THE LAST 100 FEET >> BIM IN THE FIELD TULALIP RESORT HOTEL 2009 AIA TAP BIM AWARDS

Similar documents
The designer shall also submit additional information required by the University as described and underlined below.

Project Address: Name of Person Completing Form:

03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary. Ryan Manocchio

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

Hilton Baltimore Convention Center Hotel Western Podium

BIM enhances structural analysis regardless of project size. By Doug Fitzpatrick, P.E., LEED AP and Jeffrey Yoders

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

STRUCTURAL ABBREVIATIONS S-001 GENERAL NOTES CONCRETE MASONRY NOTES DESIGN NOTES SOF NSWG-10 UAS SUPPORT FACILITY FY 2016 MILCON P-225

Existing Project Conditions. General Conditions Estimate. Michael Vergari Construction Management Advisor: Dr. Riley

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

Kiski Area High School Allegheny Township, PA FLOOR SYSTEM ANALYSIS

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

HOTEL NORTHEAST U.S. JORDAN RUTHERFORD STRUCTURAL OPTION FACULTY ADVISOR DR. THOMAS BOOTHBY AE SENIOR THESIS APRIL 8, 2013

Devin Learn Construction Management AE Senior Thesis

Bronx Mental Health Redevelopment Project

INOVA Office Building I. Adolfson & Peterson Construction. Keri Burson:

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

Phase IIIA Education Building

BIM Services Assistance with Clash Detection Collaboration with Trades Framing Panel Elevations STRONGER

Section 5 - Project Logistics

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

City of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)

ORANGE VISTA HIGH SCHOOL PHASE I

The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM

STATE OF NEW HAMPSHIRE DEPARTMENT OF NATURAL AND CULTURAL RESOURCES DIVISION OF PARKS AND RECREATION SKI PATROL HUT PROJECT #: CAP 1804

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

LIFE SCIENCES BUILDING STRUCTURAL CONCEPTS AND EXISTING CONDITIONS

Methodist Hospital for Surgery Addison, Texas. CLIENTS Methodist Health System Private Physician Consortium SRP Medical Medica Development

Texas Health Resources, Methodist Alliance Hospital, Fort Worth, Texas. Hospital; 188,000 s.f. $46.5m 58 beds with growth potential of 300 beds

3D PRINTED PARTS FOR ENGINEERING AND OPERATIONS APPLICATIONS NATHAN LUCERO

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

- DATA REQUIREMENTS BIM

Realizing Complex Design Through BIM The Louisiana State Museum and Sports Hall of Fame

Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B

structural STEEL Your connection to the healthcare structure prototype iii Exploring Seismic Load Resisting Systems

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Smarter. Safer. Leaner.

Building Information Modeling (BIM) Execution Plan

Structural Redesign Gravity System

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

FDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Construction Summary

AISC Steel & Timber Research for High-Rise Residential Buildings

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404

THE LEADER IN PREFABRICATED BATHROOM PODS

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

SYLLABUS 8/14/2012 CONE- 231 Construction Estimating Fall, 2012 Rev. 0. Course Syllabus. Fall, 2012

Prescriptive Design for Pole Barns Using the Larimer County Prescriptive Handout

Wall Panels. Structural wall panel. Architectural wall panel. Cladding wall panel. Sandwich wall panel

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

Ironton Russell Bridge Project

Modular Wood Framing Goes Vertical

Alternate Formwork System Evaluation

Civil Engineering and Architecture Detailed and Performance Objective Outline

Table of Contents. Page Title

Contracted Scope ABC of the Carolinas Excellence in Construction Awards Carolinas HealthCare System CMC Kitchen Healthcare.

North Mountain IMS Medical Office Building

Modeling for Integrated Structural Design Discussion

Aluminum Component Pipe Railings

Meriter Heights Renovations Madison, Wisconsin

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

2016 Port of San Francisco Building Code

APPENDIX 6 (not yet reviewed by UCCS) STRUCTURAL ANALYSIS/VIBRATION CRITERIA

OHSU/PSU/OSU COLLABORATIVE LIFE. SCIENCES BUILDING and OHSU SKOURTES TOWER THIS IS OUR STORY.

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

Bonner Bridge Replacement Update:

Design Specifications- Micropile Foundation System. Geopier Calculations

Abington Memorial Hospital Abington, PA. Project Description

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #139 Douthit Hills Student Community, Clemson University Project Tony Greene

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

YOUR LITE-DECK SECTIONS

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

MANHATTAN COLLEGE STUDENT COMMONS

14' x 24' Garage Plan

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

11/07/2017. Tolerances & The Intolerant World of Structural BIM Coordination. Dave Merrifield. BIM and Tolerances. Speaker Twitter Handle.

DUGOUT MODEL (4 POST) 10 x 24 SPECIFICATIONS

Full-Scope Commissioning for High-Quality Buildings

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E.

Technical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R

Thesis Proposal. Nasser Marafi. Center & Facility Service Building. St. Joseph Hospital of Orange Patient Care. Proposal

Attachment D-1: Civil/Structural Scope of Work

1. Cast-in-place concrete is specified in Section

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

This addendum will be part of the construction documents. All bidders must acknowledge the receipt of this addendum on the bid form.

November 2, Job Number: Mr. Bob Gibson Warrior Golf Assets 151 Clubhouse Drive New Castle, CO Dear Mr.

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

Transcription:

THE LAST 100 FEET >> BIM IN THE FIELD TULALIP RESORT HOTEL 2009 AIA TAP BIM AWARDS

TULALIP RESORT HOTEL >> TABLE OF CONTENTS Architect Statement Descriptive Data Contractor Statement Owner Statement Introduction Organization Chart BIM Standards Project Data The Last 100 Feet Beyond BIM Creating an Innovative Culture Plan Room Computer Integrated Work Plan (IWP) Continuous Improvement Bridging the Gap

PROJECT TEAM >> ARCHITECT STATEMENT: Our first practical introduction to BIM occurred on the Tulalip Resort Hotel with the help of the general contractor. With the construction drawings 60% complete, the contractor proposed a series of collaborative working sessions to meld their 3D model and our documents. This was to assure the accuracy of the coordinated on-site drawings reducing rework and creating project savings. The contractor, in concert with our firm, created a 3-dimensional set of shop drawings that were used to simultaneously define and coordinate all building systems. These documents reinforced confidence when fabricating and building. Due to our experience with BIM on the Hotel, our firm has committed to utilizing 3-D modeling in the future. CONTRACTOR STATEMENT: Our firm has primarily used BIM in the past throughout the design phase. These tools are used to resolve design issues and coordinate building systems and we learned that with a wellcoordinated design, less field modifications have to be made resulting in an increased protection of design intent and productivity. BIM was used on this project to coordinate the design, but we took it one step further: The Last 100 Feet. We created a culture of integration by giving access to the model and the imperative information contained within it, to every person on the ground. OWNER STATEMENT: This project was very large and challenging. Due to the fast-tracked schedule, often times final designs were not completed until well after the construction was underway. The contractor s effective utilization of BIM allowed us to maintain our very aggressive schedule and overcome many of the obstacles that otherwise would have delayed or added costs to the project. Because of the project team s effort toward substantial completion, we were able open our doors to our clients three months before the grand opening. Our hotel was completed on time and on budget. Working with a general contractor who has a firm understanding of the practical application of technology available made this a successful project. There is no doubt in my mind that we would not be where we are today if the team had not effectively and expertly implemented BIM. This is the first experience using BIM for anyone in our owner s group, and after such a positive one, we will push for these tools to be used on other building projects.

INTRODUCTION >> DESCRIPTIVE DATA Building Area Total Gross Square Feet 439.860 Estimate Cost Site Development Cost $5,814,000 Building Cost $124,186,000 Total Construction Cost $130,000,000 Building Cost/GSF $282/sf The Tulalip Resort is a 12-story hotel, casino and conference center built using a fast-track schedule. The team was challenged to deliver the project in 22 months, and to begin the project with design documents only 60% complete. To increase efficiency and quality, the team produced innovative and practical programs using Building Information Modeling. The use of BIM on this project resulted in lower delivery costs and a high level of collaboration from the Owner, Architect, Contractor, Subcontractors, and most uniquely -- craft and trades people.

ORG CHART >> PROJECT TEAM The Project Team exhibited a strong innovative and collaborative spirit - always focused on driving ultimate quality and efficiency to the project. The Integrated Construction Coordinator (ICC) managed model input and produced documents to be used in the field. They ensured constructability of the project during design and protected the integrity of design during construction. Architect Owner Contractor Project Manager Superintendent Assistant Project Manager Foreman Integrated Construction Coordinator Responsibilities Included: Creating model Model coordination Distribution of model documents to field MODEL INFORMATION BUILDING INFORMATION MODEL MEP Engineer Project Engineer Field Engineer

During the course of interior wall coordination between the contractor and architect 3 serious structural issues & 234 dimensional conflicts were resolved BIM USE >> BIM STANDARDS Building Information Modeling was used throughout the building process. As with most other projects, BIM was used for prefabrication, MEP coordination, constructability, preconstruction/quantity survey, site logistics, and 4D scheduling all allowing the design to be modified prior to costly and time-consuming conflicts arising in the field. A project website was used to transfer files between the architect, consultants, the general contractor and subcontractors. During the course of interior wall coordination between the contractor and architect, three serious structural issues were resolved and 234 dimensional conflicts. These systems were all verified dimensionally and signed off by both parties, making the model the most accurate source of information on site. 4D EXAMPLE The Tulalip Resort Hotel contained 336 typical hotel rooms. The project team used 4D to plan and coordinate the subcontractor flow through the rooms. Models augmented & replaced construction drawings By using the model the team resolved over 2500 MEP conflicts MEP COORDINATION Coordination of all building systems is the first step to achieving success in the field. The coordination process began with a standard 3D MEP coordination, which included models for HVAC, Plumbing, Mechanical Piping, Electrical, and Fire Suppression. To ensure a complete coordination, a structural steel model was provided by the steel detailer and the concrete and architectural model was provided by the general contractor.

THE LAST 100 FEET >> Before the use of BIM, foremen were spending 30% of their time reviewing the architectural drawings, retrieving the information needed, and relaying it to their crew. BEYOND BIM The project team and field crew communicated using a model available on a community computer setup in the plan room. Any crafts person, at any time, could walk into the job site trailer and access model information giving the team another tool to get the job done safer, faster, and with better precision. For the program to be effective, extracting the pertinent information from the model and delivering it to the field was critical. The vehicle for delivering information into the field was the Integrated Work Plan (IWP,) a layout drawing given to the field crews enabling them to work more efficiently. It was also used by engineers to perform quality checks in the field. CREATING AN INNOVATIVE CULTURE BIM became standard practice by connecting each team member with a practical application relating to their daily activity. The architect was directly involved with BIM during the coordination process. The Engineers used IWPs for quality control and the plan room computer. The Superintendent was involved in the IWP approval process. The MEP Engineer, of 30 years experience, ran clash detection during the MEP meetings. The Assistant Project Manager in charge of enclosure used Revit to build a model of the typical glazing and metal panel mock up for enclosure review. The Subcontractors were involved either with modeling their own scopes of work such as the MEP trades, or simply through their involvement with the IWP process and use of the plan room computer. The Last 100 Feet Bridging the generational gap The MEP Engineer, of 30 years experience, ran clash detection during the MEP meetings. 2009 BIM TAP AWARD

THE LAST 100 FEET >> PLAN ROOM COMPUTER For BIM to become a standard practice, users must understand how to leverage the tools. This means the model must be accessible to everyone for a better understanding of design intent and constructability issues. Using the model, this information can be gathered quickly and accurately. The Plan Room Computer was the tool used by both the office staff and field as a live and interactive means to communicate in 3-dimensions. The plan room computer held a version of the model, which included all MEP models, architectural models, and structural models. Every project team member was trained in using Navis Works to navigate, dimension, and manipulate objects. Instead of a select few looking for conflicts, every team member can catch coordination issues. The model on the Plan Room Computer became the primary source of information on the project. The plan room computer was so successful, the contractor is now using one on every project.

WORK ACTIVITY DESCRIPTION QUANTITY CARPENTER QUANTITIES FORM WORK LABOR QUANTITIES CONCRETE WORK DESCRIPTION QUANTITY REQ'D ITEM QTY. SIZE Rebar Formsavers Sleeves Anchor Bolts Box Outs EMBED PLATES EMBED ANGLES ANCHOR BOLTS NUMBER SIZE QTY. NUMBER SIZE QTY. NUMBER SIZE QTY. REQ'D MIX STRENGTH TYPE. DESCRIPTION MIX T3045 4000 PSI TYPE A BEAMS, COLUMNS, REINFORCED CONCRETE, SUPPORTED SLABS MIX XT3045 4000 PSI TYPE A-Xypex TUNNEL ROOF SLAB MIX T9014 3000 PSI TYPE B SPREAD FOOTINGS, WALL FOOTINGS, WALLS, GRADE BEAMS, PIERS, SUPPORTED SLABS ON COMPOSITE METAL DECK & LINEAR ACCELERATOR VAULT MIX XT9014 3000 PSI TYPE B-Xypex AREA P,S - FOUNDATION WALLS, ELEVATOR PIT/TUNNEL WALLS MIX 2709 N/A PSI CLSM BACKFILL OTHER THAN COMPACTED FILL MIX T2708 N/A PSI ALT CLSM BACKFILL OTHER THAN COMPACTED FILL (PUMPABLE) This flow chart depicts the approval process to ensure the accuracy of the IWP. THE LAST 100 FEET >> INTEGRATED WORK PLAN (IWP) The purpose of the IWP is to simplify and consolidate all information into one delivery source, creating a task specific document containing all information necessary to perform a specific task of a defined scope of work. The document contains plans and elevations, as well as 3-D views. This is accompanied by pertinent dimensional information ensuring a higher quality product delivered more efficiently. Integrated Work Plan (IWP) C B 3 QUANTITY INFORMATION 300.14 3 0' - 11 1/2" 4.1 4 0' - 11 1/2" 7' - 3" 0' - 8" MATERIAL ONSITE LIST EMBED INFORMATION 0' - 11 1/2" 2 300.14 3 300.14 0' - 11 1/2" 7' - 3" 5' - 4" 6' - 1" 0' - 7 1/16" -1' - 7 1/2" 5' - 8 1/2" 7' - 3" SOG - 5" 1' - 6 1/2" -1' - 8" Level 1 0' - 0" Tulalip Tribes Hotel & Conference Center Project Project Address: 10200 Quil Ceda Blvd. Tulalip, Wa. 98271 CONCRETE MIX DESIGNS 2' - 3 3/8" 1' - 6 1/2" 6' - 1" 2' - 7 15/16" Footing @ G.1 & 3 0' - 10 1/2" 0' - 8" Project Phone #: 360-654-2262 Drawing Review Name Position N Kurth Design Coord. Y N NA POUR RATE P= 150 + 9000R T 27' - 1 1/2" G P Greany Project Eng. J Jones Superintendant B Remmen Superintendant AIR TEMP. 60 or > 6' / HR AIR TEMP. 40 or 59 5' / HR AIR TEMP. 20 or 39 4' / HR P = LATERAL PRESSURE, PSE R = RATE OF PLACEMENT, FT/HR T = TEMP OF CONCRETE IN FORMS, Deg F 3 G.1 Dock Leveler Section 2 2 1/2" = 1'-0" No. Description Date 1 200.17 G.8 Dock leveler depressions plan 1 3/16" = 1'-0" 403.06 Architect: RPA 6 G.1 G General Contractor: Mortenson Structural Engineer: DCI 2 300.14 Interior Designer: IDI Electrical: Valley 2' - 7 15/16" 0' - 7 1/16" 6' - 1" 5' - 4" 6' - 1" Level 1 0' - 0" Plumbing: Apollo Hydronic/HVAC: Hermanson 0' - 8" 0' - 8" 0' - 8" 0' - 8" Fire Protection: SFS Depth Varies (TYP) Footing @ G.1 & 3 3 Dock Leveler Section 3 Dock Leveler 3D 4 1/4" = 1'-0" Project number 06050015 Date 1/9/2009 2:11:27 AM Drawn by Author 300.14 Scale As indicated 3-D View: Provides perspective to ensure accuracy

WORK ACTIVITY DESCRIPTION QUANTITY CARPENTER QUANTITIES FORM WORK LABOR QUANTITIES CONCRETE WORK DESCRIPTION QUANTITY REQ'D ITEM QTY. SIZE Rebar Formsavers Sleeves Anchor Bolts Box Outs EMBED PLATES EMBED ANGLES ANCHOR BOLTS NUMBER SIZE QTY. NUMBER SIZE QTY. NUMBER SIZE QTY. REQ'D MIX STRENGTH TYPE. DESCRIPTION MIX T3045 4000 PSI TYPE A BEAMS, COLUMNS, REINFORCED CONCRETE, SUPPORTED SLABS MIX XT3045 4000 PSI TYPE A-Xypex TUNNEL ROOF SLAB MIX T9014 3000 PSI TYPE B SPREAD FOOTINGS, WALL FOOTINGS, WALLS, GRADE BEAMS, PIERS, SUPPORTED SLABS ON COMPOSITE METAL DECK & LINEAR ACCELERATOR VAULT MIX XT9014 3000 PSI TYPE B-Xypex AREA P,S - FOUNDATION WALLS, ELEVATOR PIT/TUNNEL WALLS MIX 2709 N/A PSI CLSM BACKFILL OTHER THAN COMPACTED FILL MIX T2708 N/A PSI ALT CLSM BACKFILL OTHER THAN COMPACTED FILL (PUMPABLE) THE LAST 100 FEET >> Not one embed, block out, or sleeve was misplaced IWP = CONTINUOUS IMPROVEMENT IWPs had a tremendous impact on continuous improvement. 0' - 11 3/8" CL 0' - 11 3/8" CL By using color coded drawings the iron workers Level 3 - Stud Rail QUANTITY Layout INFORMATION MATERIAL ONSITE LIST EMBED INFORMATION CONCRETE MIX DESIGNS POUR RATE P= 150 + 9000R T 0' - 10 3/8" CL 0' - 10 3/8" CL 1 100I 3/4" = 1'-0" 0' - 2 5/8" CL White Stud Rail Typ. Column CC1 Revised 01/29/06 0' - 2" 0' - 9 1/8" 0' - 9 1/8" 2' - 0" 0' - 10 1/8" 0' - 10 1/8" 4' - 1" 2' - 0" 4' - 1" Sheet Name Sheet Number Project Name Project Number 302.10 Stud Rail System 100I Tulalip Tribes Hotel & Conference Center Project 06050015 Date/Time Stamp 1/12/2009 1:11:29 PM Tulalip Tribes Hotel & Conference Center Project Project Address: 10200 Quil Ceda Blvd. Tulalip, Wa. 98271 Project Phone #: 360-654-2262 Drawing Review Name Position N Kurth Design Coord. P Greany Project Eng. J Jones Superintendant B Remmen Superintendant Y N NA were able to build all of the stud rails at the same time and distribute them with the exact quantity and types, decreasing installation time by 20%. IWPs containing plan and elevation were used in the forming and pouring of shear walls, increasing production by 26%. Not one embed, block out, or sleeve was misplaced. AIR TEMP. 60 or > 6' / HR AIR TEMP. 40 or 59 5' / HR AIR TEMP. 20 or 39 4' / HR P = LATERAL PRESSURE, PSE R = RATE OF PLACEMENT, FT/HR T = TEMP OF CONCRETE IN FORMS, Deg F No. Description Date H Orange 100Y Orange 100R Orange 100AA Orange 100V Orange100X Architect: RPA Orange 100T Blue 100P Blue 100P General Contractor: Mortenson J Structural Engineer: DCI Blue 100P Orange 100AB Orange 100W Interior Designer: IDI Yellow/Brown 100U K Yellow/Brown 100U Blue 100P Orange 100V Blue 100P Orange 100T Electrical: Valley Plumbing: Apollo Orange 100T L Yellow/Brown 100U Yellow/Blue 100Z Yellow/Blue 100Z Orange 100T Hydronic/HVAC: Hermanson Fire Protection: SFS 12 11 10 8 7 5 4 3 1 6 Level 3 - Stud Rail Layout 1 1/16" = 1'-0" Level 3 - Stud Rail Layout Project number Date Drawn by 302.27 06050015 1/12/2009 1:25:19 PM N Kurth Scale 1/16" = 1'-0" Increased production rate of shear walls by 26%

QUANTITY INFORMATION WORK ACTIVITY DESCRIPTION QUANTITY CARPENTER QUANTITIES FORM WORK LABOR QUANTITIES CONCRETE WORK DESCRIPTION QUANTITY MATERIAL ONSITE LIST REQ'D ITEM QTY. SIZE Rebar Formsavers Sleeves Anchor Bolts Box Outs EMBED INFORMATION EMBED PLATES EMBED ANGLES ANCHOR BOLTS NUMBER SIZE QTY. NUMBER SIZE QTY. NUMBER SIZE QTY. CONCRETE MIX DESIGNS REQ'D MIX STRENGTH TYPE. DESCRIPTION MIX T3045 4000 PSI TYPE A BEAMS, COLUMNS, REINFORCED CONCRETE, SUPPORTED SLABS MIX XT3045 4000 PSI TYPE A-Xypex TUNNEL ROOF SLAB MIX T9014 3000 PSI TYPE B SPREAD FOOTINGS, WALL FOOTINGS, WALLS, GRADE BEAMS, PIERS, SUPPORTED SLABS ON COMPOSITE METAL DECK & LINEAR ACCELERATOR VAULT MIX XT9014 3000 PSI TYPE B-Xypex AREA P,S - FOUNDATION WALLS, ELEVATOR PIT/TUNNEL WALLS MIX 2709 N/A PSI CLSM BACKFILL OTHER THAN COMPACTED FILL MIX T2708 N/A PSI ALT CLSM BACKFILL OTHER THAN COMPACTED FILL (PUMPABLE) P= 150 + 9000R T AIR TEMP. 60 or > 6' / HR P = LATERAL PRESSURE, PSE AIR TEMP. 40 or 59 5' / HR R = RATE OF PLACEMENT, FT/HR AIR TEMP. 20 or 39 4' / HR T = TEMP OF CONCRETE IN FORMS, Deg F 4' - 1 1/2" 7' - 5" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 8' - 7" 7' - 5" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 8' - 7" 7' - 9" 4' - 0" 2' - 10" 4' - 0" 4' - 0" 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M H 6' - 6 7/8" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 7' - 6 1/4" 8' - 5 3/4" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 7' - 6 1/4" 8' - 7 1/2" 3' - 10 1/4" 5' - 3" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 1' - 10 7/8" 2' - 8 13/16" 5' - 4 1/2" 304M Revised Location (1) Btm 304M.1 (1) Top (1) Btm Revised Location 304M (1) Top (1) Btm 0' - 5" 304M 304M (1) Btm Revised Location 5' - 4 1/2" 6' - 5 1/2" 2' - 9 1/4" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 6' - 9 1/4" 9' - 2 3/4" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 6' - 9 1/4" 9' - 2 3/4" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 6' - 9 1/4" 8' - 10 1/2" L 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 300M 302M 302M 300M 300M 300M 302M 302M 5' - 8 1/2" 3' - 7" 3' - 8 1/2" 4' - 3 1/2" 3' - 8 1/2" 8' - 4 1/2" 6' - 9 1/2" 4' - 3 1/2" 3' - 8 1/2" 4' - 4 1/2" 3' - 1" 7' - 6 1/2" 7' - 7 1/2" 4' - 0" 4' - 0" 6' - 7" 7' - 2 1/2" 7' - 2 1/8" 3 12 2' - 7 1/2" 11 2' - 2 1/2" 10 301.21 Level 2 - Area 3 Steel Embed Layout 1 3/16" = 1'-0" 2' - 0 1/2" 2' - 10 1/2" 6 400.07 0' - 4 1/2" 2' - 7" 2' - 2" 2' - 8" J K Project Address: 10200 Quil Ceda Blvd. Tulalip, Wa. 98271 Project Phone #: 360-654-2262 Drawing Review Name Position Y N NA N Kurth Design Coord. P Greany Project Eng. J Jones Superintendant B Remmen Superintendant No. Description Date 1 Revision 1 Date 1 2 Revision 2 02/19/06 Architect: RPA General Contractor: Mortenson Structural Engineer: DCI Interior Designer: IDI Electrical: Valley Plumbing: Apollo Hydronic/HVAC: Hermanson Fire Protection: SFS Project number Date Drawn by Scale 06050015 1/12/2009 1:10:16 PM Author 3/16" = 1'-0" THE LAST 100 FEET >> Level 2 - Area 3 Embed Layout POUR RATE 13' - 1" 0' - 1 1/2" 0' - 6 1/8" 0' - 7 1/4" 0' - 0 7/8" 0' - 1 1/2" 0' - 6 1/8" 0' - 7 1/2" 0' - 0 7/8" 0' - 6 1/8" 0' - 0 7/8" 0' - 1 1/2" 0' - 7 1/2" 0' - 6 1/8" Tulalip Tribes Hotel & Conference Center Project Level 2 - Area 3 Embed Layout 303.04 IWP - CONTRACTOR USE The IWPs contained the following scopes of work: Pile cap and footing layout Allowing all panels to be pre-fabricated for pile caps Slab on Grade Slab edge Depressions, curbs and housekeeping pads Bolt pattern for steel columns Post-tensioned Decks (Hotel Tower) Slab edge with block outs, curbs, depressions and house keeping pads Sleeve layout PT head layout Embed layout Stud rail layout and fabrication drawings Shear wall layout Including elevations with coordinated block outs and embeds Man-hours were reduced by 20% & shaved 6 weeks off schedule Through the use of IWPs, man-hours were reduced by 20% to complete the concrete structure. The schedule for this scope of work was reduced by 10%, shaving 6 weeks off an already tight schedule.

THE LAST 100 FEET >> Over 70% more work in place per RFI IWP - SUBCONTRACTOR USE The MEP subcontractors were given coordinated layout of all slab penetrations via IWP. The use of identically coordinated layout drawings by the MEP trades, carpenters and structural subcontractors meant no field conflicts, ultimately eliminating one day from the typical PT deck pour cycle. These efforts resulted in an over 70% more work in place per RFI written when compared to previous projects. Coordinated IWPs were used for interior partition walls and CMU walls. The contractor and the architect coordinated and verified the dimensional placement of every interior wall, providing the subcontractor with a comprehensive set of drawings.

The model improved quality, increased schedule, prevented mistakes, enhanced construction documents. BRIDGING THE GAP>> The progressive culture on this project resulted in impressive production results: PROJECT STRUCTURE MONTHS OF CONTRACT BEGINNING FINAL VALUE NUMBER of NAME TYPE CONSTRUCTION TYPE VALUE INC. CO's % CHANGE RFI's VALUE/RFI Administrative Building Steel Framed 15 GC/CM $29,000,000 $33,700,000 16.2% 960 $35,104 The project team broke company records for pouring concrete shear walls by 15%. The project team beat the structural schedule by 6 weeks. The crew was 20% more efficient based on our estimate for completing the structure package. By using the model, the team was able to coordinate and pour the first deck 2 days after the release of CDs versus the average two to three months. Conference Center Steel Framed 26 GC/CM $58,000,000 $61,000,000 5.1% 1,388 $43,948 University Eng. Bldg. Concrete Framed 28 GC/CM $48,400,000 $51,200,000 5.8% 1,212 $42,244 Jail/Garage CIP Reinforced 35 GC/CM $90,468,023 $93,500,000 3.4% 2,900 $32,241 Concrete Hospital Concrete w/steel 23 GC/CM $33,941,520 $38,780,381 14.3% 1,600 $24,237 Framing State Legislative Load-Bearing 28 GC/CM $63,000,000 $90,000,000 42.90% 2,000 $45,000 Building (Renovation) Masonry Tulalip Resort Hotel PT Concrete Slab 16 GMP $130,000,000 $130,000,000 0% 981 $132,517 & Steel Frame Tulalip Resort Hotel One RFI for every $127,401 of work put in place Non-BIM Project One RFI for every $37,135 of work put in place BRIDGING THE LAST 100 FEET This project was successful because the integrated team embodied a culture of innovation & collaboration. One group could not be successful with out the other. The model served as a catalyst to bridge the gap - taking the model The Last 100 Feet into the field.