ANDORA AVENUE TTM PROJECT Subsequent Draft EIR

Similar documents
TABLE OF CONTENTS. GENERAL DESCRIPTION OF THE ENVIRONMENTAL SETTING...II-1 A. Overview of Environmental Setting...II-1 B. Related Projects...

II. Corrections and Additions to the Draft EIR

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

Appendix Y-3. Environmental Impact Comparison Social Sciences Interdisciplinary Building

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR

NIGHTTIME ILLUMINATION

I-1: Page I-11, first paragraph, first sentence, 10,500 12,500 cubic yards would be exported.

South of Woodward Avenue Project

II. Corrections and Additions to the Draft EIR

ADDENDUM TO THE EIR. Specifically, Section of the CEQA Guidelines states:

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

Foothill College Facilities Master Plan State Clearinghouse #

47. RESPONSES TO COMMENTS FROM ALICIA HERNANDEZ, DATED MAY 9, 2011.

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Air Quality in the Eastern Sierra

South Coast Air Quality Management District

Herbert Hoover High School Athletic Facilities Upgrades Project Final Environmental Impact Report

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

Draft Environmental Impact Report Serramonte Views Condominiums and Hotel Project

III. Corrections and Additions

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings

ADDENDUM TO THE AVIANO ADULT COMMUNITY PROJECT ENVIRONMENTAL IMPACT REPORT

County of El Dorado Notice of Preparation Tilden Park Project

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

4.7 NOISE FUNDAMENTALS OF NOISE AND VIBRATION

Appendix B2. Air Dispersion Modeling

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

4.13 POPULATION, EMPLOYMENT, AND HOUSING; GROWTH INDUCEMENT; AND ENVIRONMENTAL JUSTICE

APPENDIX C COMMENTS AND RESPONSE TO COMMENTS RECEIVED ON DRAFT NEGATIVE DECLARATION

I-70 East ROD 1: Phase 1 (Central 70 Project) Air Quality Conformity Technical Report

Policy for PSD Modeling District Rule 2410 Guidance for Identifying Sources to be Evaluated for Inclusion in an Increment Assessment

II. Corrections and Additions

City of Palo Alto (ID # 7047) City Council Staff Report

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR

4.12 AIR QUALITY INTRODUCTION

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES

COMPARISON OF ALTERNATIVES

3 PROJECT DESCRIPTION

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA

DRAFT Environmental Impact Report

Sutter County Community Services

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November,

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

SMUD Franklin Electric Transmission Project. Initial Study and Mitigated Negative Declaration Addendum July 2017

ENVIRONMENTAL NOISE ASSESSMENT

NOTICE OF PREPARATION

5.0 PROJECT ALTERNATIVES

Commerce Park. Draft Environmental Impact Report. CITY OF FONTANA Citrus Commerce Park SCH SEPTEMBER 2014 VOLUME 1. Project Applicant:

DISNEYLAND RESORT SPECIFIC PLAN. Conditions of Approval (Ordinance No. 5377, as last amended by Ordinance No. 6022)

Downtown Estes Loop Project Frequently Asked Questions

CANYON POWER PROJECT FACT SHEET Anaheim Public Utilities

I. Introduction/Summary

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

Baseline Hillside Ordinance Correction Sheet (Ordinance No. 184,802 Effective 3/17/17)

APPENDIX C. Environmental Noise Assessment

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

4.10 NOISE. A. Fundamental Concepts of Environmental Acoustics

GLOBAL WARMING AND RESIDENTIAL REAL ESTATE DEVELOPMENT: THE CALIFORNIA EXPERIENCE

COMPARISON OF PROJECT AGAINST EXISTING CONDITIONS

Draft Initial Study Mitigated Negative Declaration

City of White Plains Westchester County, NY. Draft Generic Environmental Impact Statement

ORDER NO. An Order of the Board of Harbor Commissioners of the City of Los Angeles amending the Port of Los Angeles Tariff No. 4.

Re: Mobility Plan 2035 FEIR Greenhouse Gas Emissions Analysis

RENAISSANCE EAST ADDENDUM TO THE RENAISSANCE SPECIFIC PLAN FINAL ENVIRONMENTAL IMPACT REPORT VOLUME 1 OF 2 STATE CLEARINGHOUSE #

Executive Summary Introduction and Background

NOTICE OF PREPARATION

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

Letter No Impact Sciences, Inc Temporary use of the Rose Bowl by the NFL November 2012

Greenhouse Gas Emission Reduction Strategies

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

3.14 TRANSPORTATION AND TRAFFIC

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

4.2 AIR QUALITY. This section analyzes the temporary and long-term impacts to local and regional air quality resulting from onsite development.

Mitigation Measures INITIAL STUDY. Aesthetics

Lawndale High School Northeastern Campus Pedestrian & Traffic Safety Project CDE Checklist

FINAL SCOPING DOCUMENT

ADMINISTRATIVE HEARING STAFF REPORT

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

Appendix H Traffic Study

Residential Acres: 0 Lots: 0 Units: 0 Projected No. of Residents: 0 Commercial

CITY OF CLOVIS Traffic Impact Study Guidelines

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers

XI. Thornton Planning Area

Clean Air Act History

Notice of Preparation of an Environmental Impact Report and Scoping Meeting

JEFFERSON MIDDLE SCHOOL GYMNASIUM

Please refer to the Response to Comment 8.2 for information about the location of portions of the project site within 1,000 feet of a landfill.

Berth [China Shipping] Container Terminal Project - Environmental Review -

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

GOOD NEIGHBOR POLICY

5365 Cherry Avenue Opportunities for Learning Charter School

Appendix C2 Dispersion Modeling of Criteria Pollutants for the Southern California International Gateway Project (Tables and figures in Appendix C2

3.0 CUMULATIVE PROJECTS SCENARIO

Neighborhood Advisory Committee. EIR Process Overview. Chapman University April 20, 2016

IV.M.1 WATER SUPPLY 1. INTRODUCTION. 2. EXISTING CONDITIONS a. Water Supply i. Los Angeles Department of Water and Power (LADWP)

Transcription:

City of Los Angeles ANDORA AVENUE TTM PROJECT ENV-1986-0062-EIR 9503 Andora Avenue/Tentative Tract Map 53426 APCNV-2004-7308-ZC SCH No. 86052110 Volume I Prepared for: City of Los Angeles Department of City Planning Environmental Review Section 200 N. Spring Street, Room 750 Los Angeles, California 90012 Prepared by: I M PA C T S C I E N C E S, I N C. 234 E. Colorado Boulevard, Suite 205 Pasadena, California 91101 (626) 564-1500 FAX (626) 564-1501

ANDORA AVENUE TTM PROJECT ENV-1986-0062-EIR 9503 Andora Avenue/Tentative Tract Map 53426 APCNV-2004-7308-ZC SCH No. 86052110 Volume I Prepared for: City of Los Angeles Department of City Planning Environmental Review Section 200 N. Spring Street, Room 750 Los Angeles, California 90012 Prepared by: Impact Sciences, Inc. 234 East Colorado Boulevard, Suite 205 Pasadena, California 91101

TABLE OF CONTENTS Volume I Section Page I INTRODUCTION... I-1 II III IV V VI VII VIII SUMMARY...II-1 PROJECT DESCRIPTION... III-1 ENVIRONMENTAL IMPACT ANALYSIS... IV-1 IV.A Aesthetics and Views... IV.A-1 IV.B Biological Resources...IV.B-1 IV.C Air Quality... IV.C-1 IV.D Cultural Resources...IV.D-1 IV.E Geology...IV.E-1 IV.F Water Resources...IV.F-1 IV.G Land Use... IV.G-1 IV.H Noise... IV.H-1 IV.I Public Services... IV.I-1 IV.I.1 Police Protection...IV.I.1-1 IV.I.2 Fire Protection and Emergency Medical Services...IV.I.2-1 IV.I.3 Public Schools...IV.I.3-1 IV.J Transportation... IV.J-1 IV.K Public Utilities... IV.K-1 IV.K.1 Water... IV.K.1-1 IV.K.2 Wastewater... IV.K.2-1 GROWTH INDUCEMENT...V-1 PROJECT ALTERNATIVES... VI-1 EFFECTS FOUND NOT TO BE SIGNIFICANT...VII-1 ORGANIZATIONS AND PERSONS CONTACTED, REFERENCES...VIII-1 Los Angeles Department of City Planning i Andora Avenue Subdivision Tentative Tract No. 53426

Volume II Appendices I IV.B IV.C IV.E IV.G IV.H IV.I IV.J EIR Summary Table Summary Tree Report Emissions Calculations Construction Emissions Localized Significance Threshold Analysis Operational Emissions CO Hotspots Greenhouse Gas Emissions Geotechnical Reports Reconnaissance Geotechnical Investigation Supplemental Geotechnical Report Geolabs Response to Review Letters Slope Analysis Noise Calculations Construction Noise Calculations Off-Site CNEL for Existing and Future Conditions Correspondence with Los Angeles Fire Department Traffic Documentation Traffic Impact Evaluation, updated August 2009 Los Angeles Department of Transportation Letter of Approval, January 21, 2010 Los Angeles Department of City Planning ii Andora Avenue Subdivision Tentative Tract No. 53426

Figure LIST OF FIGURES III-1 Site Vicinity... III-3 III-2 Regional Location... III-4 III-3 Aerial Photo... III-5 III-4 Tentative Tract Map... III-6 III-5 Related Projects... III-10 IV.A-1 Photo Location Map...IV.A-3 IV.A-2 Site Photos 1 and 2... IV.A-4 IV.A-3 Site Photos 3 and 4... IV.A-5 IV.A-4 Site Photos 5 and 6... IV.A-6 IV.A-5 Site Photos 7 and 8... IV.A-7 IV.A-6 Topographic Section Location Map... IV.A-16 IV.A-7 Topographic Sections...IV.A-17 IV.B-1 Vegetation Map...IV.B-3 IV.B-2 Fuel Modification and Grading Impacts...IV.B-46 IV.C-1 South Coast Air Basin... IV.C-5 IV.G-1 Equestrian Trails... IV.G-5 IV.G-2 Conservation Element... IV.G-6 IV.H-1 Noise Attenuation by Barriers and Elevation Differences... IV.H-3 IV.H-2 Land Use Compatibility Guidelines... IV.H-10 IV.H-3 Noise Levels of Typical Construction Equipment... IV.H-17 IV.J-1 Existing Traffic Volumes AM Peak Hour... IV.J-5 IV.J-2 Existing Traffic Volumes PM Peak Hour...IV.J-6 IV.J-3 Project Distribution... IV.J-13 IV.J-4 Project Traffic Assignment Percentages... IV.J-14 IV.J-5 Project Traffic Volumes AM/PM Peak Hour...IV.J-15 IV.J-6 Future (2010) Traffic Volumes Without Project AM Peak Hour...IV.J-16 IV.J-7 Future (2010) Traffic Volumes Without Project PM Peak Hour... IV.J-17 IV.J-8 Future (2010) Traffic Volumes With Project AM Peak Hour...IV.J-18 IV.J-9 Future (2010) Traffic Volumes With Project PM Peak Hour...IV.J-19 VII-1 Areas of Potential Exposure to Santa Susana Field Laboratory Contamination...VII-5 Page Los Angeles Department of City Planning iii Andora Avenue Subdivision Tentative Tract No. 53426

Table LIST OF TABLES III-1 Related Projects... III-8 IV.B-1 Special-Status Plant Species Reported in the Region of the Project...IV.B-8 IV.B-2 Special-Status Animal Species Reported in the Region of the Andora Site...IV.B-16 IV.B-3 Summary of Impacts to Vegetation...IV.B-45 IV.B-4 Related Projects... IV.B-59 IV.C-1 Ambient Pollutant Concentrations Registered for SRA 6... IV.C-2 IV.C-2 Top Five GHG Producer Countries and the European Union... IV.C-9 IV.C-3 GHG Emissions in California... IV.C-10 IV.C-4 Comparison of Global Pre-Industrial and Current GHG Concentrations... IV.C-12 IV.C-5 National Ambient Air Quality Standards and Designations South Coast Air Basin (Los Angeles County)... IV.C-14 IV.C-6 California Ambient Air Quality Standards and Designations South Coast Air Basin (Los Angeles County)... IV.C-15 IV.C-7 AB 32 Scoping Plan Measures... IV.C-28 IV.C-8 SCAQMD Daily Construction Emission Thresholds... IV.C-35 IV.C-9 SCAQMD Localized Significance Thresholds for SRA 6... IV.C-36 IV.C-10 SCAQMD Daily Operation Emission Thresholds... IV.C-37 IV.C-11 Estimated Unmitigated Construction Emissions... IV.C-41 IV.C-12 Modeling Results Maximum Impacts at Residential Receptors... IV.C-43 IV.C-13 Estimated Unmitigated Operational Emissions... IV.C-44 IV.C-14 Maximum Future Carbon Monoxide Concentrations With Project... IV.C-47 IV.C-15 One-Time Estimated Greenhouse Gas Emissions... IV.C-53 IV.C-16 Annualized Estimated Greenhouse Gas Emissions... IV.C-53 IV.H-1 Outside to Inside Noise Attenuation... IV.H-2 IV.H-2 Existing Weekday Modeled Roadway Noise Levels... IV.H-7 IV.H-3 Presumed Ambient Noise Levels... IV.H-9 IV.H-4 City of Los Angeles Land Use Compatibility for Community Noise... IV.H-12 IV.H-5 Construction Equipment Noise Levels... IV.H-15 IV.H-6 Weekday Modeled Roadway Noise Levels with Project... IV.H-18 IV.H-7 Weekday Modeled Roadway Noise Levels with Cumulative Projects... IV.H-20 IV.I.2-1 LAFD Fire Code Standards Applicable to the Proposed Project...IV.I.2-3 IV.I.3-1 Los Angeles Unified School District Local District 1 Number of School Types...IV.I.3-1 IV.I.3-2 Project Attendance Boundary School s Operating Capacity for the 2007 2008 School Year...IV.I.3-2 IV.I.3-3 Los Angeles Unified School District Student Generation Ratio by Dwelling Type and Grade Level...IV.I.3-5 IV.J-1 Level of Service as a Function of CMA Values...IV.J-4 IV.J-2 Critical Movement Analysis Summary Existing 2008 Conditions...IV.J-7 IV.J-3 Project Traffic Generation... IV.J-11 IV.K.2-1 Project Wastewater Generation... IV.K.2-5 VI-1 Alternative 2 Lower Intensity Alternative Impacts... VI-4 VII-1 Solid Waste Generation...VII-10 Page Los Angeles Department of City Planning iv Andora Avenue Subdivision Tentative Tract No. 53426