ELIGIBILITY CRITERIA FOR QUALIFICATION OF EPC CONTRACTORS FOR LNG TERMINAL AT GANGAVARAM, VISAKHAPATNAM, ANDHRA PRADESH (INDIA)

Similar documents
PETRONET LNG LIMITED, INDIA Current Activities : Agenda No. 5

INVITATION OF TENDER FOR TERMINAL AUTOMATION SYSTEM (TLF + TFMS) & SAFETY PLC RELATED AUTOMATION JOB AT SEVEN LOCATIONS (BATHINDA, MUGHALSARAI,

LARGE STORAGE TANK PROJECT

CALL FOR MARKET INTEREST NOTICE

LNG Terminal on the Island of Krk OPEN SEASON PROCESS PAPER BINDING PHASE

Jhabua Power Ltd. NOTICE INVITING BIDS

EXPRESSION OF INTEREST (UNDER INTERNATIONAL COMPETITIVE BIDDING)

CORPORATE PROFILE PETRONET LNG LIMITED

REPLIES TO QUERIES. Sr. Clause No Reference from RfQ cum RfP Queries Clarification. Developer. Bidder shall furnish the please.

GSPC LNG Limited B-103, 1st Floor, IT Tower - 2, Infocity, Nr. Indroda Circle, Gandhinagar , Gujarat, India.

Capabilities in LNG

Expression of Interest

1913 Lausanne, Switzerland

Ministry of Energy and Water Government of Lebanon

OIL INDIA LIMITED KG BASIN PROJECT KAKINADA GLOBAL EXPRESSION OF INTEREST NO. OIL/KGB/EOI-22

Saudi Aramco General Bid Slates (GBS)

Casework Technical Support (Social Welfare - Project Management)

A World of Solutions Visit Product Storage Terminals for Bulk Liquids

B.C. TOWBOAT INDUSTRY CONFERENCE

NEW EU DIRECTIVES CONCERNING PUBLIC PROCUREMENT TRANSPOSED INTO ROMANIAN LAW STARTING MAY JANUARY BUCHAREST

MADHYA PRADESH GOVERNMENT Madhya Pradesh Forest Department Satpura Bhawan, Bhopal (M.P.) EXPRESSION OF INTEREST (EOI)

Petroleum Planning & Analysis Cell

Ref: AIDC/CC/KP/1/2507 Date: 18/07/2017

REPUBLIC OF KENYA MINISTRY OF ENERGY AND PETROLEUM KENYA PETROLEUM TECHNICAL ASSISTANCE PROJECT (KEPTAP) PROJECT MANAGEMENT UNIT (PMU)

Iraq Ministry of Oil

Government of India Ministry of Textiles, Textiles Committee P Balu Road, Prabhadevi Chowk, Prabhadevi Mumbai

COMPLETING THE LNG VALUE CHAIN

Clean Cooking Madagascar EMD

CoTE Presentation LNG to Power Stornoway s Renard Mine Canada LNG Export 2015 May 19, 2015

REGISTRATION FOR SUPPLY, DELIVERY, INSTALLATION, REPAIR AND MAINTENANCE OF AIR CONDITIONERS SERVICE PROVIDERS

TITLE I GENERAL PROVISIONS. Article 1 Purpose

Classification of the Largest Ever Floating Storage Regasification Unit

ADDENDUM TO THE RFP TENDER DOCUMENT

Natural Gas Pipeline Crossing of Major Water Body in PHPL Ph-1B Project by Horizontal Directional Drilling (HDD) Technique

DATE 02/02/2011 DATE 02/02/2011 DATE 02/02/2011

PEER GROUPS CMP MARKET CAP EPS P/E (X) P/BV(X) DIVIDEND Company Name (Rs.) Rs. in mn. (Rs.) Ratio Ratio (%)

EOI for System integrator in Smart City project

Q4. After submission of EOI, whether the composition of consortium can be changed or new company can also be added?

Professional Practice 544

6th Annual LNG Transport Handling & Storage 2016 Forum. FSRU as The Pivotal Point for Effective LNG Distribution

TENDER FOR SALE OF IMPORTED CRUDE PALM OIL & RBD PALMOLEIN. Tender No. STC/HYD/EO/SALE/ /1 DATED 20/12/2016

Deliberation. 1. Context The regulatory framework applicable to third party access exemptions

PEER GROUPS CMP MARKET CAP EPS P/E (X) P/BV(X) DIVIDEND Company Name (Rs.) Rs. in mn. (Rs.) Ratio Ratio (%)

GENERAL GUIDELINES FOR COLD CHAIN EQUIPMENT

Expression of Interest (EOI) For. Empanelment of lawyers

KENDRIYA BHANDAR GROCERY DIVISION NEW DELHI. Registration of Suppliers of Pulses & Rice Terms & Conditions

WORLD BANK. Implementation Support Workshop February 06-10, 2012 Ankara

MAHARASHTRA JEEVEN PRADHIKARAN

TENDER DOCUMENT FOR HPL INTERNAL AUDITOR

Involvement of Expert for Technical Design of Decentralized Municipal Solid Waste Treatment Plant in Udaipur

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

Expression of Interest

Public Procurement. CHILE Claro y Cía.

SMALL LNG SOLUTIONS FOR INDONESIA

AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAWAN SAFDARJUNG AIRPORT NEW DELHI

Urgent Recruitment in Procurement and Quality Departments

GMR Holdings Private Limited

Bankers Institute of Rural Development, Lucknow. Invitation of Applications for the Empanelment of Faculty on Contract

United Nations Development Programme (UNDP) FOR THE

1.1 Detailed working concept which allows us to examine the technical aspects in the light of the project objective.

Technical Assistance for IT Training under the e- Governance project Envision Ministry of Environment and Forests Paryavaran Bhavan, CGO Complex Delhi

SUPPLIES REVIEW. This English translation is provided for information only. Only the French original version constitutes a contractual document.

SARJAK CONTAINER LINES PVT. LTD.

LIQUEFACTION STORAGE DISTRIBUTION BUNKERING SMALL-SCALE LNG SOLUTIONS

CONSTRUCTION OF 132/33 KV GIS SUB-STATION AT SONAKHALI, DISTRICT 24 PARGANAS (SOUTH) (Packge-29)

STANDARD ON QUALITY CONTROL (SQC) 1

Loading Master for Oil, LNG/Gas and Petrochemical Terminals

URGENTLY REQUIRED FOR SUDAN Oil Exploration - Operation & Maintenance (O&M) JOBS

Transportation and regasification infrastructures

The Mysore paper Mills Ltd.,

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

Finance Model used to Achieve the Bond in Lighting Retrofit. Declan Keogh Energy Engineer Carlow Kilkenny Energy Agency

Regulations of the People s Republic of China on the Emergency. Prevention and Handling of Marine Pollution Caused by Ships

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

ENGINEERING SERVICES

Hazardous Materials Management

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant

The Need for Institutional Capacity Building for Developing Solar Rooftop Markets: Experience of the USAID PACE-D TA Program in India

Floating storage and regasification barges

TENDER NOTIFICATION NO. MEGA/GD & AD/MP-L5/2017

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING

EXW EX WORKS (... named place) FCA. FREE CARRIER (... named place)

HISTORY

Stratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL

2 nd NYALI BRIDGE Mombasa

Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions

Minutes of the Pre-Bid Meeting for the PPP projects of Delhi Police held on 07 th June 2010 (11.30 A.M.) at Delhi Police Headquarters

Technical summary - supply and install racks and other associated equipment in the warehouse of the logistics

Request For Information (RFI) For a. Spectrum Management & Monitoring System (SMMS)

ADVT No. DMRC/PERS/22/HR/2017 (111), Dated: 24/11/17

LEVEL I PREQUALIFICATION DOCUMENTS

EMPANELMENT NOTIFICATION

LNG Facts A Primer. Presentation before US Department of Energy, Office of Fossil Energy, LNG Forums. March 10, Kristi A. R.

HINDUSTAN SHIPYARD LIMITED : : VISAKHAPATNAM (A Government of India Undertaking) *** ADVT NO.HR/ES(O)/0102/02/2016 DATED 24 AUG 2016

Anadarko LNG and China

THE TAMIL NADU TRANSPARENCY IN TENDERS RULES, 2000

GOVERNMENT OF ORISSA

REQUEST FOR QUOTATIONS (RFQ)

UPDATE OF THE AUTHORISATION OF A LNG CARRIER TO UNLOAD AT THE LNG TERMINAL IN PANIGAGLIA PANIGAGLIA LNG TERMINAL

Transcription:

ELIGIBILITY CRITERIA FOR QUALIFICATION OF EPC CONTRACTORS FOR LNG TERMINAL AT GANGAVARAM, VISAKHAPATNAM, ANDHRA PRADESH (INDIA) Petronet LNG Limited intends to undertake International Competitive Bidding (ICB) process for qualification of bidders for lump-sum EPC contracts to set up LNG terminal of capacity 10 MMTPA with initial installed capacity of 5 MMTPA at Gangavaram, Andhra Pradesh, India for the following packages: A. LNG Storage Facilities B. Regasification Facilities C. Marine Facilities THE OBJECTIVE OF THE QUALIFICATION CRITERIA The objective of the qualification process is to shortlist Bidders, who have the requisite experience and the financial strength to execute the Project. Eligibility Criteria A. Storage Tanks 1. The Bidder should have successfully completed EPC contract of LNG Storage tank(s) of minimum capacity of 120,000 cubic meters, during the last 10 years and out of which at least one should be operating satisfactorily. The Bidder, for the above, shall have carried, on its own, design, engineering, procurement, construction, commissioning and project management. 2. The Bidder should have successfully executed contract for construction work in India in Hydrocarbon sector in the area of Refineries /Petrochemicals/Natural Gas processing / Fertilizers / LNG regasification terminal of value not less than INR 100 Crores for a single project in last 5 years. 3. In case the Bidder does not possess this criteria 2 above on its own, it may form a consortium to include another company meeting this criteria. 4. In case the Bidder forms a Consortium to meet the criteria 2 above the leader of consortium should meet the criteria 1 above and shall carry out design, engineering, procurement, project management and commissioning of the entire facility.

5. The Bidder or Leader, as the case may be, must have an Investment Grade a)turnover atleast USD 250 Million each year for the last three financial years 6. No liquidation, court receivership or other similar proceedings should have been B: Regasification Facilities 1. The Bidder should have successfully completed EPC contract for LNG regasification terminal of minimum capacity of 2.5 MMTPA during the last 10 years and out of which at least one should be operating satisfactorily. The Bidder s Scope of Work for such a Contract shall, as a minimum, include LNG Unloading Arms, High pressure LNG send out pumps, Boil of Gas compressors,

LNG vaporizers, metering station, and utilities & fire fighting facilities. The Bidder, for the above, shall have carried, on its own, design, engineering, procurement, construction, commissioning and project management. 2. The Bidder should have successfully executed contract for construction work in India, in Hydrocarbon sector, in the area of Refineries/Petrochemicals/Natural Gas processing/fertilizers/lng regasification terminal of value not less than INR 100 Crores for a single project in last 5 years. 3. In case the Bidder does not possess the criteria 2 above on its own, it may form a consortium to include another company meeting this criteria. 4. In case the Bidder forms a Consortium to meet the criteria 2 above the leader of consortium should meet the criteria 1 above and shall carry out design, engineering, procurement, project management and commissioning of the entire facility. 5. The Bidder or Leader, as the case may be, must have an Investment Grade a)turnover atleast USD 250 Million each year for the last three financial years

6. No liquidation, court receivership or other similar proceedings should have been C: Marine Facilities 1. The Bidder should have successfully completed EPC Contract of Marine Facilities for hydrocarbon product in last 15 years and out of which atleast one should be operating satisfactorily. The experience should include a hydrocarbon jetty handling vessels exceeding 250 metre LOA, which should be in operation and dredging in sea water depths over 10 meters. The Bidder, for the above, shall have carried, on its own, design, engineering, procurement, construction, commissioning and project management. 2. In case the Bidder does not possess the experience / competency with respect to design of jetty facilities and /or dredging as per 1 above, the Bidder may rely upon on the experience / competency of associate (s)/ sub-contractor(s) / consultant (s) under a binding arrangement, provided that such associate(s) / sub-contractor(s)/ consultant (s) possesses relevant experience / competency. 3. The Bidder should have successfully executed construction work in India, in an infrastructure project of a value not less than INR 100 Crores for a single project in last 5 years. In case the Bidder does not possess this experience on its own, it may choose a Consortium Partner having such experience. 4. In case Bidder forms a Bidding Consortium to meet the criteria 3 above, the Consortium Partner(s) meeting the criteria 1 above shall be responsible for design, engineering, procurement, project management and commissioning of the entire facility 5. In case Bidder is a Bidding Consortium, the Leader shall bear the overall responsibility for the execution of the Marine Facilities, with the Consortium Members being jointly and severally liable for the performance of all the obligations under the Contract.

6. The Bidder or Leader, as the case may be, must have an Investment Grade a)turnover atleast USD 80 Million each year for the last three financial years 7. No liquidation, court receivership or other similar proceedings should have been