RCA: Yes No Property access affected? Yes No Traffic lanes affected? Yes No

Similar documents
TMP reference: Contractor: Principal (Client):

TMP reference: Contractor (Working space): Principal (Client): Contractor (TTM):

Contractor (Working space): Fulton Hogan Ltd. Permanent speed SH1N 502-D/4.412 to 502-D/2.618 L2 100km Armitage Road 0.00 to 0.

Code of practice for temporary traffic management (CoPTTM)

CoPTTM 4 th edition QUESTIONS FOR THE

Code of practice for temporary traffic management (CoPTTM)

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

Does the Work Package Plan include the relevant items as stated in the WPP template? Is the information presented in the same order as the template?

CONTINENTAL FERRY PORT SITE INDUCTION

Ensure your own actions reduce risks to health and safety

1 National Unit credit(s) at SCQF level 6: (1 SCQF credit points at SCQF level 6*)

Transport Sector Portfolio

How the NZ Transport Agency keeps you moving

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

Railway Interface Planning Scheme Rules (RIPS Rules)

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Applicant s Name: Visit to get a check done electronically.

Standard Operating Procedure for Environmental Engineering Standards

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction)

C D M R e g u l a t i o n s

DRIVER CODE OF CONDUCT FOR TRUCK AND HEAVY VEHICLE OPERATORS PERFORMING WORK FOR OR ASSOCIATED WITH CDM LOGISTICS

Section Safety Section Cleanup. None Required

Tender Document and Specifications for Council Property Assorted Painting and Decorating between Parks and Recreation and Contractor.

VICTORIAN SERVICE & INSTALLATION RULES MANAGEMENT COMMITTEE

SUPPLIES REVIEW. This English translation is provided for information only. Only the French original version constitutes a contractual document.

APPLICATION FORM FOR FILMING IN THE PUBLIC DOMAIN IN THE ADMINISTRATIVE AREA OF DUBLIN CITY COUNCIL

H&S007 Level 2 and 3 Risk Health and Safety Contractor Approval Request

RAPID INCIDENT SCENE CLEARANCE (RISC)

Becoming a Transit Bus Operator

SECTION 616 TEMPORARY TRAFFIC CONTROL

Code of practice for temporary traffic management (CoPTTM)

Guidance for Airport Operators Designating Known Suppliers of Airport Supplies

Land at Penny Pot Lane, Killinghall

MANUAL HANDLING PROCEDURE

for Law Enforcement KVE Developed by the Kentucky Transportation Center University of Kentucky in cooperation with the

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation

ATOC. Approved Code of Practice Transfer of Safety Performance Information Train Driving. Withdrawn Document. Association of Train Operating Companies

SHORT COURSES. Industry Training New Zealand

Minutes of the CoPTTM Governance Group (CGG) meeting on 6 October 2016

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

Brown Trucking Company INDEPENDENT CONTRACTOR DRIVER APPLICATION 6908 Chapman Road Lithonia, GA Fax: (770)

MWH AND THE FIJI ROADS AUTHORITY: A COLLABORATIVE APPROACH TO ASSET RENEWALS

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

MECHANICAL JOINT INTEGRITY ROUTE TO COMPETENCE GUIDANCE. Working together to prevent hydrocarbon releases through safety critical competence

2008 Transit Operator Recruitment Guide

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

NATIONAL COMPETENCY STANDARD

Directive 96/48/EC - Interoperability of the trans- European high speed rail system

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Level 2 NVQ Diploma in Roadbuilding and Maintenance (Construction) Pathway 29: Plant Road Sweeping. Qualification Specification

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures

SCHEDULE 1 CONDITIONS OF USE RELATING TO FALKIRK BUS STATION (THE BUS STATION )

9.1 Introduction Legislative requirements for JOHS Committees Composition of JOHS Committee and Safety Sub-committees...

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

Level 6 NVQ Diploma in Construction Site Management (Construction)

CONSTRUCTION PROJECT TEMPORARY FACILITIES SITING POLICY February 19, 2003

Successful Incident Management on a Major Reconstruction Project

Tender Document and Specification

THE COMPLETE GUIDE TO ISO14001

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

UCLA Procedure 615.1: Employee Driving Records

Transit Operator Recruitment Guide

Thank you for your interest in employment with GO Express Travel! We always keep an eye out for trained professionals who love to work!

3.2 Direction, Management, Implementation and Review

Section 7 Training and Safety Meetings Table of Contents

EDUCATION SUPPORT OFFICER Cardijn College Position Information Document

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

APPLICATION FOR EMPLOYMENT AS AN INTERIM MANAGER

Measurement Assurance and Certification Scotland

PennDOT s Road Closure Reporting System ( )

Subpart C_Roadway Worker Protection

NWPNET031 CONSTRUCT AND INSTALL WATER DISTRIBUTION ASSETS STEEL MAINS IS A NATIONALLY RECOGNISED TRAINING ORGANISATION (CODE 90669)

Staff Counselling Service

Environmental Regulatory Compliance Officer

BRESCIA UNIVERSITY COLLEGE. Policies and Procedures

Applicant Name. Today s Date

Special Leave. Human Resources

CONTRACT WITH THE TEMPORARY WORKERS (TERMS OF ENGAGEMENT/CONTRACT FOR SERVICES) 1.1. In these Terms of Engagement the following definitions apply:

Conception Design Construction Operation.

Health & Safety Manual. September 2013

Company Profile User Guide

SUBCONTRACTOR MANAGEMENT

Installing door ironmongery in the workplace

Dear Prospective Employee Please Read

POSITION DESCRIPTION - STAKING TECHNICIAN PAGE 1 POSITION DESCRIPTION STAKING TECHNICIAN

NZ Health & Safety at Work

APPLICATION for ISO Certification (All Standards) Contents

EXCAVATION PERMIT CHECKLIST

-NOT PROTECTIVELY MARKED- NOTTINGHAMSHIRE POLICE JOB DESCRIPTION

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

Lone Working Procedure

Contractor s Guide to Applying for Permit to Dig/Excavate

GUIDE FOR APPLICANTS

Establish quality requirements, manage, and monitor the installation of subdivision infrastructure

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

OPERATIONAL SUPPORT FUNCTION Emergency Level Notifications. Office of Emergency Management

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

Transcription:

TRAFFIC MANAGEMENT PLAN (TMP) FULL FORM Use this form for complex activities. Refer to the NZ Transport Agency s Traffic control devices manual, part 8 Code of practice for temporary traffic management (CoPTTM), section E, appendix A for a guide on how to complete each field. Organisations /TMP reference TMP reference: Contractor: Principal (Client): RCA: Road names and suburb House no./rps (from and to) Road level Permanent speed Location details and road characteristics Traffic details (main route) AADT Peak flows Description of work activity Planned work programme Consider significant stages, for example: road closures detours no activity periods. Start date Time End date Time Alternative dates if activity delayed Road aspects affected (delete either Yes or No to show which aspects are affected) Pedestrians affected? Yes No Property access affected? Yes No Traffic lanes affected? Yes No Cyclists affected? Yes No Restricted parking affected? Yes No Delays or queuing likely? Yes No Page 1

Proposed traffic management methods Installation (includes parking of plant and materials storage) Attended (day) Attended (night) Unattended (day) Unattended (night) Detour route Does detour route go into another RCA s roading network? Yes No (delete either Yes or No) If Yes, has confirmation of acceptance been requested from that RCA? Yes No (delete either Yes or No) Note: Confirmation of acceptance from affected RCA must be submitted prior to occupying the site. Removal Page 2

Proposed TSLs (see TSL decision matrix for guidance) TSL details as required Approval of Temporary Speed Limits (TSL) are in terms of Section 5 of Land Transport Rule: Setting of Speed Limits 2003,Rule 54001 (List speed, length and location) Times (From and to) Dates (Start and finish) Diagram ref. no.s (Layout drawings or traffic management diagrams) Attended day/night A temporary maximum speed limit of km/h is hereby fixed for motor vehicles travelling over the length of m situated between (House no./rp) and (House no./rp) on (street or road name) Unattended day/night A temporary maximum speed limit of km/h is hereby fixed for motor vehicles travelling over the length of m situated between (House no./rp) and (House no./rp) on (street or road name) Positive traffic management measures Contingency plans Generic contingencies for: major incidents incidents pre planed detours. Remove any options which do not apply to your job Major Incident A major incident is described as: Fatality or serious injury - real or potential Significant property damage, or Emergency services (police, fire, etc) require access or control of the site. Actions The STMS must immediately conduct the following: stop all activity and traffic movement secure the site to prevent (further) injury or damage contact the appropriate emergency authorities render first aid if competent and able to do so notify the RCA representative and / or the engineer under the guidance of the officer in charge of the site, reduce effects of TTM on the road or remove the activity if safe to do so re-establish TTM and traffic movements when advised by emergency authorities that it is safe to do so. Page 3

Incident An incident is described as: excessive delays - real or potential minor or non-inquiry accident that has the potential to affect traffic flow structural failure of the road. Actions The STMS must immediately conduct the following: stop all activity and traffic movement if required secure the site to prevent the prospect of injury or further damage notify the RCA representative and / or the engineer STMS to implement a plan to safely remove TTM and to establish normal traffic flow if safe to do so re-establish TTM and traffic movements when it is safe to do so and when traffic volumes have reduced. Detour Actions If because of the on-site activity it will not be possible to remove or reduce the effects of TTM once it is established a detour route must be designed. This is likely for: excessive delays when using an alternating flow design for TTM redirecting one direction of flow and / or total road closure and redirection of traffic until such time that traffic volumes reduce and tailbacks have been cleared. The risks in the type of work being undertaken, the risks inherent in the detour, the probable duration of closure and availability and suitability of detour routes need to be considered. The detour and route must be designed including: pre- approval form the RCA s whose roads will be used or affected by the detour route ensure that TTM equipment for the detour - signs etc are on site an pre-installed. Note also the requirements for no interference at an accident scene: When it is necessary to implement the pre-planned detour the STMS must immediately undertake the following: Notify the RCA and / or the engineer when the detour is to be established Drive through the detour in both directions to check that it is stable and safe Remove the detour as soon as it practicable and safe to do so and the traffic volumes have reduced and tailbacks have cleared Notify the RCA and / or the engineer when the detour has been disestablished and normal traffic flows have resumed. In the event of an accident involving serious harm the STMS must ensure that nothing, including TTM equipment, is removed or disturbed and any wreckage article or thing must not be disturbed or interfered with, except to: save a life of, prevent harm to or relieve the suffering of any person, or to maintain the access of the general public to an essential service or utility, or to prevent serious damage to or serious loss of property. Other contingencies to be identified by the applicant (i.e. steel plates to quickly cover excavations) Page 4

Authorisations Parking restriction(s) alteration authority Authorisation to work at permanent traffic signal sites Will controlled street parking be affected? Yes No Has approval been granted? Yes No Will portable traffic signals be used or permanent traffic signals be changed? Yes No Has approval been granted? Yes No Road closure authorisation(s) Will full carriageway closure continue for more than 5 minutes (or other RCA stipulated time)? Yes No Has approval been granted? Yes No Bus stop relocation(s) closure(s) Will bus stop(s) be obstructed by the activity? Yes No Has approval been granted? Yes No Authorisation to use Make, model and portable traffic description/number signals NZTA compliant? Yes No (delete either Yes or No) EED Is an EED applicable? Yes No (delete either Yes or No) EED attached? Yes Delay calculations/trial plan to determine potential extent of delays Public notification plan Public notification plan attached? Yes No (delete either Yes or No) On-site monitoring plan Attended (day and/or night) Unattended (day and/or night) Page 5

Method for recording daily site TTM activity (eg CoPTTM on-site record) Site safety measures Other information Site specific layout diagrams Number Title Page 6

Contact details Name 24/7 contact number CoPTTM ID Qualification Expiry date Principal TMC Engineers representative Contractor STMS TC Others as required TMP preparation Preparation Name (STMS qualified) Date Signature ID no. Qualification Expiry date This TMP meets CoPTTM requirements Number of diagrams attached TMP returned for correction (if required) Name Date Signature ID no. Qualification Expiry date Page 7

Engineer/TMC to complete following section when approval or acceptance required Approved by TMC/engineer (delete one) Name Date Signature ID no. Qualification Expiry date Acceptance by TMC (if required) Name Date Signature ID no. Qualification Expiry date Qualifier for engineer or TMC approval Approval of this TMP authorises the use of any regulatory signs included in the TMP or attached traffic management diagrams. This TMP is approved on the following basis: 1. To the best of the approving engineer s/tmc s judgment this TMP conforms to the requirements of CoPTTM. 2. This plan is approved on the basis that the activity, the location and the road environment have been correctly represented by the applicant. Any inaccuracy in the portrayal of this information is the responsibility of the applicant. 3. The STMS for the activity is reminded that it is the STMS s duty to postpone, cancel or modify operations due to the adverse traffic, weather or other conditions that affect the safety of this site. Notification to TMC prior to occupying worksite/notification completed Type of notification to TMC required Notification completed Date Time Page 8