Independent Government Estimates A Fact Sheet

Similar documents
Make or Buy Decisions in a Proposal Audit. Next Slide

How to Prepare a DCAA Compliant Cost or Price Proposal. Bag Lunch Webinar November 17, 2016

The United States Air Force Design-Build Plus User s Guide

GROUND RULES AND PRICING INSTRUCTIONS:

Cost and Pricing Overview

Factoring Method, Used in NoDoC for Calculation of Location Factors

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

Request for Proposal For: 2018 American Bar Association Temporary Services

Section M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002

Defective Pricing- Material Pricing Deficiencies. Next Slide

Multifamily Market Commentary March 2017

Revenue for chemical manufacturers

CLB 029 Wrap Rate Projections

Managing Fraud Risks. Procurement & Contacting. John J. Hall, CPA (970)

VFA SAMPLE RFP (DETAILED FACILITY CONDITION ASSESSMENT)

TEAMING, SUBCONTRACTING, AND JOINT VENTURES

A cost analysis is required for any negotiated (non competitive) contract procurement on behalf of any University program, if:

What You Don t Know About Procuring Commercial Items Could Hurt You (or Your Suppliers)! BY DORIS HOLLINGSWORTH GRAY

Contractor Business Systems Earned Value Management, Material Management and Accounting, and Property Management

International Subawards

Contractor Estimating Systems: System Adequacy Standards and Key Compliance Issues

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

AN EXECUTIVE S GUIDE TO BUDGETING FOR SECURITY INFORMATION & EVENT MANAGEMENT

Master Document Master Document. Version 4.28, dated December 2017 B-1 Planning Considerations

Cost Estimating Guideline February, 2017

Construction Contract Basics

Yes No. Yes. Yes. Firm Name. What form of business entity is your firm? When is your firm s fiscal year end (FYE)? (mm/dd/yyyy)

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Baseline Hillside Ordinance Correction Sheet (Ordinance No. 184,802 Effective 3/17/17)

FUNCTIONAL EXPENSE ALLOCATION NONPROFITS AFTER FASB ASU YEO & YEO. yeoandyeo.com. CPAs & BUSINESS CONSULTANTS. CPAs & BUSINESS CONSULTANTS

Permit Fee Schedule from Fee Ordinance

EST Accuracy of FEL 2 Estimates in Process Plants

VANDERBILT UNIVERSITY

Pricing to Win and Deliver June 19, 2012

Technical Facility Management FACILITY CONSULTING SERVICES. The Facility Audit Program

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

STATE OWNED ENTERPRISES REMUNERATION GUIDELINES

GREEN PASTURES - RESIDENTIAL ARCHITECTURAL REVIEW GUIDELINES

Source Selection. NAVAIR Public Release SPR ; Distribution Statement A Approved for Public Release; distribution is unlimited

A CIOview White Paper by Scott McCready

How to estimate the cost of new air conditioning system to an existing storage warehouse.

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services... A-2. B. Architectural Programming... A-5

Understanding the DCAA Audit Process and How to Prepare for Success

Contract Pricing Reference Guides Volume 1

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

Addendum No. 1 Page 1 of 2

Islamic Republic of Afghanistan. Ministry of Justice. (Draft) Regulation on Customs Valuation. Published in the OFFICIAL GAZETTE No: Kabul,, 201_

PHASE 4 - Post-Award. Type of Feedback Type of Contract Feedback Category Feedback

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-EC Washington, DC Regulation No December 2016

SUBSTANTIAL IMPROVEMENT

Accounting for Internally-Developed Software

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

A SYSTEM FOR ESTIMATING RESIDENTIAL CONSTRUCTION AND DEMOLITION DEBRIS

Forward Pricing Proposal- Labor Categories. Next Slide

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

ASSET INVENTORY BEST PRACTICES:

UNIFIED FACILITIES GUIDE SPECIFICATIONS. References are in agreement with UMRL dated January 2017

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued.

Without having Cost Estimation Model you are putting your Project on a Big RISK

Managing Residential Properties Learning Objectives

Uncompensated Overtime. Next Slide

Table of Contents for Guide Specifications

DEFENSE ACQUISITION REVIEW JOURNAL

Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program

Activity-Based Costing Systems

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

Facility Layout Design Case-Study: Common Conduit s New Layout

Legal Topic Note PROCUREMENT LTN 87. January Introduction

WithumSmith+Brown, PC Certified Public Accountants and Consultants BE IN A POSITION OF STRENGTH. withum.com

3 PART THREE: WORK PLAN AND IV&V METHODOLOGY (SECTION 5.3.3)

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR

Section 5 - Project Logistics

1. FROM (Bidder): (Name)

MATERIAL ALLOWANCES AND UNIT PRICES

ASSESSMENT OF AFS STRUCTURAL WALL SYSTEM FOR CBPA NSW, FEBRUARY 2008

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide

IOWA DEPARTMENT OF TRANSPORTATION. Request for Proposal

CANADIAN SOLAR INC. Corporate Governance Guidelines

The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued.

Demand Management User Guide. Release

How to Estimate the Cost of Painting an Exterior Masonry Wall. December 2010 TABLE OF CONTENTS SECTION 1: INTRODUCTION... 3

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

The following materials and documents are required in order for you to obtain a Building Permit:

ORGANIZATIONAL CONFLICTS OF INTEREST

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS

Corporate Legal Audit Program

Financial Transfer Guide DBA Software Inc.

Fiduciary Duty of Board of Directors to Oversee Financial Affairs

Department of the Navy. Earned Value Management Implementation Guide. Published by THE NAVAL CENTER FOR EARNED VALUE MANAGEMENT

University Business Classification Scheme

1. The cost of an item is the sacrifice of resources made to acquire it. 2. An expense is a cost charged against revenue in an accounting period.

COUNTY OF SAN JOAQUIN

Timekeeping for Government Contractors Mike Mardesich & Brad Tress March 28, 2017

Transcription:

1. Introduction Independent Government Estimates A Fact Sheet An Independent Government Estimate (IGE) is an unbiased cost estimate based upon the specifications and without the influence of potential contractor s marketing effort or input. In the government construction environment, the IGE is generally prepared by either the Government s own design engineer or estimator, or by the Architectural & Engineering firm that prepared the design. FAR 36.203 requires preparation of an IGE when the anticipated total contract or modification is expected to exceed the simplified acquisition threshold (SAT). At the discretion of the contracting officer, an IGE may be required for actions less than the SAT. Waiver of this requirement however, does not relieve the contracting officer of the responsibility to determine price reasonableness. FAR 36.203 further requires that the IGE be prepared in as much detail as though the Government were competing for award. The purpose of a construction IGE is three-fold: It is the basis for budgeting and reserving funds for the contract; It is the basis for comparing costs or prices proposed by offeror(s); and, It is the basis for determining price reasonableness when only one proposal is received. The key to development of a good cost estimate is to approach it from a prospective contractor s viewpoint. This means the estimate should include (1) the direct costs incident to the construction; (2) an allowance for indirect or overhead costs; and (3) an allowance for a reasonable amount of profit. Once the IGE is developed, CE and the CO ensure that the cost estimate is fully funded. 2. Types of Independent Estimates. There are many methods available for developing IGEs. Here, we discuss three of the most common estimates parametric cost estimates, engineering cost estimates, and construction cost estimates. Parametric Cost Estimates. Many construction contractors use a rule of thumb, or parametric cost estimating, to prepare their estimates. It is particularly useful when design details are not available. Government estimators often use this method to develop programming or budgetary cost estimates. For example, if the requirement is for a brick two-story house with a basement, the contractor might use $60/square foot (or whatever value is currently reasonable for the application) to estimate the price of the house: $60/sq ft x 2200 sq. ft = $132,000 house price.

In this example, the estimate relates floor space to building cost. Once a general structural design is determined, the contractor can use this relationship to estimate the total building price or cost (i.e., plus up or down scope) excluding the cost of land. This technique is reliable and can save both the contractor and the Government time and resources in the development of estimates and it produces results similar to that of other more detailed techniques. Engineering Cost Estimate. The basis of an engineering estimate is labor and material costs for significant work elements. Instead of dividing the estimate for concrete into its major components, as the contractor might do, the engineer will estimate so much for materials and so much for labor. For example, if the requirement is for a concrete patio, the engineer might estimate $70 a cubic yard in place for material and $20 a cubic yard for labor costs multiplied time the amount of cubic yards to be poured. This price would include the cost of cement, aggregate, reinforcing steel and forms, but it usually excludes all overhead and profit. Construction Cost Estimate. The basis for the construction element, frequently referred to as a brick and mortar estimate, is a detailed analysis of construction methods. Typically, the estimates prepared by government estimators and A-E firms commonly prepared to this level of detail. First, divide the required work into its major components. Each of these is then separated into its constituent elements such as cement, aggregate, reinforcing steel, additives, form lumber and hardware, form fabrication, form erection and stripping, placement of reinforcing steel, mixing and placing concrete, and finishing concrete surfaces. Next, enter the estimated unit cost of labor and material for each element, multiplied by the quantities of each. Finally, add the plant, equipment, and job overhead costs. Lastly, apply home office expense and profit to develop the total price. 3. Sources of Estimate Details. There are at least three sources available for obtaining details to support the IGE for government construction contracts and modifications. Previous Similar Contracts. Pricing from previous, similar contracts can be a valuable source of information in formulating the IGE. For example, let s say the requirement is for the establishment of an indefinite delivery-indefinite quantity (IDIQ) contract for various paving requirements. The price schedule contains 200 individual line items. In the previous competition for the same or similar requirements, six offerors responded. In this scenario, you may use the competitive prices of the six offerors in the development of the IGE for the follow-on paving contract, considering any consumer price index adjustments.

While this is an excellent source of information, you must use caution and recognize certain extenuating circumstances may invalidate the data. For example, if using unit prices from a previous requirements or IDIQ type or sole source contracts, you must consider how those prices were determined fair and reasonable. These are pertinent questions to ask: o Did you individually analyze the unit prices? o How old is the data? o Do prices need adjustment for special site conditions, changes in labor rates or materials? Architect-Engineers (A-E) Estimates. Because of the use and far-reaching impact of their estimates, A-E firms must provide comprehensive and up-to-date estimates for projects they design for the government. Using the latest computerized estimating programs and technology and commercial pricing guides, they are fully equipped to prepare accurate cost estimates for their designs. Designers must be aware of the relative economics of different types of structures and materials and must keep pace with changing trends in building costs. However, before relying on an estimate for budgetary or price analysis purposes, the estimate should be updated to include any adjustment for escalation of prices, and for any design changes (both additions and deletions) injected by the government since receipt of the initial 100% design package. This is especially important when dealing with an older design. You may discover, after-thefact that facility occupants or requirements have changed without a commensurate adjustment to the project cost estimate. Commercial Pricing Sources. These sources might include commercial pricing guides and/or software such as RSMeans Construction Cost Data, WinEstimator, DoD Facilities Pricing Guide, Parametric Cost Engineering System (PACES), and Tri-Service Cost Model (for Housing Projects). Many of the commercial software programs allow adjustments for local site conditions, labor rates, and material prices. These programs also provide pricing for construction specialties, such as square footage costs, Americans With Disabilities Act (ADA) compliance pricing, assemblies cost data, concrete/masonry, electrical, and facilities (versus residential). 4. Developing the Cost Estimate. Tips and Best Practices. The following tips and "best practices" may be useful in developing the IGE: Team Approach. It is be wise to assemble a team made up of the project stakeholders (i.e., facility users, contracting, resource managers, design

engineers, price analyst, and other technical experts) to go over the estimate during the acquisition-planning phase. This will help answer the who, what, where, and when regarding development of the estimate and it can help flush out the gray areas that may affect price. Besides providing functional expertise, the right mix of team members can be a valuable source of historical data. Structure. Define and document a structured approach to size your acquisition [Work Breakdown Structure (WBS), Cost Element Structure (CES), models, analogies with other acquisitions, market survey plans, etc., or combinations of these]. This structure provides the baseline for many acquisition decisions. Statements of Work (SOW), IGEs, tradeoff decisions, funds reallocations, contract negotiations, value engineering change proposals (VECP), and spend plans will all rely on this structure and related cost elements. Format. The emphasis is on information, not format. Most construction projects do not call for a unique combination of skills, materials, and equipment. Therefore, a logical approach and standard spreadsheets or common application software allow IGEs to be easily developed and transferred electronically. Information that should always be included is: Standard Cost Elements (tailored to fit the acquisition): Direct Labor Cost (DLC) Other Direct Costs (ODC): Materials & Supplies, Equipment, Travel, IT Overhead Costs (OVHD) General & Administrative Costs (G&A) Profit Market Research. Using cost/price data from a single source, without scrutiny, invalidates the "independence" that makes the IGE useful in price analysis or contract negotiations. This is a serious problem if competition is limited to one or only a few contractors. Refer to FAR Part 10 for Market Research techniques. Currency of Data. Validate a cost estimate more than two years old to reflect the current design, requirements of the end user, and schedule. Cost Elements. The following are standard cost elements that should be included in the IGE, as applicable. Direct Labor Cost (DLC). Direct Labor Cost is the cost of labor directly applied to producing the requirement. There are two types of DLC:

o Unburdened which includes only salary; and burdened, which includes salary plus an allocation of costs for overhead, general and administrative, profit, and any escalation for option years. o Burdened rates simplify the cost estimating process. The accuracy of this method may depend on the availability of recent, competitively negotiated burdened rates that have similar skill requirements as your acquisition. Labor burden rates vary considerably depending on the contractor s organization and facilities and the type of work performed. Other Direct Cost (ODC). These are all costs (other than labor and materials) used to satisfy the requirement: Materials & Supplies, Equipment, Travel, IT, and any other direct cost such as bonds. Do not use "Lump sum" estimates. These estimates are not useful in evaluating the proposal. Contractors Equipment Ownership and Operating Expense. Construction equipment is normally defined as a contractor s tool costing more than several hundred dollars and for which a prudent contractor would depreciate over several years or many hours of usage. It is necessary to know if the contractor will be using rented or owned construction equipment. If the contractor is using equipment they own, FAR 31.105(d)(2)(i) states actual ownership and operating expenses are used if they can be determined from the contractor s financial records for each piece of equipment. If actual expenses cannot be determined from the contractor s records, check the Army Corps of Engineers Engineer Pamphlets. There s one entitled: Construction Equipment Ownership and Operating Expense Schedule. (http://www.publications.usace.army.mil/usace-publications/engineer- Pamphlets/udt_43545_param_orderby/Pub_x0020_Date_UDT_Value/udt_43545 _param_direction/descending) If the contractor is using rented or leased construction equipment, FAR 31.105 (d)(2)(ii) and FAR 31.205-36 provide guidance. Check rental rates with local suppliers or catalogues; check invoices if retrospective pricing. Overhead Costs (OVHD). These are the regular operating expenses of a business such as rent, utilities, facility maintenance, and taxes. Overhead rates vary from one contractor to another. Overhead rates can be actual indirect cost rates or DCAA audited rates. Either way, the purpose is to determine overhead rates based on costs that are allowable, allocable and reasonable.

Profit. IAW DFARS 215.404-4, if Certified Cost or Pricing Data is required then one of the three structured methods identified must be used to develop a pre-negotiation profit or fee objective on any negotiated contract action. The most common of the three methods is the Weighted Guidelines Method. However, regardless of the need for Certified Cost or Pricing Data, it is still highly recommended that you use a structured approach to analyze profit for all acquisitions. The intent is to eliminate an arbitrary profit objective and to provide a consistent manner to reward risk, motivate efficiency and quality performance. The weighted guidelines method focuses on three profit factors: 5. Delivery Orders. Pre-priced Indefinite Delivery Contract s (SABER, paving, roofing, fencing, painting contracts): A delivery order is issued by the Government to the contractor to order work under an existing Indefinite Delivery Contract. In these instances, the IGE should consist of the specific quantities of the various line items ordered. 6. Protection of the IGE. Classify IGEs as FOR OFFICIAL USE ONLY. Do not reveal government estimates to the public under any circumstances unless the Contracting Officer deems it necessary. FAR 36.203(c) permits disclosure of information concerning the Government estimate during contract negotiations to allow the Contracting Officer to identify a specialized task and the associated cost breakdown figures. ONLY to the extent deemed necessary to arrive at a fair and reasonable price. The Contracting Officer is the only person who has the authority to disclose government cost estimates. Disclosure may put the government at a disadvantage in dealing with contractors. Moreover, it gives contractors an unfair advantage over other contractors competing for the same requirement. www.contractingacademy.gatech.edu