TMP reference: Contractor: Principal (Client):

Similar documents
TMP reference: Contractor: Principal (Client):

TMP reference: Contractor (Working space): Principal (Client): Contractor (TTM):

Contractor (Working space): Fulton Hogan Ltd. Permanent speed SH1N 502-D/4.412 to 502-D/2.618 L2 100km Armitage Road 0.00 to 0.

Code of practice for temporary traffic management (CoPTTM)

CoPTTM 4 th edition QUESTIONS FOR THE

Code of practice for temporary traffic management (CoPTTM)

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

1 National Unit credit(s) at SCQF level 6: (1 SCQF credit points at SCQF level 6*)

CONTINENTAL FERRY PORT SITE INDUCTION

Does the Work Package Plan include the relevant items as stated in the WPP template? Is the information presented in the same order as the template?

Standard Operating Procedure for Environmental Engineering Standards

Transport Sector Portfolio

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 616 TEMPORARY TRAFFIC CONTROL

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

Ensure your own actions reduce risks to health and safety

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

SUPPLIES REVIEW. This English translation is provided for information only. Only the French original version constitutes a contractual document.

Railway Interface Planning Scheme Rules (RIPS Rules)

Establish quality requirements, manage, and monitor the installation of subdivision infrastructure

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

How the NZ Transport Agency keeps you moving

C D M R e g u l a t i o n s

Code of practice for temporary traffic management (CoPTTM)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction)

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation

Section Safety Section Cleanup. None Required

Tender Document and Specifications for Council Property Assorted Painting and Decorating between Parks and Recreation and Contractor.

ArmorZone TL-2 Barrier and End Treatment

VICTORIAN SERVICE & INSTALLATION RULES MANAGEMENT COMMITTEE

Applicant s Name: Visit to get a check done electronically.

MWH AND THE FIJI ROADS AUTHORITY: A COLLABORATIVE APPROACH TO ASSET RENEWALS

Level 6 NVQ Diploma in Construction Site Management (Construction)

DRIVER CODE OF CONDUCT FOR TRUCK AND HEAVY VEHICLE OPERATORS PERFORMING WORK FOR OR ASSOCIATED WITH CDM LOGISTICS

H&S007 Level 2 and 3 Risk Health and Safety Contractor Approval Request

RAPID INCIDENT SCENE CLEARANCE (RISC)

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

Minutes of the CoPTTM Governance Group (CGG) meeting on 6 October 2016

MANUAL HANDLING PROCEDURE

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Guidance for Airport Operators Designating Known Suppliers of Airport Supplies

for Law Enforcement KVE Developed by the Kentucky Transportation Center University of Kentucky in cooperation with the

Project Manager Regional Projects Manager Department Division/Region Community Location

Environmental Regulatory Compliance Officer

Land at Penny Pot Lane, Killinghall

SHORT COURSES. Industry Training New Zealand

APPLICATION FORM FOR FILMING IN THE PUBLIC DOMAIN IN THE ADMINISTRATIVE AREA OF DUBLIN CITY COUNCIL

MECHANICAL JOINT INTEGRITY ROUTE TO COMPETENCE GUIDANCE. Working together to prevent hydrocarbon releases through safety critical competence

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

Becoming a Transit Bus Operator

9.1 Introduction Legislative requirements for JOHS Committees Composition of JOHS Committee and Safety Sub-committees...

Section 7 Training and Safety Meetings Table of Contents

Directive 96/48/EC - Interoperability of the trans- European high speed rail system

SCHEDULE 1 CONDITIONS OF USE RELATING TO FALKIRK BUS STATION (THE BUS STATION )

Subpart C_Roadway Worker Protection

Level 2 NVQ Diploma in Roadbuilding and Maintenance (Construction) Pathway 29: Plant Road Sweeping. Qualification Specification

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

SUBCONTRACTOR MANAGEMENT

POSITION DESCRIPTION - STAKING TECHNICIAN PAGE 1 POSITION DESCRIPTION STAKING TECHNICIAN

Working together to reduce speeds Six steps for organisations wishing to purchase a Speed Indicator Device (SID).

ATOC. Approved Code of Practice Transfer of Safety Performance Information Train Driving. Withdrawn Document. Association of Train Operating Companies

Successful Incident Management on a Major Reconstruction Project

SPECIFICATION FOR THE RUBBER SPEED HUMPS

3.2 Direction, Management, Implementation and Review

Tender Document and Specification

Brown Trucking Company INDEPENDENT CONTRACTOR DRIVER APPLICATION 6908 Chapman Road Lithonia, GA Fax: (770)

EDUCATION SUPPORT OFFICER Cardijn College Position Information Document

American Railway Engineering & Maintenance-of-Way Association Letter Ballot

Community & Client Services. Health & Regulatory Services

THE COMPLETE GUIDE TO ISO14001

2008 Transit Operator Recruitment Guide

NATIONAL COMPETENCY STANDARD

BRESCIA UNIVERSITY COLLEGE. Policies and Procedures

Bridge Strikes from Road Vehicles or Waterborne Vessels

Health & Safety Manual. September 2013

University of Birmingham

Road Safety Audit. Standards. GE-STY March General

Document Compilation and Approval

GUIDE FOR APPLICANTS

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

Staff Counselling Service

Field/Mobile Working Policy

Contractor s Guide to Applying for Permit to Dig/Excavate

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS SAFETY HEIRARCHY

NWPNET031 CONSTRUCT AND INSTALL WATER DISTRIBUTION ASSETS STEEL MAINS IS A NATIONALLY RECOGNISED TRAINING ORGANISATION (CODE 90669)

Guideline for Bridge Safety Management February 2012

Construction Skills Certification Scheme

Conception Design Construction Operation.

SGS EB Negotiations STATUS OF NEGOTIATIONS As at 20/05/16

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division

CONSTRUCTION PROJECT TEMPORARY FACILITIES SITING POLICY February 19, 2003

EXCAVATION PERMIT CHECKLIST

Health, Safety and Environmental Manager

National Highways Sector Schemes for Quality Management in Highway Works


Transcription:

TRAFFIC MANAGEMENT PLAN (TMP) FULL FORM Use this form for complex activities. Refer to the NZ Transport Agency s Traffic control devices manual, part 8 Code of practice for temporary traffic management (CoPTTM), section E, appendix A for a guide on how to complete each field. Organisations /TMP reference TMP reference: Contractor: Principal (Client): RCA: Road names and suburb House no./rps (from and to) Road level Permanent speed Location details and road characteristics Traffic details (main route) AADT Peak flows Description of work activity Planned work programme Consider significant stages, for example: road closures detours no activity periods. Start date Time End date Time Alternative dates if activity delayed Road aspects affected (delete either Yes or No to show which aspects are affected) Pedestrians affected? Yes No Property access affected? Yes No Traffic lanes affected? Yes No Cyclists affected? Yes No Restricted parking affected? Yes No Delays or queuing likely? Yes No Page 1

Proposed traffic management methods Installation (includes parking of plant and materials storage) Attended (day) Attended (night) Unattended (day) Unattended (night) Detour route Does detour route go into another RCA s roading network? Yes No (delete either Yes or No) If Yes, has confirmation of acceptance been requested from that RCA? Yes No (delete either Yes or No) Note: Confirmation of acceptance from affected RCA must be submitted prior to occupying the site. Removal Page 2

Proposed TSLs (see TSL decision matrix for guidance) TSL details as required Approval of Temporary Speed Limits (TSL) are in terms of Section 5 of Land Transport Rule: Setting of Speed Limits 2003,Rule 54001 (List speed, length and location) Times (From and to) Dates (Start and finish) Diagram ref. no.s (Layout drawings or traffic management diagrams) Attended day/night A temporary maximum speed limit of km/h is hereby fixed for motor vehicles travelling over the length of m situated between (House no./rp) and (House no./rp) on (street or road name) Unattended day/night A temporary maximum speed limit of km/h is hereby fixed for motor vehicles travelling over the length of m situated between (House no./rp) and (House no./rp) on (street or road name) Positive traffic management measures Contingency plans Generic contingencies for: major incidents incidents pre planed detours. Remove any options which do not apply to your job Major Incident A major incident is described as: Fatality or serious injury - real or potential Significant property damage, or Emergency services (police, fire, etc) require access or control of the site. Actions The STMS must immediately conduct the following: stop all activity and traffic movement secure the site to prevent (further) injury or damage contact the appropriate emergency authorities render first aid if competent and able to do so notify the RCA representative and / or the engineer under the guidance of the officer in charge of the site, reduce effects of TTM on the road or remove the activity if safe to do so re-establish TTM and traffic movements when advised by emergency authorities that it is safe to do so. Page 3

Other contingencies to be identified by the applicant (i.e. steel plates to quickly cover excavations) Incident An incident is described as: excessive delays - real or potential minor or non-inquiry accident that has the potential to affect traffic flow structural failure of the road. Detour If because of the on-site activity it will not be possible to remove or reduce the effects of TTM once it is established a detour route must be designed. This is likely for: excessive delays when using an alternating flow design for TTM redirecting one direction of flow and / or total road closure and redirection of traffic until such time that traffic volumes reduce and tailbacks have been cleared. The risks in the type of work being undertaken, the risks inherent in the detour, the probable duration of closure and availability and suitability of detour routes need to be considered. The detour and route must be designed including: pre- approval form the RCA s whose roads will be used or affected by the detour route ensure that TTM equipment for the detour - signs etc are on site an pre-installed. Actions The STMS must immediately conduct the following: stop all activity and traffic movement if required secure the site to prevent the prospect of injury or further damage notify the RCA representative and / or the engineer STMS to implement a plan to safely remove TTM and to establish normal traffic flow if safe to do so re-establish TTM and traffic movements when it is safe to do so and when traffic volumes have reduced. Actions Note also the requirements for no interference at an accident scene: When it is necessary to implement the pre-planned detour the STMS must immediately undertake the following: Notify the RCA and / or the engineer when the detour is to be established Drive through the detour in both directions to check that it is stable and safe Remove the detour as soon as it practicable and safe to do so and the traffic volumes have reduced and tailbacks have cleared Notify the RCA and / or the engineer when the detour has been disestablished and normal traffic flows have resumed. In the event of an accident involving serious harm the STMS must ensure that nothing, including TTM equipment, is removed or disturbed and any wreckage article or thing must not be disturbed or interfered with, except to: save a life of, prevent harm to or relieve the suffering of any person, or to maintain the access of the general public to an essential service or utility, or to prevent serious damage to or serious loss of property. Page 4

Authorisations Parking restriction(s) alteration authority Authorisation to work at permanent traffic signal sites Will controlled street parking be affected? Yes No Has approval been granted? Yes No Will portable traffic signals be used or permanent traffic signals be changed? Yes No Has approval been granted? Yes No Road closure authorisation(s) Will full carriageway closure continue for more than 5 minutes (or other RCA stipulated time)? Yes No Has approval been granted? Yes No Bus stop relocation(s) closure(s) Authorisation to use portable traffic signals EED Will bus stop(s) be obstructed by the activity? Yes No Has approval been granted? Yes No Make, model and description/number NZTA compliant? Yes No (delete either Yes or No) Is an EED applicable? Yes No (delete either Yes or No) EED attached? Yes Delay calculations/trial plan to determine potential extent of delays Public notification plan Public notification plan attached? Yes No (delete either Yes or No) On-site monitoring plan Attended (day and/or night) Unattended (day and/or night) Page 5

Method for recording daily site TTM activity (eg CoPTTM on-site record) Site safety measures Other information Site specific layout diagrams Number Title Page 6

Contact details Name 24/7 contact number CoPTTM ID Qualification Expiry date Principal TMC Engineers representative Contractor STMS TC Others as required TMP preparation Preparation Name (STMS qualified) Date Signature ID no. Qualification Expiry date This TMP meets CoPTTM requirements Number of diagrams attached TMP returned for correction (if required) Name Date Signature ID no. Qualification Expiry date Page 7

Engineer/TMC to complete following section when approval or acceptance required Approved by TMC/engineer (delete one) Name Date Signature ID no. Qualification Expiry date Acceptance by TMC (if required) Name Date Signature ID no. Qualification Expiry date Qualifier for engineer or TMC approval Approval of this TMP authorises the use of any regulatory signs included in the TMP or attached traffic management diagrams. This TMP is approved on the following basis: 1. To the best of the approving engineer s/tmc s judgment this TMP conforms to the requirements of CoPTTM. 2. This plan is approved on the basis that the activity, the location and the road environment have been correctly represented by the applicant. Any inaccuracy in the portrayal of this information is the responsibility of the applicant. 3. The STMS for the activity is reminded that it is the STMS s duty to postpone, cancel or modify operations due to the adverse traffic, weather or other conditions that affect the safety of this site. Notification to TMC prior to occupying worksite/notification completed Type of notification to TMC required Notification completed Date Time Page 8

High-visibility garment worn by Signs positioned OK? Conflicting signs covered? Correct delineation? Minimum lane widths met? Positive TTM? Footpath standards met? Cycle lane standards met? Traffic flows OK? Adequate property access? TMP or generic plan reference On-site record must be retained with TMP for 12 months. ON-SITE RECORD To be used if information below not covered in company documentation. Location details STMS (in charge) TC/STMS-NP (delegation) Site monitoring Road names(s): House number/rps: Suburb: Name ID Number Expiry date Signature Date and time Name ID Number Expiry date Signature Date and time Site to be monitored and inspection documented below. If site control delegated to a TC/STMS-NP the STMS must inspect the site once each day. Monitoring Comment Date Time Signed by Site set up Site removal Temporary speed limit it is a legal requirement to record the placement and location of TSLs. Date installed: TSL speed: Placement (RPs or street numbers): Length of TSL (m): Date removed: Date installed: Date installed: Date installed: From: To: TSL speed: Placement (RPs or street numbers): Length of TSL (m): Date removed: From: To: TSL speed: Placement (RPs or street numbers): Length of TSL (m): Date removed: From: To: TSL speed: Placement (RPs or street numbers): Length of TSL (m): Date removed: From: To: Page 9