include a country of origin mark required by MIL-PRF-38535. Parts contained die manufactured by Intel marked 1980. BAE Systems purchased these parts from Port Electronics Corp who purchased them from Aapex International Inc who purchased them from Newkoda (H.K.) Electronics Co who purchased them from Chao Yang Hualian Electronic Co who purchased them from? 3/12/2007 H. Livingston 15

Risk Mitigation Methods to Avoid Counterfeit Electronic Components The following mitigation methods can be applied to reduce the risk of receiving counterfeit parts when acquired through an independent distributor (e.g. broker ) Traceability Documentation Without certificates of conformance and acquisition traceability, the purchaser takes on unknown risks. The independent distributor s own acquisition certification should be in addition to the certificates of conformance and acquisition traceability provided by the manufacturer and previous distributors. Compliance Verification (authenticity analysis) Visual Inspection Testing Physical Analysis particularly when the independent distributor cannot produce certificates of conformance and acquisition traceability through their supply chain 3/12/2007 H. Livingston 16

Counterfeit Detection GIDEP documents reporting suspect counterfeit cases provide further insight into detection techniques The Independent Distributors of Electronics Association (IDEA) published a standard which includes inspection techniques for counterfeit detection IDEA-STD-1010-A, Acceptability of Electronic Components Distributed in the Open Market. Copyright Independent Distributors of Electronics Association (IDEA) 2006 (http://www.idofea.org/) Recent industry symposia include information on counterfeit detection techniques Counterfeit Components Detection and Prevention Symposium and Workshop 29-30 Nov. 2006 and 28 Feb 1 Mar 2007 (http://www.cti-us.com) 3/12/2007 H. Livingston 17

Caution These risk mitigation methods may not definitively distinguish authentic parts from counterfeits without Comparison to known authentic examples Assistance from the original manufacturer Without knowledge and verification of the handling, storage and shipping procedures applied throughout the supply chain, the purchaser takes on the risk of acquiring damaged parts Cases have been reported where samples from parts offered by a broker were examined to verify authenticity prior to shipment, but the parts subsequently shipped by this broker were counterfeit See GIDEP Alerts PD-A-06-01 and PD-A-06-02 3/12/2007 H. Livingston 18

Counterfeit Detection Support from Original Component Manufacturers Some original component manufacturers (OCMs) will provide support to users who believe they may have received counterfeit parts Example: Maxim Worldwide Security http://www.maxim-ic.com/sales/counterfeit_parts.cfm Obtaining support from OCMs can be a significant challenge OCMs have no obligation to provide support for products that are not acquired through their franchised or authorized distributors, resellers or aftermarket suppliers OCMs discourage users from purchasing their products from Independent Distributors 3/12/2007 H. Livingston 19

Independent Distributor Selection Source selection should include an assessment of the independent distributor s ability to verify the authenticity of the products they offer. Certificates of conformance and acquisition traceability Compliance verification via visual inspection, testing and physical analysis Purchasing and acceptance practices Subscribe to self-policing organizations Use of escrow services to hold the money until the independent distributor verifies the authenticity of products offered Use of net one or net two-day payment where the seller ships the parts and the distributor has one or two days to inspect and accept them before the distributor wires payment Examples of industry standards that can be used for evaluating the suitability of an independent distributor JESD31, General Requirements for Distributors of Commercial and Military Semiconductor Devices. (JEDEC http://www.jedec.org/download/) IDEA-STD-1010-A, Acceptability of Electronic Components Distributed in the Open Market. Copyright Independent Distributors of Electronics Association (IDEA) 2006 (http://www.idofea.org/) Vet the independent distributor in advance of procurement activity to ensure Suspect counterfeiting incidents have not occurred previously with this distributor The independent distributor has the financial means to support any contractual guarantees expected 3/12/2007 H. Livingston 20

Outsourcing Electronic Component Procurement Some users outsource procurement to another entity Electronics Manufacturing Service (EMS) provider Contract Manufacture The selection of an EMS provider or Contract Manufacturer should include audits of their methods and purchasing records to ensure their procurement practices mitigate the risk of acquiring counterfeit parts. Refer to Independent Distributor Selection 3/12/2007 H. Livingston 21

Aftermarket Supply Issues Some aftermarket sources produce finished products from a die bank Residual inventory of die no longer in production These aftermarket sources do not always issue End-of-Life notices or notify their industry and Government customers when die inventory is exhausted In one case, DSCC (not the aftermarket manufacturer) issued a notice when notified that die inventory had been exhausted A review of the GIDEP database showed no DMS notices issued by this manufacturer End-of-Life notices were not published on the manufacturer s website Users are encouraged to periodically contact aftermarket sources concerning their continued ability to supply products 3/12/2007 H. Livingston 22

Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management A significant driver for the use of independent distributors is the continued need for parts that are no longer produced by the original manufacturer. In order to reduce the likelihood of having to purchase parts through an independent distributor, Electronic Equipment Manufacturers should proactively manage the life cycle of their products versus the life cycles of the parts used within them. GEIA Handbook GEB1 includes key practices used during system development and support to mitigate the effects of future obsolescence. GEIA GEB1, Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Practices. 3/12/2007 H. Livingston 23

GEIA GEB1, Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Practices Phase 0 Phase I Phase II Phase III Planning for system upgrades in Phase I & II based upon Technology Insertion Solution Bridge buy to support production until redesign available Reclamation typically a last resort Proactive DMSMS Mitigation Approaches (4.1) Response to DMSMS Events (4.2) Concept Exploration Program Definition and Risk Reduction EMD / LRIP Production, Fielding / Deployment, & Operational Support Technology Road Mapping X X X X Planned System Upgrade 1 X X X Technology Insertion 1 X X X X Technology Transparency X X X X Life Cycle Analysis / DMSMS Monitoring X X X Alternate Source X X Substitution X X Emulation Life of Type Buy 2 X X Redesign / Design Modification 2 X X Reverse Engineering Reclamation 3 X X X 3/12/2007 H. Livingston 24

GIDEP Reporting for Counterfeit Parts Many suspect counterfeit component cases are reported via GIDEP using Failure Experience documents (AL, PA, AN, LL) These document types were designed for reporting quality or reliability deficiencies associated with parts, materials, etc. produced by a given manufacturer Failure Experience documents not well suited for reporting suspect counterfeit cases; Conventions used by participants are not consistent Manufacturer (Block 4) and CAGE (Block 12) sometimes used to identify the supplier of the counterfeit in other cases the manufacturer whose part was counterfeited is reported here Limited data fields to report additional suppliers involved a particular counterfeit case 3/12/2007 H. Livingston 25

GIDEP Reporting for Counterfeit Parts (continued) GIDEP planning to establish a new document type for reporting suspect counterfeits GIDEP issued interim guidance to GIDEP representatives for reporting suspect counterfeits using existing Failure Experience reporting vehicles See Weekly News - 22 January 2007 Guidelines for Reporting Suspect Counterfeit Products GIDEP point of contact Ms. Jinhee Graebe, Failure Experience Data Manager jgraebe@gidep.org 951-898-3245 3/12/2007 H. Livingston 26

GEIA G-12 Solid State Devices Committee Counterfeit Parts Task Group The GEIA G-12 Solid State Devices Committee develops solutions to technical problems in the application, standardization, and reliability of solid state devices. The G-12 Committee evaluates and prepares recommendations for specifications, standards, and other documents, both government and industry, to assure that solid state devices are suitable for their intended purposes. G-12 Counterfeit Parts Task Group Charter: To develop a set of guidelines that include mitigating strategies that can be used within the industry to mitigate the risk of receiving counterfeit parts from various supply chains. Operating Guidelines and Security Measures Mitigation of Part Damage Mitigating Strategies for future procurement of parts, materials, and processes GIDEP Reporting etc http://www.geia.org/ 3/12/2007 H. Livingston 27

Summary In today s supply chain environment, electronic equipment manufacturers and Government users must be vigilant in order to avoid counterfeit electronic components. The vast majority of counterfeit cases reported are associated with purchases through independent distributors. The most effective approach to avoiding counterfeit electronic components is to purchase product directly from the original manufacturer, or from a distributor, reseller or aftermarket supplier who is franchised or authorized by the original manufacturer. A substantial number of products, however, are no longer available through franchised or authorized suppliers. While they provide a necessary function within the electronic component supply chain, independent distributors are not all created equal. Electronic equipment manufacturers and Government users need to understand the independent distributor s operations and business processes. When considering purchases through independent distributors, electronic equipment manufacturers and Government users should use mitigation methods and strategic approaches to reduce the potential for acquiring counterfeit parts. 3/12/2007 H. Livingston 28