CONSUMERS ENERGY Holland, Michigan

Similar documents
COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

Motorized Pulleys Solve Harsh Environmental Problems at North American Ship Loading Terminals

bulk material handling Equipment Optimal Solutions & Technologies TENOVA. innovative solutions for metals and mining

HARBOR INFRASTRUCTURE INVENTORIES Presque Isle Harbor, Michigan

ABOUT COMMON MATERIALS:

Scraper Reclaimer Technology. Optimal solutions for Bulk Materials Handling

We Offer Solutions. Temporary Storage

MINING & MINERAL PROCESSING CAPABILITIES

A B O V E G R O U N D U N D E R G R O U N D F L E X S T E E L

National Protection and Programs Directorate Office of Cyber and Infrastructure Analysis

Motorized Pulleys Solve Materials Handling Problems in North America

KOCH Technology, Management and a Passion for Projects. The KOCH Pipe Conveyor. KOCH Transporttechnik GmbH

Proven solutions in ore processing

This document also describes the basis on which building permit fees should be calculated.

AIR EMISSION PERMIT NO IS ISSUED TO ISPAT INLAND STEEL MINING CO

Lifting Appliances of Ships and Offshore Installations

HAVER Mining HAVER & BOECKER HAVER & BOECKER

PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE

Today BUILDING STRONG. and Taking Care of People! 20 It has been nearly 50 years since a new lock was built at the Soo

Jobsite Layout Considerations

Measuring Bulk Solids on a Conveyor

Manufacture of Iron & Steel. Prepared By: John Cawley

CSX TRANSPORTATION GUIDELINES FOR THE DEVELOPMENT OF COAL UNIT TRAIN FASTLOAD ORIGINS

Capability Statement

Pelletizing technologies for iron ore

WE OFFER SOLUTIONS TEMPORARY STORAGE

Presentation ThyssenKrupp Bulk Materials Handling Dr. Markus Oles

AUMUND completes Modernisation of the Handling and Storage Systems at OAO Mordovcement

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS

Installation of RMG Cranes at Intermodal Rail Yard ABSTRACT INTRODUCTION

INTERMODAL TRANSPORTATION, USACE STYLE

Drawdown Hoppers Maximize Active Reclaim

P11 Handling and Storage E212 - Facilities Planning and Design

IAC/MHC EPC CORE COMPETENCIES PRESENTATION. Innovation. Service. Product Excellence.

The Effect of Ultra Large Container Vessels on Cranes and Infrastructure

Dry Cargo Residue (DCR) April 2016

Stone Consulting, Inc. Industrial Railroad Projects

Vale Malaysia Minerals - Teluk Rubiah Maritime Terminal ABB Stockyard Management System

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

Operations Mine Site, Tote Road and Railway

Evaluation of New Concrete Shrinkage Reducing Additive for Glen Elder Dam Spillway Inlet Slab Repair

CONSTRUCTION MANAGEMENT

SLIDE RAIL SHORING SYSTEMS

COMPLETE OFFERINGS THERMAL PROCESSING AGGLOMERATION MATERIAL HANDLING

Port of Algoma. Focal Point of the Great Lakes Region


Sampling and subsequent testing of aggregate is performed for several reasons:

IBAU HAMBURG Custom-built Small Terminals

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

2017 Facilities Engineering Awards: Design and Construction of Marine Structures. Title of Project Mississippi River Intermodal Terminal Improvements

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION

Who We Are. Located near Port, Rail and Road transportation links, Maritime Welding Inc. can deliver world-class steel fabrication services worldwide.

ATP Oil Shale Plant in China

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

CHAPTER 1 INTRODUCTION AND PROJECT DESCRIPTION

Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida

Environmental Leadership Program Inspection Form Portable Asphalt Facility

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

FUMES DESULFURIZATION HANDLING SYSTEMS COAL HANDLING SYSTEMS MECHANICAL PROCESSING OF COAL

MATERIAL ALLOWANCES AND UNIT PRICES

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

DRY BULK CARGO HANDLING

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Scaffolding Glossary of Terms A

BEDESCHI TODAY. Bedeschi today

Photo Courtesy of Jason Pineau Photography MINING SERVICES

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Capability Statement

ASTEC Large Modular Wood Pellet Plants. Wood Pellet Plants

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

Page 10-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LIGHTING AND SIGNS

2015 UTAH ASPHALT CONFERENCE AGGREGATE PRODUCTION 101. Kilgore Companies and Kimball Equipment

CEMENT INDUSTRY PROJECT EXPERIENCE

Energy & Data Transmission Systems for Underground Applications

THYSSENKRUPP INDUSTRIAL SOLUTIONS Resource Technologies: Innovative Customer Solutions

CUSTOM FABRICATION GREAT LAKES SHIPYARD

IN-PIT CRUSHING AND CONVEYING MINE PLANNING AND OPERATIONS Skillings Mining Review, June 1, 1985 by: Independent Mining Consultants, Inc.

THE 14TH R EFUELING outage at Diablo

Project Address: Name of Person Completing Form:

C. Foundation stabilization for pipe and utility structures.

JORACK. Storage Solutions from Design to Installations.

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Hudson River PCBs Superfund Site

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Global Partners LP (GLP) Investor Presentation May Bakken Product Markets & Takeaway Capacity Congress January 29, 2014 Denver, CO

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

MARINE SPECIALTY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION FOR COMPUTER BASED TESTING Revised March 2012

Scaffolding and Raised Platforms

PERMEABLE INTERLOCKING PAVERS

Meridian Manufacturing Group. Workmanship Meridian Quality Assurance Program

LEADING THE WORLD IN ENERGY ABSORPTION INDUSTRIAL. Gas Hydraulic Buffers GBR

CHAPTER 7. San Dieguito River Flooding Adaptation

Development Of Condition Based Maintenance For Coal Handling Plant Of Thermal Power Stations. By: Makarand M. Joshi

SIMINE Automation and MES

Transcription:

Krech Ojard s employs engineers specializing in providing custom engineering solutions for bulk material storage facility expansions, rail and marine transload facilities, paper and manufacturing industries, mining and larger industrial facilities handling. Whether clients require design or remediation, our capable team can meet your engineering needs. Mechanical, Structural, Civil, Rail and Marine specialized engineers combine to provide a basis of versatile experience that empowers Krech Ojard to help our clients attain their goals in a cost effective and long term manner. With a breadth of real-world experience in the mining, paper, rail, and energy industries, our employees are uniquely positioned to understand the needs and expectations of our clients. We develop realistic, effective, and functional solutions that add value and minimize costs for long-term operation. We work at length with projects involving materials handling, and are pleased to coordinate with clients to design functional systems that reduce the amount of material degradation and material loss during processing, effectively saving the client money. Dynamic and static equipment is an important factor in bulk material facilities. Krech Ojard s experience level with creating and enhancing new and used equipment systems, maintenance systems and project management of related facility projects, leads to savings for our clients and a high level of trust in their mission critical, material moving machinery. CONSUMERS ENERGY Holland, Michigan

FRAC SAND PLANT Chippewa Falls, Wisconsin Krech Ojard & Associates was retained for engineering services for the design and construction of a new frac sand plant. Krech Ojard performed services from the preparation of preliminary flow sheets through final construction documents and project management for this 2.6 million tons per year frac sand processing facility. Upon completion of flow sheets, Krech Ojard began design of the plant layout and process. Our Mechanical, Structural, and Electrical Groups worked together to ensure that interferences were minimized. Design components for the plant included: Plant Layout Foundation and Structural Steel Design Conveyors and Elevators Material Handling Equipment Sand Processing Equipment Piping Rail and Truck Dumps Raw and Processed Sand Storage Electrical Power Control Systems The frac sand facility was a fast track design-build method of delivery requiring close coordination between the owner, contractor and Krech Ojard. INTERFLOUR VIETNAM Vung Tau, Vietnam Designed 110 grain intake and distribution towers for supporting mass scales, distribution heads, conveyor head and tail sections, and sorting screens to support ship unloading. Design was accomplished using JIS metric standards and materials and included vibration analysis. Preliminary design reactions of both towers and truss bent reactions were provided to accommodate early fabrication of concrete piles. Also designed a truss supported 150m long tripper conveyor with integral shuttling cross conveyor designed to fill 96m wide bulk storage bays with various grain commodities. Created fully integrated 3D models of the conveyor to simultaneously resolve interferences, create fabrication drawings and part take offs. HALLETT DOCK Duluth, Minnesota Hallett Dock is a multimodal transshipment facility, accommodating shipping and receiving by rail, truck and ship. The location of the rail dump facility provided a unique challenge for our engineers: the underground facility is adjacent to a wetland area, twenty feet below the water level. The installation of fifty foot sheet piles formed a coffer dam, allowing the site to be safely excavated. One hundred vertical piles into the silt below, utilizing the friction of the soil against the surface of the piles to anchor the facility into place. The new structure features a dust collection system that collects and solidifies airborne particles and returns them to the conveying system, reducing both product loss and air pollution. DETROIT EDISON BEEMSTERBOER COAL TRANSFER FACILITY Chicago, Illinois Worked with DTE Coal Services on the Powder River Basin coal transshipment facility on the Calumet River. The purpose of this facility is to provide an additional DTE facility for the distribution of PRB coal to local markets. The coal will be delivered to the facility in up to 150 car unit trains in 120 ton capacity cars, unloaded and reloaded into vessels or rail cars for local distribution. It is anticipated that this facility will begin operations with a through-put of 2.5 million tons annually and eventually grow to 5 million tons. Blending of three types of coal is a requirement. Plans and cost estimates have been prepared for a phased development that anticipates an initial through-put of two million tons annually to a fully developed site with a capacity of ten million tons annually.

ALASKA RAILROAD CORPORATION SEWARD STORAGE FACILITY Seward, Alaska Projects at this salt water transload and storage facility have ranged from structural and mechanical upgrades, and long-term maintenance plans and other capital improvements Other projects at this facility included equipment specifications, water reclamation and protection systems and also involved facility and equipment upgrades required to increase the rate of rail car unloading, stockpiling, reclaiming, and ship loading. Rail car unloading and stockpiling rates were to increase from 3000 TPH to 4800 TPH. Reclaiming and ship loading rates were to increase from 1200 TPH to 2000 TPH. PLANT EXPANSION Western Wisconsin Develop improvements related to material load out at a Wisconsin facility. Provided civil, mechanical and structural engineering services which included: preliminary flow sheets, preliminary design drawings, civil engineering (including topographical data), load out rail design, plant upgrade designs for the foundation, superstructure, and mechanical equipment, construction cost estimate, peer review of rail, environmental coordination, storm water management plans and water quality control measures. Developed a critical path engineering, procurement, and construction schedule. This is an essential tool given the aggressive project timeline and the need to impact existing plant operations as little as possible. PLANT EXPANSION Western Wisconsin Provided engineering services to design a rail loadout upgrade, as well to provide project management, structural, mechanical, and electrical engineering services for the proposed rail loadout upgrade and other plant updates. Improvements to the plant included plans to add a new conveying system and rail loadout to double the current capacity to load railcars. The electrical controls were also discussed, including the potential need to move the existing rail loadout control room to grade and relocate the MCC panels in this area to a dedicated location in order to accommodate the new loadout. CONSUMER S ENERGY Holland, Michigan Involved in facility and equipment upgrades required to increase coal conveying rates of Consumer s Energy s power plants back-up fueling path from 900 tph to 2000 tph PRB coal. Conducted a review of the current train unloading system, prepared detailed design package (engineering, materials handling, structural design), prepared equipment specification package, developed maintenance and spare parts manual, and provided construction management, construction inspection, QA/QC, Primavera scheduling services.

CANADIAN NATIONAL RAILWAY MATERIAL HANDLING UPGRADES Duluth, Minnesota Design upgrades to a lake shore stacker. This project included a 3,000,000 NT bulk storage facility, 75 foot high stockpiles, 4,000 foot long reversible yard belt and a rail mounted stacker. Upgraded the conveyor system from 2700 to 4000 LTPH, conducted preliminary engineering, layout and cost estimate, detail design (material handling & structural design), project management, equipment specification and purchasing assistance. The engineering effort for these projects consisted of stability analysis and design of jacking systems and temporary supports to permit replacement of main slew bearings, boom pendants and main travel drive trucks. MIDWEST ENERGY RESOURCES Superior, Wisconsin Performed multiple services for this facility, the largest coal transshipment facility. This large scale facility has been extensively upgraded in recent years and has been a source of variable and unique projects for KO. Recently assisted in the expansion of MERC s annual capacity from 18,000,000 to 25,000,000 NT, the design of a dustless conveyor transfer points, the design of a rail car dust suppression system, design of a fill station, increase stockpiling and car unloading rate from 3500 NT to 5000 NT/HR and the design of a rotary coupler rail car dump. TACONITE HARBOR ENERGY CENTER Schroeder, Minnesota Investigated the capital and operating costs of upgrading the facility s coal-delivery systems. The harbor and rail facilities serving this power station were examined by our mechanical and rail engineering divisions, to determine the costs associated with delivery of coal by rail, as well as the potential for increasing the capabilities of the existing ship-unloading facilities. P-2 CONVEYOR MODIFICATIONS Conveyor P2 is a luffing conveyor that builds the loadout stockpile. Because of the deteriorated condition of the existing P-2 boom, it was recommended to replace the entire boom assembly with a new shop fabricated assembly. The design of the replacement boom truss included features to enable improved maintenance of the P-2 conveyor. The pivot assembly was designed to allow intermittent duty. The head of the truss included features for pulley removal, including an overhead trolley and a secure point to lift the belt away from the pulley. Also at the head, the dust spray and wind screen were included in the design. Walkways and head platforms were designed to accommodate the placement of a drive pulley and cart for removal to grade or access by crane near the base of the tower.

GRAYMONT KILN #5 EXPANSION & PLANT UPGRADES Superior, Wisconsin Krech Ojard was hired to design all of the refractory, process, and storage equipment, on pile and helical anchor deep foundations, to support the installation of a new kiln #5, a state of the art high efficiency preheater lime kiln. Additional work focused on development of Balance of Plant process flow, conveyor systems, silo dust control, dust collector upgrades, crushing and screening operations, material re-claim tunnel, integrated rail and truck load-out systems, as well as significant structural modifications to existing buildings to support the new process equipment. Also staged erection and welding of a 13 diameter steel rotary kiln shell required the design of custom saddles, shoring towers, and timber crib foundations. The design considered kiln alignment requirements, poor soil conditions, and lateral bracing requirements during the construction phase. LIMESTONE MATERIAL HANDLING STUDY The mining facility s product requires milled limestone in the agglomerator plant for the production of flux pellets. Provided engineering services for a feasibility study of a new on-site limestone unloading system, storage facility, crusher facility and crushed limestone transfer system. LOAD OUT IMPROVEMENT STUDY Investigated options for improving the loadout operations at a crude ore facility. The two issues addressed in the study are accurate ore car loading and protection from locomotive-equipment collisions during loadout operations. Provided general arrangement drawings for each of the proposed modifications including cost estimates. BALLING DRUM REPLACEMENT DESIGN Performed a feasibility study at an iron ore mine to improve their taconite balling process. The project involved the replacement of two existing ten foot diameter drums with two twelve foot diameter drums, reworking feed and takeaway conveyors, and replacing the existing roll screens with wider, longer roll screens. The current equipment could be difficult to maintain with limited access, so a key element of the design is to improve access to the new equipment. 3D modeling of the entire balling process was the approach taken by Krech Ojard to tackle this problem. 3D modeling allows for previewing installed additional equipment to test allowances, connections, spacing and more.

krechojard.com