Water Well Decommissioning Guidelines

Similar documents
SECTION MONITORING WELL ABANDONMENT

NGWA s Water Well Construction Standard: ANSI/NGWA 01-14

PipeLife Jet Stream, Inc. Post Office Box 190 Siloam Springs, AR O F

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

Design and Operation of Landfills

Flowing Artesian Wells

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

LEYDEN BOARD OF HEALTH REGULATIONS FOR PRIVATE WELLS ADOPTED 7/9/2013. Table of Contents

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE

COMBINED WELLS. 1 Central combined well. 1.1 Implementation

UNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems

SITE INVESTIGATION. Foundation Engineering

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

7. Completing the Well s Structure

Diaphragm wall Construction

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide

INVESTIGATION RESULTS

SECTION GRAVEL PACKED WATER WELL

Design Guideline for Gravity Systems in Soil Type 1. January 2009

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

File No Supplemental November Geotechnical and Environmental Consulting Engineers

Cross Borehole Electrical Resistivity Tomography (ERT) Measurements

Sealing Leaking Ponds

Wastewater Capital Projects Management Standard Construction Specification

PRODUCT DATA SHEET SikaProof Bentonite

C. Foundation stabilization for pipe and utility structures.

(1) All sanitary landfill facilities, at a minimum, shall include the following:

is a possibility of the existence of permafrost as a result

CONSTRUCTION RULES TABLE OF CONTENTS

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Learning Outcomes. Background Definitions. Lesson 2 & 3. Definitions, Background, Classification, Applications and Costs

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

SECTION AGGREGATES

P Temporary piezometer. MW Piezometer to remain in place. P Temporary piezometer

SECTION CAST-IN-PLACE CONCRETE

SPECIFICATION : BORING AND JACKING

B BASF MasterFlow MasterFlow MasterFlow MasterFlow C CGM Grout...8

SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS

PROPER CARE OF UNUSED WELLS

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

By CTS Cement Manufacturing Corp.

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

Excavation for Natural Gas Mains and Services

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

Time-Dependent Strength Behavior of Soil-Bentonite Slurry Wall Backfill

Table of Contents. Section 10,010 - Demolition of Building Structures Section Includes Description of Work 1. 1.

Foundation/Site Work Code Requirements

REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION

SECTION () SOIL-BENTONITE SLURRY TRENCH CUTOFF WALL

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

(this cover page left intentionally blank)

Awesome Aquifers A DEMONSTRATION. THE GROUNDWATER FOUNDATION

Integral Waterproofing

Construction. SikaTop 111 Plus. Application Instructions. Sika Corporation

7. The diagram below represents cross sections of equal-size beakers A, B, and C filled with beads.

Ground Improvement. Martin G. Taube, P.E., P.G. February 4, 2003

National Groundwater and Contaminated Land Centre. Decommissioning Redundant Boreholes and Wells

The following sections provide the approved standard infiltration testing specifications.

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

EXPERIENCE WITH BACKFILLING UNDERGROUND VOIDS AND SHAFTS DURING MINE CLOSURE

Causes of Bacteria in Water Samples 1

Borehole Data Package for Calendar Year RCRA Wells at Single-Shell Tank Waste Management Area TX-TY

Best Management Standards / Specifications. For Concrete Slab Raising. Prepared in conjunction with the Concrete Repair Association

STRUCTURAL MASONRY SPECIAL INSPECTOR. Study Guide

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

STANDARD SPECIFICATIONS SECTION JACKED CASING

Civil Engineering Practice

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

RECYCLED ASPHALT PAVEMENT AND ASPHALT MILLINGS (RAP) REUSE GUIDANCE MARCH 2013 (VERSION 1.0)

SECTION XXXXX CHEMICAL GROUTING

BAYFILTER SPECIFICATIONS

METHOD STATEMENT for INSTALLATION OF MICROPILE

Study on Permeation Grouting Using Cement Grout In Sandy Soil

Closure Plan Ash Disposal Area PGE Boardman Power Plant

9. SOIL PERMEABILITY. 9.0 Why is it important to determine soil permeability?

Potential effects evaluation of dewatering an underground mine on surface water and groundwater located in a rural area

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR DRILLED SHAFT FOUNDATIONS

A. Product Data: Submit manufacturer s product data, with complete general and specific installation instructions, recommendations, and limitations.

Technical Bulletin No. MK3176. PREPARED: July, 2010

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

CW 3615 RIPRAP TABLE OF CONTENTS

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

RETAINING WALL LEVEL BACKFILL

SPECIFICATION FOR ENGINEERED FILLS

13.Well Records, Documentation, Reporting & Tagging

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES

SepticDesign.ca Gunnell Engineering Ltd.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 836 SEEDING AND EROSION CONTROL WITH TURF REINFORCING MAT January 18, 2013

SECTION UTILITY MANHOLES AND STRUCTURES

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

INSTALLATION INSTRUCTIONS

Schnabel Foundation Company

Underwater Concrete in Drilled Shafts: the Key Issues and Case Histories

Transcription:

Water Well Decommissioning Guidelines Approval Date: June 1, 2007 Effective Date: September 10, 2007 Approved By: Gerard MacLellan Version Control: This is a new guideline

I. Introduction The Water Well Decommissioning Guidelines provide instructions for completing water well decommissioning that is protective of groundwater and conducted in a manner acceptable to Nova Scotia Environment and Labour (NSEL). Water wells that NSEL specifically requires to be decommissioned, or other water wells that are not used or maintained for present or future use, must be immediately decommissioned following these Guidelines, according to the Well Construction Regulations. The Water Well Decommissioning Guidelines are not intended to apply to environmental wells installed for groundwater contaminant monitoring or remediation purposes, for which other more applicable decommissioning methods may be required. The objectives of water well decommissioning are to prevent surface water infiltration into an aquifer via the well, prevent the vertical movement of water within a well and remove physical hazards. II. Definitions In these guidelines, the following definitions apply: bentonite clay decommission drilled well dug well grout a type of processed natural clay material used to seal wells. When hydrated with water, bentonite has low permeability, is non-shrinking and is highly viscous. Bentonite is available in powder (for slurries), granular, chip and pelletized form. an extremely fine grained, cohesive soil material that meets the classification for clays as determined under ASTM Standard ASTM D2487, Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System) and has a relatively low permeability capable of meeting a laboratory-tested value for hydraulic conductivity of no greater than 10-6 cm/s. means to permanently fill in and seal a well to eliminate the well as a source of water, or as a potential physical hazard and to prevent movement of water within the well. a well that is constructed by drilling a hole in the aquifer using a drill, such as a rotary drill, cable tool or jet drill; a well that is constructed by digging a hole into the aquifer either manually or mechanically; a stable and impervious bonding material that is capable of preventing the vertical movement of water: along the outside of a casing; between well casings and well liners; and in decommissioned wells. Typical grout materials include bentonite and neat cement. In some cases, such as for salt water or contaminated well applications, grout may need to be specifically designed to be non-shrinking and nonreactive. Nova Scotia Environment and Labour Page 1 of 5

high solids a type of grout consisting of a mixture of powdered or granular, bentonite grout bentonite clays and water, that contains at least 20 percent bentonite solids by weight and when set exhibits a flexible, low permeability grout seal. neat cement NSEL pressure grout method well cement slurry containing Portland cement and water. When cured, neat cement forms a hard, rock-like impermeable barrier. Nova Scotia Environment and Labour. method of grout placement that pumps liquid grout under pressure through a hollow tremie pipe, or hose, placed to the bottom of a well. The tremie pipe is typically gradually withdrawn as grouting proceeds to fill the well. Water is displaced as the grout fills the hole from the bottom up to the surface. an artificial opening in the ground made for the purpose of obtaining groundwater supply and includes the well casing and any attached parts, but does not include constructed ponds or dugouts. III. Typical Decommissioning Methods Drilled well decommissioning must be conducted only by well drillers holding a valid certificate of qualification (certified well driller), dug well decommissioning only by well diggers holding a valid certificate of qualification (certified well digger), or either type of well may be decommissioned by an individual conducting work on lands that they own or lease. Certification requirements are contained in the Well Construction Regulations. These guidelines must be followed for all well decommissioning. The following are typical decommissioning methods required by NSEL for drilled wells and dug wells. If these methods are followed no prior application or notice to NSEL is required, as noted in the Well Construction Regulations. However, decommissioning of water wells under conditions other than the typical ones described does require prior submission to, review of, and acceptance by NSEL. A. Drilled Wells 1) Remove all pumping equipment including pumps and other obstructions from the well. 2) Measure and record the static water level depth, total depth of the well, depth of well casing and diameter of well casing. 3) Calculate and record the theoretical volume of grout materials needed to fill the well. 4) Remove entire casing if feasible, otherwise where the bedrock-soil interface allows cut casing at least 0.6 m below grade surface, or cut casing at the bedrock surface. [Note: Where removal of casing may result in geologic formation collapse into the borehole, this should be accounted for in the decommissioning design.] Nova Scotia Environment and Labour Page 2 of 5

5) Well grout materials for typical decommissioning must be installed by either: a) pressure grout method - Place an appropriate mix of neat cement, sandcement concrete mix (no gravel), high solids bentonite grout or other nonshrinking liquid grout from the bottom of the well to the top of casing using a tremie pipe or hose. Volumes of liquid grout placed in a well should closely match the estimated amount needed to fill the well. Where possible, place at least 0.3 m additional grout above the top of the casing, followed by a minimum of 0.3 m compacted natural fill to be level to grade surface; or b) hand placement of dry granular bentonite chips - For wells less than 61 m (200 ft) deep, medium or coarse grade, dry screened bentonite chips may be installed by hand pouring. For wells greater than 61 m (200 ft) deep it is recommended that only coarse grade (i.e. 3/4 inch or greater) dry screened bentonite chips be used for hand placement. All dry granular bentonite chips used must be adequately screened over a wire mesh screen during placement to prevent fine particles that are typically present in bags from entering the well and causing premature swelling and bridging. Bentonite chips must be poured slowly into a well no faster than manufacturer recommended rates. Bentonite grout levels must be checked periodically using a weighted line to ensure bridging is not occurring in the well. Volumes of bentonite chips placed in a well should closely match the estimated amount needed for sealing. Fill to the top of the casing. Where possible, place at least 0.3 m additional grout above the top of the casing, followed by a minimum of 0.3 m compacted natural fill to be level to grade surface. 6) Complete at surface by ensuring mounding, paving or grading to eliminate surface water ponding, as well as using topsoils to promote the establishment of vegetation, if appropriate. The potential for grout settlement should be considered and accounted for. 7) Complete a Water Well Decommissioning Record with the information required under the Well Construction Regulations and submit to NSEL. 8) Other drilled well grouting methods may be possible. However, site specific decommissioning methods that do not follow the typical methods described in Section III A for drilled wells, must follow Section III C. B. Dug Wells 1) Remove all pumping equipment including pumps and other obstructions from the well. Nova Scotia Environment and Labour Page 3 of 5

2) Measure and record the static water level depth, total depth of the well, depth of well casing and diameter of well casing. 3) Calculate and record the theoretical volume of grout and other materials needed to fill the well. 4) Pump down water level in the well as much as is practicable. 5) Remove cement crocks or other well casing materials from surface to at least 1.5 m below grade surface, however it is not necessary to remove casing materials below the static water level depth. [Note: Where removal of casing may result in geologic formation collapse into the borehole, this should be accounted for in the decommissioning design.] 6) If the base of the dug well is in contact with bedrock, install a layer of commercial bentonite grout from the base of the well to at least 0.3 m above the bedrock/overburden interface, prior to following backfilling requirements of 7). 7) Install backfill of clean natural soils (free of large roots, vegetation or other organic matter, or boulders) in compacted layers no greater than 3 m thick, from the base of well to 1 m below grade surface. 8) The upper 1 m of backfill material must include either: a) 1 m of uniform, clean, compacted clay free of boulders; or b) a layer of at least 0.3 m of dry granular bentonite. 9) Complete at surface by ensuring mounding, paving or grading to eliminate surface water ponding, as well as using topsoils to promote the establishment of vegetation, if appropriate. The potential for grout settlement should be considered and accounted for. 10) Complete a Water Well Decommissioning Record according to the Well Construction Regulations and submit to NSEL 11) Other dug well backfilling methods may be possible. However, site specific decommissioning methods that do not follow the typical methods described in Section III B for dug wells must follow Section III C. C. Site Specific Decommissioning Methods for Special Conditions Some water wells have special conditions for which typical decommissioning methods in some cases may not be recommended by certified well drillers/diggers. Such wells could include, among others, those groundwater supply wells that: a) have flowing artesian conditions; b) have salt water impacts; c) are high yield production wells; Nova Scotia Environment and Labour Page 4 of 5

d) are extremely deep; e) are contaminated by natural or man-made conditions; f) are constructed by neither drilling nor digging; or g) have other unusual conditions. These water wells may require alternative site specific decommissioning methods or specialized grout materials. For such wells, if decommissioning methods are to deviate from Section III A or Section III B of these Guidelines, alternative methods must be proposed in a written decommissioning plan to NSEL by a certified well driller/digger or a registered, professional geoscientist (P.Geo.) or engineer (P.Eng.) qualified in hydrogeology. The decommissioning plan must be acceptable to NSEL. Decommissioning must not proceed until written acceptance of the plan from NSEL is received by the proponent. Environmental wells installed for groundwater contaminant monitoring or remediation purposes should follow other NSEL decommissioning guidance. IV. Required Documentation Each certificate holder or individual who is responsible for completing the decommissioning of a water well must: (a) (b) deliver a copy of the record to the owner after the water well decommissioning is completed; deliver the record to NSEL after the water well decommissioning is completed (I) (ii) immediately upon request by NSEL; or by January 31 of the calendar year following the water well decommissioning. (c) keep a copy of the record for at least 2 years after the date the water well decommissioning is completed. June 1, 2007 Dated Original Signed By: Gerard MacLellan Executive Director Environmental Monitoring and Compliance Nova Scotia Environment and Labour Nova Scotia Environment and Labour Page 5 of 5