AVAILABLE Projects TRANSPORT

Similar documents
Suez Canal. The Suez Canal Zone represents a new chapter in the economic development of

Water and Energy Resource Potential of Ethiopia Status of Development and Investment Opportunities. Ethiopian Investment Forum 07 June, 2011

STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR ENERGY SECTOR: CASE STUDY OF OLKARIA GEOTHERMAL EXPANSION PROGRAMME IN NAKURU COUNTY, KENYA.

TABORA INVESTMENT FORUM 19 th JULY 2013 AT SERENA HOTEL DAR ES SALAAM

Climate Change Policy for Punjab

Kahawa Sukari, 2nd South Avenue

Dar es Salaam Regional PPP Risk Allocation Workshop

Brief Overview of Renewable Energy Regulation in Tanzania

Renewable energy: Investing in Africa

Special Economic Zone At Duqm

WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months)

REPUBLIC OF KENYA MINISTRY OF ENERGY AND PETROLEUM KENYA PETROLEUM TECHNICAL ASSISTANCE PROJECT (KEPTAP) PROJECT MANAGEMENT UNIT (PMU)

Power Africa Geothermal Road Show. Presented by David Kagiri

KERIO VALLEY DEVELOPMENT AUTHORITY INVITATION TO TENDER

RENEWABLE ENERGY OPPORTUNITIES IN KENYA

BRIEF OF THE KENYAN ENERGY SECTOR AND CURRENT STATUS OF NUCLEAR POWER PROGRAM

NAMIBIA: LOGISTICS HUB FOR SOUTHERN AFRICA CAPE TOWN, SOUTH AFRICA 17 NOVEMBER 14 (& BEYOND)

Energy Infrastructure as an Economic Development Enabler in a Devolved Government Structure

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

World Small Hydropower Development Report 2013

ETHIOPIA. Aspiring to Become the Leading Manufacturing Hub in Africa by 2025

Promoting Sustainable Development in the Arctic

INFRASTRUCTURE PROJECTS IN PIPELINE

The energy that you want

Energy sector in Mongolia. Contents Brief of energy sector Energy sector policy Future trend

DRAFT Nelson, Tasman and Marlborough (Top of the South) regional summary STATE HIGHWAY INVESTMENT PROPOSAL SEPTEMBER 2017

INVESTING IN AFRICA. Company Profile

NELSAP AT A GLANCE. Overview of NELSAP

REPUBLIC OF KENYA MINISTRY OF GENDER, CHILDREN AND SOCIAL DEVELOPMENT

ECER Secretariat. Level 22, Menara 3, Kuala Lumpur City Centre, Kuala Lumpur. Tel : / 22 Fax :

AÇU PORT Infrastructure and energy solutions for Brazil

ESP ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Cons ulting Group

Nigeria: Opportunities, Challenges, and Business Environment

GEOTHERMAL DEVELOPMENT IN KENYA COUNTRY UPDATE. Cornel Ofwona Geothermal Development Company

Renewable energy (RE) is any energy source that naturally replenishes and cannot be exhausted. Renewable energies include:

Promoting Renewable Energy Development: An Introductory Workshop for Energy Regulators. Kenyan Country Report

Sustainable Energy for All (SE4ALL) Action Agenda for Ghana. Presented By: Gifty Delali Tettey (Mrs.) Deputy Director Ministry of Power

CURRICULUM VITAE. July 2008-Nov 2008: CMAAE shared facility: Specialization in Agribusiness Management- University of Pretoria, South Africa

Power & Energy. Solutions for a better world

Water Demand Management (WDM) - current water productivity methodology and water management tool in South Africa

SICAL Logistics Limited. Single Window for Integrated Logistics

Development Partners Urban Initiatives

sustainable Energy Deployment in Egypt

SCOPING STUDY TO DEVELOP STRATEGIC APPROACH FOR ENTERPRISE DEVELOPMENT IN COASTAL FISHING COMMUNITIES IN KENYA

Lesotho Highlands Water Project. Refiloe Tlali Chief Executive LHDA 22 May 2015

Solar Termal Roadmap for Mozambique. Authors F. Arthur (EDM), G. Nhumaio (UEM), A. Saide (FUNAE) and F. Cumbe (ENPCT)

5.3 Experiences with PES in Kenya

JOBS AROUND THE WORLD

Provincial Policy Statement 2014 Training Aid

Town of Alabama Agricultural and Farmland Protection Plan

IEEJ:August Uruguay Paula Cobas. Energy Policy Course Tokio, 2015

Towards a Petroleum Sector Master Plan for Kenya

Qube Holdings Limited. Presented to. Challenges & Efficiencies Presentation to AmCham May 2015 Maurice James Managing Director

Energy and Resources-- Cuba

The Future of the Ocean Economy - Offshore Wind

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])

Port of Vancouver USA Clark College Business Advisory Committee May 9, 2017

Expand Win-Win Cooperation; Promote Sino-African Mutual Development

MINISTRY OF MINERAL RESOURCES AND ENERGY MOZAMBIQUE REPORT ENERGY POLICY

Appendix A: Project Characteristics

Opportunity for Private Investment Mauritius Island Container Terminal

แผนพ ฒนาพล งงานทดแทนและพล งงานทางเล อก พ.ศ Alternative Energy Development Plan: AEDP2015

REFORMS IN AFRICA. Samuel O. Helu. Kenya Ports Authority FEBRUARY 4-8 TH, 2008, KAMPALA, UGANDA

HYDRO ENERGY AND ENVIRONMENTAL POLICIES IN TURKEY

Gorgon Project Update: Selected Images

EVIDENCE REPORT No 135

Investment Opportunities in the Energy Sector of Eritrea.

REPUBLIC OF KENYA. Ministry of Energy and Petroleum DRAFT NATIONAL ENERGY AND PETROLEUM POLICY

European Economic Area Financial Mechanism GR03 Programme «Renewable Energy» Energy profile: Norway

Alexandria port Eldekhiela port

Irrigation Investment. The case of Ethiopia

Working With Cost Reflective Tariffs-The Kenyan Experience

SMART CITIES SMART GRID REFUELING INFRASTRUCTURE SENSORS, COMMUNICATIONS AND NETWORKING SYSTEMS HUMAN FACTORS

HYDROPOWER GENERATION, THE GOOD, THE BAD AND THE UGLY

Attachment A: TransformTO Short-term Strategies

Energy Efficiency in Sustainable Port Development and Operations

Embassy of Denmark in Vietnam 2 / 10

LAND USE POLICIES BY COMMUNITY DESIGNATION

AfDB s Activities in the Water and Sanitation Sector: Strategies and Pipeline of Projects. Water Development and Sanitation Dept.

Ports & Maritime Organization. Two Proposed Investment Projects of PMO

INSEAD PPPs as Policy Instruments. Abraham Akkawi November 29, 2010

THE NORTHERN GATEWAY PIPELINE: A POSSIBLE CORRIDOR TO SEED RENEWABLE ENERGY IN BRITISH COLUMBIA, CANADA. McGill University, Montreal, Quebec, H3A 2A7

Country Action Plan-Proposed Outline

KENYA S PLANS FOR GEOTHERMAL DEVELOPMENT A GIANT STEP FORWARD FOR GEOTHERMAL

National Energy Policy of Ethiopia

Intrepreneurial Challenges and Opportunities, and Their Impacts to Bakrie Group

2 Demanding Markets. 3 Competitive Solutions. 4 International Presence. 6 Gas Turbines and Combined Cycle Plants. 10 Steam Power Plants.

Water Dependency of Geothermal Power Generation Systems

Appendix A. Project Description

ENHANCING RENEWABLE ENERGY DEVELOPMENT

Impacts of Drought in the e Philippines

STRENGTHENING YOUR PORT S FINANCIAL STABILITY THROUGH DIVERSIFICATION

Port of Algoma. Focal Point of the Great Lakes Region

Draft Report on Energy access among the Urban and Peri-Urban Poor in Kenya

Presentation by Hon. John Kiyonga Munyes, EGH, MP Minister for Labour Government of the Republic of Kenya

Renewables: The True Costs. Michael Taylor and Eun Young So IRENA, Bonn, Germany 7 May 2015

2017/ /20 SERVICE PLAN

DEEPWATER COMMERCIAL SEAPORT IN BELOMORSK AS AN IMPORTANT REFERENCE POINT OF ARCTIC POLICY

SUSTAINABLE USE OF OCEANS IN THE CONTEXT OF THE GREEN ECONOMY AND THE ERADICATION OF POVERTY, PRINCIPALITY OF MONACO, NOVEMBER, 2011

Research on China's power industry investment in Kazakhstan. Gao Yang

Transcription:

AVAILABLE Projects TRANSPORT 01 Lamu Port (LAPSSET- Lamu Port Southern Sudan Ethiopia Transport Corridor Project) Promoter: Kenya Ports Authority (KPA) Estimated Investment: USD 664 million Private Sector Participation: Build-Operate-Transfer Location: Lamu The project will see the construction of three additional berths and a draft of 18 metres to accommodate larger ships equivalent to 100,000 tons. The first three berths are under construction through the Government funding. The port will be linked to Ethiopia and South Sudan through a road network and a standard gauge railway line via Garissa, Isiolo, Maralal, Lodwar and Lokichogio. Nairobi Commuter Rail Promoter: Kenya Railways Corporation Estimated Investment: USD 68 million (private equity) USD 70 million (private debt) Private Sector Participation: Concession Location: Nairobi This project seeks a partner to run the commuter service of the Nairobi Commuter Rail and will include provision of rolling stock. The new rail line will provide expanded, safe, affordable and efficient rail commuter services in Nairobi with the additional benefit of decongesting the capital city s roads. The Government has already invested in the restoration of the rails. Railway Cities Promoter: Kenya Railways Corporation Estimated Investment: USD 2,150 million Private Sector Participation: Joint Venture Location: Nairobi, Mombasa, and Kisumu This initiative will redevelop existing rail stations into mini cities, which include business parks for light manufacturing, hotels, shopping arcades, restaurants and parking garages.

01 Thika TRANSPORT Toll Road Promoter: Kenya National Highways Authority (KeNHA) Estimated Investment: USD 56 million Private Sector Participation: Concession Location: Nairobi - Thika Highway The highway serves numerous large commercial and industrial enterprises and rapidly growing real estate zones. The 52 km long high capacity expressway is part of the International Trunk Road linking Kenya to Southern Africa through Tanzania and Northern Africa through Ethiopia. It connects high potential industrial and commercial areas in central parts of Kenya to the regional highway backbone (Northern Corridor), Kenya s International Airport, and three (3) major city arterial roads. The highway will enable smooth dispersal of traffic within the greater Nairobi metropolitan area.

AVAILABLE Projects TRANSPORT 01 Mombasa 2nd Container Terminal Promoter: Kenya Ports Authority Estimated Investment: USD 330.1 million Location: Mombasa A new container terminal at the port of Mombasa on an area of 100 hectares at the western side of the existing Kipevu Oil Terminal is planned to create an additional capacity of 1.2 million TEU. Multi-story Terminal at Likoni Promoter: Kenya Ferry Services Limited Estimated Investment: USD 31 million Location: Mombasa Development of a multi-story terminal on 1.6 hectares in Mombasa to provide a modern ferry terminal, parking, bus terminal as well as a variety of commercial services to maximize revenue potential of the site. UPCOMING PROJECTS Project PPP Structure for food courts at JKIA O&M of JKIA Terminal 2(Greenfield Terminal) Kisumu Lake Port Integrated Marine Transport System(IMTS) O&M of Nairobi Southern Bypass 2nd Nyali Bridge O&M of Nairobi- Thika Road Dualing of Nairobi- Nakuru Road Dualing of Nairobi- Mombasa Highway Conversion of berths 11-14 into container terminals. Promoter Kenya Airports Authority Kenya Airports Authority Kenya Ports Authority Kenya Ferry Services Limited Kenya National Highways Authority Kenya National Highways Authority Kenya National Highways Authority Kenya National Highways Authority Kenya National Highways Authority Kenya Ports Authority

02 ENERGY Olkaria I United 6 (70MW) Promoter: Kenya Electricity Generating Company (KenGen) Estimated Investment: USD 314 Million Private Sector Participation: EPC Location: Olkaria, Naivasha The Olkaria I Unit 6 geothermal power project is an extension to the recently completed Olkaria I Unit 4&5 under the GoK s 5000+Strategy of provision of affordable power through renewable energy sources. Opportunities exist for EPC Contractor for: Lot 1- LOT I Contract: Steam-field Development. Lot 2- LOT II Contract: Power Plant - Civil, Electrical and Mechanical Works including interconnection to Grid. Olkaria V (140MW) Promoter: Kenya Electricity Generating Company (KenGen) Estimated Investment: USD 554 Million Private Sector Participation: EPC Location: Olkaria, Naivasha This project will increase geothermal generation through the development of a new 140 MW power plant. This provides the following opportunities to EPC contractors. Lot I: steam-field development contract Lot II: power plant - civil, electrical and mechanical EPC contract Lot III: sub-station, transmission line and interconnection into the grid Lot IV: local infrastructure works (road, offices, training school and accommodation).

AVAILABLE Projects ENERGY 02 Meru Wind (400MW) Promoter: Kenya Electricity Generating Company (KenGen) Estimated Investment: USD 888 Million Private Sector Participation: EPC Location: Meru The proposed project will be undertaken in three phases of 50MW, 150MW and 250MW. The project provides opportunities for EPC Contractor to design, supply, install, test and commission Phase I of the Meru Wind Project. In addition, an equity partner is required for the subsequent phases. Olkaria VI (140MW) Promoter: Kenya Electricity Generating Company (KenGen) Estimated Investment: USD 418.52 Million Private Sector Participation: EPC Location: Olkaria, Naivasha Olkaria Field is endowed with geothermal energy for the provision of steam and power. KenGen has been exploring the field and currently, the exploited capacity amounts to 487MW of power. The project presents opportunities in terms of advisory services, consultancies, financing (loan or equity), EPC contract, O&M management contract among others in line with the preferred model that will be selected for implementation. 635MW Geothermal Olkaria Pipeline Promoter: Kenya Electricity Generating Company(KenGen) Estimated Investment: USD 1716.77 million Private Sector Participation: Joint Venture Location: Olkaria Field, Naivasha The Government of Kenya has granted KenGen the license to develop the Olkaria field, which has an estimated resource potential of about 1200 MW, of which 204.8 MW is already developed, and an additional 280 MW is in the construction stages. The development will also bring local employment opportunities and skills development directly through the provision of construction and operational jobs, and indirectly through the attraction of investment into the area.

02 ENERGY KenGen Industrial Park Promoter: Kenya Electricity Generating Company (KenGen) Private Sector Participation: Leasing Location: Olkaria, Naivasha This project will see the development a world-class mixed use industrial park including various clusters of businesses, manufacturing and services in Olkaria. The project will cover 1200 acres and will benefit from the proximity to the geothermal power stations and the Nairobi-Kampala railway Mombasa Petroleum Trading Hub Promoter: National Oil Corporation (NOCK) Estimated Investment: USD 500 million Private Sector Participation: Joint Venture Location: Mombasa The Trading Hub will be a modern petroleum terminal comprising of two offshore petroleum jetties with one dedicated to loading/ offloading of crude oil and black fuels. The other dedicated to refined products. A modern greenfield petroleum tank farm with a design capacity of 800,000MT is to be developed in phases from an initial minimum capacity of 300,000 MT. The project aims at improving supply security and reducing the cost of supply. Liquefied Natural Gas (LNG) Storage and Regasification Facility with Associated Power Generation Promoter: Ministry of Energy Estimated Investment: USD 685 million Private Sector Participation: 30 year concession for LNG facility and a 20 year power purchase agreement for a Build Own Operate plant with additional time for decommissioning and land restoration Location: Dongo Kundu, Mombasa The project comprises of two components. One component involves the development of a jetty, storage and the re-gasification facilities. The second component will see the development of a power generation plant in partnership with KenGen and the private sector.

AVAILABLE Projects ENERGY 02 Arror Multipurpose Dam Promoter: Kerio Valley Development Authority Estimated Investment: USD 302.48 million Private Sector Participation: Joint Venture Location: Kapsowar Town The development is proposed to generate 60MW of hydropower using waters of Arror River, as well as irrigating 2500 hectares for crop production whilst conserving, rehabilitating and protecting the environment along the Arror. Magwagwa Multipurpose Dam Promoter: Lake Basin Development Authority Estimated Investment: USD 979.8 million Private Sector Participation: Joint Venture Location: Magwagwa Magwagwa Multipurpose Dam Project comprises the construction of a 95m high and 450m long concrete faced rock fill dam with a design total output of 120MW and an annual energy production of 510GWh per year. It also comprises a reservoir with a maximum capacity of 445*10,000,000 cubic meters expected to supply water to 19 service centres starting with Magwagwa town, whilst also providing water for irrigation and fisheries.

02 ENERGY Gitwiki Hydro Falls Promoter: County Government of Meru Estimated Investment: USD 4.5 million Location: North Imenti The development is proposed to generate 1.5 MW of hydropower on Kathita River. The payback period of the development is seven years. The annual revenue projection is USD 657,000. Kamachege Hydro Falls Promoter: County Government of Meru Estimated Investment: USD 7.5 million Location: South Imenti The development is proposed to generate 2.5MW of hydropower using waters of Kithinu River. The annual revenue projection is USD 1.095 million.

AVAILABLE Projects ENERGY 02 Nturingwi Solar PV Promoter: County Government of Meru Estimated Investment: USD 200 million Location: Nturingwi The development is proposed to generate 80MW of solar power. The flat topography, its average global horizontal irradiation of 6.2kWh/m 2 per day and 2263.3kWh/m 2 per annum make it ideal for a solar PV project. Kandebene Wind Project Promoter: County Government of Meru Estimated Investment: USD 100 million Location: Kangeta Hills- Tigania East The development is proposed to generate 50MW as the area falls under wind class 4-5. The annual revenue projection is USD 14.45 million, with an estimated payback period of seven years. UPCOMING PROJECTS Project Kiambere-Solar Energy Development 2x100MW Menengai Phase I-I 800 MW Menengai Phase 2 Offshore Jetty 300MW Geothermal Plant Promoter Tana & Athi Rivers Water Development Authority Geothermal Development Corporation (GDC) Geothermal Development Corporation (GDC) National Oil Corporation of Kenya Geothermal Development Corporation (GDC)

AVAILABLE Projects AGRICULTURE 03 TANA DELTA IRRIGATION SUGAR PROJECT Promoter: Tana & Athi Water Rivers Development Authority Estimated Investment: USD 120.402 million Private Sector Participation: Joint Venture Location: Garsen County, 100km North of Malindi Development of 20,000 hectares of sugar fields, construction of a 10,000 hectares sugar processing plant, installation of a 34 MW cogeneration power plant and installation of ethanol plant with capacity of 75,000 litres per day. FISH PORT DEVELOPMENT PROJECT Promoter: Coast Development Authority Estimated Investment : USD 820 million Location: Kenyan Coastline The project is designed to develop a modern and equipped fish port along the Kenyan coastline. UPCOMING PROJECTS projects Tana Delta Irrigation Sugar Project Meat Processing Plant Fruit Processing Plant Modern state-of-the-art Abattoir Munyu Mutipurpose and Greater Kibwezi Irrigation Tana Delta Irrigation Rice Project PROMOTER Tana &Athi Water Rivers Development Authority Kerio Valley Development Authority Kerio Valley Development Authority Mandera County Government Tana &Athi Water Rivers Development Authority Tana &Athi Water Rivers Development Authority

AVAILABLE Projects REAL ESTATE 04 Konza City Technopolis Promoter: Konza Technopolis Development Authority Estimated Investment: USD 14.5 Billion Private Sector Participation: Joint Venture Location: Malili, Machakos The aim is to develop an ultra-modern Technopolis City 60km south off Nairobi. The Konza Technopolis will comprise of a Business Processing Offshoring (BPO) Park, together with a residential area and a modern Central Business District. UPCOMING PROJECTS projects Civil Servants Housing Project PROMOTER Ministry of Land, Housing and Urban Development

05 Tourism Isiolo ResorT Promoter: Ministry of Tourism Estimated Investment: USD 184 Million Private Sector Participation: Public Private Partnership Location: Isiolo The project will include the development of a five-star hotel (400 rooms), two-three star hotels (300 rooms), conference facilities, an office park and car park for 2000 vehicles. Mombasa International Convention Center Promoter: Tourism Finance Corporation Estimated Investment: Undisclosed Location: Mombasa This project entails the development of a multi-purpose convention centre, with a contemporary design to ensure large scale meetings, events and conferences can be facilitated in Kenya. The site is located on a reformed quarry within Haller Park, located south of the Bamburi Cement plant along the Mombasa-Malindi Highway, on the Kenyan Coast. Expansion and Development of Kenya International Convention Centre Promoter: Kenya International Convention Centre Estimated Investment: USD 232 million; average operating cost of USD 11 million Private Sector Participation: Build-Lease-Transfer Location: Nairobi This project covers the expansion and development of a 300-bed hotel and exhibition centre in the middle of Nairobi s central business district.

AVAILABLE Projects tourism 05 First Class Hotel at Bomas of Kenya Promoter: Ministry of Tourism Private Sector Participation: Public Private Partnership Location: Karen Development of a five-star hotel with authentic African architecture and features. Traditional houses like those of the Maasai, Kalenjin, Mijikenda and Luo can be used, and are easily adaptable to hotel-type accommodation. UPCOMING PROJECTS projects Development of Marina at Shimoni Masinga Dam Ecotourism Complex PROMOTER Tourism Finance Corporation Tana & Athi Water Rivers Development Authority 06 water supply Mwache Multipurpose Dam Development ProjectS Promoter: Coast Development Authority Estimated Investment: USD 285.04 Million Location: Mwache River, Mombasa This project sees the construction of an 83.7m high dam with capacity to produce 47.45 million m3 of water per annum for domestic use - serving 1.5 million people and 20,000 livestock. This dam will also have an annual capacity to produce 51.79 million m3 of water for irrigation to serve an irrigated area of 8,532 hectares.

06 water supply Lake Challa Water Resources Development Project Promoter: Coast Development Authority Estimated Investment: USD 387 Million Location: Challa River, Coast This investment will see the development of a multi-purpose project to contribute to increases in water production for domestic use in agriculture and for irrigation, livestock, fisheries and forestry. Dembwa Multipurpose Dam Development Project Promoter: Coast Development Authority Estimated Investment: USD 8 Billion Location: Dembwe River, Taita Taveta This project includes the development of a 100m high dam with a reservoir capacity of 60 million m3 set to generate 3 MW of hydro power, irrigate 3,000 hectares, serve 200,000 people and 20,000 livestock and conserve 300 km3 of catchment land. Sabaki River Basin IntegreateD Promoter: Coast Development Authority Estimated Investment: USD 100 Million Location: Sabaki River, Malindi This integrated project is set on 10,000 hectares and will involve crop farming, livestock production, aquaculture, environment conservation, water supply and sanitation and development of support infrastructure.

AVAILABLE Projects water supply 06 UPCOMING PROJECTS projects projects Nairobi Bulk Water Supply Nandi Forest Multipurpose Dam Webuye Multipurpose Dam Development Nairobi Solid Waste Management Mombasa Solid Waste Management Nakuru Solid Waste Management PROMOTER Athi Water Services Board Lake Basin Development Authority Lake Basin Development Authority Nairobi County Government Mombasa County Government Nakuru County Government 07 health 300 - Bed Hospital at KNH-Private Wing Promoter: Kenyatta National Hospital Estimated Investment: USD 36 million Location: Nairobi This project will see the development of the first full health PPP project in Kenya and will provide local access to state-ofthe-art specialty care thereby reducing the need to travel. As a build-operate-transfer PPP investment, the investor will finance, construct, operate and maintain the envisaged seven-story building to house a 300-bed private wing. UPCOMING PROJECTS projects Equipment Lease and Infrastructure Improvement ICT Services at Kenyatta National Oxygen Plant PROMOTER Ministry of Health Ministry of Health Ministry of Health

08 education Moi University Student Hostels Promoter: Moi University Private Sector Participation: Build-Operate-Transfer (BOT) PPP model Location: Nairobi Construction of seven student hostels and blocks to accommodate 9,880 students. UPCOMING PROJECTS projects Embu University College Student Accommodation Hostels Maseno University Student Accommodation Hostels Egerton University Student Accommodation Hostels SEKU Student Accommodation Hostels Kenya School of Government- Embu Accommodation Hostels PROMOTER Embu University Maseno University Egerton University SEKU Kenya School of Government-Embu

AVAILABLE Projects MANUFACTURING 09 Shimoni Cement Productions Promoter: Coast Development Authority Estimated Investment: USD 249.428 Million Private Sector Participation: FDI, Development Partners, PPP Location: Shimoni, Kwale District, Coast Province This project will see the development of a cement production plant from which the cement will be used for domestic use and export. UPCOMING PROJECTS projects Flat Glass Production Dongo Kundu Special Economic Zones PROMOTER Coast Development Authority Ministry of Industrialization Cooperatives and Enterprise Development 10 finance Expansion of Jamii Bora Bank Promoter: Jamii Bora Estimated Investment: USD 20 Million Private Sector Participation: Joint Venture Location: Nairobi The bank focuses on small and medium entrepreneurs seeking to scale up to become future corporates. The bank seeks either equity or long-term debt to expand and match the growing demand of these clients. UPCOMING PROJECTS projects Nairobi International Financial Centre PROMOTER The Treasury