ISSN: [Biju* et al., 6(5): May, 2017] Impact Factor: 4.116

Similar documents
A term used to embrace the techniques of method study and work measurement, which are employed to ensure the best possible use of human and material

STUDY ON BEHAVIOUR OF WORKERS IN CONSTRUCTION INDUSTRY TO IMPROVE PRODUCTION EFFICIENCY

IJRET: International Journal of Research in Engineering and Technology eissn: pissn:

CHAPTER 2 DEVELOPMENT OF MANAGEMENT THOUGHTS

Chapter 07 Design of Work Systems

Cost Analysis and Estimating for Engineering and Management

Irena Hejduk. Warsaw School of Economics, Warsaw, Poland. Waldemar Karwowski. University of Central Florida, Orlando, USA

MICRO AND MACRO LEVEL ANALYSIS OF LABOR PRODUCTIVITY

Available online at ScienceDirect. Procedia Computer Science 64 (2015 )

Management. tenth edition. Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall 2 1

CONCEPTUAL DESIGN OF AN AUTOMATED REAL-TIME DATA COLLECTION SYSTEM FOR LABOR-INTENSIVE CONSTRUCTION ACTIVITIES

1. What is Management?

Improving Productivity Using Work Study Technique

A RESEARCH PROPOSAL ON TQM IN COURIER COMPANIES IN INDIA

SCHEDULING FOR HIGH-RISE BUILDING CONSTRUCTION USING SIMULATION TECHNIQUES

SEVEN (7) PRINCIPLES FOR IMPROVING WORKFLOW

SERVICE QUALITY ATTRIBUTES AFFECTING THE SATISFACTION OF RAILWAY PASSENGERS OF SELECTIVE ROUTE IN SOUTHWESTERN PART OF BANGLADESH

Implement industrial relations strategies

How to Keep Millennials Engaged and Productive in the Workplace

CHAPTER-8: SUGGESTION, RECOMMENDATION & FUTURE WORK:

Operate Retail Technology Information and Competencies. Module - SIRXICT001A. Overview 2 Maintain Retail Equipment 2

Chapter Ten. Motivating Employees. McGraw-Hill/Irwin. Copyright 2010 by the McGraw-Hill Companies, Inc. All rights reserved.

JOB INSTRUCTION. Instructors Guide Session 3

Copyright 2000 Society of Manufacturing Engineers MANUFACTURING INSIGHTS. An Introduction to Lean Manufacturing

Operations Management

Study of Material Management Techniques on Construction Project

Continuous Improvement Toolkit. Value Analysis

Formal Techniques in Large-Scale Software Engineering

INTRODUCTION TO INDUSTRIAL ORGANIZATIONAL PSYCHOLOGY

FACTORS INFLUENCING THE CONSUMERS TOWARDS BUYING MARUTI CARS IN THOOTHUKUDI DISTRICT

Top 10 Eminent Domain Business Relocation Mistakes

[Ganesh S* et al., 5(7): July, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116

Re-engineering a Helping Hand

Comparative time study of different sewing operation of a T-shirt

Some Definitions. Introduction to Work Measurement

Classical & Neo Classical Theories

Historical Phases of Production

Risk Analysis Overview

Chapter 1. Introduction

Chapter 5 Productivity Improvement Techniques

Compiled by RKS. Industrial Engineering

EQUIPMENT EVALUATION TOOL BASED ON THE MANUFACTURING SYSTEM DESIGN DECOMPOSITION

Estimation of the Marginal Rate of Return and Supply Functions for Schooling: The Case of Egypt

Line Balancing through Cycle Time Reduction

University of Illinois HR Operations Scanner Survey Respondent Overview and Instructions

JUST IN TIME (JIT), LEAN, AND TOYOTA PRODUCTION SYSTEM (TPS)

Final Examination Semester 2 / Year 2011

1) Introduction to Information Systems

CHAPTER 1 INTRODUCTION

Agricultural Labor Practices 2017

Time & Attendance Management. An Overview

Increasing Productivity by Reducing Manufacturing Lead Time through Value Stream Mapping

Introduction of a Japan Concrete Institute Guideline: Practical Guideline for Investigation, Repair and Strengthening of Cracked Concrete Structures

AN EXPERIMENTAL ANALYSIS OF ADVERTISING STRATEGIES

!"##$%&'#("')*+#'*,#'*-'.*,/'+#0--'1' 2*+$#$*%'3"+4/$2#$*%+'0%3'"506,0#$*%' 76,8'9:4"66"%4"'7*%-"/"%4"'

Critical Factors Influencing Quality Performance in Construction Projects

Adam Smith: The Origin of the Division of Labor

GENUS, LXVI (No. 2), 2010

TOPIC 2 : WORK METHODS 2.1 Elemental breakdowns 2.2 Performance rating 2.3 Personal, fatigue, unavoidable delay allowances 2.4 Workload and line balan

Dallas Center for Performance Excellence (CPE) Executive Summary

CHAPTER 3 RESEARCH METHODOLOGY

Module 3 Social Groups: Factors affecting Group Formation

SPECIAL PURPOSE SIMULATION MODELING OF TOWER CRANES

WRITTEN ERGONOMICS PROGRAM WILLIAM S. HART UNION HIGH SCHOOL DISTRICT Risk Management

Chapter 3. Labour Demand. Introduction. purchase a variety of goods and services.

Construction Waste Minimization and Reuse Management

IMPROVEMENT OF OVERALL EFFICIENCY OF PRODUCTION LINE BY USING LINE BALANCING

Lesson:-02 DIFFERENT APPROACHES AND SYSTEMS OF MANAGEMENT, SKILLS, ROLES AND MODERN CHALLENGES

INTRODUCTION. LEVEL 1: Global site location. LEVEL 2: Supra-space plan

ADKAR Exercise Copyright Prosci

Assessment of labour Risk in High-Rise Building

A STUDY OF THE RELATIONSHIP BETWEENBUFFERS AND PERFORMANCE IN CONSTRUCTION

WMS Best Practices Top Ten List

Who Are My Best Customers?

ISSN: [Chaudhari* et al., 6(4): April, 2017] Impact Factor: 4.116

Lean Gold Certification Blueprint

Careers List Professional Careers in Construction

Uses and analysis of the ILO October Inquiry data on occupational wages and hours of work 1

Quality Assessments of Statistical Production Processes in Eurostat Pierre Ecochard and Małgorzata Szczęsna, Eurostat

ABSTRACT OF THE PhD THESIS UNIVERSITY OF PUNE

RESOURCE OPTIMIZATION IN CONSTRUCTION OF A RESIDENTIAL APARTMENT USING PRIMAVERA P-6 SOFTWARE

MACHINE AND LABOR TIMES REQUIRED TO IMPLEMENT KENTUCKY'S SKID TRAIL EROSION CONTROL AND REVEGETATION BMPS

[ know me ] A Strategic Approach to Customer Engagement Optimization

An Exercise In Process Modeling

Customer Relationship Management in Banking Industry- A Study of Kadapa District

Factors that Influence Financial Literacy: A Conceptual Framework

Economic growth and poverty reduction: the role of the agricultural sector in rural Indonesia ABSTRACT PAPER A03

Using Quality Function Deployment in Singulation Process Analysis

How to Engage Employees. A Guide for Employees, Supervisors, Managers, & Executives

The 5S Philosophy. A better Work Environment for Everyone

Overview This tutorial presents an overview of the ADKAR model for change management.

International Journal of Multidisciplinary Research and Development. N.Elangovan, M.Gomatheeswaran

City of Surrey. Agricultural Advisory Committee Minutes. Regrets: Councillor Hunt D. Arnold G. King

Determination of a Fair Price for Blood Transportation by Applying the Vehicle Routing Problem: A Case for National Blood Center, Thailand

Chapter 2 Simulation Examples. Banks, Carson, Nelson & Nicol Discrete-Event System Simulation

Estimation of Production rates for Formwork Installation using Fuzzy Expert Systems

PERFORMANCE MEASUREMENT OF RESIDENTIAL PROJECTS IN INDIA: A BALANCED SCORECARD APPROACH

Risk awareness in conducting business. Why is it worth to implement risk management progamme? - Marcin Marczewski, Konrad Roziewski - SASMA TEAM

Leveraging Smart Meter Data & Expanding Services BY ELLEN FRANCONI, PH.D., BEMP, MEMBER ASHRAE; DAVID JUMP, PH.D., P.E.

Smarter City Vision. An opportunity to think and act in new ways. State of Texas, Public Sector + +

Transcription:

IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY ENHANCE LABOUR PRODUCTIVITY THROUGH APPLICATIONS OF WORK STUDY PRINCIPLES Mayuri Sanjay Doiphode*, Prof. Uday J. Phatak Civil Engineering Department, Wagholi, Pune-412205,Imperial College of Engineering and research, INDIA DOI: 10.5281/zenodo.571595 ABSTRACT Civil is a basic branch of engineering and hence construction industry is one of the largest industry in economy. Because of its large presence, it contributes to the national economy and provides employment to the large no of people. Large amount of investment is made in the constructing ports, roads, urban infrastructural development, telecommunication sectors, power plants, and rural development etc. Various studies are performed by different researchers to improve the efficiency and effectiveness of construction process, implementation various techniques to reduce re-work and improve the productivity. Labour productivity is a very important factor in the construction industry that affects the overall quality of construction. Different labors have their own capacity of working and they show different level of productivity and affect the time and quality of the construction. Case studies and work measurement can improve the planning of human effectiveness. Using this study we can improve the efficiency and economy of the construction industry. Purpose of this work, focuses the benefits of time and method study employed in construction sectors. Method study and work measurement and work sampling has been used to measure the productivity of the various construction activities. It is expected that this concept will help to improve the further quality of the product and reduce risks. In essence, the focus is to apply method study and work measurement and statistical analysis to various construction activities to the observation data sets generated for different construction processes on site and determines their productivity processes and establish regression equation using statistical analysis. KEYWORDS: Time and motion study, productivity, works sampling, statistical analysis. INTRODUCTION Work Study is a step by step examination of the method to carry out the activities. Work study is used to improve the effective use of the resources and also used to set up the standards of the performance for which the activities are carried out. In work study the word Efficiency began in the 19 th to 20 th century.the work measurement i.e. the time and method study i.e. the motion is two principle activities of work study. These two studies are originated in the work of T.W. Taylor. T.W. Taylor is called as the father of scientific management. Method study is used to achieve the economy of project. The goal of this project is to understand the skills required to perform a work and to provide the correct training. The work study concept isused to increase the output and quality of the labour productivity. Time study is a direct and homogeneous observation of task, using a timekeeping device e.g. decimal stopwatch, electronic stopwatch and videotape camera are used to record the task to have time taken for completing that particular job and most of this device is used for the repetitive cycles for short to long durations. Workers observation must be competent; find out the difficulty in the job and decide what best solution is. Problem statement for work study increases the output in mindbecause; worker is under impression that he has made a mistake. Basic purpose of this project is to improve the quality of labour productivity and ultimately quality of production. [48]

LITERATURE REVIEW The origin of scientific management. An American, Frederick Winslow Taylor (1856-1915) is the founder of scientific management, in his famous book, Principle of Scientific Management in 1911; he suggested new principles of industrial organization and stressed the advantages of an extreme division of labour and mechanization in the workplace. The principles of scientific management were developed at a time when American industry and economy entered the stage that characterized modern industries in the country. Taylors view was that the objective of management should be maximized so that there is prosperity of both employers and employees. As Taylors principles of scientific management were adopted complimenting tools, techniques were developed including time and motion study. Frank Bunker Gilbert Sr (July 7, 1868-June, 14, 1924) was an advocate of scientific management; Frank Gillbreth and his wife Lillian Moller Gillbreth are known as the parents of motion study. Labour productivity and work sampling: The bottom line by H. Randolph Thomas. This paper describes the relationship between labour productivity and direct work. They compare 30 projects that show, direct work is better in winter than the rest of the year. According to this result it s illogical and this can be found by using linear regression model. This paper shows that direct work is not related to productivity. In that the conclusion is based on the three assumptions. First one is wait time is inversely proportional to the direct work time. The second is, direct work is directly proportional to the better productivity. Third one is better productivity depend on the less time spent waiting. In this paper author says, the labour productivity is increased when we spend more time on the direct work activity. Most of the data collected from the nuclear power plant construction project; because work sampling studies have not been widely conducted in other sectors of the construction industries. This paper mention about the various factors that effect the labour productivity. The major factors are type, scope, layout and complexity, time frame, construction method, weather, skill of the work force, work practices, length of workdays etc. Causes of variation in construction project task starting times and duration by Brad W.Wambeke, Simon M.Hsiang. In this paper author gives us definition for variation. It is the difference between time that was planned and what actually happened during the task. Variation in the task is important because the same way causes same result,that s why we are not improving the productivity performance. A construction project consists of a large no of interdependent tasks, where starting time of various activities affects indirectly all activities. Delay in any of the activities affects the schedule planned and ultimately decreasing the productivity. Enhance comparative study of motion based on modeling and classification of harmful actions in construction. In this paper author gives us the action recognitions for analysis of safety, analysis of health and also the analysis of operation. The most important factor in this paper is health and safety. The classification of unsafe actions are decided by monitoring workers behavior due to which workers get injured that is detected from the monitoring by recording video, taking pictures using camera etc. These unsafe actions are improved by their feedback and behavior, for finding such problems. Author uses the data from various captured data, from that recognition of unsafe actions, focusing on rotation angles, joints angles, position vectors and movement direction that four factors will be used as features for classification and indicating this author used the (RGB-D)i.e. red, green, blue plus depth sensor. Effects of Design-Integrated process planning on productivity in Rebar placement. In this paper author gives the planning process on productivity in Rebar placement. Rebar that is the reinforcement bars is a major portion of today s construction and the rebar is a main constitute of this type of construction. In this paper, author gives us idea about planning process and thus improving the productivity. Author gives us three different techniques for placement of rebar 1) productivity rating. 2) five-minute rating, and 3) continuous time study and finally the productivity result is based on the comparison and it will be show whether planning process has significantly reduced non-productive time. [49]

Factors affecting labour productivity in building project in the Gaza strip. In this paper, author gives us factors affecting the labour productivity. The productivity is a dominant issue in the constructor field. Productivity depends on time and motion. It is an issue in both the developing and developed countries. The developed countries are recognized with the factors that we have to increase and which will be used to improve productivity. In this paper author gives the factors that are affected, the material shortage, lack of labour experience, lack of labour surveillance, misunderstanding between labour and superintendent and drawing and specification alteration during execution. Construction labour productivity and its improvement. Author says that productivity is a dominant issue in the construction sector and the most important challenge is its improvement. Many researchers have been doing this in the past, still they need to improve the labour productivity hence its proved that there is no standard definition for productivity. This paper is on the basis of questionnaires. In this data is collected and analyzed and also gives the steps for improvement of labour productivity. Introduction to work study; George Kanawaty, 199 2, International Labour office Geneva. The original author of this book was late C.R.Wynne-Roborts, who mainly intended as a training manual, who attended course in work study at management development and productivity. The second revised edition was published ten years later and this edition was prepared by R.L.Mitchell and last edition that is the fourth edition was prepared by George Kanawaty. While updating he wrote many chapters of the new material. In this book he introduced six parts. In that first one is the productivity, work study and human factor, gives us the definition of the productivity. Productivity is calculated as the ratio of output to input. In this output is particularly defined as a product. Output depends on the input like land and building in a convenient location, material, energy, machines and equipment and human recourse. Task of management isto improve productivity without changing other recourse or balancing against another. Aim of work study is to examine the way an activity is carried out, and simplify or modify to reduce the unnecessary or excess work and reduce re-work. The second part of this book is the method study. In that they define method as a systematic recording of a selected job, examine the way of work in order to make improvement. Method study consist eight steps; select, record, examine, develop, evaluate, define, install and maintain. With the help of these steps improve the same amount of productivity. The third part of this book is the selected production management technique. Production cost depends on the way a product is designed. The fourth part is the work measurement. The work measurement is the second complementary technique of work study. Work measurement is the time required for that particular activity.it depends on the poorly designed process and specification. This chapter gives us steps for reducing waste of time by eliminate unnecessary movement to improve the productivity. The second last part is that; how work study has become an effective tool in improving productivity. The overall book of introduction to work study is very effective. With the help of this we can improve the productivity. Study of various factors affecting labour productivity and methods to improve it - Mr.A.A.Attar, prof.a.k.gupta.prof.d.b.desai. In this paper, author gives the various factors that affect the production which includes lack of material, bad weather, proper guidelines, design specification, financial problem to owner etc. For improving such type of problems he gives guidelines as below:- Proper training to the laborers. Motivating the workers toward project completion. Store the required material in stock. Pre planning of activity. Maintain work discipline. Time to time remuneration to workers. In this paper author try to find the factors that affect the productivity and also gives the guidelines to improve it. [50]

Productivity improvement technique and its relationship with work study. In this chapter author gives us the productivity improvement technique which is useful for the individual and organization growth in productivity. In this chapter the aim is to introduce and understand productivity improvement, work study and its relation with productivity improvement. Work study procedure consist eight steps as shown in fig- Work Study Procedure Select Job Record from direct observation Examine recorded facts Develop economic method Maintain new standard Intall new method Define new method Measure Work & calculate standard time Symbols for Method Study consists the following symbols:- Operation Denoted by Transportation Denoted by T Storage Denoted by s Inspection Denoted by Delay Denoted by Flow chart for work study includes motion study and the time study as given by the author. It is very useful for finding the work study as below; Work Study Motion Study Time Study Motion Study (Macro) (Micro-motion Study) (Micro) Work Measurement Work measurement- How to find the work measurement? There are 6 basic steps namely selection, recording, examining, measuring, compiling and precisely defining method. Flow chart for work measurement is as follows; [51]

Basic Procedure of work Measurements Source: - International labour organization, International to work study, universal publishing corporation, India, 1986, PP. 192 Relationship between method study and work study:- In work study give us two parts that is the method study and the time study. In method study first examine the job and finding the alternative more efficient method to perform him. In time study calculate how time required for that activity and determine necessary time to perform a job. Following work study principles in any construction industry we can improve the productivity and also improve the planning. [52]

Flow chart for the Work Study Source:-ILO, Introduction to work study, Universal publishing corporation, India 1986, PP. 34. CONCLUSION Direct work percentages from work sampling studies can be used to predict labour productivity measured as the work hours per unit of output.it can decrease and control costs improve working conditions in the surrounding and motivate people. The most important thing of this project is to learn how to train the workers particularly production workers in their skills and techniques so they can become motion and time conscious. Using the motion studies we will eliminate waste of time (Work measurement) and motion study (Method study) and work sampling has been achieved employed to measure the productivity that is output per worker hour of the various construction activities. It can be calculated individual workers performance and identifying operations that are having problems so the problems can be corrected. REFERENCE [1] Marvin E.Mundel,(1916) Motion and Time study improving productivity, Prentice Hall India,c1994 [2] H. Randolph Thomas (1991) Labour Productivity and work sampling the bottom line, Journal Construction Engineering Management., p.p-423-444. [3] Brad w. Wambeke,, Causes of variation in construction project task starting times and duration,2011 [4] M.N.Pal, A.K.Chatterjee Indian Adaptation Introduction to Work Study. International Labour Office, Geneva [5] Sanguk Han, SangHyun Lee,Feniosky Pena-Mora, Comparative Study of Motion Features for Similarity-Based Modeling and Classification of Unsafe Actions in Construction,2014 [6] Md. Salim and Leonhard E. Bernold, (1993) Effects of design-integrated process planning on productivity in rebar placement. Journal Construction Engineering Management p.p. [7] Adnan Enshassi, Sherif Mohamed, Ziad Abu Mustafa1 and Peter Eduard Mayer (2007) Factors affecting labour productivity in building projects in the Gaza strip. Journal. of Civil Engineering and Management.2007.13(4):P.P 245-254 [8] Mr.C.Thiyagu, Mr.M.Dheenadhayalan, Construction Labour Productivity and its Improvement, Volume: 02 Issue: 08 Nov-2015. [53]

[9] Mr.A.A.Attar, Prof.A.K.Gupta, Prof.D.B.Desai, A study of various factors affecting labour productivity and method to improve it, (2014) PP: 11-14. CITE AN ARTICLE: Doiphode, M. S., & Phatak, U. J., Prof. (2017). ENHANCE LABOUR PRODUCTIVITY THROUGH APPLICATIONS OF WORK STUDY PRINCIPLES. INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY, 6(5), 48-53. doi:10.5281/zenodo.571595 [54]