US Army Corps of Engineers Tulsa District

Similar documents
Kaydon Corporation Small Business Individual Subcontracting Plan

CONSTRUCTION CONTRACTOR APPRAISAL SUPPORT SYSTEM (CCASS) POLICY

TABLE OF CONTENTS VOLUME 5 SUBCONTRACTING [L.33; L.9; M.2(4); M.2.4; J.20]...

DoD Mentor- Protégé Program

Volume II: Cost Proposal and Business Information

Section M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002

AFARS APPENDIX AA ARMY SOURCE SELECTION SUPPLEMENT

Office of Small Business Programs (OSBP) Doing Business with the Defense Health Agency Information Brief

Maximizing Subcontracting Opportunities with Small Businesses

SeaPort-e to SeaPort-NxG Susan W. Tomaiko SeaPort Program Manager Naval Sea Systems Command

CECOM Office of Small Business Programs (OSBP) MILCOM Small Business Workshop FY2011

AIR FORCE SUSTAINMENT CENTER

TEAMING, SUBCONTRACTING, AND JOINT VENTURES

Working with SAIC. Babak Nouri November 9, 2011

ITES-2S IDIQ Performance Based Observations

The Small Business Program

SWT CONSTRUCTION PARTNERING

Office Of Small Business Programs

TCAQ UNCLASSIFIED. Together, we deliver.

PHASE 4 - Post-Award. Type of Feedback Type of Contract Feedback Category Feedback

Contractor Manpower Reporting (CMR)

Agility, A New Logistics Leader. Jean Ann M. Grandinetti Director Supplier Diversity

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Contractor Estimating Systems: System Adequacy Standards and Key Compliance Issues

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Product Acceptance and Release - QA

DOING BUSINESS WITH THE

Approved for Public Release; Distribution Unlimited The MITRE Corporation. All rights reserved.

Not Your Uncle... SAM Tips for Navigating the System for Award Management October 2012

GSA Schedule Contracting: Understanding the Process, Opportunities, and Pitfalls

LESSON 6 Quality Assurance Surveillance Plan (QASP)

UNCLASSIFIED RFP SECTIONS L&M. Table Exchange CONTRACTING OFFICERS & PROGRAM MANAGERS UNCLASSIFIED DISTRIBUTION A: APPROVED FOR PUBLIC RELEASE

Lakehurst Small Business Roundtable General Meeting May/10/2016

Understanding IDIQs: Get to Know GSA s OASIS. Dec. 15, 2016

THE INS AND OUTS OF JOINT VENTURE AND MENTOR-PROTÉGÉ AGREEMENTS WHAT YOU NEED TO KNOW TO EFFECTIVELY STRUCTURE YOUR RELATIONSHIPS

CDM DEFEND. Continuous Diagnostics and Mitigation (CDM) Dynamic and Evolving Federal Enterprise Network Defense (DEFEND) Industry Day May 15, 2017

DAU Hot Topics Forum on: Using commercial items to increase innovation, increase competition and lower costs

ORGANIZATIONAL CONFLICTS OF INTEREST

FirstSource II Ordering Guide

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Government Contract Quality Assurance (GCQA) Surveillance Planning

Winning the Procure-to-Pay Battle

Evaluating Request for Proposal (RFP) Responses. Presented By: Department of General Services Bureau of Procurement

ARC Woman Owned Small Business Industry Day Office of Small Business Programs Acquisition Forecast & NVDB Presentation February 5, 2013

HOWEVER, IT S NOT THAT SIMPLE.

Veterans Technology Services Governmentwide Acquisition Contract VETS GWAC. Ordering Guide v1.2 May 8, 2013

All Small Mentor-Protégé Program & Joint Ventures

SEC ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY.

Counterfeit Mitigation

GUIDANCE FOR THE CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)

Frequently Asked Questions on Metro s MicroTransit Pilot (MTP)

Understanding the DCAA Audit Process and How to Prepare for Success

GROUND RULES AND PRICING INSTRUCTIONS:

Contractor Business Systems Earned Value Management, Material Management and Accounting, and Property Management

REQUEST FOR PROPOSALS. Gail Wilson,

Supporting OSD Defense Cost and Resource Center (DCARC)

USDA Farm Service Agency Commodity Operations. Patrick Dardis Kansas City Commodity Office

Source Selection for Construction and AE Contracts

DLA Troop Support Pre-Proposal Conference

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR

REQUEST FOR PROPOSAL

HOW TO DO BUSINESS WITH Lockheed Martin. Copyright 2015, Lockheed Martin Corporation. All rights reserved 0000.PPT 1/5/2016 1

DCMA INSTRUCTION 2501 CONTRACT MAINTENANCE

Internal Controls Required for Systems Involved in Procurement to Payment Processes

The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued.

GSA Update for HAMA. Eddie Mills 12 May 2017

Solicitation Overview and Virtual Site Visit Procedures for the Enhanced Army Global Logistics Enterprise (EAGLE) Afghanistan W52P1J-15-R-0004

GMIG Courses and Course Descriptions

REQUEST FOR PROPOSALS

Decision. Contrack International, Inc.-Costs. Matter of: B File: Date: February 17, 2010

REQUEST FOR PROPOSALS

Integrity National Corporation

Minority/Women Business Enterprise (M/WBE) Compliance Guidelines and Forms

Make or Buy Decisions in a Proposal Audit. Next Slide

PHASE 2 - Pre-Final Proposal Revision

Request for Proposal For: 2018 American Bar Association Temporary Services

HUBZone Compliance Issues: Staying Ahead of the Curve

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx

Better Buying Through Interagency Acquisitions

FOR PLANNING PURPOSES ONLY!

SEATTLE S NEW WMBE INCLUSION PLAN

The PPI log is for informational purposes only. It does not amend the RFP. If a revision to the RFP is required, a formal amendment will be issued.

Naval Surface Warfare Center Industry Day Contracts

What You Don t Know About Procuring Commercial Items Could Hurt You (or Your Suppliers)! BY DORIS HOLLINGSWORTH GRAY

Department of the Navy. Earned Value Management Implementation Guide. Published by THE NAVAL CENTER FOR EARNED VALUE MANAGEMENT

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

COMMERCIAL ITEM CONTRACTING AND GSA FEDERAL SUPPLY SCHEDULES. Lorraine Campos Addie Cliffe Nkechi Kanu

The DCARC UNCLASSIFIED UNCLASSIFIED. DCARC Helpdesk Jen Horner (253) x1. Software and Web Development

Defective Pricing- Material Pricing Deficiencies. Next Slide

Supplier Scorecard Guidelines SG-0110

Scientific Services Program (SSP) Bidder s s Conference

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

DEPARTMENT OF DEFENSE OPERATIONAL SUITABILITY TEST CRITERIA FOR CONTRACT WRITING SYSTEMS

Forward Pricing Proposal- Labor Categories. Next Slide

SEAPORT-e WORKSHOP Navy Gold Coast Small Business Event

SBPllO Fundamentals of the FAR for Small Business Professionals Lesson The Purpose of FAR/ DFARS

A cost analysis is required for any negotiated (non competitive) contract procurement on behalf of any University program, if:

U.S CENT DIRECT DENNIS

Supplement to the Official Journal of the European Union. Official name: National registration number: 2

CATALOG. Training and Professional Development. Contract Holder. July 2017 through June 2018

Aircraft Manufacturing Organisations Certification

SHELTON INDUSTRIAL PATTERN INC.

Transcription:

US Army Corps of Engineers Tulsa District Subcontracting Success Gene Snyman Small Business Deputy 10 FEB 2016

Agenda Overview Small Business Participation Factor Small Business Subcontracting Plan Subcontracting Reporting CPARS Implications 2

Why the Emphasis on Subcontracting? FY09-Current 96 Final Reports 25 C-Type Contracts @ 86% of goals achieved (-$581M) 71 IDIQ Contracts @ 40% of goals achieved (-$1.3B) 10.4% met all 5 goals Current SWT Cycle - Aggregate Goal $266M, Current $125M SBA performs compliance reviews Reviews of ISR/SSR data in esrs Full On-Site Compliance Reviews Contract Office Due Diligence 3

Subcontracting Overview Lots of Work to Subs Entry Ramp Corps contracts with the Prime Government Oversight Loosely Controlled SB Participation Plan CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS) SB Subcontracting Plan Subcontracting Reporting 4

SB Participation Factor Regs (DFARS 215.304) Relative Weight (FAR 15.304-5) Goals (DFARS PGI 215.304) Minimum w/ onus on contractor to use market research to determine best effort. SB, SDB, HZ, WOSB, SDVOSB, HBCU/MI minimums presented as % of total contract value Submit Large and Small (Unrestricted const over $1.5M) Any Verbiage with Small Business Participation Plan Form (Tab H, Army Source Selection Supplement (AS3)) Criteria for Evaluation (DFAR 215.305 PGI) The extent to which SB firms are specifically identified in proposals; The extent of commitment to SB firms (for example, enforceable commitments are to be weighted more heavily than non-enforceable ones); The complexity and variety of the work small firms are to perform; Past performance of the offerors in complying with requirements of the clauses at FAR 52.219-8, Utilization of Small Business Concerns, and 52.219-9, Small Business Subcontracting Plan; and The extent of participation of SB firms in terms of the value of the total acquisition and the extent of which the proposals meets or exceeds small business participation goals for this acquisition. Scoring: Outstanding, Good, Acceptable, Marginal, Unacceptable

SB Subcontracting Plan Regs (clause FAR 52.219-9) Goals Generally reflect Districts goals (SB 43%, SDB 24%, HZ, 13%, WOSB 8%, SDVOSB 4%, HBCU/MI 2.5%) Negotiable, however IAW FAR 19.705-2(c) If it is determined that there are no subcontracting possibilities, the determination must be approved at a level above the contracting officer and placed in the contract file. Submit To KO (SB gets copy) IAW FAR 52.219-9(d) paragraphs (1) through (11) Criteria for Evaluation (AFARS 19.705, Appendix DD) FAR 52.219-9(d) paragraphs (1) through (11) Need 70/100 to be acceptable Must reflect dollar values in proposal (SB Participation) Scoring: Acceptable, Unacceptable and 100 point scale Required prior to Award Not required by Small Businesses

Subcontracting Reporting Regs (DFARS 252.219-7003, Class Deviation 2008-O0008-eSRS (Feb 2009)) Submit Contractors submit Summary Subcontract Report (SSR) through esrs to DCMA annually (30 OCT) (District does not see these) Contractors submit Individual Subcontracting Report through esrs to KO (30 APR & 30 OCT) Required by if Subcontracting Plan is required Must be coded as required in FPDS Reports dollars subcontracted during fiscal year Encompasses all subcontracting (in US/territories) under prime contracts and subcontracts with the awarding agency, regardless of $ value Comments provide guidance for the person reviewing the ISR Don t just list outreach events; explain effort to meet goals Rejected if dollars are not the same as in Subcontracting Plan Rejected if no comments for categories where contractor entered zero Email address, put KO and SB as minimum With IDIQs the process is an art Receipt Responsibility to acknowledge receipt of or reject ISRs resides with contracting office (acknowledge does not mean accept) SB Role Rolls up, synopsizes and forwards to KO and CORs with comments. Sends feedback to company subcontracting surveillance officer.

CPARS Regs (FAR Part 42, FAR PART 15, FAR Subpart 42.1502). Prepared Per Task Order Interim at mid point of contracts 24 months or more At End of Period of Performance At Government's Discretion Evaluation Unsat (noncompliant with FAR 52.2-9-8, 52.2-9-9, DFARS 252.219-7003 and any other SB participation requirements in the contract. In SWT, SB Deputy will draft eval for COR based on esrs reports. Definitions for Outstanding, Above Average, Satisfactory, Marginal, Unsatisfactory

CPARS (FAR 42.1503 Table 42-2) Evaluation: Satisfactory: Demonstrated a good faith effort to meet all of the negotiated subcontracting goals in the various socio-economic categories for the current period. Complied with FAR 52.219-8, Utilization of Small Business Concerns. Met any other small business participation requirements included in the contract/order. Fulfilled the requirements of the subcontracting plan included in the contract/order. Completed and submitted Individual Subcontract Reports and/or Summary.

CPARS (FAR 42.1503 Table 42-2) Evaluation: Very Good: Met all of the statutory goals or goals as negotiated. Had significant success with initiatives to assist, promote and utilize SB, SDB, WOSB, HUBZone, VOSB, and SDVOSB. Complied with FAR 52.219-8, Utilization of Small Business Concerns. Met or exceeded any other small business participation requirements incorporated in the contract/order, including the use of small businesses in mission critical aspects of the program. Endeavored to go above and beyond the required elements of the subcontracting plan. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner. To justify a Very Good rating, identify a significant event and state how they were a benefit to small business utilization. Small businesses should be given meaningful and innovative opportunities to participate as subcontractors for work directly related to the contract, and opportunities should not be limited to indirect work such as cleaning offices, supplies, landscaping, etc. There should be no significant weaknesses identified.

CPARS (FAR 42.1503 Table 42-2) Evaluation: Very Good: Exceeded all statutory goals or goals as negotiated. Had exceptional success with initiatives to assist, promote, and utilize small business (SB), small disadvantaged business (SDB), women-owned small business (WOSB), HUBZone small business, veteran-owned small business (VOSB) and service disabled veteran owned small business (SDVOSB). Complied with FAR 52.219-8, Utilization of Small Business Concerns. Exceeded any other small business participation requirements incorporated in the contract/order, including the use of small businesses in mission critical aspects of the program. Went above and beyond the required elements of the subcontracting plan and other small business requirements of the contract/order. To justify an Exceptional rating, identify multiple significant events and state how they were a benefit to small business utilization. A singular benefit, however, could be of such magnitude that it constitutes an Exceptional rating. Small businesses should be given meaningful and innovative work directly related to the contract, and opportunities should not be limited to indirect work such as cleaning offices, supplies, landscaping, etc. Also, there should have been no significant weaknesses identified.

Tips Communicate! Plan for Redundancy in each category based on expected Task Orders (show your work in SB Participation Factor verbiage) Show your market research that supports your goal formation: DSBS Your own experience with Subs in a particular area Show SB obligations based on construction schedule for C Contracts Show SB enforceable committment Helpful to show/provide outreach events, but that only shows intent, what shows proof? Show ISRs associated with Experience Factor (requested in SWT UR RFPs)

CPARS Recent Protest: New Orleans District: "Marginal" rating on factor 5 was assessed based on record of poor performance as demonstrated in ESRS Individual Subcontracting Report, even though the company proposed to exceed SB goals in several categories. GAO agreed.

Questions? Gene Snyman gene.snyman@usace.army.mil O: 918-669-7010 C: 918-398-3712

BUILDING STRONG