SINKING THE PIT SINCE THE SECOND WORLD WAR

Similar documents
Introduction to Longwall Mining and Subsidence

From Colonia Jardín to Cuatro Vientos

The Use of the Roof The Upper Level Company

UNDERGROUND MINE DESIGN AND SCHEDULING INFORMATION TECHNOLOGY IN MINE PLANNING

underground coal mine delay data analysis system

How to achieve faster drifting in mining, some aspects. SME Denver February 2007 Gunnar Nord Atlas Copco Rock Drill AB Sweden

Underground Coal Solutions

Unit 16 Mine Development

Surface Mining... Dragline Methods. Draglines and mining

Underground Conveyor Systems Product Overview

Highwall Mining. Extend Mine-able Reserves

THE GROUNDBREAKING TUNNEL

Nonrenewable Energy Resources 5.1

MINING ENGINEERING. Subject Code: MN. Course Structure. Engineering Mathematics. Vector Calculus. Differential Equations. Probability and Statistics

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation.

New Zealand Steel Mining Ltd TAHAROA REHABILITATION PROGRAM PRESENTATION. Reihana Chadwick & Greg Brown

4. PROFILE ON GRANITE CUTTING

An alternative mining method at the Kvannevann Mine, northern Norway

Ventilation System Design for a Thin-Seam Mining Panel

CROWN PILLAR ON VENTILATION DRIFT AT DEEP MILL LEVEL ZONE (DMLZ) PT FREEPORT INDONESIA

Numerical Modelling and Prediction of Abandoned Mine Methane Recovery: Field Application from the Saar Coalfield, Germany

Welcome to Elkview; Visitor Presentation September 11, 2014 Don Sander, GM, Elkview

COMMUNITY BOARD EIGHT

Author. Mr. Abdur Rashid Khan, FCMA

Fossil Fuel Consumption: United States and China

Application of fault tree analysis to coal spontaneous combustion

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

Research in Gold Mining and Metallurgy

Chair for Geomechanics and Rock Mechanics / Rock Engineering - History ( ) ( )

Case Study BHP Billiton Appin Drift Australia

An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20.

Mine Water Management in the Ruhr coalfield

Surface products. Underground products

Innovative Mine Water Management Techniques for Submarine Coal Mines of the Sydney Coalfield, Nova Scotia

SOLUTIONS, AS SOLID AS STEEL

ROTARY DRILLING TECHNIQUES LARGE DIAMETER

Welcomes. H.E. Milan Hovorka, Ambassador, The Czech Republic to India & Czech Business Delegation. 09 th Nov 2017 CIL HQ, Kolkata

SUBMISSION ON PROPOSED NEW MINING INDUSTRY REGULATIONS SUBMISSION OF BROKEN HILLS GOLD CO. LTD (BROKEN HILLS HISTORIC MINE)

Multislice Longwalling for Thick Seam Extraction - Properties of Goaf in the Roof and Gate Roads Behaviour

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification

Montana Ground-Water Assessment Statewide Monitoring Well Network

UNDERGROUND CHARACTERISATION AND RESEARCH FACILITY ONKALO ANTTI IKONEN, MIA YLÄ-MELLA, TIMO ÄIKÄS POSIVA Oy Olkiluoto, Finland

ST IMPLICATIONS IN THE CNGS PROJECT

EXPERIENCE WITH BACKFILLING UNDERGROUND VOIDS AND SHAFTS DURING MINE CLOSURE

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

MANAGEMENT OF EXPLOSION RISKS IN UNDERGROUND COAL MINES WITH THE USE OF BAG BARRIERS

The Lead Belt Heavyweight. Amid challenges, Doe Run s foundation is solidly rooted 1,200 feet underground.

Richard W. Franke Comments on EROEI of Oil, Coal and Nuclear page 1

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Botkin & Keller: Environmental Science: Earth as a Living Planet 8th Edition Guided Reading Assignment: Energy Unit- Chapters

Contaminated Land - Managing the Risk

APPLICATION OF QUALITY ENGINEERING IN ASSESSMENT OF MINING TECHNICAL EQUIPMENT FAILURE WITOLD BIALY 1, PAVEL BENO 2

TABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment

Subsidence Analysis for Underground Coal Mining Operations: The Use of Airborne Laser Scanning Data

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association

New 790-Megawatt Unit. Council Bluffs Energy Center

Hardrock Tunnel Boring Machines

Mining Solutions. Setting higher standards below ground

CLAY BRICK PRODUCTION PLANT

Application Prospect of Backfill Technology for Pillar Recovery in Room and Pillar Mining Method, Pakistan

Venice Pumping Plant Dual Force Main Project Draft EIR

Metro Montreal Successful operation of a state-of-the-art roadheader ATM 105-ICUTROC competing with drill & blast operation in urban tunnelling

4th International Engineering and Construction Conference - July 28, 2006

CHAPTER 1 GLOBAL OVERVIEW

An Archaeological Survey of Three Historic Industrial Cement Complexes in Rosendale, New York.

2016 ANNUAL ICR AND TRR WELL FIELD REPORT ICR WATER USERS ASSOCIATION

CHAPTER V MINING METHODS AND COAL PROCESSING TECHNOLOGY

How Are Alberta s Largest Manufacturing Sectors Faring in the Current Recession?

Large-scale site formation for a residential development at Sheung Shing Street, Ho Man Tin


The growth rates of agriculture, forestry & fishing, mining & manufacturing and electricity, gas & water supply increased.

Understanding Gas Protection Measure Selection within Waterproofing Systems. John Naylor Technical Director

Strategic mine planning of surface mining projects incorporating sustainability concepts

Help Inspector Parliament decipher the secret code by answering these questions correctly.

Field trips 7, 14, 15. Brenner Base Tunnel

A resource pack for teachers and students

Faro Mine Remediation Project - A Risk-Based Approach to Work Planning - April, 2016

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Solving Large-Scale Production Scheduling Problems in Underground Mining

UNDERPINNING A CRANE FOUNDATION

35th International Conference on Ground Control in Mining

Towards Sustainable Mining Industries in India Challenges

Advice to decision maker on coal mining project

Scraper Reclaimer Technology. Optimal solutions for Bulk Materials Handling

Open Cut Coal Solutions

Section Safety Section Cleanup. None Required

ETS. Scripps Networks Expansion Knoxville, Tennessee. Services Provided: Subsurface Exploration - drilling geotechnical engineering

Pioneering China s Tallest: Form and Structure of the Ping An Finance Ce nter

Underground Hazardous Waste Disposal: Current Trends And Future Prospects

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel.

Disaster Advances Vol. 6 (S6) December 2013

METSO MULTI-FLO MINING SCREENS METSO MF MINING SCREENS TECHNICAL SPECIFICATION

1. Hardness 2. Streak 3. Density 4. Crystal structure 5. A mineral must be a naturally occurring, inorganic. 7. c 8. f 9. a 10. d 11. g 12. e 13.

The Aizhai Suspension Bridge is

Our Mother of Sorrows Grotto


Liquid Waste Coordination Committee

Transcription:

SINKING THE PIT Betws New Drift Mine John Dorian Evans BA, BA Hons, MA, MED, PHD, PGCE Text of a talk delivered at The Archaeology and History Society (Ammanford and District) On 18 th September 2006 Betws new drift mine was the last pit to be sunk by the National Coal Board and work began in 1974 on its construction. The main reason in sinking it was that since nationalisation in 1947 there had been massive pit closures due to the exhaustion of coal. Some pits needed massive investment to make them viable and working conditions in some pits were unacceptable. During the early years after the coal industry was taken into public ownership there were mergers of pits to improve production. In the Amman Valley between 1947 and 1976 a total of 14 collieries closed and were redeployed at other pits. In the early 1970s there was an energy crisis when the price of crude oil quadrupled and King Coal was back after a decline in its product market. SINCE THE SECOND WORLD WAR In 1947 there were 214 pits in Wales employing 114,823 personnel and producing 22,707,000 tons. Exports stood at 1,062,000 tons. By 1973 there were 51 pits employing 34,000 men with a saleable output of 10,8008,000 tons and an export level of 657,307 tons of coal. In the Amman and Gwendraeth Valleys new pits were sunk at Abernant, Cynheidre, Cwmgwili and Lyndsey, the first two being long life pits sunk in the 1950s while the latter were sunk in the 1960s. The old Betws colliery (called Ammanford number 1 pit) was sunk in 1899 on the site where the new Betws mine would be sunk in 1974. This is where Jim Griffiths worked who later became deputy leader of the Labour Party and the first secretary of state for Wales in 1964. Image 1: Old Betws No. 1, opened circa 1890, where the late Rt. Hon. James Griffiths, Secretary of State for Wales, worked as a miner.

Work began on Betws New Mine in 1974 and meant tunnelling drifts 3,200 metres beneath Ammanford Colliery under the Betws Mountain. The depth of working the surface ranged from 150 to 800 metres and the work was carried out by Jim Williams, a company from Neath. To support the roof steel arches were erected at one metre intervals. The cycle of work involved: boring, firing, clearing the rock with Emco machines, and erecting arches. The rate of advance was 50 yards a week for two and half miles of roadway with one in five gradients. The work took two and a half years and 400,000 tons of rock were extracted. Image 2: Construction of Drift Entrance May 1974 Image 3: Sinking the Drifts Image 4: Construction of Drift entrance June 1974 The cost of the development of the pit was 8 million and the pit was expected produce 12 million tons of anthracite coal, mainly from the Red Vein. At the time of sinking it was the most modem mine in Europe with the latest technology, such as computer-controlled conveyors and electronic devices to detect methane gas.

Image 5: Entrance Room in 1976-1977 Image 6: Intake Drift Spake Image 7: Return Spake Intake Image 8: Surface Boarding Station The pit has 14 coal seams but the main ones are the Red vein and the Peacock. The Red vein is 1.5 metres thick with a sandstone/siltstone roof and clay floor. At the time of sinking the pit, two coal faces were to operate on a retreat mining system with an annual production of 500,000 tons of coal. A third face was to be held as a standby. It was estimated that there were 5 million tons of Red vein coal at the pit and 7 million tons of Peaccck coal. A further feature of the mine was that it had the longest drivages in the country and the design went into sinking the big Selby Pit in Yorkshire. The men earned 67 basic per week with 250 bonus advancing 22 metres a week, double shift. They hit the coal in 1977. After the main tunnels were completed, underground roadways had to be constructed to access the coal.

Image 9: Underground Roadway Image 10: F1 Gate Road January 1999 Image 11: Gate Road with a conveyor belt to carry the coal

All of this work took four years to complete, including the surface buildings, and in 1976 Jim Callaghan, then prime minister, visited the pit. Image 12: Visit of Prime Minister James Callaghan 1976 Image 13: Jim Callaghan visiting the pit Coal extraction at the pit was a long wall face using a Shearer cutting machine and hydraulic roof supports were used.

Image 14: Shearer coal cutter at work on a face with hydraulic face supports The official opening of the pit took place on march 1st 1978 by Prince Charles. He was informed that in the construction of the pit there were two square miles of reserves of coal at the pit and the main tunnels to the bottom of the drift were over two miles, with an additional 10,000 yards of smaller tunnels to access the coal. Image 15: Prince Charles visits the pit Image 16: Commemorative plaque when Prince Charles visited the pit Image 17: Intake Drift Entrance THE PIT IN ITS HEYDAY During the 15 years when the pit was in public control 600 tons of coal were leaving the pit every hour on 7 miles of conveyors. Between 1978 and 1993 a total of 21 long wall retreat faces were mined, each 200 metres long.

In 1983 12 million of investment was made at the mine to access new seams beyond the Gardners Fault. In 1984/85 a further 3.9 Million was made to sink a further drift and an air shaft to improve ventilation at the mine. By 1989 the colliery was losing 5 million a year due to geological problems, even though the manpower had been reduced through redundancies. In January 1993 coal production ended under British Coal ownership and Betws colliery was placed on a care-and-maintenance basis until 1994 when the management buyout took place. THE MANAGEMENT BUYOUT The management buyout meant that the directors had to secure a 3 million lease. Around 90 men would be employed at the pit producing 100,000 to 150,000 tons of coal each year for 10 years. The system of working changed from long wall to pillar and stall and involved three men clearing the coal by shovel, spread over three shifts. The cycle was: boring, firing, clearing the coal, and erecting steel bars. Output was 12 tons from each face per shift. Around 2,000 detonations per week were used. Between the buyout and the year 2000 a total of 380 coal stalls were worked and, in distance, 35 miles of roadway. In the year 2000 the mine experienced further geological problems and the manpower was reduced to 50 men while development work took place to access the Wigan seam. Between the year 2000 and 2003 the mine received 4.9 million of investment from the Department of Trade and Industry but, despite this, costs were rising, in particular Employment Insurance, which rose from 125,000 to per annum to 450,000. In July 2003 the mine ceased production. Image 18: Men handing in their lamps on the last shift, July 2003 Image 19: Last day at the mine, July 2003

Work commenced to seal the drifts and the site is now being reclaimed with a housing estate built on the site. TO CONCLUDE According to the Department of Trade and Industry there is an estimated further 2 million tons of anthracite coal still available at the pit not mined. Yet its coal could be used in the four corners of the world because of its properties.