Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships

Similar documents
Natural Gas STAR Methane Challenge Program: Supplementary Technical Information for ONE Future Commitment Option

195LiquidsCatalog.

192GasCatalog.

Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers

POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES

Downsizing a Claus Sulfur Recovery Unit

Technowrap composite repairs for the maintenance of piping, pipelines, vessel or structural integrity Simon R. Frost, Walker Technical Resources

Accreditation of Hot Tap Organizations

Pigging Products & Services

Design & Construction Standards, Revised January

Pipeline Integrity. QuestIntegrity.com CHALLENGE CONVENTION

System & Equipment Checkout Procedure Client Name Plant Location

The Pipelines Regulations, 2000

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Condensed Study Guide

PRS INTERNATIONAL BV COMPANY INTRODUCTION

Infrastructure Point Repair System Technical Specifications

Pre-Publication Draft - September 21, 2016 APD MARINE LOADING COLLECTION EFFICIENCY GUIDANCE

Reducing Lost and Unaccounted for Natural Gas in Distribution Systems

Industrial Services. Minimizing Downtime. Maximizing Performance. LDAR. Leak Detection and Repair (LDAR) Services

B-500 / B-600 SERIES

CISTERN & DRY-HYDRANTS

TABLE OF CONTENTS LIST OF FIGURES LIST OF ATTACHMENTS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

A Discussion of Natural Gas Pipeline System Efficiency. Gas/Electric Partnership Houston, Texas February 11, 2010

Installation Practice InnerSeal

Electrical Resistance Monitoring

Management System. Updated Document Review

White Paper. Fire Sprinkler Riser Corrosion. (May 2014) Jeffrey Kochelek (Engineered Corrosion Solutions, LLC) V.1.0.1

Rolairtrol Air Separator For Hot and Chilled Water Systems

Valbart Through Conduit Slab Gate Valve (TCSGV)

CHAPTER 6 : GAS SAMPLING SYSTEMS

The PennEast Pipeline Project

maximize productivity in your operations

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

SECTION TAPPING SLEEVES AND VALVES

Estimation of Emissions from CO 2 Capture and Storage: the 2006 IPCC Guidelines for National Greenhouse Gas Inventories

SANITARY SEWER CHEMICAL GROUTING

THE PURPOSE OF PIGGING WHY PIG A PIPELINE?

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Wastewater Capital Projects Management Standard Construction Specification

6 th Pipeline Technology Conference 2011

United Pipeline Systems

Diffused Aeration Piping Equipment

INDUSTRIAL PIPE FITTINGS, LLC

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

Machining, Bolting and Flange Management

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

CONDUITS AND FITTINGS

SECTION FACILITY SANITARY SEWERS

GUIDANCE DOCUMENT April 6, Guidance on Estimating Condensate and Crude Oil Loading Losses from Tank Trucks

Water Utility Science Water Math and Hydraulics 050. Name: Date:

Polymer Linings for Restoration & Corrosion Protection of Steel Surfaces: Crude Oil Storage Tank Repair and Reline in New Zealand

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Remote Digital Video Inspection

The Best Solution to Paint Finish Defects

The Importance of Pipeline Cleaning: Risks, Gains, Benefits, Peace of Mind

TAMDID PIPES GRP MANHOLE BROCHURE

recycle water reuse it save up to from showers & baths for flushing toilets 30% of water use

Pipeline Oil & Gas Equipment, Inc.

CHAPTER 11 CONDUITS AND FITTINGS

289 Series Spring-Loaded Relief Valves

SUMMER 15 EXAMINATION

Natural Gas Processing

Regulatory Agenda and Notices RSPA / OPS

Description [in natural gas volume] Emissions estimated from size of breach / pressure / duration calculation

Gas Holder Tank Maintenance, Design, Fabrication & Installation

REQUEST FOR DEVIATION WATER AND WASTEWATER SYSTEM STANDARD SPECIFICATIONS

Gilflo flowmeters. for steam, liquids and gases

RADON WELLISUMP BASIN FOR NEW HOME CONSTRUCTION

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8)

Water Treatment Program. Training Manual

Methane Emission Factor Development Project for Select Sources in the Natural Gas Industry. Draft Task 1 Report

nalcofabtech.com A Nalco Champion Company

WATER DISTRIBUTION WORKER I WATER DISTRIBUTION WORKER II

NRRI Colloquium July 11, 2015 Answering Questions about Methane Emissions from the Natural Gas Sector

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

PIPELINE PRODUCTS. RD-6 Anti-Corrosion Coating System. Sales and Support:

GEOMEMBRANE INSTALLATION GUIDELINES RUFCO 20, 30 & 40 MIL UNREINFORCED DURA SKRIM 30, 36 & 45 MIL REINFORCED

The Use of FRP (Fiberglass-Reinforced Plastic) in Phosphate Fertilizer and Sulfuric Acid Processes

Case Studies in Energy Efficiency and Water Conservation Projects

MEMORANDUM. The general findings of the assessment are as follows:

Gas Transmission and Distribution Piping Systems

Owners Manual Models: 200-RODI4-XXX. US Water Systems 4 Stage RO/DI System Installation and Maintenance Manual.

THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK

METAL PRODUCTS PIPELINE ENGINEERING. Engineered Products for the Pipeline Pigging and Flow Assurance Industry

INSTALLATION MANUAL PIPE SUPPORT

289 Series Spring-Loaded Relief Valves

B. System Design and Performance Requirements

Top Performance Pipes for Toughest Conditions

OPPORTUNITIES FOR ENERGY EFFICIENCY AND DEMAND RESPONSE IN CORRUGATED CARDBOARD MANUFACTURING FACILITIES

Methane Emission Factor Development Project for Select Sources in the Natural Gas Industry. Task 1 Report

Natural Gas Gathering Lines. John Williams Director Service Monitoring and Enforcement Department

Methane concentrations are measured using portable gas detection instruments, usually a methane meter or explosimeter which has a readout in either

MS-2A LINER SPECIFICATIONS: for STRUCTURAL REPAIR and SEALING of MANHOLES

Line filters LINE FILTERS

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

CalScan TM EP Executive Summary. In-Line Inspection. Prepared for: SEICO Date issued: October 8, 2009 PII reference number:

TITLE 64 LEGISLATIVE RULE BUREAU FOR PUBLIC HEALTH SERIES 15 CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION. use.

Transcription:

Transmission Pipeline Opportunities Advancing Project Development in India through Public Private Partnerships 22 23 February, 2007

Pipeline Maintenance and Repair: Agenda Methane Losses from Pipeline Maintenance Hot Taps Composite Wrap Pipeline Pumpdowns Pipeline Pigging Discussion Questions 2

Methane Losses from Current Pipeline Maintenance Practices Natural gas is often vented to the atmosphere when performing pipeline repairs and new connections Up to 56,600 m 3 * natural gas vented when making a new connection Up to 170,000 m 3 * natural gas vented when replacing pipe that has non-leaking, external damage These practices result in methane emissions Loss of sales Service disruption and customer inconvenience Costs of evacuating the existing piping system * pipelines ranging from 4 to 18 inches (10 46 centimeters) diameter operating at 100 to 1,000 pounds per square inch gauge pressure (7.8 69 atmospheres) 3

Methane Losses from Major Repairs Not always possible to repair a pipeline without taking it out of service Major pipeline repairs often involve closing off the repair area and venting gas to the atmosphere Major repairs Internal corrosion Leak repairs Installing large connections 850 to 170,000 m 3* natural gas vented to the atmosphere with each repair * pipelines ranging from 4 to 18 inches (10 46 cm) diameter operating at 100 to 1,000 pounds per square inch gauge pressure (7.8 69 atm) 4

Pipeline Maintenance and Repair: Agenda Methane Losses from Pipeline Maintenance Hot Taps Composite Wrap Pipeline Pumpdowns Pipeline Pigging Discussion Questions 5

Hot Taps for New Connections Connecting pipelines without service disruption or methane emissions Source: Williamson Industries Inc. 6

Hot Tapping Procedure Connect branch fitting and permanent valve on the existing pipeline while in service Install hot tapping machine on the valve Cut through pipeline wall and extract coupon through the valve Close valve and remove hot tapping machine Connect branch line Schematic of Hot Tapping Machine 7

Hot Tap Benefits Continuous system operation shutdown and service interruptions are avoided No gas released to the atmosphere Avoided cutting, realignment and re-welding of pipeline sections Avoid inerting / gas freeing pipeline section for hot work Reduced planning and coordination costs Increased worker safety 8

Project Summary for India Using hot taps for in-service pipeline connections Project Description: Using hot taps for 320 in-service pipeline connections (305 small taps and 15 large taps) Methane Saved: Sales Value 1 : $73,200 Capital and Installation Cost 2 : ($57,800) Operating and Maintenance Cost 3 : Payback Period: 691,000 cubic meters per year (24,400 Mcf per year) ($1,800) per year 10 months 1 Gas price in India $3/Mcf ($106/thousand m 3 ) 2 All costs have been converted to an Indian basis using the methodology described in US Natural Gas STAR program success points to global opportunities to cut methane emissions cost-effectively, Oil and Gas Journal, July 12, 2004 3 O&M Cost for purchased small hot tap equipment and contract service cost for larger taps. 9

Pipeline Maintenance and Repair: Agenda Methane Losses from Pipeline Maintenance Hot Taps Composite Wrap Pipeline Pumpdowns Pipeline Pigging Discussion Questions 10

Composite Wrap for External Repair Permanent On-Line Pipeline Repair Technology Source: Duke Energy 11

Composite Wrap: What Are They? 1) A high-strength glass fiber composite or laminate 2) An adhesive or resin bonding system 3) A high- compressive- strength load transfer filler compound Source: Clock Spring Company L. P. 12

Composite Wrap Installation After excavation and pipe preparation External defects filled with filler Composite wrap wound around pipe with adhesive or laminating agents Typically 5 centimeters (2 inches) of wrap must extend beyond damage Excavation site refilled after curing time Reducing pressure improves quality of repair Source: Armor Plate 13

Composite Wrap Lessons Learned Trained but not skilled crafts persons required Specialized welding and lifting equipment not required Minimizes access concerns No delays awaiting metal sleeve Cathodic protection remains functional Proven permanent repair for external defects Temporary repair for internal faults In-service pipeline repair methodology Ideal for urgent and quick repair Avoid service disruptions Cost-effective 14

Clock Spring Columbia Experience Clock Spring was tested on a 61 centimeter (24 inch) diameter pipeline affected by external damage Pipeline had 75% diameter deflection and a defect length of 1.83 meters (6 feet) Clock Spring used 87 ten centimeter (four inch) wide wrap kits and 150 filler kits to repair the damage Clocks Spring wrap passed pressure cycles lasting 15 minutes at pressures up to 1800 pounds per square inch gauge (psig)* * 1800 psig = 123 atm 15

Project Summary for India Composite wrap for repair of non-leaking pipeline defects Project Description: Using composite wrap to repair a 15 centimeter (6 inch) pipeline defect Methane Saved: Sales Value 1 : $11,100 Capital and Installation Cost 2 : ($5,800) Operating and Maintenance Cost 2 : Payback Period: 105,000 cubic meters per year (3,690 Mcf per year) ($0) per year 6 months 1 Gas price in India $3/Mcf ($106/thousand m 3 ) 2 All costs have been converted to an Indian basis using the methodology described in US Natural Gas STAR program success points to global opportunities to cut methane emissions cost-effectively, Oil and Gas Journal, July 12, 2004 16

Pipeline Maintenance and Repair: Agenda Methane Losses from Pipeline Maintenance Hot Taps Composite Wrap Pipeline Pumpdowns Pipeline Pigging Discussion Questions 17

Pipeline Pumpdown Minimizing emissions when you must cut out a section of pipeline Source: Duke Energy 18

Methane Recovery by Pipeline Pumpdown Use in-line compressors to pull down the pressure to minimum suction pressure Use portable compressor to pull down pressure even further Cost is justified by immediate payback in gas savings About 90% of gas usually vented is recoverable 19

Sequence of Depressurization Events 20

Pipeline Pumpdown Equipment In-line pipeline compressor Typically has compression ratio of 2 to 1 Blocking upstream valve reduces pipeline pressure to safe limits for maintenance Portable compressor Typically has compression ratio of 5 to 1 Can be used in conjunction with in-line compressor to further reduce pressure in the pipeline section Justifiable only when multiple sections of pipeline are to be serviced (i.e. long sections of maintenance or pipeline valve station maintenance where stopples are not feasible) 21

Economics of Pipeline Pumpdown Calculate gas vented to atmosphere by depressuring pipeline Calculate gas saved with in-line compressors Calculate gas saved with portable compressor Consider cost of a portable compressor O&M costs of a portable compressor Consider fuel costs for operating portable compressor Calculate the difference in gas savings 22

Project Summary for India Using pipeline pump-down techniques to lower gas line pressure before maintenance Project Description: Performing a pump-down four times per month on a 76 cm (30 inch) pipeline at 600 psig with a portable compressor Methane Saved: Sales Value 1 : $795,000 7,500,000 cubic meters per year (265,000 Mcf per year) Fuel Cost 2 : Lease and Maintenance Cost 3 : Payback Period: 1 Gas price in India $3/Mcf ($106/thousand m 3 ) ($9,900) per year ($454,000) per year 7 months 2 Fuel cost is based on consuming 1,950 m 3 (69 Mcf) of gas per application at $3/Mcf ($106/thousand m 3 ) 3 All costs have been converted to an Indian basis using the methodology described in US Natural Gas STAR program success points to global opportunities to cut methane emissions cost-effectively, Oil and Gas Journal, July 12, 2004 23

Pipeline Maintenance and Repair: Agenda Methane Losses from Pipeline Maintenance Hot Taps Composite Wrap Pipeline Pumpdowns Pipeline Pigging Discussion Questions 24

Methane Losses from Pipeline Pigging Gas lost when launching and receiving a pig Fugitive emissions from pig launcher/receiver valves Gas lost from storage tanks receiving condensate removed by pigging Gas vented from pipeline blowdowns 25

Pigging Pipelines Hydrocarbons and water condense inside pipelines, causing pressure drop and reducing gas flow Periodic line pigging removes liquids and debris to improve gas flow Also inspect pipeline integrity Efficient pigging: Keeps pipeline running continuously Keeps pipeline near maximum throughput by removing debris Minimizes product losses during launch/capture www.girardind.com/ 26

Pigging Applications Pipeline pigs come in a variety of shapes and sizes for different applications Cleaning pigs Have brushes or blades to help remove debris Sealing pigs Make tight seal for removing liquids from the pipe Inspection pigs Specialized pigs outfitted with instruments to monitor the pipeline integrity www.westernfilterco.com 27

How Does Pigging Vent Methane? Pig launchers have isolation valves for loading pigs, pressurizing pigs, and launching pigs with gas bypassed from the pipeline Launcher pressuring/depressuring loses methane out the vent valve Gas Flow Vent Valve Pig Launcher Gas Flow www.girardind.com/ 28

Pigging Vents Methane Twice! Methane lost through vent valve on the launcher and again through vent valve on the receiver Once receiver is isolated from the line, it must be depressured to remove the pig Liquids ahead of the pig drain to a vessel or tank Isolation valve leaks may cause excessive venting to depressure www.girardind.com/ 29

Estimating Pigging Vents E = P * V / 14.7 * n * f where: E = methane emissions (m 3 ) P = Gathering line pressure (psia) V = Launcher and receiver volume (m 3 ) n = % methane f = number of piggings Pig trap isolation valve leakage greatly increases this minimum amount of gas venting psia = pounds per square inch absolute 30

Estimating Emissions from Pigging Estimating V Estimating P Line Diameter Methane Emissions Volume (inches) (cm) (cf) (m 3 ) 6 15 0.9 0.025 12 30 4.6 0.130 18 46 11.5 0.326 26 66 27.7 0.784 34 86 65.2 1.846 48 122 170.7 4.834 Adapted from www.pigsunlimited.com Estimating n Default: 315 psia* Default: 78.8 % methane * 315 psia = 21.4 atm 31

Methane Recovery: Use Inert Gases Pipeline maintenance requires pipe section blowdown before work can begin Gas in pipeline is usually vented to the atmosphere Inert gas can be used to drive a pig down the section of pipe to be serviced, displacing the natural gas to a product line rather than venting Inert gas is then blown down to the atmosphere, avoiding methane loss 32

Inert Gas Setup Existing pig launcher can be used, set up to work with inert gases Portable nitrogen supply connected to the pig launcher vent Close valve on the main pipeline, pressurize launcher with inert gas, open launcher to main pipeline Supply nitrogen until pig reaches receiver www.girardind.com/ 33

Industry Experience One partner reported using inert gas to purge six pipelines for maintenance Gas savings from these applications was 15,200 m 3 (538 Mcf) These savings correspond to a typical application of: 3.2 kilometers (2 miles) of 25 centimeters (10 inch) diameter pipeline 34

Is Recovery Profitable? No capital costs with existing pigging facilities Labor costs are estimated at eight hours for two operators Increased safety is the primary benefit of this project Gas savings are a secondary benefit, as the labor and nitrogen costs outweigh the gas value 35

Project Summary for India Using inert gases and pigs to perform pipeline purges Project Description: Purging 3.2 kilometers (2 miles) of 25 centimeters (10 inch) diameter pipeline using nitrogen from a nitrogen rejection unit (NRU) Methane Saved: Sales Value 1 : $270 Capital and Installation Cost 2 : ($0) Operating and Maintenance Cost 2 : Payback Period: 2,500 cubic meters per year (90 Mcf per year) ($16) per year 1 month 1 Gas price in India $3/Mcf ($106/thousand m 3 ) 2 All costs have been converted to an Indian basis using the methodology described in US Natural Gas STAR program success points to global opportunities to cut methane emissions cost-effectively, Oil and Gas Journal, July 12, 2004 36

Discussion Questions To what extent are you implementing these practices? How could these practices be improved upon or altered for use in your operation(s)? What are the barriers (technological, economic, lack of information, regulatory, focus, manpower, etc.) that are preventing you from implementing these practices? 37