Status of Gazprom Neft s Offshore Projects Development on the Russian Shelf. Gazprom Neft PJSC Alexey Fadeev Gazpromneft Sakhalin LLC

Similar documents
DEVELOPING GAZPROM MINERAL RESOURCE BASE

Arctic and Cold Climate Solutions Russian Market Update th Open Dialogue/Network Meeting Stavanger 8 th March, 2017 Vladimir Ryashin

HMS-utfordringer i Nordområdene konferanse Captain Erik Almkvist. vikingsupply.com

HSE Challenges for Construction and Operation in the Sakhalin Offshore Climate

Consultancy Engineering, IPM Solutions, Logistics Management, Supply Base Kholmsk and Yuzhno-S

Expat Life in Sakhalin

On the development of the new Energy Strategy of Russia (ESR-2035)

Cuba Block 9 Production Sharing Contract (Melbana Energy 100% # )

Gazpromneft Yamal LLC July Novoportovskoye oil and gas condensate field development strategy and transport logistics

The Simple Math Problem

Investment Potential of the Sakhalin Region

Marine Imaging Systems

Investment offer in shipbuilding industry. Tyumen region

The geographical position of the Russian Federation is unique - the length of its borders is 60,900 km, including 38,800 km of sea borders; Russia

GAZPROM IN EASTERN RUSSIA, ENTRY INTO ASIA-PACIFIC MARKETS

Oil Spill Preparedness and Response

Search and Discovery Article #41755 (2015) Posted January 18, General Statement

Caspian Energy Group. an EPCI contractor in the Caspian Sea

PROSPECTS AND OPPORTUNITIES FOR USING LNG FOR BUNKERING IN THE ARCTIC REGIONS OF RUSSIA

PETROLEUM SECTOR DEVELOPMENT. Industrialization of the Sector in the country and its impact on long term national economy

Cost Estimates & Financing of a New NSR Maritime Infrastructure

Norwegian Coastal Administration

EPCI offshore contractor

Performance Improvement

UK Oil and Gas Reserves and Resources. As at end 2016

Potential Supply of Natural Gas in the United States Report of the Potential Gas Committee (December 31, 2016)

Evaluation and Classification of Hydrocarbon Resources

GAS-TO-LIQUIDS - «Iran GTL»

Regulations of the People s Republic of China on the Emergency. Prevention and Handling of Marine Pollution Caused by Ships

Caracas July Snøhvit LNG Project: LNG Production. Europe s. Roy Scott Heiersted. Statoil ASA

WELCOME TO GO MARINE GROUP

Arctic field logistics and transarctic shipping Development of new business and commercial models for Arctic transportation

Unconventional Gas Market Appraisal

Chatham Rock Phosphate. Chatham Islands. April 2013

Anchor Handling and Towing Vessels. State of the art solutions for Anchor handling - and towing vessels

Offshore installation operations in Arctic waters. Igor Kopsov, Region Manger SURF Russia and Kazakhstan

Appendix A: Project Characteristics

Marcellus Shale Water Group

EXECUTIVE SUMMARY OFFSHORE & TRANSPORT DAMEN OFFSHORE SERIES - ANCHOR HANDLING TUG SUPPLIER

Expert Analysis of the Impacts on Western Gray Whales of the Construction of Temporary Unloading Facilities by Exxon in Piltun Bay, Russia

How to get NRS on the railway Agenda? Kjell Stokvik Managing Director

Oil Search Update - Projects & Initiatives

LNG as a marine fuel in BC. West Coast Marine LNG Workshop 26 th June 2012

Wintershall Noordzee Production Optimisation Initiative. Value Creation through Innovation

APTOMAR AS. Fra produktsalg til tjenestesalg, styrets påvirkning for endring av forretningsmodell. 1.November 2016

MEDIUM TERM PLAN

FUGRO GROUP LNG FIELD DEVELOPMENT AND FACILITIES. TACKLING your complex challenges. UNDERSTANDING your operational objectives

Spent Nuclear Fuel Regional Transhipment Centre at FSUE ATOMFLOT

PRE-FEASIBILITY REPORT ON DRILLING OF ONE EXPLORATORY WELL PDAL (RPD-11) IN SIVASAGAR DISTRICT, ASSAM.

Without having Cost Estimation Model you are putting your Project on a Big RISK

SONATRACH ALGERIA SONATRACH. Vision & Perspectives. ALGERIA - Energy Day 04th May, 2016 HOUSTON - TEXAS - USA

For personal use only Operations Update

Standardization of the Evaluation Criteria on Petroleum Resources

Barents Sea Hydrocarbon and Seal Evaluation Study

Investor Presentation

THE ARCTIC: The World s New Economic Frontier and Opportunity for Development, Shipping, and Expansion

AADE -04-DF-HO-44. Abstract

BASICS OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA)

TIMBER TERMINAL FACTOR. Personalized service in handling wood and timber cargo

Consultation on Draft Air Quality. Strategy for the Thames

SEISMIC CONSULTANCY SERVICES

International activities on a broad footing

SHALE FACTS. Production cycle. Ensuring safe and responsible operations

ICE CLASSIFIED MARINE VESSELS FOR ARCTIC OPERATIONS

VIET NAM LOSSES CAUSED BY TYPICAL DISASTERS FROM 1978 TO 2005 TYPICAL DISASTERS IN VIET NAM ECONOMIC LOSS RECORDED FROM

Offshore upstream logistics for operations in arctic environment

Arctic shipping, opportunities and environmental implications

Commercial Sea Port of Ust-Luga Russia's strategic choice

15 Years of Industrial CO2 Storage Experience

Barents Monitoring Arkhangelsk Oblast 2009

Russian energy policy in North- East Asia: prospects for energy exports to NEA countries

3 Offshore logistics system to support exploration and production

INTEGRATED MARINE AGENCY AND LOGISTICS SERVICES

12. FINANCING GEOTHERMAL PROJECTS

Productivity improvements in a changing world

Engineering and technologies Hydrogen Technology

The Problem Regulation of Risk

Thermal Recovery Status and Development Prospect for Heavy Oil in China

An Appraisal Project for Offshore Methane Hydrate in Japan* By Takatoshi Namikawa 1, Masaru Nakamizu 1, Koji Ochiai 1, and Yoshihiro Tsuji 1

Energy Cooperation in Northeast Asia

ASSET PERFORMANCE MANAGEMENT STRATEGY

RENEWABLE ENERGY IN RUSSIA. CURRENT STATE AND DEVELOPMENT TRENDS

World class shipbuilding and repair

NEBOSH International Technical Certificate in Oil & Gas Operational Safety

Norway in pole position: 20 years of CCS

Successful Completion Optimization of the Eagle Ford Shale

EXPLORATION & NIGERIAN EXPLORATION & PRODUCTION

How IBC-2009 seismic and wind loading standards apply to emergency standby power systems

Multiple approaches on supporting nuclear program development and contracting of NPPs

A powerful reservoir management solution for our times

OIL POLLUTION EMERGENCY PLAN

Oportunidades de negocio SECTOR MARÍTIMO Y SERVICIOS

National Contingency Chapter Section 4 - Canadian Coast Guard Response Management Structure

Introduction to GeoX. Simplicio P. Caluyong. What is GeoX?

BlueCrest Energy Activity Update, J. Benjamin Johnson CIRCAC Board of Directors Meeting Kodiak, 9/12/2014

Promoting sustainable mobility: natural gas and biomethane as a fuel for transport

Admiralty Inlet Pilot Tidal Project FERC No Appendix D. Water Quality Monitoring Plan

Transcription:

Status of s Offshore Projects Development on the Russian Shelf PJSC Alexey Fadeev Gazpromneft Sakhalin LLC 15.03.2018

PJSC one of the largest oil companies in Russia 2

PJSC one of the largest oil companies in Russia PJSC is a vertically-integrated oil company with its main activities in exploration and development of oil and gas fields, marketing of produced oil as well as production and sales of oil products. is one of Russia s top-three oil producers. The Company increased oil production by 4,1% and achieved 89,75 mln TOE in 2017. Proven hydrocarbon reserves of the Company are over 2,78 billion TOE, which ranks together with the largest oil companies in the world. is the globally first company involved in commercial production of oil in severe conditions of Arctic shelf. performs geologic survey works in conventional oil provinces of Russia as well as offshore. 3

Current and Prospective Offshore Projects 4

Offshore assets portfolio within PJSC activities Production stage Geological exploration Kheisovsky license block Prirazlomnoye oil field North Wrangel LB Severo-Zapadny LB, Dolginskoye oil field Ayashsky LB 5

Prirazlomnoye Field 36 years operating life 70 mln t recoverable oil 4.8 mln t at the oil peak per year Pechora Sea Shelf Nenets Autonomous District 122 m Height from the sea level Reservoir 19 20 m Sea depth near platform Clays Oil-saturated rock Water-saturated rock Dense rock Lower permian upper carboniferous bioclastic limestone 6

The Pechora Sea shelf: Creating offshore oil production cluster Project features Barents Sea Novaya Zemlya Kara Sea North-Western licence block: North-Western 2D seismic exploration - 12,806 line km license block s 8,861 km 2 Dolginskoye oil field: covered with 3D seismic survey, 4 wells drilled within its area Scheduled: 2 more exploratory wells 236 mn t of oil 1,730 mn BOE Recoverable resources Prirazlomnoe oil field 875 mn TOE 6.3 bn BOE h 25 187 m Dolginskoye oil field s 1,173 km 2 h 21 46 m Recoverable resources 7

The Barents Sea shelf: Climatic and technical challenges Project features 2D seismic exploration - 15,078 line km Scheduled: 20,000 line km of 2D seismic exploration > 1,000 km 2 of 3D seismic exploration 2 wells drilling of exploration wells Novaya Zemlya Kara Sea 2.22 billion TOE 16.1 billion BOE Kheysovsky block s 83,590 km 2 h 200 500 m Severnaya Zemlya Recoverable resources 8

Shelf of the Eastern Siberian Sea and the Chukchi Sea: Great potential, severe conditions Project features 2D seismic exploration - 4,842 line km Scheduled: > 37,000 line km of 2D seismic exploration > 1,000 km 2 of 3D seismic exploration drilling of 2 exploration wells Eastern Siberian Sea North Wrangel block s 117,620 km 2 h 40 200 m New Siberian Islands 3.01 billion TOE 22.8 billion BOE Geological resources 9

Shelf of the Sea of Okhotsk proved oil and gas province Project figures Part of Sakhalin-3 project LB near the fields of Sakhalin-1 and Sakhalin-2 3D exploration maturity: 2157 km 2 Sea of Okhotsk Ayashsky LB 4294 km 2 60 150 m Sakhalin island Done in 2017: 1 well drilling of prospecting and appraisal well >250 Mln TOE Geological resources 10

Main challenges in construction of prospecting and appraisal well at the Ayashsky LB and efficient ways of problems handling 11

Main challenges of Ayashsky LB project implementing 1 2 Severe climate conditions Tight deadlines 3 Procurement management 4 5 Development and implementation of the project management plan Preservation of sensitive ecosystem of shelf seas ТРАНСПОРТНО-ЛОГИСТИЧЕСКИЕ И ПРОМЫШЛЕННЫЕ ПЕРСПЕКТИВЫ ОСВОЕНИЯ АРКТИЧЕСКОГО ШЕЛЬФА: МЕЖДУНАРОДНЫЙ АСПЕКТ 12 page 12

Key competence of Gazpromneft-Sakhalin LLC: operations in the Russian shelf in severe weather conditions Hands-on experience for wells construction in the Arctic shelf Lessons learned sessions Development of Project cooperation regulations Drilling works on paper (DWOP) sessions Testing works on paper (TWOP) sessions Logistics sessions HSE sessions Schedule planning Project team Usage of the best Russian and international practices 13

Integrated Transport & Logistics Scheme of the Project OFFICE at SPB АСС 1 1 Saint-Petersburg Project team in SPB: management center Specialist s functional support Expert support by scientific and technical center 4 AHTS 2 Project s Front Office 5 NOGLIKI SSDR Yuzhno-Sakhalinsk PSV PSV 3 Korsakov Integrated Logistics Base Point of personnel accumulation and transportation Receiving of drilling waste Integrated point of information (dispatch) YUZHNO-SAKHALINSK 2 3 KORSAKOV KHOLMSK AHTS 4 5 SSDR Nogliki Construction of the well (representatives of Gazpromneft-Sakhalin and contractors) Medical evacuation of personnel Transport of radioactive sources BUNKERING 14

Project schedule of well construction Purchase of inventory and services, preparatory work Aggregated plan of works for well construction Start of SSDR mobilization Towing of SSDR PSV mobilization SSDR installation Drilling of the well Start of SSDR demobilization Testing of the well A key project management tool detailed network schedule of the project, planned with the reserves at the time Monitoring of the drilling process on the basis of the graph "depth/day Monitor production and support processes with regular reports on the project, which also allows to quickly interpret the results of the drilling Elimination Towing of SSDR to the port September 16 - March 17 April May June July August Septembe r October 15

Effective process of well construction: drilling rig and technical solutions 1 Drilling rig selection 2 Technical solutions selection Fitted with a state-of-the-art drilling and process equipment In 2014 the rig was retrofitted. In 2017 the rig was additionally retrofitted to comply with the climatic and met-ocean conditions of the Sea of Okhotsk SSDR fully complies with the latest Russian and international industrial and environmental safety standards SSDR «HAKURYU-5» Shallow depth to set the rig handled using the anchor type retaining drilling Taking into account the potential complications of the upper part of the section (subsurface gas), standard technological approach to the drilling of the upper intervals was not applicable In this regard, the project team chose the list of technical solutions that have proved their efficiency in the drilling process: riser less drilling drilling a pilot hole a certain type of mud 16

Korsakov Sea Commercial Port - integrated center for marine operations support of for the Project Achievements Integrated center for marine operations support Dispatch service Sufficient depth of the approach channel Train unloading unit Areas for development Transportation of ionizing radiation sources Expansion of the zone of temporary storage under customs control Installation of emergency diesel generators in the southern district 17

To ensure the logistics operations of the Project, the optimal configuration of the vessels has been defined 2 transport & towing vessels (AHTS) 2 supply vessels (PSV) 1 rescue vessel Powerful (pull force of 275 t) modern vessels with hybrid power plants attracted from the Norwegian market Perform operations for the towing and fsetting/removing the rig on the drilling site, deliver materials and equipment Have the ability to transport personnel Approved for transportation of ionizing radiation sources Achievements New economical vessels attracted from the Asian market Carry out removal of drilling waste, transportation of materials, equipment and personnel 1 ship of 2 was drawn only for the period of active work at the beginning of the project (the first 76 days) Areas for development Modern vessel of the f Rosmorrechflot fleet, Russia Carries emergency rescue duty The selected configuration of vessels allowed safely, promptly and effectively to support project by materials, equipment, personnel Further work with market owners to reduce the rates for vessels attract Study of the alternative variants of ionizing radiation sources transportation (helicopter) 18

Safety and environmental awareness the main priority during shelf projects development 19

Safety and environmental awareness priority at Ayashskaya-1 projects implementation Achieved HSE results The plan of liquidation of emergency oil spills Warning system of oil spill, rescue duty Implementation of the principle "zero discharge Applicability of the s best practices in HSE to suppliers and contractors Plans for 2018 Co-financing of the Red Book publication of the Sakhalin region Custody of animals in Zoological and Botanic Park of Yuzhno- Sakhalinsk Carrying out of the scientific study of the biological diversity within Ayashsky license block Safety business is successful business! 20

invites for cooperation! 21

Contacts PR-Department of PJSC pr@gazprom-neft.ru www.gazprom-neft.ru 22