DESIGN BASIS FOR AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD.

Similar documents
STANDARD ENGINEERING SPECIFICATION FOR VENTILATION SYSTEM HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT

B. System Design and Performance Requirements

B. ASHRAE 1991 HVAC Applications Handbook: Chapter 34--Testing, Adjusting and Balancing.

Your partner for the right solution


Fiberglass Cooling Towers

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH

ENGINEERING SERVICES

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

Application of Advanced Energy Technologies

MOBILE SUBSTATIONS TRAILER AND SKID. tgood.com. Energy, Fast!

Mechanical (HVAC)* * MasterFormat Specifications Division 23

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

SECTION COOLING TOWER

Ehsan Soltani. Date of Birth: 1 Sep, 1980 Nationality: Iranian Marital Status: Married Mobile :(+98)

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

ACBC Floor Mounted Active Beam

COOLING TECHNOLOGY INSTITUTE

SECTION AIR DUCT CLEANING

Noise Control. Commercial, Industrial, and Environmental Products and Solutions.

Kawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications

MSC Guidelines for Review of Ventilation System Plans

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

Mobile Nitrogen Vaporizer Skid

List of Enquiry Items for Enquiry BAP/PUR/FGD/EQS/2014/ E dt

Element D Services Heating, Ventilating, and Air Conditioning

Draft Indoor Air Quality Regulations

Introduction of the latest Technology of Energy Conservation

Energy Recovery Ventilation Equipment

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Chapter 3.7: Cooling Towers

Containment Booths. FOR MORE INFORMATION ON CONTAINMENT BOOTHS CALL +44 (0) OR

Tender for HVAC work of Library Building At IIM Ahmedabad

ARRANGEMENT AND WORKING OF MULTIPORT FLOW SELECTOR VALVE IN PRODUCTION MANIFOLD:

/ Hybrid Cooling Towers

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Lifting Appliances of Ships and Offshore Installations

The following document can be provided to an Engineer, Contractor, or Owner to allow them to

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

A/E Design Deliverable Checklist

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

Planning for Biomed Facility Puts Energy Efficiency Under Microscope

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers.

Performance Efficiency Standard for Evaporative Cooling Equipment

EC medium pressure axial fans.

INDIA HABITAT CENTRE New Delhi

FACILITIES MAINTENANCE WORKER

Modular Chiller Plants A GLOBAL LEADER IN ENERGY SOLUTIONS

We are now interested to do a project of Down Hill Conveyor System for our Indian customer : A New, 7 MTPA Iron Ore design

Innotech is a registered Trademark of Mass Electronics Pty Ltd Copyright 2013 Mass Electronics Pty Ltd

Large University Central Chiller Plant Design Considerations

General Specifications for HVAC System Cleaning

DANVEST POWER UNIT. with special Low Load Unit for wind-diesel power stations

A GUIDE TO REACH SYSTEM RELIABILITY. Commercial HVAC Buyers Guide

Industrial Application of Thermal Energy Harvesting

COMMERCIAL LOAD ESTIMATING. Load Estimating Level 3: Block and Zone Loads. Technical Development Program

This document also describes the basis on which building permit fees should be calculated.

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Packaged reciprocating gas compressors

Forced Draft Decarbonators. Degasification

Transform your HVAC performance. Good for your comfort, for the environment and for your bottom line

PAINT BOOTHS GENERAL PURPOSE

SCOPE OF WORK FOR STEEL SHEDS OF FIRE WATER PUMP HOUSE & PRODUCT PUMP HOUSE

ASHRAE Chapter Meeting HVAC Noise & Vibration Control Specifications & Best Practices

Pioneer Forced Draft Cooling Tower Specifications

Check-List of General Building Services

A. Drawings and general provisions of the Contract, including General Conditions Specification Sections, apply to this section.

Chilled Beams. The new system of choice?

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

Fenestration Components: Mechanical Summary. Water heater energy factor: Ef Fuel type: Gas Electric Other

Great Ocean Rd Ice Creamery

CI/SfB (57.7) 1st edition

DESIGN SPECIFICATION FOR FOUNDATIONS

FABRIC EXPANSION JOINTS. Technical Brochure

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.

TM Series Cooling Tower Specification

Telecommunication Spaces

Full-Scope Commissioning for High-Quality Buildings

Indoor Air Quality Improvement in a School Building in Delhi

AIRCOOL VENTILATORS FURTHER INFORMATION

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

Information Delivery Manual (IDM)

Retro-Commissioning for Existing Facilities

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

DIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations

Trends and drivers in the Finnish ventilation and AC market

Blackstone: flexible and environmentally friendly power plant

Oki (High Pressure Boiler Plant)

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

District Cooling Sustainable Design. Presented by George Berbari CEO of DC PRO Engineering

Sampling. Stationary Portable. Sampling. Sewage Treatment. Municipal Sewerage Systems. Water Protection Control

Energy Conservation Best Know Methods Phil Naughton

Nilan VPL Active heat recovery and cooling (air/air)

Geothermal Power Plant

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

ENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program

PAINT BOOTHS LARGE EQUIPMENT

Transcription:

CONDITIONING AND VENTILATION FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT TEIL JOB NO.: 6261 DOCUMENT NO.: 6261-HVAC-PKG-300 TEIL SPECIFICATION NO.:--- 2 28.09.2010 For Bid Enquiry DVM AVP SJP 1 23.12.09 Revised as per Client AMR SMW SVW Comments 0 For Bid Enquiry AMR / ARN SMW SVW Rev no. issue date Description Prepared by Checked by Approved by TOYO ENGINEERING INDIA LIMITED MUMBAI INDIA

DOC.No. 6261-HVAC-PKG-300 DHT PROJECT Page 2 of 7 Sr. No. DESCRIPTION PAGE 1 General 3 2 Codes and Standards 3 3 Special requirements 3 4 Safety requirements 3 5 Design Basis for Air Conditioning System 4 6 Design Basis for Ventilation System 5 7 Air Conditioning & Ventilation System Equipments & Material 6

DOC.No. 6261-HVAC-PKG-300 DHT PROJECT Page 3 of 7 1.0 GENERAL This specification covers the minimum requirements for the design, engineering, manufacture, inspection, testing and supply of Air Conditioning & Ventilation system. In addition to concurrence to this specification following consideration to be taken: 1. Compliance with applicable national or overseas codes & standards as well as any statutory regulation in existence for a specific item. 2. All equipment shall be sourced from PMC s mandatory / recommended Vendor List. The supplied model shall have proven track record. 3. Facility for any known future expansion of plant capacity with a minimum of modifications or shutdown. 2.0 CODES AND STANDARDS The main codes, standards wherever applicable for each equipment or system are indicated in the technical specifications of respective systems. Other reference documents, as applicable, are also listed in these corresponding specifications wherein the requirements of various codes and standards are amended or supplemented for compliance by the Contractors. 3.0 SPECIAL REQUIREMENT 3.1 Contractor shall develop the system taking into consideration the requirements defined in Feed package, Specifications, Data sheets. 3.2 Equipment shall be complete in all respects and any item or feature not covered in the specification, but essential for proper operation shall be included by the Contractor. Also the plant shall conform in all respects to high standards of engineering design, state of art, reliability and continuous operation. 3.3 Package Equipment layouts shall be prepared taking into consideration various factors like requirement of operatability, approach, safety withdrawal space requirement, maintenance, foundation requirements etc. for convenient operation. 3.4 Selection, fabrication and installation of piping works shall meet the Piping requirements defined elsewhere in Feed Package. 3.5 Design, engineering, fabrication, testing of vessels / storage tank shall meet the specifications enclosed elsewhere in the Feed Package. 3.6 Electrical equipment and material shall be in accordance with the electrical specifications enclosed elsewhere in the feed Package. All equipment selected for hazardous area shall be certified by the Testing Authority as specified in Electrical specifications or equivalent international testing agency for the service and area in which it is to be used.

DOC.No. 6261-HVAC-PKG-300 DHT PROJECT Page 4 of 7 3.7 The controls / indicators which are required to be connected to remote control room (DCS) shall be terminated in a junction box (with terminal strip) or local panel (located at the edge of skid) as applicable. 3.8 Selection & Installation of Instrumentation & controls shall meet minimum requirements defined in the Instrument specification attached elsewhere in Feed Package. 4.0 SAFETY REQUIREMENTS 4.1 Operational hazards should be reduced to a minimum. Contractor shall use sound engineering judgment to complete an installation that will perform the required function without compromising this aim. 4.2 Electrical devices shall meet the requirements for the area classifications in which they are installed. 4.3 Couplings, gears and exposed rotating parts shall be provided with adequate guards of nonsparking type. Drive belts, if used, shall be antistatic type. 4.4 Piping shall be arranged in a manner so as to avoid tripping or headroom problem. Piping or tubing of insufficient mechanical strength for standing or hanging shall be protected from personnel traffic. 4.5 Requirements of noise limits and equipment vibration as defined in standard specification shall be met. 5.0 DESIGN BASIS FOR AIR CONDITIONING 5.1 Air Conditioning shall be provided for the Sub-Station-75 Building. Contractor shall develop the complete Air Conditioning system configuration and submit along with bid and also before starting the detailed engineering work for owner/pmc approval. 5.2 The air Conditioning System shall be air cooled based system for the Sub-Station-75 Building. 5.3 Air Conditioning unit shall be available for continuous and round the clock operation. All areas requiring air conditioning for 24 hrs. /day. Following redundancy shall be maintained in Air Conditioning System; a) Water cooled chiller - 100% standby. b) VAM No standby. c) Fresh Air Fan - 100% standby. d) Chemical Filter Unit - No standby. e) AHU Upto 3 nos AHU s, 1 no standby, for 4 no and above, 2 no standby. f) Chilled water pumps - 100% standby. g) Cooling water pumps - 100% standby. h) Exhaust fans No standby. i) Exhaust fans for Battery Room Minimum 1 no of fan as standby j) Supply air fans for Battery Room Minimum 1 no of fan as standby k) FRP Cooling Tower with Basin 100% Standby.

DOC.No. 6261-HVAC-PKG-300 DHT PROJECT Page 5 of 7 5.4 Design Conditions: Outdoor design Conditions are as under (As per ISHRAE); Season Dry Bulb Temp.( 0 C) Wet Bulb Temp.( 0 C) Summer 33.3 27.8 Monsoon 30.6 27.8 Winter 18.3 13.9 Daily range 6.11 0 C 5.5 Min 10% margin over heat load calculation shall be considered for selecting capacity of Air Conditioning equipments. 5.6 Water cooled condensers shall be selected as per Basic Engineering Design Basis attached elsewhere. 5.7 For all air-conditioned buildings housing electronic equipment Chemical air filters are required to be installed in fresh air circuit. Inside quality of air shall be maintained as min ISA, G1 class within A/C area. For outdoor design conditions refer Basic Engineering Design Basis attached elsewhere. Minimum One air change per hour shall be considered for air conditioning. 5.8 Fresh Air arrangement for each building AC System; comprising of Bird Screen, Louvers, Volume Control Damper, motorised Fire Damper, Ducting, Chemical Filter with pre & fine dust filter (as per requirement), Centrifugal Fan shall be provided. 5.9 Fire Dampers shall be electrical motorised operated. Fire dampers shall be provided as per clean agent zoning. Relevant OISD norms shall be followed while deciding the location of fire dampers` Air Conditioning equipment shall be interlocked with gas/smoke detection and fire fighting system of the plant. 5.10 Safety factor shall be considered as minimum 12.5% in respect to Room sensible Heat and minimum 10% in respect of Room latent Heat. 5.11 Insulated supply air ducting shall be as per IS 655 / SMACNA complete with volume control damper, Splitter damper, guide Vanes, fire resistant flexible connection between Unit and ducting, air flow switch in main supply air ducts, duct supporting arrangement with anchor fasteners. 5.13 Duct mounted Electric strip finned heaters shall be provided complete with heating and safety thermostat with suitable inspection window for heater maintenance. 5.14 Self standing / wall mounted / audio/ visual annunciation panel for Package unit/ Air Heaters status and temperature / pressure instruments/controls as per standard Specifications.

DOC.No. 6261-HVAC-PKG-300 DHT PROJECT Page 6 of 7 5.15 Bidder to furnish the duct layout, while preparing duct layout purchaser s lighting layout and other relevant drawings shall be referred. Further any modification if required at site shall be done by Bidder to avoid interference, after taking proper approval 5.16 Bidder to furnish guaranteed power consumption for system. 6.0 DESIGN BASIS FOR VENTILATION S 6.1 All battery rooms shall have separate supply air fans and exhaust fans and fan motors shall be Ex.d type (gas group IIA/IIB/IIC). Minimum 12 air changes per hour of the room volume shall consider for ventilation of these rooms. Material of construction of Exhaust fans shall be suitable for fumes generated in Battery room. 6.2 For other rooms where ventilation is required like Clean Agent room in Control Building, minimum 12 air changes per hour of the room volume shall be considered for designing the exhaust system of the rooms. 6.3 Electrical (MCC Rooms) shall be ventilated. Minimum air changes to be considered for air quantity calculation shall be 12/hr. Air quantity shall also be calculated on the basis of 3 0 C temperature rise above ambient air (Taking care of the design temperature of the electrical equipment inside) and the higher of the two shall be provided. 6.4 Air intakes shall be located in non-hazardous and chemical fume free areas. 6.5 The system shall be provided with HDPE filters with frame work (minimum 90%, 10 microns), motorised CBRI certified fire dampers with frame in Supply air duct, control cable, power cable, interlocks to actuate audible alarm in case of fire, spring actuated counter weight operated pressure relief dampers with frame, bird screen, GSS air intake louvers with frame & bird protection screen, ducting with anodised aluminum grilles with aluminum angle frame, differential pressure measuring stn. across filters, manometers in space, associated civil, electrical, instrumentation, structural work & painting, inspection, performance testing. 6.6 The fans and motor noise level shall not exceed 85 dba at 1m distance from the equipment. 7.0 AIR CONDITIONING & VENTILATION EQUIPMENTS AND MATERIAL For details of Air Conditioning System & Ventilation system, refer following specifications; 6261-AA-301 6261-AA-310 6261-AA-320 6261-AA-340 Standard Engineering Specifications for Air conditioning system Standard Engineering Specifications for Air Handling Unit Standard Engineering Specifications for pressurization and Ventilation system Standard Engineering Specifications for Axial Fan

DOC.No. 6261-HVAC-PKG-300 DHT PROJECT Page 7 of 7 8.0 LIST OF SUGGESTED VENDOR 8.1 AIR CONDITIONING - CENTRAL Sub-vendors shall be as per Vendor List attached with this tender. 8.2 AIR CONDITIONING VAM Sub-vendors shall be as per Vendor List attached with this tender. 8.3 VENTILATION & PRESSURISATION Sub-vendors shall be as per Vendor List attached with this tender.