Max. building height (m)

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

Environmental, Health and Safety Policy for Contractors

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

Demolition Safety!!!!

Section Safety Section Cleanup. None Required

MATERIAL HANDLING, STORAGE, AND DISPOSAL

Excavation Safety Program

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

Date Prepared: Location: Time: Approximate Temperature (degrees F): Weather Conditions: Project Name:

Continuing Certificate of Occupancy Pre-Inspection Checklist

Scaffolding. Safety Guide. STOP! Before you climb

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

EM385 Construction Safety and Health Certification Course Section 14 Material Handling, Storage, and Disposal

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

9.3.9 Industry uses code

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

SAFE WORK METHOD STATEMENT

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

The Corporation of The City of London

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Personal Protective Equipment (PPE) Safety Program

A/E Design Deliverable Checklist

Safety and Environmental Orientation and Practices for Contractors

CAL/OSHA ELECTRICAL HIGH VOLTAGE

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

A. The Contractor shall limit his construction activities, including materials storage, to areas designated by the Owner's Representative.

DIVISION 02 SELECTIVE DEMOLITION

THE EXPERT APPROACH TO PREMISES LIABILITY

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

Environmental Conditions Laboratories (for commercial use) Group

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

6.1 Introduction to Wastewater Issues

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

Chapter 18 Welding Table of Contents

(1) Site Suitability PURPOSE

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

first flush water diverters water quality first downspout, post/wall mounted and in-ground diverters

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

SCAFFOLDS Revision No: 3

CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER

Advanced Ventilation for Residential applications FBC Res 2010.

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

TENTS AND OTHER MEMBRANE STRUCTURES

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

Victorian Dangerous Goods (Storage & Handling) Regulations 2012 Summary

3.3 Guidelines for Performing Building Inspections All building inspectors should read and understand the following information:

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Commercial Tax Abatement

Hind Energy & Coal Beneficiation (India) Ltd.

TENTS AND MEMBRANE STRUCTURES

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

Administrative Changes

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

E. STORMWATER MANAGEMENT

Commercial Medical Marijuana Operation Design Guidelines

Walking/Working Surfaces

Construction Indoor Air Quality (IAQ) Management Plan

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

FACILITIES MAINTENANCE WORKER

Hotel/Motel. Slip, Trip and Fall Self Inspection Checklist. Completed by: Date: Time:

Environmental Leadership Program Inspection Form Portable Asphalt Facility

TRENCHING AND EXCAVATION

Application For Waste Regulation (Check all that apply)

Training Certification Categories

+/0'-/12!"&21'1/345$1.1/3!6#''-7-! 8#9!:!;<;=!

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

FACILITIES MANAGEMENT CONTRACTOR SAFETY PROGRAM

One and Two Family Additions

RESTAURANTS AND FOOD OUTLETS

Scissor Lift Safety for Clients and Employees or ARS

Landscaping and Fencing

Residential Sewer Backup Prevention Program

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

RESIDENTIAL BUILDING REQUIREMENTS

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

Hazardous Waste Management

Last Updated March 15, 2016

PRESCRIPTIVE COMPLIANCE METHOD

New Montgomery County Elementary School. Construction Indoor Air Quality Management Plan IEQc3.1 IAQ Plan During Construction

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

CONSTRUCTION SAFETY GUIDE

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

Risk Assessment and Preventive Measures Checklist for Construction and Renovation. Location of Construction: Project Start Date: Estimated Duration:

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

ARTICLE 4 SUPPLEMENTARY PROVISIONS

Transcription:

PROJECT SITE W N S E

GAIL LTD. Reliance Bhavan Pushpak Society Eshanya Florenza Taksh Bunglows Pushpak Township Saroj Park Society Umedhbhai Park Society Pushpak Residency PROJECT SITE Pratham Shrusti Complex Naramada Branch Canal Uma Nagar Society Aum Bunglows Ankur Park Society Ambica Park Society Park Wood Apartment Hari Darshan Society Jalanand Township Sahyog Society GORWA Vitthlesh Bunglows N W E S Laxmi Nagar

Floor FSI Area in Sq Meter Built up Area in Sq Meter Basement 0 6135.4 Ground/HP 8696.32 10893.42 1st 14498.97 14670.87 2nd 8536.7 8708.6 3rd 2947.15 3119.05 4th 2947.15 3119.05 5th 2947.15 3119.05 6th 2947.15 3119.05 7th 2947.15 3119.05 8th 2947.15 3119.05 9th 2947.15 3119.05 10th 2947.15 3119.05 11th 2947.15 3119.05 12th 2947.15 3119.05 Others 0 171.9 Total 61203.49 71770.69 Prajapati Upendrakumar Dalsukbhai IDE 18 M W ROAD A RO AD D Type A A A1 A1 A2 A2 A2 Total Information 1 Survey number, F.P. No, TPS No Survey Number: 463+464+466/1+470 & 468+ 469+471, 472,473, OP No: 71& 72, FP No: 71& 72, TPS No: 01(Gorwa Ankodia) at Village Gorwa Ankodia, Vadodara 2 Land area ( m )2 42,130 3 Net Land area ( m )2 40,398.79 4 Permissible FSI( m )2 64,638.06 5 Proposed FSI( m )2 6 Maximum height of building, m 61,203.49 40 2 7 TotalBuilt up area ( m ) 8 Maximum Number of floor 9 Total number of units 71,770.69 142 Tenament and 192 Flats 10 Basement area for parking ( m ) 11 Area break up (land ), m G/HP +12 Floor 2 6135.40 2 Ground coverage 10893.42 Green area 4213.00 12 Parking arrangement with its breakup in m Surface parking area 3680 Hollow Plinth parking 2197.1 2 O COLOUR NOTE R I DE ROAD GR OU ND L EVEL E C UTTING INV ER T LVL. GROUN D LV L. D IS T. IN MT. D RA IN AGE SECTION SCA LE H OR IZ ON T A L : - 1.00 C M.= 4.00MT. VER T IC A L : - 1.00 C M. = 1.00MT. LA WN 8 951 SQ.FT. W 18 I D COP 1 34872 SQ. FT T GENERAL NOTES M 9 SITE ENTRY List PLOT BOUNDRY MW H.T. LINE Proposed Built up area in Sq Meter - Each Tenament Number Ground Floor First Floor Second Floor Total 6 65.65 89.84 40.56 196.05 39 66.6 89.84 40.56 197 4 66.01 85.46 38.95 190.42 33 66.82 85.46 38.95 191.23 8 53.23 72.45 38.72 164.4 50 54.04 72.45 38.72 165.21 2 54.04 72.45 38.72 165.21 142 426.39 567.95 275.18 1269.52 Sr. No 9 M T W I D E R O A D COP 2 8835 SQ. FT AREA: 30 M WIDE ROAD ENGINEER IS FULLY RESPONSIBLE FOR LEAVING OPEN SPACE AND MARGIN THE DEPTH AND POSITION OF EXISTING MU NICIPAL MAINHOLE IS VERYFIED ME ON SITE AND PREMISES GATES DRAINAGE CONNECTION. IT IS CERTIFY THAT ACCORDING TO GDCR-2021 ALL REQUIREMENTS OF THE BUILDING ARE CHECKED AND NECESSARY ACTIONS ARE TAKEN. IT IS CERTIFY THAT ACCORDING TO THE CLAUSE NO. 4.5.3 OF THE GDCR-2 021, THE STRUCTURE OF THE BUILDING IS DESIGN AS PER THE NORMS OF THE INDIAN STANDARDS. DESIGN OF THE STAIRCASE AND RAILING IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 23.1.12 AND 23.14 AND 24.6 OF GDCR-2021 PEDESTTRIANS RAMP IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 2 3.1.5 OF GDCR-2021 LIFT IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 23.23 AND 24.7 OF THE GDCR-2021 WATER TANK IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 23.6 OF THE GDCR-2021 SEPARATE LETTER BOX IS PROVID ED AT GROUND LEVEL FOE EACH UNIT. WATER TANK FOR FIRE SAFETY REQUIREMENT PROVIDED AS PER CHEPTER NO. 24 OF GDCR-2 021 ELECTRICAL INFRASTRUCTURE SHALL BE PROVIDED AS PER CLAUSE NO. 23.11 DRINKING WATER FACILITY FOR DISABLED PERSONS IS PROVIDED AS PER THE CLAUSE NO.23.6.2 DRAINAGE FACILITY IS PROVIDED AS PER THE CLAUSE NO. 23.10 SIGNAGES OF THE PARKING PLACE IS TO BE PROVIDED AS PER THE CLAUSE NO. 2 3.7 OF THE GDCR-2021 ENTRANCE OF THE BUILDING IS PROVIDED AS PER THE CLAUSE NO. 23.1.7. OF THE GDCR-2021 THE PAVING OF BUILDING UNIT/FINAL P LOT AS PER THE PROVISION OF THE CLAUSE NO. 23.1.4. OF THE GDCR-2021 THE STRUCTURE OF THE BUILDING IS AS PER THE NORMS OF THE SPECIFIED IN THE INDIAN STANDARDSAND TAK E NACESSARY ACTION FOR THE STRUCTURAL SAFETY DURING THE CONSTRUCTION. RAIN WATER STORAGETAN K AND RAIN WARET HARVESTING SYSTEM IS PROVIDED AS PER THE CLAUSE NO. 2 7.2 OF THE GDCR-2021 COMMUNIT Y BIN IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO 27.3 OF GDCR-2021 GREY WATER RECYCLING SYSTEM IS PROVIDED AS PER THE CLAUSE NO. 2 7.4 OF GDCR-2021 TREE PLANTATION IS PROVIDED AS PER THE CLAUSE NO. 2 7.5 OF GDCR-2021 SOLAR WATER HEATING SYSTEM IS PROVIDED AS PER THE CLAUSE NO. 2 7.6 OF GDCR-2021 POLLUTIUON CONTROL SYSTEM IS PROVIDED AS PER THE CHAPTER NO. 28 OF GDCR-2021 FIRE SAFETY SYSTEM IS PROVIDED AS PER THE CHAPTER NO. 24 OF GDCR-2021 MAINTENANCE AND UPGRADATION OF BUILDING AS PER THE CHAPTER NO. 29 OF GDCR-2021 ANY DEFIC IENCY OF VENTILATION IN CELLAR MU ST BE MADE GOOD BY RESORT TO A MECHANICAL SYSTEM VIZ BLOWERS EXHAUST FANS, AIR CONDITIONING SYSTEM ACCORDING TO THE STANDARDS IN PART VIII BUILDING SERVICES, SECTION I LIGHTING AND VENTILATION NATIONAL BUILDING CODE AT BASEMENT SL AB DRAINAGE LIN E IS PERMITTED THROUGH R.C.C CHANNEL DEVLOPER OWNER STR. ENGINEER ENGINEER C.O.W. 18626 SQ.FT. AUTHORITY

Annexure 5: Water balance Construction phase: S. No. 1. 2. 3. Purpose Domestic water for labour Dust suppression Use in construction, curing etc Water Requirement Quantity (kld) 6.75 Remarks 45 lpcd for 150 workers Arrangement for domestic water requirement will be met by contractor Quantity (kld) 5.73 Wastewater Generation Remarks Wastewater will be disposed into septic tank 5 - - Losses 10 - - Losses Total 21.75 5.73 Operation phase: S. No. 1. 2. 3. Domestic Purpose Residential (135 LPCD for 1503 Occupants) Visitors ( 15 LPCD for 200 Visitors ) Horticulture development (4.5 Lit/m 2 (4213 m 2 Land area) Water Requirement (kld) Fresh water requirement (kld) Wastewater Generation (kld) Treated wastewater used (kld) 202.92 135.27 162.32 67.63 3 1 2.4 2 18.95 0 0 18.95 Total 224.87 136.27 164.72 88.58 Wastewater will be treated into 200 KLD capacity of STP. Treated wastewater will be reused into flushing and gardening purpose. Balance treated wastewater will be disposed into municipal sewer line.

Annexure 6: Storm water management Storm Water Drainage System The rainwater will be collected through piped drains and conveyed into rainwater harvesting system for filtration. All storm water drains have been designed for adequate size and slope such that there shall not be any flooding in the site. It shall be ensured that no wastewater shall enter into storm water drainage system. Rainwater Harvesting Plan Adequate rainwater harvesting pits will be provided in the project premises. The rainwater collected from the project area will be conveyed into the rainwater harvesting system consisting of Desilting-cum-Filter Chamber, Oil & Grease Separators and finally shall be conveyed into recharge pits and balance if any will be disposed municipal storm water line. Details of maximum storm water generated Description Area in sq m Maximum rainfall intensity In m/h Runoff coefficient Total storm water In cum/h Roof area 10,893.42 0.045 0.8 392.16 Paved area 25,292.37 0.045 0.5 569.07 Green area 4213 0.045 0.2 37.91 Total 40398.79 999.14 11 No of Percolation Well required Annual recharge of ground water Description Area in sq m Maximum rainfall intensity In m/annual Runoff coefficient Total storm water In cum/annual Roof area 10,893.42 0.911 0.8 7939.12 Paved area 25,292.37 0.911 0.5 11520.67 Green area 4213 0.911 0.2 767.60 Total 40398.79 20227.39 Annual recharge of ground water ~20,000 m 3

Rain water harvesting scheme

Annexure 7: Fire and Safety Adequate fire protection facilities will be installed as per the National Building Code given in 2005, Residential Buildings are classified as Group A, Sub Group A-4 Following component/item will be provided: Under the clauses (4.18.2, 6.1.2, 6.2.3, 6.3.2, 6.4.3, 6.5.2, 6.5.2.1, 6.5.2.2, 6.5.2.3, 6.5.2.4, 6.5.2.5, 6.6.2, 6.7.2, 6.8.2 and 6.9.2) following are minimum requirements for fire fighting installations. Fire Extinguishers Hose Reel Wet riser Automatic Sprinkler System (Basement) Manually Operated Electric Fire Alarm System Underground Static water Storage Tank-1,00,000 liter. (Two Number ) Terrace Tank -10,000 lit (Each block) Pump Near Underground Static Water Storage Tank (Fire Pump) with minimum Pressure of 3.5 kg/cm 2 at Terrace Level One Electric and one diesel pump of capacity 2 280 lit/min and one electric pump of capacity 180 lit/min. Based upon the Occupancy (Clause 4.3 Table 20, 21 & 22, NBC): Description Unit Value Residential Occupant load m 2 /person 12.5 Occupants per unit exit width Number of occupants Stairways-25 Ramps-50 Doors -75 Travel distance form occupancy m 30

Annexure 8: Environmental Management Plan 1.0 Structure of EMP Environmental Management Plan (EMP) is the key to ensure a safe and clean environment. The desired results from the environmental mitigation measures proposed in the project may not be obtained without a management plan to assure its proper implementation & function. The EMP envisages the plans for the proper implementation of mitigation measures to reduce the adverse impacts arising out of the project activities. EMP has been prepared addressing the issues like: Pollution control/mitigation measures for abatement of the undesirable impacts caused during the construction and operation stage Details of management plans (Landscape plan, Solid waste management plan etc.) Institutional set up identified/recommended for implementation of the EMP Post project environmental monitoring programme to be undertaken Expenditures for environmental protection measures and budget for EMP 2.0 Proposed Environmental Mitigation Measures The major impacts due to different project activities were identified during the study. The mitigation measures proposed for the impacts constitute the part of Environmental Management Plan (EMP). The environmental mitigation measures for construction and operation phases have been given in Table1. Table 1. Proposed Environmental Mitigation Measures Area Mitigation Measures Construction Stage: Water quality Toilet and drinking water facilities for construction workers are provided by the contractor at the construction site to avoid unhygienic condition at site. Air quality Dust suppression measures are undertaken such as regular sprinkling of water around vulnerable areas of the construction site by suitable methods to control fugitive dust during earthwork and construction material handling/ over hauling. Properly tuned construction machinery & vehicles in good working condition with low noise & emission are used and engines are turned off when not in use. Noise level Protective gears such as ear mufflers etc. are provided to construction personnel exposed to high noise levels. Solid wastes Waste construction materials are recycled and excess construction debris are disposed at designated places in tune with the local norms. Landscape Appropriate landscape including plantation of evergreen and ornamental flowering trees, palms, shrubs and ground covers at open spaces within the complex will be done, which would serve the dual purpose of controlling fugitive dust and improving the aesthetics of the area. Safety Adequate safety measures complying to the occupational safety manuals are adopted to prevent accidents/hazards to the construction workers. Operation Stage: Water quality Wastewater will be collected and treated into 200 KLD of STP. Treated wastewater will be reused for flushing and gardening. Balance treated wastewater will be disposed into municipal line. 11 number of rainwater harvesting recharge wells will be developed Air quality Trained staff will be handle traffic movement Regular monitoring of ambient air quality will be carried out as per norms. Solid wastes Solid wastes will be segregated into organic and inorganic components. The recyclable inorganic wastes will be sold to prospective buyers. The bio-degradable wastes will be disposed near by municipal bins. Rainwater Adequate rainwater harvesting will be provided harvesting Fire protection Fire protection facilities will be provided as per GDCR and NBC Landscape Proper maintenance of landscape round the year including replacement of the decayed plants. Safety Adequate safety measures complying to the occupational safety manuals to prevent accidents/hazards to the maintenance workers. Others The building will be provided with disabled-friendly design, timber-free

construction, energy efficient lighting & ventilation, and control of indoor environment. 3.0 Environmental Monitoring Plan It is imperative that the Project Authority set up regular monitoring stations to assess the quality of the surrounding environment after the commissioning of the project. An environmental monitoring programme is important as it provides useful information and helps to: Verify the predictions on environmental impacts presented in this study, Assist in detecting the development of any unwanted environmental situation, and thus, provides opportunities for adopting appropriate control measures, and Evaluate the performance and effectiveness of mitigation measures proposed in the EMP and suggest improvements in management plan, if required, Satisfy the legal and statutory obligations. The post project monitoring plan including areas, number and location of monitoring stations, frequency of sampling and parameters to be covered is summarized in Table 2. The monitoring will be the responsibility of EMC. Table 2: Environmental Monitoring Plan Source Monitoring Location Parameters to be Monitored Frequency Ambient Air Quality Ambient Noise At 3 locations (1 inside the complex and 2 outside in surrounding 1 km zone along predominant wind directions) At 3 locations (1 inside the complex and 2 outside in surrounding 100 m zone) PM 10, PM 2.5, SO 2, NO x Once in a season and as per requirement of SPCB Day and night Once in a season and as equivalent noise level per requirement of SPCB Stack Stack PM, SO 2, NO x, CO Once in a season and as per requirement of SPCB The post operational monitoring schedule will be under the supervision of the Site Engineer at the project site. Monitoring will be carried out by recognized laboratories. 4.0 Environment Management Cell An Environment Management Cell (EMC) will be responsible for implementation of the post projectmonitoring plan for this project. The composition of the Environment Management Cell and responsibilities of its various members are given in Table 3. Table 3. Environment Management Cell S. No. Designation Proposed responsibility 1. Chairman of Society Overall responsibility for environment management and decision making for all environmental issues 2. Secretary Hires a Consultant and fulfills all legal Requirements as per MOEF/GPCB/CPCB 3. Supervisor Ensure environmental monitoring as per appropriate procedures

5.0 Environmental Budget A capital cost provision of about Rs. 44.5 lakh has been kept in the project cost towards the environmental protection, control & mitigation measures and implementation of the EMP. The budgetary cost estimate for the EMP is given in Table 4. S. No. Head Table 4 Environmental Budget Approximate recurring cost per annum (Rs. in lacs) Approximate Capital cost (Rs. In lacs) Basis for cost estimates 1. Air 1.0 2.0 Stack and DG room 2. Water 1.5 20.0 STP cost 3. Solid and hazardous waste management 4. Environment monitoring 1.0 2.0 Provide bins door to door and transportation cost 2.5 0 The recurring cost would be incurred on hiring of consultants and payment of various statutory fees to regulatory agencies. 5. Rain water 2.5 16.5 Collection system, treatment and recharge well 6. Green belt 1.5 4.0 - Total 10 44.5 6.0 General Principles in Greenbelt Design Plants grown in such a way so as to function as pollutant sinks are collectively referred as greenbelt. These plants should also provide an aesthetic backdrop for persons using the site and for the surrounding community. General principles in greenbelt design considered for this study are: Type of pollution (air, noise, water and land pollution) likely from the activities at the site Semi arid zone and sub-zone where the greenbelt is located (and hence the plant species which can be planted in the area). Water quantity and quality available in the area Soil quality in the area Greenbelt is designed to minimize the predicted levels of the possible air and noise pollutants. While designing the scheme the following facilities are considered: Site perimeter and approach road Along the internal roads In and around the building area To ensure a permanent green shield around the periphery planting is recommended in two phases. In the first phase one row of evergreen and fast growing trees (which grows up to 10-15m) with maturity period of around three years shall be planted at 3.0 meter interval along with fast growing ground covers to enhance the water holding capacity, improve the organic content and check the soil erosion. In the second phase after eighteen months, second row of trees with large leaf surface area with large ever green canopy and longer life span shall be planted at 6.0 meters intervals.

6.1 Greenbelt Design for Site The selection of the trees is based on their phenology (thus road side trees will not have leaf fall during summer and rainy seasons when shade is most needed). Trees with more litter fall have been avoided. The selection criteria of the species are based on pollution mitigation capacity (including particulate matter), large leaf surface area to deep root system and less litter fall. Faster growing trees with lighter canopy will be planted alternatively with relatively slow growing trees with wider canopy. Trees of about 6.0 m heights will be planted at 4.5 m intervals, 2.5 m away from the road curbing as per CPCB guidelines. Trees will be planted along the outer periphery at centerline of road between the set back line and the boundary of the plots. Palms and shrubs will be planted along the roads and around recreational lawns. 6.2 Greenbelt Management It is presumed that the selected plants will be grown as per normal horticultural practice and the authorities responsible for the plantation will make adequate provisions for water and protection of the saplings. A budgetary cost estimate is also prepared for greenbelt development. Water source Water tankers may also be used at the initial stages of development of the plant. Irrigation method Water hydrants may be installed at 50 m intervals to irrigate area under shrubs and ground covers. 6.3 Improving Indoor Air Quality The indoor air quality can be improved by any of the following: Ventilation Include the use of natural, dilution, local exhaust, or increased ventilation efficiency. The most effective engineering control for prevention of indoor air quality problems is assuring an adequate supply of fresh outdoor air through natural or mechanical ventilation. When possible, use local exhaust ventilation and enclosure to capture and remove contaminants generated by specific processes. Room air in which contaminants are generated should be discharged directly outdoors rather than recirculated. Outside air intakes should not be located in close proximity to potential sources of contamination (automobile garages, building exhausts, and roadways). Work Place Recommendations Eliminate or control all known and potential sources of microbial contaminants by prompt cleanup and repair of all areas where water collection and leakage has occurred including floors, roofs, drain pans, humidifiers containing reservoirs of stagnant water, air washers etc. Remove and discard porous organic materials that are contaminated (e.g., damp insulation in ventilation system, ceiling tiles, and carpets). Clean and disinfect non-porous surfaces where microbial growth has occurred Maintain indoor air relative humidity below 60% Adjust intake of outdoor air to avoid contamination from nearby soil, vegetable debris unless air is adequately conditioned. Isolate, if feasible, areas of renovation, painting, carpet laying, pesticide application, etc., from occupied areas that are not under construction. Supply adequate ventilation during and after completion of work to assist in diluting the contaminant levels. Eliminate or reduce contamination of the air supply with cigarette smoke by banning smoking or restricting smoking to designated areas which have their air discharged directly to the outdoor rather than recirculated.

6.4 Safety Aspects of the Project The following needs to be implemented: Fall Protection The Contractor is required to provide fall protection to employees who are working at heights equal to or greater than 1.8 m. fall protection can be in the form of perimeter protection such as guardrails and toe rails, personal protective equipment (PPE), a safety monitoring system, or a fall protection plan. Activities that require personal fall protection systems include steel erection bolting, riveting, fitting-up and plumbing-up, work over water and some deep excavation work. On buildings or structures not adaptable to temporary floors, and where scaffolds are not used, safety nets will be installed and maintained whenever the potential fall distance exceeds two storey. The PPE standard should cover occupational foot, head, hearing, and eye protection. Foot Protection: If machines or operations present the potential for foot injury, the Contractor must provide foot protection, which is of safe design and construction for the work to be performed. Workers and visitors should not be allowed on a construction site without safety boots. Head Protection: If head hazards remain after all steps have been taken to control them (safety nets for work at heights, proper housekeeping), the Contractor must provide employees with appropriate head protection. Noise Protection: Workers should be wearing hearing protection devices (ear plugs, ear muffs, canal caps) that are in good condition whenever they are involved in noisy activities. Eye Protection: When machines or operations present potential eye injury from physical or chemical elements, the Contractor must select, provide, maintain and required affected employees to use appropriate eye protection. Eye protection (safety glasses and goggles, face shields and welding helmets) must be adequate and reasonably comfortable. To the greatest extent possible, working surfaces must be kept dry to prevent slips and falls and to reduce the chance of nuisance odors from pooled water. All equipment and materials should be stored in designated storage areas that are labeled as such. Ladders and Stairs The Contractor is required to inspect and maintain all ladders and temporary/portable steps to ensure that they are in good working condition. Portable ladders used for access to an upper landing surface must extend a minimum of 1.8 m above the landing surface, or where not practical, be provided with grab rails and be secured against movement while in use. All ladders must be used only on stable and level surfaces unless secured to prevent accidental movement. Ladders must not be used on slippery surfaces unless secured or provided with slipresistant feet to prevent accidental movement. The Contractor should provide a ladder (or stairway) at all work points of access where there is a break in elevation of 0.5 m or more. When there is only one point of access between levels, it must be kept clear to permit free passage by workers. If free passage becomes restricted, a second point of access must be provided and used. At all times, at least one point of access must be kept clear. All required stairway and ladder fall protection systems must be provided and installed before employees begin work that requires them to use stairways or ladders. Scaffolds Access to Scaffolds - access to and between scaffold platforms more than 0.6 m above or below the point of access will be made by portable/attachable ladders or ramps. Employees must never use makeshift devices, such as boxes and barrels, to increase the scaffold platform working level height.

Trenching and Excavation The area around the trench/excavation would be kept clear of surface encumbrances. Water should not be allowed to accumulate in the excavation. Adjacent structures would be shored in accordance with the design documents to prevent collapse. Guardrails or some other means of protecting people from falling into the trench/excavation would be present. The trench or excavation would be shored or sloped to prevent cave-ins. Electrical Safety If work has to be done near an overhead power line, the line must be de-energized and grounded before work is started. A licensed electrician would have completed all temporary wiring and electrical installations required for construction activities. Fuses and circuit breakers would be used to protect motherboards, conductors and equipment. Extension cords for equipment or as part of a temporary wiring system will not be damaged or compromised in any way and insulation must be of the highest grade. Anytime electrical equipment is deactivated for repair, or circuits are shut off, the equipment will be locked out and tagged at the point where it can be energized. Temporary lights may not be suspended by their cords. The Contractor would provide the necessary safety equipment, supplies and monitoring equipment to their personnel. Cranes A competent person has been designated to supervise activities that require the use of cranes. Cranes would not be operated near any power lines. All picks would be carefully planned to ensure that the crane adequately hoist the load. The hoisting signals would be posted on the exterior of the crane. Occupational Noise Exposure The Contractor should implement engineering controls to reduce noise levels. The Contractor should provide hearing protection to employees that are exposed to noise levels above the permissible limit. Welding and Cutting The Contractor's employees would be trained in hot work procedures. There should be adequate ventilation to reduce the build up of metal fume. The hot work operators would use proper personal protective equipment (i.e., welding helmet, burning goggles, face shield, welding gloves, and apron). There would be a fire extinguisher present at all welding and burning activities. Extinguishers would also be placed at locations where slag and sparks may fall. Oxygen and flammable gas bottles are separated by at least 7 m when not in use. The Contractor would control the release of gases, vapors, fumes, dusts, and mists with engineering controls (e.g., adequate ventilation). General Guidelines Signs and symbols would be visible during any construction activity that presents a hazard. Upon completion of such activity, the postings must be removed immediately. The Contractor would post specific DANGER signs when an immediate hazard exists and specific CAUTION signs when the potential for a hazard exists. EXIT, NOTICE and specific safety signs may also be posted in the work area.

Signage for traffic control, including directional signs, is applicable when the Contractor is disrupting traffic along a public way. Danger signs are posted at all immediate hazards (i.e. Danger: Open Hole). Caution signs are posted at all potential hazards (i.e. Caution: Construction Area, Caution: Buried Cable). The floor that is being used as the erection floor must be solidly planked or decked over its entire surface except for access openings. Every floor, working place and passageway would be kept free from protruding nails, splinters, holes or loose boards. Combustible scrap and debris (wood, clearing/grubbing material) would be removed from the site daily or should be securely stored in covered containers. The Contractor would have a spill prevention control and countermeasure plan that limits the risk of releases of oil or hazardous materials to the environment.