The H-25/H-15 Gas Turbine A Product of Hitachi Quality

Similar documents
Kawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications

Industrial Power. SGT-800 Gas Turbine. Power Generation: (ISO) 47.5 MW(e) / 50.5 MW(e) / energy

Gas Turbine Inlet Air Cooling System

Equipment Design. Detailed Plant Conceptual Design. Version 9.0

5.2 MW Solar Mobile Power Unit

9HA.01 SETS EFFICIENCY WORLD RECORD

Efficient and Flexible AHAT Gas Turbine System

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

Dr. L. Axelsson, Chief Engineer, Development

Understand boiler performance characteristics. Use these suggestions when buying, designing or optimizing steam generators

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

Syllabus Cogeneration: Definition, Need, Application, Advantages, Classification, Saving potentials

Operating Status of Uprating Gas Turbines and Future Trend of Gas Turbine Development

At Elliott Group, we are committed to providing each customer with the best possible solution to the challenges they face. Japan

TITAN 250 GAS TURBINE SYSTEM. FOR POWER GENERATION APPLICATIONS.

DEVELOPMENT OF A TOOL FOR SIMULATING PERFORMANCE OF SUB SYSTEMS OF A COMBINED CYCLE POWER PLANT

APPLICATION OF THE LATEST AERODERIVATIVE GAS TURBINE TECHNOLOGY

Volvo VT Archived 6/2006

FULL PAPER FP_A.5_CLP_CCGT Upgrade

Reflow Oven. USA HEADQUARTERS:

POST COMBUSTION CO 2 CAPTURE SCALE UP STUDY

360 vision page 13. Air-cooled evolution page 18. 3D testing page 22. Patriot gains page 26

EFFECT OF AMBIENT TEMPERATURE, GAS TURBINE INLET TEMPERATURE AND COMPRESSOR PRESSURE RATIO ON PERFORMANCE OF COMBINED CYCLE POWER PLANT

Geothermal Steam Turbines for Various Purposes

Gas Turbines Addressing Middle Eastern Power Generation Needs

Electricity Generation from Waste Heat

We power the world with innovative gas turbines

Draft Results Capital Cost and Performance of New Entrant Peaking Unit

Application of an Integrally Geared Compander to an sco 2 Recompression Brayton Cycle

Steam Turbine Solutions

Your partner for the right solution

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power.

a. The power required to drive the compressor; b. The inlet and output pipe cross-sectional area. [Ans: kw, m 2 ] [3.34, R. K.

Sullair Water Chillers. Precision Chilled Water

Combined cycle with detailed calculation of Cp in the HRSG

8.33 Power Plant Controls: Cogeneration and Combined Cycle

Thermal Design of a Hermetically Sealed Turbo-Generator Operating in a Small-Power CHP Plant

Microturbine Energy Solutions in the CHP Industry

Geothermal Power Plant

Development of 1MW high efficiency gas engine cogeneration system

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver

MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs

TGG, TBG, TEG, TUG, 3.9 TBS, Gene-Link series

SGT-8000H gas turbine series proven in commercial operations

8Combined Cooling, Heating and Power Technologies (CHP): An Overview

Texas Hospital. Central Plant Redesign. Central Utility Plant SECOND PLACE HEALTH CARE FACILITIES, EXISTING 2013 ASHRAE TECHNOLOGY AWARD CASE STUDIES

Steam Power Station (Thermal Station)

SANY ASPHALT BATCHING PLANT

Steam Turbines. Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW.

Optimization of Combined-Cycle Power Plant Operating Pattern

Latest Simulation Technologies for Improving Reliability of Electric Power Systems

Exergy Analysis of a Power Plant in Abu Dhabi (UAE)

1300 MW Repowering Project: Claus C

Union College Combined Cooling, Heat and Power Project

FlexEfficiency* 60 Portfolio

TOTEM. Cogeneration (CHP) Range. TECHNICAL SUBMITTAL TR r2. Highest total efficiency with modulating output and lowest NO X emissions available

Design and Operating Experience of Supercritical Pressure Coal Fired Plant

Industrial Application of Thermal Energy Harvesting

Performance of a Gas Turbine Power Plant

TOSHIBA. Steam Turbine

III III

energytech.at energytech.at [ energy technology austria ] Cogeneration (CHP) TechnologyPortrait

GE Global Research Rahul Bidkar Doug Hofer Andrew Mann Max Peter Rajkeshar Singh Edip Sevincer Azam Thatte

Combustion Turbine Inlet Cooling using Direct Evaporative Cooling

AN EXERGY COST ANALYSIS OF A COGENERATION PLANT

Consider a simple ideal Rankine cycle with fixed turbine inlet conditions. What is the effect of lowering the condenser pressure on

,1 1 11)

Multi-Variable Optimisation Of Wet Vapour Organic Rankine Cycles With Twin-Screw Expanders

MCG THERMODYNAMICS II. 22 April 2008 Page 1 of 7 Prof. W. Hallett

Autogas Series. Regenerative Turbine Coro-Flo Pumps For High Differential Pressure Applications Using LPG and Other Liquefied Gases.

Industrial Opportunities and New Cycles Gas turbine - Cogeneration

2016 BioCleantech Forum TURBODEN ORC TECHNOLOGY: STATE-OF-THE-ART. Ilaria Peretti. Manager, Sales and Business Development North America

Improvement of distillation column efficiency by integration with organic Rankine power generation cycle. Introduction

CHAPTER 22 SELECTION CONSIDERATIONS OF COMBINED CYCLES AND COGENERATION PLANTS

Performance Evaluation Of Gas Turbine By Reducing The Inlet Air Temperature

SYMPOSIUM ON INDUSTRIAL APPLICATIONS OF GAS TURBINES

Grand Composite Curve Module 04 Lecture 12

Electricity generation, electricity consumption, system integration, production and consumption balance

Lubricated Rotary Screw Air Compressors. Constant Speed Drives and Variable Speed Drives kw hp

Study on Valve Management of DEH for Steam Turbine *

Cutting-Edge Pumping Solutions for the Concentrated Solar Power Generation

Steam Turbine Performance Improvements Through R&M

Environmental Control Solutions

Power plant Asset. Thermal power Hydro power Geothermal power. QuestIntegrity.com CHALLENGE CONVENTION

TECHNIQUES OF CCHP AS A RIGHT WAY TO APPLY THE 2 ND LAW OF THERMODYNAMIC: CASE STUDY (PART ONE)

Thermodynamic Considerations for Large Steam Turbine Upgrades and Retrofits

GATE: A Simulation Code for Analysis of Gas-Turbine Power Plants

Elliott Turbine Generator Sets PRODUCT

Steam balance optimisation strategies

Analysis of Stress Distribution on the Gas Turbine Compressor Wheel Due To the Centrifugal Forces

Comparison of micro gas turbine heat recovery systems using ORC and trans-critical CO 2 cycle focusing on off-design performance

High Efficient Peak Power on Demand

Atlas Copco Oil-injected Rotary Screw Compressors. GA 7-90 VSD 7-90 kw/9-120 hp

Chapter 3.7: Cooling Towers

Thermodynamic analysis of a regenerative gas turbine cogeneration plant

Waste Heat Recovery at Compressor Stations

Progress in NAKOSO 250 MW Air-Blown IGCC Demonstration Project

Gas-fired efficiency in part-load and pulse operation

Carrington Power Station

MEDWAY: A HIGH-EFFICIENCY COMBINED CYCLE POWER PLANT DESIGN

Transcription:

DMLieferant www.dmliefer.ru

The H-25/H-15 Gas Turbine A Product of Hitachi Quality The H-25 s fuel savings will repay your investment within a few years while allowing you a range of fuels from distillate to natural gas. And with cogeneration or combined cycle plants, even higher efficiency will be achieved. Plus an excellent automation system will add ease and precision to your operations after a fast installation. Excellent engineering, superior quality control, and reliable service has earned Hitachi gas turbines a reputation for excellence and efficiency. With an output of 30MW class and, coupled with the latest in gas turbine technology, Hitachi s H-25 becomes a superior value. H-15 gas turbine is scale down model H-25 gas turbine. (17MW class) Features - 34.8% (LHV base) Gas Turbine Thermal Efficiency with Advanced Technology - High Reliability and Easy Maintenance with Heavy Duty Design - High Fuel Flexibility with Low Emission Level - Quick Delivery and Easy Installation - Fully Automated Digital Control - Applicable to Replacing Existing Old Gas Turbine with New H-25 - Suitable for Cogeneration, Combined Cycle Power Plant and Motor Driven Compressor Drive - Maintenance Support for Customer s Satisfaction 1

Performance Simple Cycle Performance ITEM UNIT ISO Condition (Ambient Temperature: 15 deg C) Conventional Combustor case H-25 H-25 H-15 Natural Gas Distillate Oil Natural Gas Output kw 32,000 31,000 16,900 Efficiency %(LHV) 34.8 33.9 34.3 Heat Rate kj/kwh 10,350 10,610 10,500 Btu/kWh 9,806 10,157 9,950 Exhaust Flow kg/s 96.6 96.6 52.9 Exhaust Temp deg C 561 561 564 Output (%) Correction Curve Effect of compressor inlet temperature on maximum output (Base load) 130 120 110 100 90 80 70-20 -10 0 10 20 30 40 50 Compressor Inlet Temperature (deg C) NOx Emission Combustor Fuel NOx Abatement Injection Flow (%* 1 ) NOx ppm (15% O2) 0 188 Natural Gas Steam 2.5 53 Conventional Combustor Water 3.0 25 0 264 Distillate Oil Steam 2.5 74 Water 3.0 42 LNC (Single Fuel Type) LNC (Dual Fuel Type) Natural Gas 0 25 Natural Gas 0 25 Distillate Oil Water 2.5 42 Note: *1 : Mass flow ratio to inlet air Ambient Temperature : 15 deg C Relative Humidity : 60% Operation Condition : Base Load LNC : Low NOx Combustor 2

Specification Major Components The control compartment, gas turbine package, generator package, and generator auxiliary compartment make up the H-25 gas turbine generator set for 50 and 60 Hz application. Compressor Combustor Turbine Specification Components Design Gas Turbine Type Heavy Duty Design Simple Cycle Single Shaft Horizontal Split Casing, Stacking Rotor Rotating Speed H-25 : 7,280rpm / H-15 : 9,710rpm Compressor Type 17 Stages Axial Type Turbine Combustor Type Cooling Type Liner Cooling 3 Stages Impulse Type Air Cooled 1st and 2nd Stage Nozzle and Bucket Reverse Flow Type Conventional Type or Low NOx Type (25ppm) Combustor H-25 : 10 Combustors / H-15 : 6 Combustors Slot Cooling 3

The Advantages of Replacement The H-25 Gas Turbine can be used, not only to create new, highly efficient power plants, but also to replace the Old Machine, gaining an immediate 20% reduction in fuel consumption. Transported separately, the combination with the re-utilized existing equipment is done at the installation site. And when replacing an existing Old Machine with the H-25, the replacement can be performed in a short period, because existing foundations, building works, and ancillary equipments are compatible. Replacement Experiences of Old Machines Country : Japan Number of unit : One(1) Operation date : Nov., 1988 Country : Bahamas Number of unit : Four(4) Operation date : 2002, 2003, 2005, 2007 Country : Nigeria Number of unit : Six(6), Six(6) Operation date : 2002, 2005 Country : Iraq Number of unit : Three(3) Operation date : 2007 Country : Iraq Number of unit : Two(2) Operation date : 2007 Typical Annual Fuel Savings by Replacing with H-25 Annual Fuel Savings (M$ US / Year ) 10 8 6 4 2 0 2 years to repay investment 20000 ( 17.1% ) 18000 ( 19.0% ) 0 1 2 3 4 5 6 7 8 Fuel Cost ( US$ / MBtu (LHV) ) Heat Rate(LHV) Btu/kWH (Efficiency %) 16000 ( 21.3% ) 14000 ( 24.4% ) 11975 ( 28.5% ) New Machine 15 Years Old Frame Machine ISO Base Load Condition, Continuous Operation 4

Modular Package Design The control compartment, gas turbine package, generator package, and generator auxiliary compartment make up the H-25 gas turbine generator set for 50 and 60 Hz application. H-25 Major Components with Compact Package Design - Minimizes Site Installation Work and Period - Flexible Site Layout - Easy Handling and Transportation No. Package Weight 1 Gas Turbine + Base Lube Oil Tank, Reduction Gear and Auxiliaries 47 t 82 t 2 Generator 85 t 3 Air Intake System 51 t 4 Exhaust System 7 t H-15 No. Package Weight 1 Gas Turbine + Base 30 t Auxiliary Equipment 49 t 2 Generator 37 t 3 Air Inlet System 33 t 4 Ventilation Fan 1 t 5 Exhaust System 5.6 t 6 Mist Separator 1.5 t 5

Application Cogeneration Plant The high efficiency H-25 gas turbine offers users very high thermal efficiency, high reliability, and easy maintenance. Applicable to various cogeneration systems, Hitachi provides system engineering to meet various heat and power requirements to optimize the design. H-25 Gas Turbine Cogeneration Plant (Oman) System Configuration Fuel Steam Air HRSG Generator H-25 Gas Turbine Water Typical Performance Power Output Heat Output Overall Efficiency 29,910 kw (6 MPa/300 deg C) 60 ton/hr More than 80% (LHV) UNFIRED Steam Production FIRED Steam Production 70 HRSG Inlet Temp. 560 deg C 100 HRSG Inlet Temp. 700 deg C Steam Flow (t/h) 60 50 250* Saturated Steam 300* 350* 400* 450* 500* Steam Flow (t/h) 90 80 70 250* Saturated Steam 300* 350* 400* 450* 500* 40 2 4 6 8 10 Steam Pressure (MPa) 60 *: Steam Temperature (deg C) 2 4 6 8 10 Steam Pressure (MPa) 6

Application Combined Cycle Plant The higher operating temperature of gas and steam cycles makes an H-25 combined cycle power plant achieve high efficiency generation. By creating a packaged type combined cycle plant, Hitachi makes installation, operation, and maintenance an easy part of your power generation. H-25 Gas Turbine Combined Cycle Plant (Japan) System Configuration 1025 (1-1-1) Fuel Air Steam Generator H-25 Gas Turbine HRSG Generator Condenser Water 2025 (2-2-1) Fuel Air Steam Turbine Fuel Generator Air Condenser H-25 Gas Turbine & Generator HRSG Combined Cycle Standard Performance Type Type Type (GTG-HRSG-STG) 1025(1-1-1) 2025(2-2-1) Total Output kw 43,760 87,800 Gas Turbine Output kw 29,730 1 29,730 2 Steam Turbine Output kw 14,030 28,340 Plant Efficiency %(LHV) 50.1 50.3 Natural Gas, ISO Base Load Operation 7

Application Motor Driven Compressor Drive Higher response & easy speed control with 50-105% control range Flexible selection of gas compressor sizing Less maintenance System Configuration Fuel Air C.B. C.B. Tr. Inverter H-25 Gas Turbine Circuit Breaker Motor C.B. Tr. Inverter Transformer Gas Compressor C.B. Tr. Inverter C.B. Tr. C.B. H-25 Gas Turbine Project (Indonesia) 8

Hitachi Turbine Global Service Periodical Shut-down Inspection 3 2 1 1 Inspection Type Combustion Inspection Interval 16,000 (Gas) 12,000 (Oil) Downtime 7 days 2 Hot Gas Path Inspection 32,000 (Gas) 24,000 (Oil) 16 days 3 Major Inspection 64,000 (Gas) 48,000 (Oil) 25 days Continuous Operation Case * Interval & downtime shall be subject to operating cycle and conditions, etc. * Cool downtime (1 days) and start-up (1~2 days) are not included in downtime. 9

H-25/H-15 gas turbine is manufactured by severe quality assurance and control in Hitachi Works, Hitachi City, Japan. Hitachi City Tokyo 10

http://www.power-hitachi.com 11 DMLieferant www.dmliefer.ru No. KPR-11-001