ADDENDUM NUMBER TWO MECHANICAL CONSTRUCTION IDC 2015 (SEED PROJECT H51-N342-FW DATA CENTER CRAC) H51-D159-FW (Seed Project H51-N342/MUSC#50025)

Similar documents
Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

PIPE AND TUBE RAILINGS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

LAGUARDIA COMMUNITY COLLEGE - CUNY August 3, 2009

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION EXPANSION CONTROL

PREFABRICATED STEEL TRUSS SPECIFICATIONS

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

SECTION METAL BUILDING SYSTEMS

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM

SECTION PLATE CONNECTED WOOD TRUSSES

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE

1. Cast-in-place concrete is specified in Section

American Metal Specialties, Inc.

SECTION ALUMINUM RAILINGS

SECTION ACOUSTICAL PANEL CEILINGS

SECTION DECORATIVE METAL AND GLASS RAILING

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

A. Access doors and frames are part of an access door and frame allowance.

Project Address: Name of Person Completing Form:

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

SPECIFICATIONS: Architectural Aluminum Railings

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION TURBINE VENTILATORS

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

SECTION CLIMBING WALLS

MAINTENANCE MEZZANINE PROJECT NO CONTRACT NO

SECTION METAL MATERIALS, METHODS AND FASTENING

SECTION PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY 1.3 PERFORMANCE REQUIREMENTS

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

SECTION PANEL AND POST AND PYLON SIGNAGE. 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs.

SECTION CHAIN-LINK FENCES AND GATES 02821/1

Specification Lightning Protection Systems

BEARING METAL STUD FRAMING

SECTION CANOPIES. Display hidden notes to specifier. (Don't know how? Click Here) Copyright ARCAT, Inc. - All rights reserved

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

Table of Contents. List of Drawings

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

Division 11 - Equipment Section 11401

SECTION PREFABRICATED PIPE BRIDGE(s)

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION UNIT MASONRY SYSTEM

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

Fig Beam Clamp Retaining Strap (B-Line B3367)

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

Aluminum Component Pipe Railings

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS. 1. Hangers and supports for electrical equipment and systems.

SECTION ORNAMENTAL HANDRAILS AND RAILINGS

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College


Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation.

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

A. Product Data: For each type of deck, accessory, and product indicated.

Specifications for FL-100 Soffit Panel

SECTION GYPSUM BOARD ASSEMBLIES

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS

SECTION MASONRY ACCESSORIES

CURTAINWALL DEFLECTION SOLUTIONS

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

Section 906. STRUCTURAL STEEL

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM

B. Related Requirements: 1. [Section "Door Hardware"] for door hardware for hollow metal doors.

The designer shall also submit additional information required by the University as described and underlined below.

DIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: CAST CONNEX CORPORATION

A. Product Data shall be provided for each type of product indicated.

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

SECTION SEISMIC CONTROL OSHPD

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Pultruded Grating/Treads and Fabrications REVISED

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Baffle Wall Panel Products and Fabrications REVISED 11.

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

Wall Panels. Structural wall panel. Architectural wall panel. Cladding wall panel. Sandwich wall panel

Smarter. Safer. Leaner.

Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION

SECTION ROLLER GATES

PIPE AND TUBE RAILINGS

Transcription:

ADDENDUM NUMBER TWO August 24, 205 PROJECT NAME: PROJECT NUMBER: MECHANICAL CONSTRUCTION IDC 205 (SEED PROJECT H5-N342-FW DATA CENTER CRAC) H5-D59-FW (Seed Project H5-N342/MUSC#50025). MODIFICATIONS TO THE SPECIFICATIONS A. Insert new specification 05200 Structural Steel Framing included in this addendum into the base bid specifications. B. Insert new specification 2643 Lightning Protection System included in this addendum into the base bid specifications. 2. CHANGES TO DRAWINGS A. Replace drawing M0 in base bid set with drawing M0 included in this addendum. B. Replace drawing M00 in base bid set with drawing M00 included in this addendum. C. Replace drawing M0 in base bid set with drawing M0 included in this addendum. D. Replace drawing M05 in base bid set with drawing M05 included in this addendum. E. Replace drawing ED0 in base bid set with drawing ED0 included in this addendum. F. Replace drawing E0 in base bid set with drawing E0 included in this addendum. G. Replace drawing E20 in base bid set with drawing E20 included in this addendum. 3. QUESTIONS FROM CONTRACTORS A. Please supply Steel Specifications. See specification 05200 included in this addendum. B. Please supply Welding Instructions See Drawing M0 included in this addendum. COLUMBIA P.O. Box 50644 Columbia, SC 29250 2330 Main Street Columbia, SC 2920 Phone (803) 765-942 Fax (803) 765-9848 CHARLESTON 45-D Jessen Lane Wando, SC 29492 Phone (843) 725-086 Web www.mecainc.com

August 25, 205 Addendum No. Two MECHANICAL CONSTRUCTION IDC 205 (SEED PROJECT H5-N342-FW DATA CENTER CRAC) H5-D59-FW (Seed Project H5-N342/MUSC#50025) Page 2 of 3 C. Please supply locations on the walls for the brackets for the piping there are no dimensions on the brackets, connect details, etc. See Drawing M05 included in this addendum. D. Please supply Roofing specifications. Also who is the original roofer (who is the warranty under for the roof) Carolina Roofing E. Please supply Flashing details. See details on drawings. F. Please assist with information on the Steel structures on the roof what are the sizes, gauges, dimension, etc. See details on drawings. Sizes are a part of means and methods. G. Please supply specification for Re-Fire proofing specifications for Fire protection on steel. The building is a 2 hour protected structure. Use Carboline s Southwest Type 7GP product or equal. H. What needs to be painted and what type of paint? No painting will be required. I. What is the brand name of the windows and the original installer? Unknown J. Regarding Sheet E20, we looked for the Panels 3H2-B and 3H2-C with MUSC personnel during the prebid and no one could locate them. Are they on the 3 rd floor or the 6 th floor and in what location? Circuits for DCA-, DCAC-3, ACC-7, and ACC-8 have been relocated to existing emergency panel 6H# as indicated drawings E0 and E20 included in this addendum. K. Are we going to need to provide any electrical for any temporary cooling, during the process of the CRAC units being demoed and replaced? Temporary power will be provided by MUSC. L. Regarding the controls, and VESDA, BAS, etc, are they handled by the mechanical contractor or MUSC on this project? Unit controls are provided by the manufacturer. Unit is compatible with JCI campus wide controls. COLUMBIA P.O. Box 50644 Columbia, SC 29250 2330 Main Street Columbia, SC 2920 Phone (803) 765-942 Fax (803) 765-9848 CHARLESTON 45-D Jessen Lane Wando, SC 29492 Phone (843) 725-086 Web www.mecainc.com

August 25, 205 Addendum No. Two MECHANICAL CONSTRUCTION IDC 205 (SEED PROJECT H5-N342-FW DATA CENTER CRAC) H5-D59-FW (Seed Project H5-N342/MUSC#50025) Page 3 of 3 M. Who is the Fire Alarm vendor for this data center, we assume while we are installing new conduits under the floor, the FA will need to be disabled. Fire Alarm System vendor is L&S Electronics. The existing FACP is manufactured by Edwards and is located on the St floor behind the elevator lobby. N. Sheet E20 has a note regarding extending the lightning protection system to the new ACC units, it states see lightning protection extension notes, this sheet, but did not see any notes. Can the LP system extension be clarified? To clarify the lightning protection system extension, E20 was changed to indicate the existing system and extension and Section 2643 was added to the specifications. O. Is there any heat tape needed on the piping, and if so, where are those circuits being fed from? No END OF ADDENDUM TWO COLUMBIA P.O. Box 50644 Columbia, SC 29250 2330 Main Street Columbia, SC 2920 Phone (803) 765-942 Fax (803) 765-9848 CHARLESTON 45-D Jessen Lane Wando, SC 29492 Phone (843) 725-086 Web www.mecainc.com

State Project Number: H5-N342-FW Bid Documents 7/7/205 PART GENERAL. RELATED DOCUMENTS SECTION 05 2 00 STRUCTURAL STEEL FRAMING A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 Specification Sections, apply to this Section..2 SUMMARY A. Section Includes:. Structural steel. 2. Bearing Plates B. Products furnished, but not installed under this Section:. Anchor rods and embed plates indicated to be built into masonry, installed under Division 04 Section "Unit Masonry". C. Related Sections:.3 DEFINITIONS. Division 0 Section "Quality Requirements" for independent testing agency procedures and administrative requirements. 2. Division 05 Section "Post Installed Structural Anchors" for wedge, and adhesive anchors A. Structural Steel: Elements of structural-steel frame, as classified by AISC 303, "Code of Standard Practice for Steel Buildings and Bridges" and as modified herein..4 PERFORMANCE REQUIREMENTS A. Connections: Provide details of connections required by the Contract Documents to be selected or completed by structural-steel fabricator, including comprehensive engineering design by a qualified professional engineer, to withstand loads indicated and comply with other information and restrictions indicated.. Select and complete connections using AISC 360. 2. Use LRFD; data are given at factored-load level. Structural Steel Framing 05 2 00 -

State Project Number: H5-N342-FW Bid Documents 7/7/205 3. All bolted connections for bracing members shall be designed and fabricated as slip critical connections to allow for field reaming of holes to address fit up issues. 4. All bolted connections for axial loaded members shall be designed and fabricated as slip critical connection to allow for field reaming of holes to address fit up issues. 5. The minimum number of bolts for any connection shall be two. 6. All steel to steel connections shall extend at least two thirds of the depth of the supported member being connected. B. Connections: Provide details of connections required by the Contract Documents to be selected or completed by structural-steel fabricator to withstand loads indicated and comply with other information and restrictions indicated..5 SUBMITTALS. Select and complete connections using schematic details indicated and AISC 360 A. Product Data:. Primers 2. Paints 3. Electrodes a. Indicate what welding process will be used with each electrode b. Submit electrodes for both shop and field welding c. Provide manufacturer's standard certificate of conformance indicating compliance with the requirements for H5 as tested in accordance with AWS A4.3 4. Post installed structural anchors: See specification section 050520 B. Shop Drawings: Show fabrication of structural-steel components.. Include details of cuts, connections, splices, camber, holes, and other pertinent data. 2. Include embedment drawings showing plan location and elevation of all embedded items. 3. Indicate welds by standard AWS symbols, distinguishing between shop and field welds, and show size, length, and type of each weld. Show backing bars that are to be removed and supplemental fillet welds where backing bars are to remain. Structural Steel Framing 05 2 00-2

State Project Number: H5-N342-FW Bid Documents 7/7/205 4. Indicate type, size, and length of bolts, distinguishing between shop and field bolts. Include scale drawings of all gusset plates. 5. Provide minimum /4" thick cap plates at the ends of all exposed HSS members, and at the top of all HSS columns. 6. Equally space filler beams or joists between columns and/or other dimensioned beams unless noted otherwise. Identify members and connections of the seismicload-resisting system. C. Delegated-Design Submittal:. For structural steel connections indicated to comply with design loads provide structural design data signed and sealed by the qualified professional engineer responsible for their preparation. a. Each individual calculation shall be clearly labeled in coordination with erection drawings such that it identifies the member(s) that the connection applies to. 2. Professional Engineer's Statement: A written statement indicating that the for fabrication shop drawings incorporate all the connection requirements included in the calculations submitted for approval inclusive of any corrections required in response to shop drawing review comments. The statement shall be prepared by, and signed and sealed by the professional engineer that completed the calculations submittal. D. Minutes of preinstallation conference..6 QUALITY ASSURANCE A. Engineering Responsibility: Preparation of Shop Drawings, design calculations, and other structural data by a qualified professional engineer. B. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. C. Fabricator Qualifications: A qualified fabricator that participates in the AISC Quality Certification Program and is designated an AISC-Certified Plant, Category SBD (Conventional Steel Building Structures) D. Fabricator Responsibility. The structural steel fabricator shall be responsible for enlisting the Cold Formed Steel Purlin fabricator as a direct subcontractor. 2. The structural steel fabricator shall be responsible for enlisting the steel erector as a direct subcontractor. Structural Steel Framing 05 2 00-3

State Project Number: H5-N342-FW Bid Documents 7/7/205 E. Structural Steel and Architectural Structural Steel Installer Qualifications: The erector shall be experienced in installing structural steel equal in material, design and scope to the structural steel required for this project. F. Post Installed Structural Anchor Installer: See specification section 050520 for requirements G. Welding Qualifications: Qualify procedures and personnel according to AWS D./D.M, "Structural Welding Code - Steel.". Welders and welding operators performing work on bottom-flange, demandcritical welds shall pass the supplemental welder qualification testing, as required by AWS D.8. FCAW-S and FCAW-G shall be considered separate processes for welding personnel qualification. H. Comply with applicable provisions of the following specifications and documents:. AISC 303. 2. AISC 34 and AISC 34s. 3. AISC 360. 4. RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts." I. Preinstallation Conference: Conduct conference at Project site.. Review special inspection and testing and inspecting agency procedures for field quality control. 2. Review items requiring special inspection and testing that must be tested and inspected prior to installation of decking, concrete slabs, or other items that might limit access to the item to be tested or inspected 3. Review welding requirements 4. Review electrode storage requirements 5. Review pre-construction bolt installation verification 6. Review bolt installation calibration requirements.7 DELIVERY, STORAGE, AND HANDLING A. Store materials to permit easy access for inspection and identification. Keep steel members off ground and spaced by using pallets, dunnage, or other supports and spacers. Protect steel members and packaged materials from corrosion and deterioration. Structural Steel Framing 05 2 00-4

State Project Number: H5-N342-FW Bid Documents 7/7/205. Do not store materials on structure in a manner that might cause distortion, damage, or overload to members or supporting structures. Repair or replace damaged materials or structures as directed. B. Store fasteners in a protected place in sealed containers with manufacturer's labels intact..8 COORDINATION. Fasteners may be repackaged provided Owner's testing and inspecting agency observes repackaging and seals containers. 2. Clean and relubricate bolts and nuts that become dry or rusty before use. 3. Comply with manufacturers' written recommendations for cleaning and lubricating ASTM F 852 fasteners and for retesting fasteners after lubrication. A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers' recommendations to ensure that shop primers and topcoats are compatible with one another. B. Coordinate installation of anchorage items to be embedded in or attached to other construction without delaying the Work. Provide setting diagrams, sheet metal templates, instructions, and directions for installation. PART 2 - PRODUCTS 2. STRUCTURAL-STEEL MATERIALS A. W-Shapes and Tees: ASTM A 992. B. Channels, Angles Shapes:. ASTM A 36 unless noted otherwise 2. ASTM A 572/A 572M, Grade 50 where indicated. C. Plate and Bar:. ASTM A 36 unless noted otherwise 2. ASTM A 572/A 572M, Grade 50 where indicated. D. Cold-Formed Hollow Structural Sections: ASTM A 500, Grade B, structural tubing.. Square or Rectangular HSS: Fy=46 KSI 2. Round HSS: Fy=42 KSI E. Welding Electrodes: Comply with AWS requirements. Structural Steel Framing 05 2 00-5

State Project Number: H5-N342-FW Bid Documents 7/7/205. All weld filler metal shall meet the requirements of H6 as tested in accordance with AWS A4.3 per AISC 34-05 Appendix W. 2. All weld filler metal shall have a minimum CVN toughness of 20 ft-lbs at 0 degrees Fahrenheit. 3. Demand Critical Welds: All weld filler metal shall have a minimum CVN toughness of 20 ft-lbs at minus 0 degrees Fahrenheit per AWS and 40 ft-lbs at 70 degrees Fahrenheit per AISC 34-05 Appendix X. 2.2 BOLTS, CONNECTORS, AND ANCHORS A. High-Strength Bolts, Nuts, and Washers: ASTM A 325, Type, heavy hex steel structural bolts; ASTM A 563 heavy hex carbon-steel nuts; and ASTM F 436 hardened carbon-steel washers.. Finish: a. Plain for primed or painted steel b. Hot-dip zinc coating, ASTM A 53/A 53M, Class C for hot dip galvanized steel. 2. Direct-Tension Indicators: ASTM F 959, Type 325 compressible-washer type. a. Finish: ) Plain for unprimed steel or steel receiving standard shop primer. 2) Mechanically deposited zinc coating, ASTM B 695, Class 50 for hot galvanized steel or steel to receive high performance top coating. B. Threaded Rods: ASTM A 36 unless noted otherwise.. Nuts: ASTM A 563 heavy hex carbon steel. 2. Washers: ASTM A 36/A 36M carbon steel. 3. Finish: a. Plain for unprimed steel or steel receiving standard shop primer. b. Hot-dip zinc coating, ASTM A 53/A 53M, Class C for hot galvanized steel or steel to receive high performance top coating. C. Post Installed Structural Anchors: See specification section 055020 for products 2.3 PRIMER A. Standard Primer: Fabricator's standard lead- and chromate-free, nonasphaltic, rustinhibiting primer. Structural Steel Framing 05 2 00-6

State Project Number: H5-N342-FW Bid Documents 7/7/205 2.4 PAINT. Typical all primed steel unless noted otherwise A. Galvanizing Repair Paint: ASTM A 780. 2.5 FABRICATION A. Structural Steel: Fabricate and assemble in shop to greatest extent possible. Fabricate according to AISC's "Code of Standard Practice for Steel Buildings and Bridges" and AISC 360.. Camber structural-steel members where indicated. 2. Fabricate beams with rolling camber up. 3. Identify high-strength structural steel according to ASTM A 6/A 6M and maintain markings until structural steel has been erected. 4. Mark and match-mark materials for field assembly. 5. Complete structural-steel assemblies, including welding of units, before starting shop-priming operations. B. Thermal Cutting: Perform thermal cutting by machine to greatest extent possible.. Plane thermally cut edges to be welded to comply with requirements in AWS D./D.M. C. Bolt Holes: Cut, drill, mechanically thermal cut, or punch standard bolt holes perpendicular to metal surfaces. D. Finishing: Accurately finish ends of columns and other members transmitting bearing loads. E. Holes: Provide holes required for securing other work to structural steel and for other work to pass through steel framing members.. Cut, drill, or punch holes perpendicular to steel surfaces. Do not enlarge holes by burning. 2. Baseplate Holes: Cut, drill, mechanically thermal cut, or punch holes perpendicular to steel surfaces. 3. Weld threaded nuts to framing and other specialty items indicated to receive other work. Structural Steel Framing 05 2 00-7

State Project Number: H5-N342-FW Bid Documents 7/7/205 2.6 SHOP CONNECTIONS A. High-Strength Bolts: Shop install high-strength bolts according to RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts" for type of bolt and type of joint specified.. Joint Type: a. Snug tightened unless noted otherwise B. Weld Connections: Comply with AWS D./D.M and AWS D.8/D.8M for tolerances, appearances, welding procedure specifications, weld quality, and methods used in correcting welding work.. Assemble and weld built-up sections by methods that will maintain true alignment of axes without exceeding tolerances in AISC 303 for mill material. 2. Remove backing bars and runoff tabs, back gouge, and grind steel smooth. 2.7 CLEANING AND SHOP PRIMING A. Cleaning: 2.8 GALVANIZING. Clean and prepare steel surfaces that are to remain unprimed according to SSPC- SP 2, "Hand Tool Cleaning." 2. Clean and prepare steel surfaces that are to receive standard primer according to SSPC-SP 3, "Power Tool Cleaning." 3. Clean and prepare steel surfaces that are to receive special primer according to the associated painting specification. When not specifically noted the minimum cleaning shall be SSPC-SP 6, "Commercial Blast Cleaning." A. Hot-Dip Galvanized Finish: Apply zinc coating by the hot-dip process to structural steel according to ASTM A 23/A 23M.. Fill vent and drain holes that will be exposed in the finished Work unless they will function as weep holes, by plugging with zinc solder and filing off smooth. 2. Galvanize loose and hung lintels, shelf angles, all exposed exterior steel and all steel located in exterior masonry walls unless noted otherwise. Coordinate with drawings and specifications. a. Galvanized elements to be top coated shall not be quenched, and shall be swept blast to ensure proper adhesion of top coats. Structural Steel Framing 05 2 00-8

State Project Number: H5-N342-FW Bid Documents 7/7/205 2.9 SOURCE QUALITY CONTROL A. Testing Agency: Owner will engage an independent testing and inspecting agency to perform shop tests and inspections and prepare test reports.. Provide testing agency with access to places where structural-steel work is being fabricated or produced to perform tests and inspections B. All source quality control shall be completed by the fabricator s personnel unless noted otherwise and shall be in accordance with the certified fabricator s quality control manual, AISC Code of Standard Practice, and AWS D.. C. Testing Agency: Fabricator will engage an independent testing and inspecting agency to perform shop tests and inspections and prepare test reports as required. D. Special inspections are not required at the source of fabrication based on the requirement for an AISC certified fabricator. E. Correct deficiencies in Work that test reports and inspections indicate does not comply with the Contract Documents. F. Bolted Connections: Shop-bolted connections will be tested and inspected according to RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts." G. Welded Connections: In addition to visual inspection, shop-welded connections will be tested and inspected according to AWS D./D.M. H. In addition to visual inspection, shop-welded shear connectors will be tested and inspected according to requirements in AWS D./D.M for stud welding and as follows: PART 3 - EXECUTION 3. EXAMINATION. Bend tests will be performed if visual inspections reveal either a less-thancontinuous 360-degree flash or welding repairs to any shear connector. 2. Tests will be conducted on additional shear connectors if weld fracture occurs on shear connectors already tested, according to requirements in AWS D./D.M. A. Verify, with steel Erector present, elevations of concrete- and masonry-bearing surfaces and locations of anchor rods, bearing plates, and other embedments for compliance with requirements.. Prepare a certified as-built survey of bearing surfaces, anchor rods, bearing plates, and other embedments showing dimensions, locations, angles, and elevations. B. Proceed with installation only after unsatisfactory conditions have been corrected. Structural Steel Framing 05 2 00-9

State Project Number: H5-N342-FW Bid Documents 7/7/205 3.2 PREPARATION A. Provide temporary shores, guys, braces, and other supports during erection to keep structural steel secure, plumb, and in alignment against temporary construction loads and loads equal in intensity to design loads. Remove temporary supports when permanent structural steel, connections, and bracing are in place unless otherwise indicated. 3.3 ERECTION A. Set structural steel accurately in locations and to elevations indicated and according to AISC 303 and AISC 360. B. Base and Bearing Plates: Clean concrete- and masonry-bearing surfaces of bondreducing materials, and roughen surfaces prior to setting plates. Clean bottom surface of plates.. Where ungrouted anchor rod sleeves are required caulk the annular surface between the sleeve and the anchor rod to prevent grout from entering the sleeves. 2. Set plates for structural members on wedges, shims, or setting nuts as required. 3. Weld plate washers to top of baseplate as indicated. 4. Snug-tighten anchor rods after supported members have been positioned and plumbed. Do not remove wedges or shims but, if protruding, cut off flush with edge of plate before packing with grout. 5. Promptly pack grout solidly between bearing surfaces and plates so no voids remain. Neatly finish exposed surfaces; protect grout and allow to cure. Comply with manufacturer's written installation instructions for shrinkage-resistant grouts. a. Use grout forms and grout surcharging as required to ensure that grout completely fills the space below bearing or base plate, and no voids remain. C. Maintain erection tolerances of structural steel within AISC's "Code of Standard Practice for Steel Buildings and Bridges." D. Align and adjust various members that form part of complete frame or structure before permanently fastening. Before assembly, clean bearing surfaces and other surfaces that will be in permanent contact with members. Perform necessary adjustments to compensate for discrepancies in elevations and alignment.. Level and plumb individual members of structure. 2. Make allowances for difference between temperature at time of erection and mean temperature when structure is completed and in service. Structural Steel Framing 05 2 00-0

State Project Number: H5-N342-FW Bid Documents 7/7/205 E. Do not use thermal cutting during erection unless approved by Architect. Finish thermally cut sections within smoothness limits in AWS D./D.M. F. Do not enlarge unfair holes in members by burning or using drift pins. Ream holes that must be enlarged to admit bolts. G. Shelf Angles anchored to steel frame:. Sequencing of shelf angle installation shall be as indicated in drawings 2. Unless noted otherwise do not permanently attach shelf angles until concrete slabs have been poured and cured. 3. Once slabs have been poured and cured coordinate final elevation of shelf angle with contract documents and masonry contractor and permanently fasten. 4. Do not located based on local member geometry. 3.4 FIELD CONNECTIONS A. High-Strength Bolts: Install high-strength bolts according to RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts" for type of bolt and type of joint specified.. Joint Type: As indicated on shop drawings. B. Finger Tight Bolts: All joints noted as finger tight shall be hand tightened as required to install elements. Do not tighten by mechanical means. Provide jam nuts to prevent nut from backing off. 2. After initial tightening turn nut and jam nut in opposite direction to bind them against one another. C. Weld Connections: Comply with AWS D./D.M and AWS D.8/D.8M for tolerances, appearances, welding procedure specifications, weld quality, and methods used in correcting welding work.. Comply with AISC 303 and AISC 360 for bearing, alignment, adequacy of temporary connections, and removal of paint on surfaces adjacent to field welds. 2. Assemble and weld built-up sections by methods that will maintain true alignment of axes without exceeding tolerances in AISC's "Code of Standard Practice for Steel Buildings and Bridges" for mill material. D. Post Installed Structural Anchors: See specification section 055020 for products Structural Steel Framing 05 2 00 -

State Project Number: H5-N342-FW Bid Documents 7/7/205 3.5 FIELD PAINTING A. Field painting of structural steel for finished appearance in exposed conditions or for high performance coating systems is specified in Division 09 painting sections. 3.6 FIELD QUALITY CONTROL A. Testing and Inspection: Owner will engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports in accordance with the schedule of special inspections. B. Correct deficiencies in Work that test reports and inspections indicate does not comply with the Contract Documents. C. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements. 3.7 REPAIRS AND PROTECTION A. Galvanized Surfaces: Clean areas where galvanizing is damaged or missing and repair galvanizing to comply with ASTM A 780. B. Touchup Painting: At all exterior and exposed interior conditions promptly clean, prepare, and prime or reprime field connections, rust spots, and abraded surfaces of prime-painted joists, bearing plates, abutting structural steel, and accessories.. Clean and prepare surfaces by hand-tool cleaning, SSPC-SP 2, or power-tool cleaning, SSPC-SP 3. 2. Apply a primer of same type as shop primer used on adjacent surfaces. Coordinate with Part 2 priming requirements END OF SECTION 05 2 00 Structural Steel Framing 05 2 00-2

State Project Number: H5-N342-FW Bid Documents 7/7/205 PART - GENERAL.0 RELATED DOCUMENTS.02 SCOPE SECTION 26 4 3 LIGHTNING PROTECTION SYSTEM A. The following apply to the work under this section:. Section 26 05 00, Electrical, General 2. Section 26 20 00, Interior Wiring Systems A. Provide a complete, Master Labeled lightning protection system. B. Pay for and obtain UL Master Label inspection service and label "C." Requires SPD s on all incoming lines. Affix label to building in a location directed by Architect and in compliance with UL requirements..03 APPLICABLE CODES AND STANDARDS A. The latest editions of the following codes and standards apply to this work:.04 SUBCONTRACTORS. LPI-75 - Lightning Protection Institute Standard 2. NFPA 780 - Lightning Protection Code 3. UL 96/96A - Master Labeled Lightning Protection Systems 4. NFPA 70 - National Electrical Code. A. The lightning protection equipment and equipment shall be furnished and installed by a subcontractor or manufacturer whose principal business is the provision of lightning protection systems and who is a franchised or authorized dealer representative of a recognized manufacturer of lightning protection equipment and systems, as approved by the Engineer. B. System components shall be by Thompson Lightning Protection Company, Heary Brothers, Harger or approved equal..05 DRAWINGS A. The drawings accompanying these specifications are diagrammatic only and do not represent detailed requirements for the system. LIGHTNING PROTECTION SYSTEM 26 4 3 -

State Project Number: H5-N342-FW Bid Documents 7/7/205 B. Provide complete, labeled system including all hardware and appurtenances and perform detailed design based on complete plans and specifications for all trades. C. Consult drawings of all trades for requirements and coordinate with construction. PART 2 - PRODUCTS 2.0 MATERIALS A. Air Terminals: Solid copper, bronze, or aluminum, minimum /2-inch diameter; lengths and bases to suit mounting conditions and to comply with Master Label requirements. B. Conductors: Stranded, minimum AWG #5 strand, copper; minimum weight 375 pounds per 000 feet, or equivalent aluminum. PART 3 - EXECUTION 3.0 INSTALLATION A. Bonding: Bond all metal structures, equipment, structural metal and piping on roof. END OF SECTION LIGHTNING PROTECTION SYSTEM 26 4 3-2

38 37 36 35 34 33 32 3 30 29 28 27 26 25 24 23 22 2 20 9 8 7 6 5 4 3 2 0 9 8 7 6 5 4 3 2 NEW 3/4" THICK PLATE STEEL WELD TO COLUMN WEB EXISTING COLUMN TYPICAL 8 LOCATIONS NOTE: REMOVE EXISTING BRICK FOR INSTALLATION OF RISER SUPPORT BRACKET AT 8'-0" ON CENTER FROM 2ND FLOOR TO SIXTH FLOOR. RE-INSTALL BRICK AFTER INSTALLATION OF SUPPORT BRACKET. PROVIDE BACKER ROD AND CAULK OPENING BETWEEN BRINK AND STEEL TUBING. PIPE SUPPORT BRACKET DETAIL ENLARGED PLAN VIEW NOTES: CONTRACTOR TO INCLUDE REMOVAL OF EXISTING SPRAY ON FIRE PROOFING FOR INSTALLATION AND WELDING OF STEEL PLATE AND THE NEW SPRAY ON FIRE PROOFING OVER STEEL PLATE AND COLUMN TO MATCH EXISTING UPON COMPLETIONS OF WORK. VERTICAL PIPE SUPPORTS TO BE INSTALLED AT 8'-0" ON CENTER (MAXIMUM). 2"x4" TUBE STEEL. (HSS 4 x 2 x 3/6" MIN.) HOT DIPPED GALVANIZED. PIPE INSULATION AS REQUIRED. GALVANIZED UNI-STRUT TO BE SECURED TO STEEL PIPE SUPPORT BRACKET. SECURE REFRIGERANT PIPING TO UNI-STRUT WITH "HYDRA-SORB" OR "CUSH-A-CLAMP". 2"x6" TUBE STEEL. (HSS 6 x 2 x 3/6" MIN.) HOT DIPPED GALVANIZED. /2" GALV. STEEL PLATE. NOTE: CONTRACTOR RESPONSIBLE FOR ALL ANCILLARY SUPPORT STEEL, ATTACHMENTS, ETC. ALL GALVANIZED MATERIALS. EXISTING EXTERIOR WALL NOTE: PROVIDE SEISMIC RESTRAINTS AND BRACING PER SPECIFICATIONS. THROUGH BOLT TO SECURE STEEL PLATES TO EXISTING EXTERIOR WALL NOTE: ALL EXTERIOR PIPE HANGERS, BEAM CLAMPS, SUPPORTS, BRACKETS, ETC. TO BE GALVANIZED. FASTENERS TO BE STAINLESS STEEL B M0 WELD OR FASTEN UNI-STRUT TO STEEL PLATE PIPE SUPPORT BRACKET DETAIL UNI-STRUT. HOT DIPPED GALVANIZED END CAP THREADED ROD CLEVIS HANGER PIPING AND INSULATION UNI-STRUT SUPPORT RISER (GALV). SECURE TO SUPPORT RAIL BELOW. REFER TO DETAIL, THIS SHEET. PROVIDE GALVANIZED ATTACHMENT PLATES AND BOLT TO SECURE. NOTE: PROVIDE SEISMIC RESTRAINTS AND BRACING PER SPECIFICATIONS. SECURE PIPING TO UNI-STRUT WITH "HYDRA-SORB" OR "CUSH-A-CLAMP". E M0 PIPE INSULATION AS REQUIRED. CROSS BRACING. PROVIDE GALVANIZED CROSS BRACES, BOLTS, NUTS, FASTENERS, ETC. TO SECURE SUPPORT RISERS. SUPPORT RISERS DOWN TO SUPPORT RAILS. REFER TO DETAIL, THIS SHEET PIPE SUPPORT BRACKET DETAIL UNI-STRUT. HOT DIPPED GALVANIZED PROVIDE GALVANIZED ATTACHMENT PLATES AND BOLT TO SECURE. UNI-STRUT SUPPORT RISER (GALV). SECURE TO SUPPORT RAIL BELOW. REFER TO DETAIL, THIS SHEET. NOTE: ALL EXTERIOR PIPE HANGERS, BEAM CLAMPS, SUPPORTS, BRACKETS, ETC. TO BE GALVANIZED. FASTENERS TO BE STAINLESS STEEL PROVIDE STAND-OFF SEISMIC SUPPORT BRACKETS TO SECURE SUPPORT RISERS NOTE: PROVIDE SEISMIC RESTRAINTS AND BRACING PER SPECIFICATIONS. SECURE PIPING TO UNI-STRUT WITH "HYDRA-SORB" OR "CUSH-A-CLAMP". CROSS BRACING. PROVIDE GALVANIZED CROSS BRACES, BOLTS, NUTS, FASTENERS, ETC. TO SECURE SUPPORT RISERS. F M0 SUPPORT RISERS DOWN TO SUPPORT RAILS. REFER TO DETAIL, THIS SHEET PIPE INSULATION AS REQUIRED. UNI-STRUT. HOT DIPPED GALVANIZED PIPE SUPPORT BRACKET DETAIL PROVIDE GALVANIZED ATTACHMENT PLATES AND BOLT TO SECURE. UNI-STRUT SUPPORT RISER (GALV). SECURE TO SUPPORT RAIL BELOW. REFER TO DETAIL, THIS SHEET. NOTE: ALL EXTERIOR PIPE HANGERS, BEAM CLAMPS, SUPPORTS, BRACKETS, ETC. TO BE GALVANIZED. FASTENERS TO BE STAINLESS STEEL PROVIDE STABD-OFF SEISMIC SUPPORT BRACKETS TO SECURE SUPPORT RISERS A B C D E F G H NOTES: CONTRACTOR TO INCLUDE REMOVAL OF EXISTING SPRAY ON FIRE PROOFING FOR INSTALLATION AND WELDING OF STEEL PLATE AND THE NEW SPRAY ON FIRE PROOFING OVER STEEL PLATE AND COLUMN TO MATCH EXISTING UPON COMPLETIONS OF WORK. VERTICAL PIPE SUPPORTS TO BE INSTALLED AT 8'-0" ON CENTER (MAXIMUM). NEW 3/4" THICK PLATE STEEL (50 KSI) WELD TO COLUMN WEB EXISTING COLUMN NOTE: REMOVE EXISTING BRICK FOR INSTALLATION OF RISER SUPPORT BRACKET AT 8'-0" ON CENTER FROM 2ND FLOOR TO SIXTH FLOOR. RE-INSTALL BRICK AFTER INSTALLATION OF SUPPORT BRACKET. PROVIDE BACKER ROD AND CAULK OPENING BETWEEN BRINK AND STEEL TUBING. 2"x4" TUBE STEEL. (HSS 4 x 2 x 3/6" MIN.) HOT DIPPED GALVANIZED NOTE: PROVIDE SEISMIC RESTRAINTS AND BRACING PER SPECIFICATIONS. NOTE: ALL EXTERIOR PIPE HANGERS, BEAM CLAMPS, SUPPORTS, BRACKETS, ETC. TO BE GALVANIZED. FASTENERS TO BE STAINLESS STEEL EXISTING STRUCTURAL BEAM NOTE: CONTRACTOR RESPONSIBLE FOR ALL ANCILLARY SUPPORT STEEL, ATTACHMENTS, ETC. ALL GALVANIZED MATERIALS. BEAM CLAMP. GALVANIZED UNI-STRUT. HOT DIPPED GALVANIZED CLEVIS HANGER PIPING AND INSULATION I J K L 2"x6" TUBE STEEL. (HSS 6 x 2 x 3/6" MIN.) HOT DIPPED GALVANIZED HSS TO PLATE 5 6" 5 6" /8" CAP PLATE GALVANIZED UNI-STRUT TO BE SECURED TO STEEL PIPE SUPPORT BRACKET. SECURE REFRIGERANT PIPING TO UNI-STRUT WITH "HYDRA-SORB" OR "CUSH-A-CLAMP". M N PLATE TO EXISTING COLUMN 5 6 " 0" +/- 9-/4" +/- REFRIGERANT PIPE RISER. SUPPORT FROM UNI-STRUT AND 2x6" TUBE STEEL. C M0 PIPE SUPPORT BRACKET DETAIL PIPE AND INSULATION (TYP) O A M0 SECURE SUPPORT ON EACH SIDE PIPE SUPPORT BRACKET - SECTION NOTE: REFER TO SPECIFICATIONS FOR CONSTRUCTION REQUIREMENTS FOR ALL ROOF CURBS AND RAILS. CONTRACTOR IS RESPONSIBLE FOR ALL ROOF FLASHING AND REPAIRS. COORDINATE ROOF BOND REQUIREMENTS WITH OWNER AND OWNER APPROVED ROOFING SUB-CONTRACTOR. 2" SECURE SUPPORT AT EACH END 2" MIN ABOVE FINISHED ROOF GALVANIZED UNI-STRUT SUPPORT POST UP. REFER TO UNI-STRUT PIPE SUPPORT DETAILS GALVANIZED UNI-STRUT SUPPORT PEDESTAL SECURE TO SUPPORT RAIL. FLASHING CAP (SECURE TO EQUIPMENT RAIL) 8 GA. WELDED GALVANIZED STEEL SUPPORT WITH COUNTER FLASH CAP, 2"x4" WOOD NAILER AND MITERED CORNERS SECURE EQUIPMENT SUPPORT TO STRUCTURE WITH MECHANICAL FASTENERS (TYP.) CANT, FLASHING AND COUNTERFLASHING BY ROOFING CONTRACTOR-SEALED WATERPROOF. NOTE: REFER TO SPECIFICATIONS FOR CONSTRUCTION REQUIREMENTS FOR ALL ROOF CURBS AND RAILS. CONTRACTOR IS RESPONSIBLE FOR ALL ROOF FLASHING AND REPAIRS. COORDINATE ROOF BOND REQUIREMENTS WITH OWNER AND OWNER APPROVED ROOFING SUB-CONTRACTOR. GENERAL NOTE: INSTALLATION SHALL BE PER NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA) ROOF CURB CRITERIA. 2" SECURE SUPPORT ON EACH SIDE SECURE SUPPORT AT EACH END 2" MIN ABOVE FINISHED ROOF EQUIPMENT PER PLANS NEOPRENE VIBRATION ISOLATION PAD (TYP.) FLASHING CAP (SECURE TO EQUIPMENT RAIL) 8 GA. WELDED GALVANIZED STEEL SUPPORT WITH COUNTER LASH CAP, 2"x4" WOOD NAILER AND MITERED CORNERS SECURE EQUIPMENT SUPPORT TO STRUCTURE WITH MECHANICAL FASTENERS (TYP.) CANT, FLASHING AND COUNTERFLASHING BY ROOFING CONTRACTOR-SEALED WATERPROOF. EXISTING ROOF SHEET METAL COVER AND PIPE COLLAR (MEDIUM BRONZE) COVER EACH SIDE. SECURE TO EXISTING MULLIONS AND NEW CHANNELS ALTERNATE NO. PIPE PENETRATION THROUGH LOUVER DETAIL REMOVE EXISTING BLADES TO ACCOMMODATE PIPE PENETRATION PROVIDE NEW CHANNEL AT SIDE AND BOTTOM TO SECURE EXISTING LOUVER BLADES EXISTING LOUVER PLOT DATE: 3 JULY 205 N:\2000\285.02\TEMPLATE\*.DWG P Q R S T U V W GENERAL NOTE: INSTALLATION SHALL BE PER NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA) ROOF CURB CRITERIA. NO SCALE EXISTING ROOF EXISTING STRUCTURE NO SCALE EXISTING STRUCTURE DETAILS ASSOCIATED WITH THE AIR COOLED CONDENSER INSTALLATION AND REFRIGERANT PIPING SYSTEMS SHALL BE INCLUDED IN ALTERNATE NO.. THIS INCLUDES ALL PIPING, VALVES, EXTERIOR PIPE HANGERS, BEAM CLAMPS, SUPPORTS, BRACKETS, PIPE FITTINGS AND ACCESSORIES, ETC. TO BE GALVANIZED. FASTENERS TO BE STAINLESS STEEL SCALE: /4" = '-0" 0 2' 4' 8' X Y Z JRB APPROVAL PROFESSIONAL SEAL (S) A & E FIRM A & E STATE NO. SHEET TITLE PROJECT TITLE LOCATION NO. REVISION DATE BY APP LOCATION NO. REVISION DATE BY APP CONTRACTOR DRAWN BY CHECKED BY PROJECT MANAGER ARCHITECTURAL DESIGN ENGINEERING DESIGN LANDSCAPE ARCHITECT Mailing Address: P. O. Box 50644 Columbia, South Carolina 29250 Street Address 2330 Main Street Columbia, South Carolina 2920 Phone No. (803) 765-942 mecainc.com MECHANICAL DETAILS ALTERNATE NO. PSYCHIATRIC INSTITUTE DATA CENTER CRAC INSTALLATION STATE PROJ. NO. H5-N342-FW MUSC PROJECT. NO: DRAWING NO. SHEET Website DIVISION DATE: 3 JULY 205 50025 M0

38 37 36 35 34 33 32 3 30 29 28 27 26 25 24 23 22 2 20 9 8 7 6 5 4 3 2 0 9 8 7 6 5 4 3 2 A B C D E F G H I J K L M N O P Q R S T U THIRD FLOOR MECHANICAL DEMOLITION PLAN PLOT DATE: 3 JULY 205 N:\2000\285.02\TEMPLATE\*.DWG V W X Y SCALE: /4" = '-0" 0 2' 4' 8' Z JRB APPROVAL PROFESSIONAL SEAL (S) A & E FIRM A & E STATE NO. SHEET TITLE PROJECT TITLE LOCATION NO. REVISION DATE BY APP LOCATION NO. REVISION DATE BY APP CONTRACTOR DRAWN BY CHECKED BY PROJECT MANAGER ARCHITECTURAL DESIGN ENGINEERING DESIGN LANDSCAPE ARCHITECT Mailing Address: P. O. Box 50644 Columbia, South Carolina 29250 Street Address 2330 Main Street Columbia, South Carolina 2920 Phone No. (803) 765-942 mecainc.com THIRD FLOOR MECHANICAL DEMOLITION PLAN PSYCHIATRIC INSTITUTE DATA CENTER CRAC INSTALLATION STATE PROJ. NO. H5-N342-FW MUSC PROJECT. NO: DRAWING NO. SHEET Website DIVISION DATE: 3 JULY 205 50025 M00

38 37 36 35 34 33 32 3 30 29 28 27 26 25 24 23 22 2 20 9 8 7 6 5 4 3 2 0 9 8 7 6 5 4 3 2 A B C D E F G H I J K L M N O P Q R S T U THIRD FLOOR MECHANICAL RENOVATION PLAN PLOT DATE: 3 JULY 205 N:\2000\285.02\TEMPLATE\*.DWG V W X Y SCALE: /4" = '-0" 0 2' 4' 8' Z JRB APPROVAL PROFESSIONAL SEAL (S) A & E FIRM A & E STATE NO. SHEET TITLE PROJECT TITLE LOCATION NO. REVISION DATE BY APP LOCATION NO. REVISION DATE BY APP CONTRACTOR DRAWN BY CHECKED BY PROJECT MANAGER ARCHITECTURAL DESIGN ENGINEERING DESIGN LANDSCAPE ARCHITECT Mailing Address: P. O. Box 50644 Columbia, South Carolina 29250 Street Address 2330 Main Street Columbia, South Carolina 2920 Phone No. (803) 765-942 mecainc.com THIRD FLOOR MECHANICAL RENOVATION PLAN PSYCHIATRIC INSTITUTE DATA CENTER CRAC INSTALLATION STATE PROJ. NO. H5-N342-FW MUSC PROJECT. NO: DRAWING NO. SHEET Website DIVISION DATE: 3 JULY 205 50025 M0

38 37 36 35 34 33 32 3 30 29 28 27 26 25 24 23 22 2 20 9 8 7 6 5 4 3 2 0 9 8 7 6 5 4 3 2 A B C D E F G H I J K L M N O P Q R S T U PLOT DATE: 3 JULY 205 N:\2000\285.02\TEMPLATE\*.DWG V W REFRIGERANT PIPING RISER DIAGRAM X Y SCALE: /4" = '-0" 0 2' 4' 8' Z JRB APPROVAL PROFESSIONAL SEAL (S) A & E FIRM A & E STATE NO. SHEET TITLE PROJECT TITLE LOCATION NO. REVISION DATE BY APP LOCATION NO. REVISION DATE BY APP CONTRACTOR DRAWN BY CHECKED BY PROJECT MANAGER ARCHITECTURAL DESIGN ENGINEERING DESIGN LANDSCAPE ARCHITECT Mailing Address: P. O. Box 50644 Columbia, South Carolina 29250 Street Address 2330 Main Street Columbia, South Carolina 2920 Phone No. (803) 765-942 mecainc.com PSYCHIATRIC INSTITUTE DATA CENTER CRAC INSTALLATION STATE PROJ. NO. H5-N342-FW MUSC PROJECT. NO: DRAWING NO. SHEET Website DIVISION DATE: 3 JULY 205 50025 M05

38 37 36 35 34 33 32 3 30 29 28 27 26 25 24 23 22 2 20 9 8 7 6 5 4 3 2 0 9 8 7 6 5 4 3 2 A B C D E F G H I J K L M N O P Q PSYCHIATRIC INSTITUTE THIRD FLOOR ELECTRICAL DEMOLITION PLAN R S T U V W X Y SCALE: /8" = '-0" 0 2' 4' 8' Z LOCATION NO. REVISION DATE BY APP LOCATION NO. REVISION DATE BY APP CONTRACTOR APPROVAL DRAWN BY CHECKED BY PROJECT MANAGER ARCHITECTURAL DESIGN ENGINEERING DESIGN LANDSCAPE ARCHITECT PROFESSIONAL SEAL (S) A & E FIRM A & E STATE NO. SHEET TITLE GWA: 5-2984 Midlands Office - Main 68 Laurelhurst Avenue Columbia, SC 2920 (803)252-699 Fax (803)799-5494 gwa@gwainc.net http://www.gwainc.net PSYCHIATRIC INSTITUTE THIRD FLOOR ELECTRICAL DEMOLITION PLAN DIVISION PROJECT TITLE PSYCHIATRIC INSTITUTE DATA CENTER CRAC INSTALLATION STATE PROJ. NO. H5-N342-FW MUSC PROJECT. NO: DRAWING NO. SHEET 50025 DATE: 7 JULY 205 ED0

38 37 36 35 34 33 32 3 30 29 28 27 26 25 24 23 22 2 20 9 8 7 6 5 4 3 2 0 9 8 7 6 5 4 3 2 A B C D E F G H I J K L PSYCHIATRIC INSTITUTE THIRD FLOOR ELECTRICAL PLAN - NEW WORK M N O P Q R S T U V W X PSYCHIATRIC INSTITUTE SIXTH FLOOR ELECTRICAL PLAN - FOR REFERENCE SCALE: /8" = '-0" 0 2' 4' 8' Y Z LOCATION NO. REVISION DATE BY APP LOCATION NO. REVISION DATE BY APP CONTRACTOR APPROVAL DRAWN BY CHECKED BY PROJECT MANAGER ARCHITECTURAL DESIGN ENGINEERING DESIGN LANDSCAPE ARCHITECT PROFESSIONAL SEAL (S) A & E FIRM A & E STATE NO. SHEET TITLE GWA: 5-2984 Midlands Office - Main 68 Laurelhurst Avenue Columbia, SC 2920 (803)252-699 Fax (803)799-5494 gwa@gwainc.net http://www.gwainc.net PSYCHIATRIC INSTITUTE THIRD FLOOR ELECTRICAL PLAN - NEW WORK DIVISION PROJECT TITLE PSYCHIATRIC INSTITUTE DATA CENTER CRAC INSTALLATION STATE PROJ. NO. H5-N342-FW MUSC PROJECT. NO: DRAWING NO. SHEET 50025 DATE: 7 JULY 205 E0

38 37 36 35 34 33 32 3 30 29 28 27 26 25 24 23 22 2 20 9 8 7 6 5 4 3 2 0 9 8 7 6 5 4 3 2 A B C D E F G H I J K L M N O P PSYCHIATRIC INSTITUTE ROOF ELECTRICAL PLAN - ALTERNATE NO. Q R S T U V W X Y SCALE: /8" = '-0" 0 2' 4' 8' Z LOCATION NO. REVISION DATE BY APP LOCATION NO. REVISION DATE BY APP CONTRACTOR APPROVAL DRAWN BY CHECKED BY PROJECT MANAGER ARCHITECTURAL DESIGN ENGINEERING DESIGN LANDSCAPE ARCHITECT PROFESSIONAL SEAL (S) A & E FIRM A & E STATE NO. SHEET TITLE GWA: 5-2984 Midlands Office - Main 68 Laurelhurst Avenue Columbia, SC 2920 (803)252-699 Fax (803)799-5494 gwa@gwainc.net http://www.gwainc.net PSYCHIATRIC INSTITUTE ROOF ELECTRICAL PLAN - ALTERNATE NO. DIVISION PROJECT TITLE PSYCHIATRIC INSTITUTE DATA CENTER CRAC INSTALLATION STATE PROJ. NO. H5-N342-FW MUSC PROJECT. NO: DRAWING NO. SHEET 50025 DATE: 7 JULY 205 E20