Seismic Retrofit of Reinforced Concrete Building Structures with Prestressed Braces

Similar documents
SEISMIC RETROFIT OF RC MEMBERS USING FRP WITH VERY LOW YOUNG S MODULUS

STRENGTHENING WITH WING WALLS FOR SEISMICALLY SUBSTANDARD R/C BEAM-COLUMN JOINTS

In-plane testing of precast concrete wall panels with grouted sleeve

Seismic Evaluation and Retrofit of Beam- Column Joints of Mid-America Bridges Part 2: Steel Sheet and Plate Retrofit

SEISMIC RETROFIT OF BEAM-COLUMN JOINTS WITH FRP SHEETS

SEISMIC RETROFITTING OF REINFORCED CONCRETE COLUMNS USING CARBON FIBER REINFORCED POLYMER (CFRP)

Modelling of RC moment resisting frames with precast-prestressed flooring system

CYCLIC TESTING OF BOLTED CONTINUOUS I-BEAM-TO-HOLLOW SECTION COLUMN CONNECTIONS

SEISMIC TEST OF CONCRETE BLOCK INFILLED REINFORCED CONCRETE FRAMES

Seismic Retrofit Of RC Columns With Inadequate Lap-Splice Length By External Post-Tensioned High-Strength Strips

Analytical Investigation of Seismic Performance of Exterior RC Beam-Column Joints Rehabilitated with New Scheme

Experimental investigation of the use of CFRP grid for shear strengthening of RC beams

Collapse prevention of infill-brick wall of RC frames with FRP Stitching Technology

FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE BRIDGE PIER COLUMNS SUBJECTED TO SEISMIS LOADING

Council on Tall Buildings

Deformation Capacity of RC Structural Walls without Special Boundary Element Detailing

Pile to Slab Bridge Connections

NON-LINEAR FEM ANALYSIS FOR CES SHEAR WALLS

Strengthening of infilled RC frames by CFRP

Performance based Displacement Limits for Reinforced Concrete Columns under Flexure

LATERAL LOAD BEHAVIOR OF UNBONDED POST-TENSIONED HYBRID COUPLED WALLS. Qiang SHEN Graduate Research Assistant. Yahya C. KURAMA Assistant Professor

CYCLIC BEHAVIOR OF SLENDER R/C COLUMNS WITH INSUFFICIENT LAP SPLICE LENGTH

PERFORMANCE OF RC BRIDGE COLUMNS SUBJECTED TO LATERAL LOADING

SEISMIC PERFORMANCE OF CONCRETE TILT-UP BUILDINGS: CURRENT WALL-TO-SLAB CONNECTIONS

1. INTRODUCTION. Fig.1 Dimension of test specimen

Cold-Formed Steel Special Bolted Moment Frames: Cyclic Testing and Numerical Modeling of Moment Connections

GFRP retrofitted RC frames with columns subjected to high axial stresses

Application of Tensioned CFRP Strip Method to an Existing Bridge

Shake-table test on a four-storey structure with reinforced concrete and unreinforced masonry walls

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

22. DESIGN OF STEEL BRACED FRAMES Eccentrically Braced Steel Frames

Upgrading the shear strength of non-ductile reinforced concrete frame connections using FRP overlay systems

HYBRID MOMENT FRAMES AND UNBONDED PT SHEAR WALLS

Moment curvature analysis of concrete flexural members confined with CFRP grids

EARTHQUAKE DESIGN CONSIDERATIONS OF BUILDINGS. By Ir. Heng Tang Hai

SHAKE TABLE TESTING OF BRIDGE REINFORCED CONCRETE COLUMNS UNDER COMBINED ACTIONS

FEASIBILITY STUDY ON SEISMIC RESPONSE ESTIMATION OF DAMAGED R/C BUILDINGS BASED ON OBSERVATION DATA AND NUMERICAL ANALYSIS

Seismic Detailing of RC Structures (IS: )

Fagà, Bianco, Bolognini, and Nascimbene 3rd fib International Congress

IMPROVEMENT OF THE DEFORMATION CAPACITY BY THE USE OF FIBERS

Gravity Load Collapse of Reinforced Concrete Columns with Brittle Failure Modes

UHPC Connection of Precast Bridge Deck

DYNAMIC CHARACTERISTICS ASSESSMENT OF STEEL BEAM-COLUMN CONNECTIONS WITH FLOOR SLAB

STRUCTURAL PERFORMANCE OF RC BEAMS AND BEAM-COLUMN SUBASSEMBLAGES USING REINFORCEMENT WITH SLEEVE JOINTS AT THE END OF BEAMS

5.4 Analysis for Torsion

RETROFITTING OF COLUMNS WITH RC JACKETTING AN EXPERIMENTAL BEHAVIOR

INHERENT DUCTILITY OF REINFORCED CONCRETE SHEAR WALLS WITH NON-SEISMIC DETAILING

Structural Upgrade of Reinforced Concrete Column-Tie Beam Assembly using FRP Composites

REHABILITATION OF RC BUILDINGS USING STRUCTURAL WALLS

DESIGN FOR PROGRESSIVE COLLAPSE 1

Anchorage Failure and Shear Failure of RC Exterior Beam-Column Joint

USE OF CFRP ANCHORS TO STRENGTHEN LAP SPLICES OF RECTANGULAR RC COLUMNS

RESPONSE OF SUBSTANDARD REINFORCING DETAILS T CONNECTIONS UPGRADED WITH CONCRETE COVERS AND CFRP

Strength Design of Reinforced Concrete Structures

ANCHOR BOLTS IN CLAY MASONRY WALLS

Effect of beam dimensions on structural performance of wide beam-column joints

Ensuring sufficient robustness to resist

ULTIMATE LOAD-CARRYING CAPACITY OF SELF-ANCHORED CONCRETE SUSPENSION BRIDGE

SEISMIC EFFECTS ON COUPLED SHEAR WALL STRUCTURE BY COUPLING BEAMS WITH SIDE BOLTED STEEL PLATES

EARTHQUAKE DESIGN AND CONSTRUCTION OF TAL COMPOSITE BRIDGE PIERS

Shaking Table Test of Controlled Rocking Reinforced Concrete Frames

CVEN 483. Structural System Overview

Cyclic In-Plane Shear of Concrete Masonry Walls Strengthened by FRP Laminates

DUCTILITY REQUIREMENTS FOR BUILDINGS

Original Publication: International Journal of High-Rise Buildings Volume 5 Number 3

CFT Column-to-Cap Beam Connections for. Accelerated Bridge Construction in Seismic Regions. Lisa Marie Berg. Master of Science in Civil Engineering

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 2, No 2, 2011

NONLINEAR FINITE ELEMENT ANALYSIS OF NON- SEISMICALLY DETAILED INTERIOR RC BEAM-COLUMN CONNECTION UNDER REVERSED CYCLIC LOAD

Structural Systems with Enhanced Seismic Resiliency Using High-Performance Materials

Pacific Earthquake Engineering Research Center

Hybrid Reinforced Concrete Frame Building with Pumice Brick Masonry Infill under Static Lateral Loading

EXPERIMENTAL STUDY ON REINFORCED CONCRETE COLUMN STRENGTHENED WITH FERROCEMENT JACKET

Application of Buckling Restrained Braces in a 50-Storey Building

A SIMPLIFIED METHOD FOR THE ESTIMATION OF THE SEISMIC RESISTANCE OF RC FRAMES WITH WEAK INFILL PANELS

Drift Compatibility of Corner Joints. NEES Webinar #2 December 12, 2014

POST-TENSIONING APPLICATION AND TECHNOLOGY. Moe Kyaw Aung

FINITE ELEMENT MODELING OF NON-DUCTILE REINFORCED CONCRETE COLUMNS

MID-STORY SEISMIC ISOLATION FOR STRENGTHENING OF A MULTI-STORY BUILDING

Lateral Design of Mid- Rise Wood Structures

Analytical Study on Seismic Performance of Hybrid (DUAL) Structural System Subjected To Earthquake

Effect of FRP strengthening on the behavior of shear walls with opening

SEAU 5 th Annual Education Conference 1. ASCE Concrete Provisions. Concrete Provisions. Concrete Strengths. Robert Pekelnicky, PE, SE

ANALYTICAL STUDIES OF A FULL-SCALE STEEL BUILDING SHAKEN TO COLLAPSE

MIDAS Training Series

SEISMIC VULNERABILITY ASSESSMENT OF STEEL PIPE SUPPORT STRUCTURES

Modeling of Coupled Nonlinear Shear and Flexural Responses in Medium-Rise RC Walls

SEISMIC RETROFIT OF NON-DUCTILE RECTANGULAR REINFORCED CONCRETE COLUMNS BY CFRP JACKETING

AN ANALYSIS OF THE BEHAVIOR OF HYBRID STEEL BEAM RC COLUMN CONNECTION

Introduction to Earthquake Engineering Behaviour of structures under earthquakes

INNOVATIVE DESIGN AND TESTING OF A SEISMIC RETROFITTED STEEL DECK TRUSS BRIDGE

EXPERIMENTAL STUDY ON RC COLUMNS RETROFITTED BY FRP AND SUBJECTED TO SEISMIC LOADING

EXPERIMENTAL STUDY OF THE DEFORMATION CAPACITY OF STRUCTURAL MASONRY

BEHAVIOR OF REINFORCED CONCRETE BEAM WITH OPENING

PRELOADING EFFECT ON LOAD CAPACITY AND DUCTILITY OF RC BEAMS STRENGTHENED WITH PRESTRESSED CFRP STRIPS

PERFORMANCE OF MECHANICAL SEISMIC LOAD TRANSMISSION DEVICE BASED ON IMPACT

CONNECTION PERFORMANCE OF BUCKLING RESTRAINED BRACED FRAMES

Feasibility and Detailing of Post-tensioned Timber Buildings for Seismic Areas

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials

Experimental study on seismic behavior of composite concrete and

Transcription:

Journal of Advanced Concrete Technology Vol. 7, No. 3, 337-345, October 9 / Copyright 9 Japan Concrete Institute 337 Scientific paper Seismic Retrofit of Reinforced Concrete Building Structures with Prestressed Braces Susumu Kono 1 and Takeshi Katayama 2 Received 1 June 9, accepted 28 September 9 Abstract A prestressed concrete brace system was first proposed in 1 to dramatically simplify seismic strengthening procedures. Since the proposed system does not necessitate any steel bar anchorage, the construction period is shorter and the construction cost is lower. The system has been revised in terms of its aesthetics, materials, and construction methods since the first proposal of the system. This paper introduces a series of prestressed concrete brace system and discusses their interesting features. Design procedures and some examples are also introduced with experimental results. 1. Introduction 1 Associate Professor, Dept. of Architecture and Architectural Engineering, Kyoto Univ., Kyoto, Japan. E-mail:kono@archi.kyoto-u.ac.jp 2 Structural Engineer, Takenaka Co., Honmachi, Osaka, Japan. 1.1 Background After major earthquakes at Northridge (USA), Kobe (Japan), Kocaeli (Turkey), Chichi (Taiwan) in 199 s, the seismic upgrading of existing buildings has been attracting more attention than ever. At the same period, there was an effort in Japan to address problems related to the seismic rehabilitation of concrete building structures. Based on the efforts, the standard and guidelines for seismic evaluation and retrofit methods were summarized (The Japan Building Disaster Prevention Association, 5). The efforts have been continuously made and some of them are published in English (Japan Concrete Institute, 7). Upgrading of seismic performance of buildings normally be achieved by increasing strength or ductility, or combining both. When a ductility enhancement retrofit method is taken, the construction cost tends to be lower but the response displacement becomes large leading to serious damage of structural components. When a strength enhancement retrofit method is taken, the construction cost is larger but the damage tends to be minor in general. However, many existing buildings in Japan have not had seismic upgrading in any methods since construction is costly due to intensive labor work and long suspension of service. The research project started to develop a simple seismic strengthening system which decreases construction period and construction cost by using no bolt anchorage. Based on this concept, a prestressed precast concrete brace system was initially proposed (Watanabe et al. 4). The system has been revised since then to refine the configuration, materials and construction procedures. In this paper, a series of prestressed brace system is introduced and their interesting features are discussed with experimental results. 1.2 Basic concept of prestressed brace system The prestressed brace system resists the external lateral force by placing prestressed diagonal braces in an existing frame as shown in Fig. 1(a). The diagonal members may be made of precast concrete, fiber reinforced concrete, or concrete filled tube. When the diagonal member experiences shortening, the horizontal component of the axial force of the shortened brace resists the external lateral force. When the diagonal member experiences elongation, it is possible to freely come out of the surrounding frame since there is no bolt anchorage. To avoid this phenomenon, a special device with a flat spring and steel pipe (FSSP) in Fig. 1(b) is installed at the bottom end of each diagonal member. FSSP maintains a certain amount of compressive force in the diagonal member even if the diagonal brace elongates. The axial compression force shortening relation of a brace is shown in Fig. 1(c). First, the diagonal member and FSSP are assembled and prestressing force is introduced to the assemblage. After placing the assemblage in the frame and releasing the prestressing force, the assemblage comes to Point C. As time goes by, the prestressing force decreased to Point D due to creep and shrinkage of concrete and Point D is considered the condition under the ordinary service condition. The amount of creep and shrinkage is evaluated from empirical equation to evaluate Point D. When the assemblage experiences the seismic force, the brace is designed to move between Point F and Point B so that it does not fail due to excessive shortening and does not come out of the frame under elongation. In this manner, the brace resists the lateral load while it is in the first quadrant of Fig. 1(c). In other words, due to the initial prestressing force, the brace resist the lateral force mainly when it is subjected to compression but to some extent when it is subjected to minor tension as indicated. If it experiences a large amount of tension, the brace no longer carries lateral force. Major design issues related to the prestressed brace system can be seen in Fig. 1(a). These

338 S. Kono and T. Katayama / Journal of Advanced Concrete Technology Vol. 7, No. 3, 337-345, 9 Design lateral seismic force at left corner Design for joint shear Design for concrete bearing Design for beam tension (beam and slab reinforcement) Design lateral seismic force at right corner Non-shrink high strength mortar Design for direct shear Compression force due to lateral seismic force Design for axial force considering buckling Design for additional column tension Free length of a set of flat springs Estimation of loss of brace prestress due to creep and shrinkage under service load condition Small compression force due to spring reaction (a) Brace system and its major design issues Minimum length Flat spring A set of flat springs Steel pipe Bearing plate Bearing plate (b) Assemblage of flat springs and steel tube Axial force (compression) Free length Flat spring free Axial strength of a brace F Design response range Just after the release of prestressing force After the loss due to creep and shrinkage Tension response Compression response E D C B A Stiffness of a diagonal element Initial stiffness is due Axial shortening of a brace to FSSP device (c) Axial force-displacement relation of brace Fig. 1 Prestressed brace system and its resisting mechanism.

S. Kono and T. Katayama / Journal of Advanced Concrete Technology Vol. 7, No. 3, 337-345, 9 339 design issues are again discussed using the design flow chart later. 2. Evolution of presressed brace system 2.1 First generation: X-shape precast prestressed concrete brace with a circular center core The first generation of prestressed concrete brace consists of four precast elements as shown in Fig. 2(a) and the detail information is seen in References (Watanabe et al. 4, Kono et al. 5). Precast Element C has a circular core which works as a hub of the diagonal braces. After assembling four elements at a construction site, prestressing force is introduced to two lower legs. Gaps between element ends and frame corners are filled with high strength no-shrinkage mortar. After hardening of mortar, the prestressing force is released. Then the X-shape brace extends and fixed to the boundary frame by itself. When a frame with the brace experiences lateral load, one of diagonal members works effectively in compression and the other diagonal member carries a little or no load. Figure 3 shows lateral load drift relations of tested specimens shown in Fig. 2(b). Two figures showed the results of two specimens with different axial buckling strengths of braces: the brace of No. 2 had higher buckling strength than that of No. 1. Both No. 1 and No. 2 failed with crushing of the brace concrete. The maximum capacity of No.1 was +397 kn and -41 kn, that of No. 2 was +726 kn. The initial stiffness was 122 kn/mm for No. 1 and 162 kn/mm for No. 2. Both specimens showed elastic response with small energy dissipation till failure. The hysteresis curves show minor slips near the origin. As mentioned earlier the axial stiffness of a brace changes at the point E in Fig. 1(c), that is, the brace shows relatively low stiffness until the re-contact of the steel bearing plate and the steel pipe of FSSP device. Observed slip is mainly due to this abrupt stiffness change. The amount of slip depends on several variables such as the initial prestressing force and the stiffness of FSSP device. The slip does not seem to affect the seismic performance very much. Figure 3 also shows the lateral load carried by frame. The contribution of the original frame was obtained by deducting the Steel plate Special wedge device for releasing prestressing force Nut anchor for mild reinforcement Precast element A After releasing of prestressing no-shrinkage mortar is filled up Epoxy glue Prestressing bar Duct P1 3 3 21 3 3 Prestressing bar- φ32 to sim ulate the long term axialloading. Prestressing bar- φ13 2 to prevent beam yielding in tension φ4@ 7 Beam section 275x325 φ4@ 1 Colum n section 3x3 325 P2 275 1425 Precast element B Precast element C Introduction of prestressing force FSSP device (a) Four-piece precast brace unit B race section 1x12 for N o.1 12x15 for N o.2 φ4@ 5 (b) Specimen configuration (Unit: mm) Fig. 2 The first generation prestressed brace system (Watanabe et al. 4). 325 8 6 -.4 -.2.2.4.6 Drift angle (%) No.1 8 6 -.4 -.2.2.4.6 Drift angle (%) No.2 Lateral load (kn) Lateral load (kn) - - - Total response Frame contribution - Total response Frame contribution -6-8 -4 4 8 Lateral displacement (mm) -6-8 -4 4 8 Lateral displacement (mm) (a) Specimen No. 1 (b) Specimen No. 2 Fig. 3 Lateral load drift relation of the prestressed brace system (Watanabe et al. 4).

34 S. Kono and T. Katayama / Journal of Advanced Concrete Technology Vol. 7, No. 3, 337-345, 9 Compression failure occurred near the center hub. (a) Compression failure at the foot of brace No. 1 (b) Failure modes of No. 2 Fig. 4 Failure modes of the first generation brace system. (a) Office building (b) High school building (c) University building A (c) University building B Fig. 5 Examples of the first generation brace system (Courtesy of Daiwa Co.). lateral component of measured brace compressive force from total lateral force where the brace compressive force was calculated by concrete strain measurements. At the peak load, 64 % was sustained by the brace in No.1 and 79 % in No.2, respectively. However, the post-peak behavior for both specimens is brittle since the failure is caused by the compressive failure of the brace as shown in Fig. 4 although the damage of surrounding frame was limited to flexural cracks of beams and columns since the enforced displacement was not very large. Hence, it is not appropriate to anticipate any energy dissipation after the peak and the design should count solely on the strength enhancement. Due to its low cost and ease of construction, the first generation brace system has been used at many school buildings and some office buildings as shown in Fig. 5. For example, it is quite attractive to be able to finish the retrofit work during a two-week winter or spring vacation if the prestressed brace system is employed at schools. For the first generation brace system, prestressing force was applied with prestressing rods embedded in the X-shape assemblage. Since the one end of the rod

S. Kono and T. Katayama / Journal of Advanced Concrete Technology Vol. 7, No. 3, 337-345, 9 341 was anchored at the central hollow circle as shown in Fig. 2(a), prestressing force was not very efficiently introduced and it was not possible to take out prestressing rods after the construction. Hence removing the installed prestressed braces was not possible without damaging the brace and frame. 2.2 Second generation: X-shape precast prestressed concrete brace without a circular center core The second generation of prestressed brace system does not have a circular central core as shown in Fig. 6 (Kono and Watanabe 6a, 6b). The brace system consists of four legs and one central unit. Five units are assembled at a construction site and prestressing force is applied along both diagonal directions with external cables as shown in Fig. 7. The gaps between the brace ends and frame corners are filled with high strength and no-shrinkage mortar as the first generation brace system. After the grout mortar hardens, the prestressing force is released so that the brace diagonals extend and securely fit into the existing frame. From this generation, the prestressing force is applied to the whole length of the brace with external rods and the efficiency of introduction of prestressing force was greatly improved. Rods can be reused and the brace can be taken out by reapplying the prestressing force if necessary, making it possible to relocate the brace. The relocation capability is appealing to warehouse structures which occasionally change the live load configurations. Two-story braced specimens in Fig. 6(b) were built and tested to see the behavior under cyclic lateral load when the multi-story frame with the second generation bracing system experiences overall cantilever type deformation. Details of experiment can be seen in References (Kono and Watanabe 6a, 6b). The ultimate failure was caused by the tensile yielding of the first story column and the load-drift relation after the yielding was greatly enhanced as shown in Fig. 8. Specimen E1 had much larger deformation capacity after the peak. This large deformation capability was made possible by tensile yielding of the first story columns. Stiffness of the frame decreased first when the flexural cracking started at drift angle (R), R=±.5 %, then again when Fig. 7 Introduction of prestressing force by external cable (Courtesy of Daiwa Co.). Steel plate Element A Element B Element C Rebars are inserted in a duct and grouted. Element C FSSP device Prestressing force was applied with an external cable system. (a) Assembled brace (b) Two-story specimen (E1) Fig. 6 The second generation prestressed brace system (Kono and Watanabe 6a).

342 S. Kono and T. Katayama / Journal of Advanced Concrete Technology Vol. 7, No. 3, 337-345, 9 (a) Loading system 3 1-1 - Braced frame -3 Original frame Analysis - -3-2 -1 1 2 3 4 5 Loading point drift (%) (b) Lateral load drift relation Fig. 8 Test setups and results for Specimen E1 in Fig. 6 (Kono and Watanabe 6a). longitudinal bars of columns started to yield at R= ±.4 %. The maximum lateral load in positive direction, +324 kn, was recorded at R= +1.5 %. The force in the diagonal brace at the first floor was computed from the mean strain measured with strain gages on all four brace surfaces and the stress-strain relationship obtained from a cylinder compression test. The horizontal component was subtracted from the total lateral load to obtain the contribution due to the two columns of the original frame. The portion of the lateral load carried by the original frame is compared to the total load carried by the braced frame. The lateral load carrying capacity of braced frames was nearly three times larger than that of the original bare frame as Specimens No. 1 and 2. Specimen E1 also shows some slip near the origin due to the loose contact of FSSP device as Specimens No.1 and 2 but a small amount of slip is considered permissible. The ductility of Specimen E1 is much greater than the first generation brace system. An example of the second generation is shown in Fig. 9. Since the volume of concrete decreases, the brace blocks out less view and more light can pass the retrofitted span. 2.3 Third generation: Single line prestressed brace using concrete filled tube or fiber reinforced concrete The third generation of prestressed brace system is a single line element as shown in Fig 1 (Kono and Watanabe 7a, 7b). Materials of the brace were either concrete filled tube (CFT) or fiber reinforced concrete (FRC) to increase the deformation capability so that the brace does not exhibit sudden drop of load after the peak load. The details of experiment are shown in References (Kono and Watanabe 6a 6b). Loading system is shown in Fig. 11. Fig. 12 shows the lateral load drift relations for CFT (CFT-S6) and FRC (FRC-L3) braced frames. For CFT-S6, the initial stiffness changed when cracking was observed at the left (left in Fig. 1 and Fig. 11) column-beam joint and Fig. 9 Use of the second generation brace system at the first story of a company dormitory building (Courtesy of Daiwa Co.). the beam ends at R=.2%. The load carrying capacity still increased until the yielding of the beam at R=.6%. The number of cracks increased from R=.4% at the left column-beam joint but the maximum crack width was less than.1 mm. The axial force of the brace reached the maximum value at R=.4% and started to buckle resulting in the second stiffness change. Total lateral load reached the peak at R=.6% when buckling deformation of the brace was visually observed. Load carrying capacity decreased gradually after buckling but brittle failure did not happen. On the other hand, the load drift relation of FRC-L3 was stiffer than that of CFT-S6 because of the larger section size of the brace. The reinforced concrete portal frame of FRC-L3 showed the first cracks at the left column-beam joint at R=.2%. The load carrying capacity increased up to R=.6%. After that, drift angle increased with keeping the load carrying capacity almost constant. At this stage, large diagonal bearing and shear cracks were observed at the left column-beam joint and the brace started to

S. Kono and T. Katayama / Journal of Advanced Concrete Technology Vol. 7, No. 3, 337-345, 9 343 (a) CFT-S6 (b) FRC-L3 t= 1. 6 Inside is filled with paste. 7 5 75 (c) CFT-S6 brace (d ) FRC-L3 brace Fig. 1 Third generation bracing system with CFT and FRC braces (Kono and Watanabe 7a). penetrate the left column-beam joint. Minor cracks parallel to the axial direction were observed in the brace at R=.8%. The brace of FRC-L3 was so strong that it penetrated the left column-beam joint by 2 to 3 mm. FRC-L3 failed due to the shear or bearing failure of the left beam-column joint. CFT-S6 showed gradual degradation of load after the buckling occurred at the spliced mid span. FRC-L3 reaches the peak load at drift angle of.8%, whereas Specimens No. 1 and No. 2, which employed the ordinary precast concrete as shown in Fig. 3, reached the peak at drift angel less than.6%, and the effect of fiber can be seen. However, FRC-L3 shows the rapid degradation after the compressive failure has occurred at the mid span. The configuration of the third generation was changed to a line element so that the brace aesthetically looks better and a door opening can be made at the braced span if necessary. Since a line element can resist against force in a single direction and does not work in opposite direction, it is necessary to place braces for the opposite direction at some other spans. However, placing simple line elements instead of X-shape elements saves construction time and labor. In addition, CFT has more advantages in construction. The steel tube of CFT may be divided into several pieces, brought to the construction site using existing elevators, assembled at site, and placed in the existing frame, then the inside of the steel tube is filled with grout mortar. In this way, CFT necessitates the minimum amount of construction materials and excludes heavy construction equipment. Fig. 11 Loading system in 7. 3. design and construction 3.1 Design procedures The proposed design procedure (Kono and Watanabe 8) is shown in Fig. 13. The possible ultimate failure modes of braced frame include five modes: (1) buckling of diagonal members, (2) joint shear failure, (3) tensile failure of beams, (4) tensile or compression failure of the first story column when the multiple-story brace system, and (5) the rocking mode of the foundation. The buckling of diagonal members is designed to precede the other failure modes to avoid the damage to the structural components in the existing buildings. The buckling strength needs to take into account the initial imperfections of the diagonal members. All possible

344 S. Kono and T. Katayama / Journal of Advanced Concrete Technology Vol. 7, No. 3, 337-345, 9 failure modes are sequentially checked based on the design flow in Fig. 13. After the determination of the ultimate failure mode, the initial prestressing force of the brace is determined considering the prestressing loss due to the shrinkage and creep. The number and location of braces and the structural type of existing buildings also influence the initial prestressing force. Main consideration at design is the determination of the ultimate failure mode, computation of the lateral load carrying capacity and displacement capacity, determination of the initial prestressing force, and determination of the mechanical properties of FSSP (flat spring-steel tube). 3.2 Construction methods There are two ways to introduce prestressing force to braces: pre-tensioning and post-tensioning. For a pre-tensioning system, the prestressing force is introduced to the assembled braces with external cables, the Lateral load (kn) 5 3 1-1 Frame and brace Surrounding frame - -.2.2.4.6.8 1 Drift (%) (a) CFT-S6 Lateral load (kn) 5 3 1 Frame and brace -1 Surrounding frame - -.2.2.4.6.8 1 1.2 1.4 1.6 Drift (%) (b) FRC-L3 Fig. 12 Lateral load drift relations for specimens in Fig. 1 (Kono and Watanabe 7a). Determine the number and location of braces. Determine the section size of braces (L/D<3). Compare the story shear forces for the brace buckling and the column-beam joint failure. [1] Judge if braces buckles.. [2] Judge if column-beam joint fails. [2-1] Column-beam joint shear failure [2-2] Bearing failure at frame corners [3] Check axial tensile failure of beams does not happen. [4] Check that a multi-story braced structure does not show a cantilever type deformation and failure (Axial tensile yielding of tension column. Axial compression failure of compression column.) [5] Check if a braced span shows a rocking mode. Determine the ultimate failure mode, strength, and the ductility index. Determine the prestressing force. Determine the properties of flat springs Fig. 13 Design flow of prestressed braces.

S. Kono and T. Katayama / Journal of Advanced Concrete Technology Vol. 7, No. 3, 337-345, 9 345 assemblage is placed inside the frame, the gap between the assemblage and the surrounding frame is grouted, and the external cables are released and taken out. On the other hand, the post-tensioning system, the assemblage of brace is placed inside the frame, the gap is grouted, and the hydraulic jack is used to introduce prestressing to the assemblage. The threaded steel tube is extended to fill the gap made after the introduction of prestressing force. It is possible to relocate both pre-tension and post-tension systems. By re-applying the prestressing force to the brace assemblage, the assemblage shortens and can be removed form the position. The same procedure may be taken to put the assemblage in a new location. 3 Conclusions Prestressed brace system was proposed to retrofit existing buildings vulnerable to seismic damage by basically increasing the strength. The system is recognized as a quick, easy and economical retrofit method since it employs no bolt anchorage. The system has been frequently used at school buildings for its short construction period. The paper introduces the evolution of the system since 1. The current system has ductility, re-location ability and easier construction using advanced materials. The good seismic performance of the system has been proved through experiment and analysis from their first introduction. Acknowledgement A part of this research was financially supported by Japanese Ministry of Land, Infrastructure and Transport (PI, F. Watanabe) and Kajima Research Fund (PI, S. Kono). The authors acknowledge Prof. Emeritus F. Watanabe, and S. Miyazaki, Y. Okuno, M. Tani, Y. Ichioka, K. Takao, T. Matsuda, M. Oda, Y. Kimura and H. Hasegawa, who are former students, at Kyoto University, for their contribution to experimental and analytical works from 1 through 8. Special thanks are extended to Takenaka Co., Daiwa Co. and Nagai Design Office for their valuable technical suggestions. References Japan Concrete Institute (7). Seismic rehabilitation of concrete structures. Editor Shunsuke Sugano. Kono, S. and Watanabe, F. (5). Seismic retrofit using precast prestressed concrete braces. Advanced Materials for Construction of Bridges Buildings and other Structures, August 14-19, Maui, Hawaii. Kono, S. and Watanabe, F. (6a). Seismic performance of RC structures strengthened with precast prestressed concrete braces. 2nd International fib Congress, June 5-8, Naples, Italy, Paper 9-36. Kono, S. and Watanabe, F. (6b). Seismic retrofit using precast prestressed concrete braces. 8th US National Conference on Earthquake Engineering, Disc1, Paper 8NCEE-63. Kono, S., Oda, M. and Watanabe, F. (7a). Seismic retrofit of RC structures with prestressed CFT and FRC braces. Eighth Pacific Conference on Earthquake Engineering, Dec 5-7, Singapore, Paper 8PCEE/19. Kono, S., Oda, M., Watanabe, F. (7b). Proposal of a new RC structure seismic retrofit method using prestressed concrete braces. Structural Engineering World Congress - 7, Nov 2-7, 7, Bangalore, India, Paper 123. Kono, S. and Watanabe, F. (8). Seismic retrofit of RC buildings with prestressed braces. Fumio Watanabe Symposium, October 24-25, 8, Kyoto, Japan, 233-24. The Japan Building Disaster Prevention Association (5). Standard for Seismic Evaluation of Existing Reinforced Concrete Buildings, 1, Guidelines for seismic retrofit of existing reinforced concrete buildings, 1, and technical manual for seismic evaluation and seismic retrofit of existing reinforced concrete buildings, 1. First English edition, Translated by Building Research Institute. Watanabe, F., Miyazaki, S., Tani, M. and Kono, S. (4). Seismic strengthening using precast prestressed concrete braces. The 13th World Conference on Earthquake Engineering, Vancouver, August, Paper 346.