ALBANY WATER BOARD SCHEDULE OF RATE STRUCTURE FEBRUARY 1, 2009

Similar documents
BOARD OF PUBLIC UTILITIES SCHEDULE OF WASTEWATER RATES PROVISIONS APPLICABLE TO ALL CONSUMERS

Appendix A Fees, Charges and Rates

City of Anacortes Utility Rates & Information January 2016

City of Flushing. Water and Sewer Rates

City Council Public Input Session Water / Sewer Rate Study. March 19, 2014

SCHEDULE A NORTH SUMTER COUNTY UTILITY DEPDENDENT DISTRICT NORTH SUMTER UTILITIES WATER AND WASTEWATER RATES AND CHARGES AS OF OCTOBER 1, 2017

Petersburg - Water, Sewers and Sewage Disposal

UNION PUBLIC SERVICE DISTRICT, a public utility

Section 3. Applications. A separate application shall be made and a separate meter shall be installed for each premise, defined as follows:

City of Ottawa Water, Wastewater and Stormwater Rate Structure Review

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES

MANHEIM AREA WATER & SEWER AUTHORITY (MAWSA) Resolution : Fee Schedule

RESPONSE TO ACUSATIONS PRINTED ON FLYER BEING CIRCULATED

BEDMINSTER MUNICIPAL AUTHORITY FEE SCHEDULE

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE

APPENDIX A 2017 INDEX TO SCHEDULES

Utilities Extension Project (UEP) North 2. Northwest Cape Coral Neighborhood Association Meeting September 18, 2014

FACTS INFORMATION GENERAL LEGEND HIGHLIGHTS FINANCIAL FIBER OPTIC ELECTRIC & NATURAL GAS WASTEWATER FACTS WATER & NUMBERS PHONE.

APPENDIX C Cumulative Growth Calculations

Village of Arlington Heights. Sewer Back-up Rebate Program

2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages

TORONTO MUNICIPAL CODE CHAPTER 851, WATER SUPPLY. Chapter 851 WATER SUPPLY

GUIDELINE FOR PROVIDING WATER AND SEWER SERVICE TO DEVELOPER PROJECTS AND PUBLIC OR PRIVATE PROPERTIES

UNOFFICIAL COPY OF HOUSE BILL 558. Read and Examined by Proofreaders:

County of Sonoma Agenda Item Summary Report

TITLE V: PUBLIC WORKS 50. SOLID WASTE

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

WATER AND SEWER CAPACITY FEE STUDY

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

Florida State University Utilities Department Best Management Practices Guidelines Water System Revised 09/14/09

Photographic Processing Facility Sector Control Policy

How to Read Your Water Bill and related topics. Tom Heikkinen, General Manager

Project Need and Evaluation

The following is required for a complete permit submittal for each unit.

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

ELECTRIC COST OF SERVICE AND RATE DESIGN STUDY

Project Plan and Financing Plan for Reinvestment Zone Number Two,

CUSTOMER GUIDE TO WATER AND SEWER UTILITY SERVICES

Exhibit MSD 1 METROPOLITAN ST. LOUIS SEWER DISTRICT RATE CHANGE PROPOSAL FEBRUARY 26, 2015

2018 Smart Energy New Homes Program Manual

County of Sonoma Agenda Item Summary Report

SPILL ESTIMATION. Not Just A Guess Anymore

City of Norwalk. Residential Development Permit Process

Figure 1. Report of Inspection Process Flowchart.

HALTON REGION Budget and Business Plan Water & Wastewater Overview

RESOLUTION NO RESOLUTION OF THE CITY COUNCIL OF BOULDER CITY, REPEALING AND REPLACING RESOLUTION NO TO INCREASE THE WATER SERVICE CHARGE

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

The following is required for a complete permit submittal for each unit.

Bloomington Township Public Water District User Information Packet. Water Service

Altoona Water Authority

SANITATION DISTRICT NO. 1 RULES AND REGULATIONS

DRAFT FINAL REPORT. City of Kalispell. Stormwater Impact Fee Study

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177

What is a stormwater utility fee?

Construction Application for Permit (CAP) Instructions

Key Terms. The identifying six digit number, within the Freddie Mac Reimbursement System, for each Expense Item.

ELECTRICAL SERVICE EXTENSION POLICY

Potable Water Supply, Wastewater & Reuse Element

Zoning Permits 11-1 ZONING PERMITS

Dual Water Systems in Northern Colorado. Wayne E. Eckas, P.E. Aqua Engineering, Inc., Fort Collins, Colorado

RESOLUTION NO A RESOLUTION SETTING RATES FOR WASTEWATER SYSTEM USE AND REPEALING

CAPACITY MANAGEMENT OPERATIONS & MAINTENANCE

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

Welcome! Thank you for your interest in upgrading your service with Great Lakes Energy Cooperative (GLE).

Fee Schedule. Air Pollution Community Right-to-Know Materials and Waste Management Public Drinking Water Surface Water Voluntary Action Program

Minn. Stat. Sec.18C.305 BULK PESTICIDE/FERTILIZER STORAGE - NEW PERMIT APPLICATION

Water Service Connection/Alteration Permit Application

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

FOOTING DRAIN DISCONNECTION PROGRAM GUIDELINES

ALERT. Snohomish Easter Parade, Bonnet Contest, and Egg Hunt

Raw water sources, facilities, and infrastructure

Uncontrolled Document when printed. Refer to internet for latest version. Disclaimer refer

SaaS Listing CA Agile Central

Student Handout Calculating Runoff

POLICY FOR MISCELLANEOUS CUSTOMER CHARGES

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

OFFICE OF INSPECTOR GENERAL City of Chicago

Wastewater Treatment & Water Supply Alternatives Analysis

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

XI. Thornton Planning Area

WATER SERVICE AND USE RULES AND REGULATIONS CITY OF SANTA CLARA

Tax Increment Financing (TIF) Public Information Meeting October 11, 2011

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

Port of Newport Rates Page 1 of 8

CONSUMER ADVOCATE DIVISION=S ANNUAL REPORT FOR 2013 AND COMPARATIVE RESIDENTIAL RATE STUDY ******************************************************

Scottish Water Business Stream Charges. Scheme of Charges:

Water Use, Conservation, and Efficiency Rome, Georgia A Report by the Coosa River Basin Initiative July 2014

6. INFRASTRUCTURE CHARGES

Notice of Tariff Change Effective January 1, 2014

National Water Demand Management Policy

REQUEST FOR DEVIATION WATER AND WASTEWATER SYSTEM STANDARD SPECIFICATIONS

Water Conservation in Poultry Processing. William C. Merka Extension Poultry Science Department The University of Georgia Athens, GA 30602

shipping forms VTL Transport Toronto area To Trader s Trader s Forum Show

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Water By-law. W-8 Consolidated November 22, 2016 In Force and Effect January 1, As Amended by:

First things first.. A Brief Overview of the PTI Program. Why offer training? PTI Survey Results. Today s Main Topics:

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

SECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION

SPECIFIC REQUIREMENTS FOR INDUSTRIAL ACTIVITIES

Transcription:

SCHEDULE OF RATE STRUCTURE RESIDENTIAL/ COMMERCIAL RATE (A) TIER I LARGE USER RATE (C) TIER II LARGE USER RATE (C) UNMETERED RATE (per unit, per cycle) VACANT PROPERTY (per front foot, per year) Rates Prior to March 1, 2008 $2.15 $3.44 $4.13 $220.00 $1.72 Rates through January 31, 2009 (B) $2.28 $4.13 $4.96 $330.00 $2.06 Rates Effective February 1, 2009 $2.45 $4.44 $5.33 $355.00 $2.21 ---------------------- SEWER CHARGE IS BILLED AT 100% OF ABOVE WATER RATES ---------------------- (A) The minimum water charge for residential customers will be increased 7.5%, from $29.74 (per 4 month billing cycle) to $31.97 (per 4 month billing cycle). The minimum amount includes 1,300 cubic feet of water per billing cycle. (B) Prior rates were effective March 1, 2008. (C) Tier I customers are defined as those customers who utilize in excess of 120,000 cubic feet of water per billing cycle. Tier II customers are defined as those customers who utilize in excess of 600,000 cubic feet of water per billing cycle. Tier I and Tier II large user rates apply to all water usage for those customers who meet the user definition. (D) A 1% monthly finance charge (or 12% annually) is currently charged on any unpaid accounts (those not paid within 30 days of the date billed) based on the average monthly balance of the account. This finance charge will remain unchanged. (E) A one time penalty of 5% is currently charged to all accounts not paid within 30 days of the initial date of billing. An additional penalty of 5% is currently charged to all accounts delinquent as of November 15 of each year and, as such, subject to rollover and collection by the City of Albany on the City s general taxes. These penalties will remain unchanged. 1of 5

SCHEDULE OF COST RECOVERY AND OTHER COMMERCIAL RATES Air Conditioning (Annual) Recirculating Non-recirculating Prior to February 1, 2009 $15.00/H.P. $75.00/H.P. Summary of Rates Effective February 1, 2009 $16.15/H.P. $80.65/H.P. Refrigeration (applies to existing services only) Recirculating Non-recirculating Fire Service/Sprinklers (Annual) 3" service or less 4" service 6" service 8" service Over 8" service Fire Hydrant Charges Base permit charge for up to 5,000 gallons (Up to 10 calendar days) Charge for each additional day (beyond 10 days) Charge for each 1,000 gallons (Over 5,000 gallons) Fire hydrant meter deposit $15.00/Ton $75.00/Ton $147.00 $291.00 $438.00 $583.00 $876.00 $300.00 $35.00 $6.00 $250.00 $16.15/Ton $80.65/Ton $158.00 $313.00 $471.00 $627.00 $941.00 $323.00 $38.00 $6.50 $269.00 Closing Meter Reading Charge A charge of $50.00 will be made for each closing reading taken by Water Department personnel. Tapping Charges Charges will range from $340.00 (for a 3/4" tap) to $1,272.00 (for a 12" tap). (See page 3) Meter Fees Charges are based upon the size of the meter (see page 3) and are subject to change. Fire Flow Charges $300.00 each test. Turn On/Shut Off Charges Curb box $35.00; branch valve $50.00 (4 or larger). Missed Appointment Charge A charge of $50 will be assessed for any missed appointment/no show (after the second attempt). Service Termination/Restoration Charges for service termination and restoration will be billed at labor and materials rate. Other Charges for labor and materials, for work performed on private property pursuant to a signed consent form, will be billed on a flat basis. 2of 5

SCHEDULE OF MATERIAL AND LABOR FEES Tapping Charges ¾ $340.00 1 $425.00 1 ½ $511.00 2 $597.00 4 $768.00 6 $938.00 8 $1,108.00 12 $1,272.00 All tapping rates include material and equipment charges. Fees on Water Meters Meter with Orion Head 5/8 $189.00 Meter with Orion Head 1 $293.00 Meter with Orion Head 1-1/2 $587.00 Meter with Orion Head 2 $738.00 Meter only: 5/8 $50.00 Meter only: 1 $173.00 Meter only: 1-1/2 $459.00 Meter only: 2 $663.00 Orion Head only: 5/8 through 2 $143.00 Fees on water meters are based upon current market conditions and are subject to change. Please call for current prices of meters or heads in excess of 2. Due to escalating freight costs, the Albany Water Board reserves the right to adjust the costs for meters and heads. 3of 5

SCHEDULE OF MATERIAL AND LABOR FEES Frozen meter replacements Customer will be charged for the cost of a new meter, for the size currently in place, plus labor and materials: Labor charge during working hours: $150.00 (Plus cost of meter) Labor charge during non-working hours: $239.00 (Plus cost of meter) Water Service Repair Charges ¾ up to 1 service repair $4,085.00 1 ¼ up to 2 service repair $4,460.00 Fire Branch and Private Water Main Repair Charges 4 $4,140.00 6 $4,260.00 8 $4,355.00 4of 5

SCHEDULE OF FEES FOR SEWER PERMITS Class of Building Sewer Permit Fee 1 One or two-family residential $35.00 2 Multifamily residential dwellings (3 dwelling units or $35.00, plus $10.00 per more). dwelling unit for each dwelling unit over 2. 3 Commercial buildings with sanitary sewage waste only, $60.00 gross building area not more than 2,500 square feet. 4 Commercial buildings with sanitary sewage waste only, gross building area more than 2,500 square feet, but not more than 50,000 square feet. 5 Commercial buildings with sanitary sewage waste only, gross building area more than 50,000 square feet. 6 Industrial buildings or any building, structure, or improvement discharging wastewater (other than sanitary sewage) with a gross building area not more than 20,000 square feet. 7 Industrial buildings or any building, structure or improvement discharging wastewater (other than sanitary sewage) with a gross building area greater than 20,000 square feet. $60.00, plus $10.00 for each 2,500 square feet (or first 2,500 square feet. $225.00, plus $5.00 for each 2,500 square feet (or first 50,000 square feet. $210.00 $210.00, plus $10.00 for each 2,500 square feet (or first 20,000 square feet. Storm Sewer Permits Permit Fee 8 Less than 3 acres $35.00 9 3 acres to 5 acres $110.00 10 5 acres to 20 acres $110.00, plus $10.00 per acre in excess of 5 acres. Z:\kahn40021\WP\AWB\Rate Str (proposed) 2009.12.08.doc 5of 5