Spring Forecast Based Operations, Folsom Dam, California

Similar documents
Hydrology for Folsom Dam Water Control Manual Update

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

Hydrology for Folsom Dam Water Control Manual Update

Missouri River Basin Water Management

Missouri River Basin Water Management

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

APPENDIX A NOTICE OF PREPARATION/ NOTICE OF INTENT. Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09

Cedar River Watershed Habitat Conservation Plan

The Impacts of Climate Change on Portland s Water Supply

Mark Twain Lake Water Control Manual Update

Lower Yuba River Redd Dewatering and Fry Stranding Study 2008 Annual Report

CAP Excess Water Task Force

Myths and Facts about a Drought Year in the San Joaquin Valley

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT

TROA & Improved S2S Forecasting An Opportunity Jeanine Jones, CDWR

LTMS Environmental Work Windows INFORMAL CONSULTATION PREPARATION PACKET. February 2004 Draft Version 1.4

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

U.S. Army Corps of Engineers Reservoir Operations Maria Placht, Institute for Water Resources, USACE 49

Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference. Mark Cook, PE Manager, Hoover Dam

South Platte River Importance of Return Flows and Replacing Depletions to Down-Stream Water Users

Settlement Agreement Report

Great Lakes Update. Volume 189: 2013 January through June Summary

Potential Use of Real-time Information for Flood Operation Rules for Folsom Reservoir. Katherine M. Maher B.S. (University of California, Davis) 2008

Regional Habitat Indicators Project. Workshop #1. Nov 9, 2016

Appendix D - Evaluation of Interim Solutions

Section 2. Mono Basin Operations

Considerations for Modeling a Water Bank at the Aspinall Unit with Current Environmental Flows

Los Angeles 3 rd Regional

SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA

CALFED Ecosystem Restoration Program (ERP)

M.L. Kavvas, Z. Q. Chen, M. Anderson, L. Liang, N. Ohara Hydrologic Research Laboratory, Civil and Environmental Engineering, UC Davis

Hood River Water Conservation Strategy: achieving long-term water resource reliability for agriculture & local fish populations

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

IRRIGATION CONTROLLERS

United Water Conservation District November 2016 Hydrologic Conditions Report 2017 Water Year. December 6, 2016

For Bandon Utilities Commission

Folsom TCD Value Planning Study July Tom Gohring September 9, 2014

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

Overview of Recent Developments in California Environmental Laws

Uncertainty in Hydrologic Modelling for PMF Estimation

Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION

NOTICE OF PREPARATION

System Plan Components Inventory

2017 WATER MANAGEMENT PLAN

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow

Overview of the Instream Flow/Fish Habitat Element of the WRIA 1 Watershed Management Project. By Jeremy Freimund, P.H.

Recent RiverWare and RiverSMART applications on the Colorado River Basin RiverWare User Group Meeting August 24, 2016

Utilization of the SWAT Model and Remote Sensing to Demonstrate the Effects of Shrub Encroachment on a Small Watershed

Interest in a Community Model for Operational Delta Forecasting

ANNUAL PROGRESS REPORT FOR 2014 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN ROGUE WATERSHED DISTRICT OREGON DEPARTMENT OF FISH AND WILDLIFE

NBI strategic water resources analysis Phase I findings

Village of Mamaroneck Flood Mitigation Status Report

Competing objectives for the Colorado River Can we have it all?

Bridge River Power Development Water Use Plan. Revised for Acceptance for the Comptroller of Water Rights

Colorado River Basin Water Supply and Demand Study. Navigating the Future of the Colorado River Natural Resources Law Center June 9, 2011

2

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development

Bird Track Springs Basis of Design Report APPENDIX HYDROLOGIC ANALYSIS FOR BIRD TRACK RESTORATION PROJECT

CHAPTER 7 POWER PRODUCTION AND ENERGY CONSUMPTION

Information Request 11

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

Administration Division Public Works Department Anchorage: Performance. Value. Results.

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

Modeling Your Water Balance

Science Supporting Policy: The Case For Flow Quantity

Lecture 9A: Drainage Basins

Central Valley Project (CVP) Operations: In Brief

APPENDIX A. Project Scoping

CHAPTER 7. San Dieguito River Flooding Adaptation

Hood River Basin Study

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas

TURBINE VENTING FOR DISSOLVED OXYGEN IMPROVEMENTS AT BULL SHOALS, NORFORK, AND TABLE ROCK DAMS

UNCLASSIFIED AD NUMBER LIMITATION CHANGES

ARCHITECTURAL & ENGINEERING CONTRACTS TASK ORDER

TRACKING THE GAS TEMPERATURE EFFECT IN A DISTRIBUTION SYSTEM

Stanley J. Woodcock, Michael Thiemann, and Larry E. Brazil Riverside Technology, inc., Fort Collins, Colorado

Chehalis Basin Strategy Causes of Extreme Flooding. October 11, 2016 Policy Workshop

The State of the Colorado River

Climate Change & Urbanization Have Changed River Flows in Ontario

Alternative Futures for the City of La Paz, Mexico

Appendix B. Storm Drain System Data

Improved Water Supply Forecasts for the Kootenay Basin

SUPERSEDED. BDCP Conservation Measure 1: Water Facilities and Operation. BDCP Bay Delta Conservation Plan

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

CEE3430 Engineering Hydrology

Notice No Closing Date: May 12, 2017

United States Department of the Interior

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation

Here is an overview of the material I will present over the next 20 minutes or so. We ll start with statistics, move on to physics, and look at

I/I Analysis & Water Balance Modelling. Presented by Paul Edwards

Lower Ohio and Middle Mississippi Rivers Flood Management

Issues Options and Strategies for Flood Management : Shifts in approaches for flood Management in Bangladesh

Are Juvenile Chinook Salmon Entrained at Unscreened Diversions in Direct Proportion to the Volume of Water Diverted?

The Hydrological and Ecological Impacts of Climate Change in a Large Lake Case Study of Lake Saimaa, Finnish Lake District

Transcription:

Spring Forecast Based Operations, Folsom Dam, California Paul E. Pugner, P.E. Chief, Water Management Section Sacramento District U.S. Army 1325 J Street, Room 1126 Sacramento, CA 95814-2922 Tel: (916) 557-711 Fax: (916) 557-7863 E-mail: Paul.E.Pugner@usace.army.mil Web: www.spk-wc.usace.army.mil BIOGRAPHICAL SKETCH Graduate of Humboldt State University, 1975, B.S. Environmental Engineering and Utah State University, 1976, M.S. Civil Engineering, Specializing in Water Resources. Joined the Sacramento District, USACE in 1976 in the Reservoir Control Section. Performed and managed hydrology and reservoir operations portions of flood damage reduction and environmental restoration studies since joining the Sacramento District. Has been the Chief of Water Management for the Sacramento & San Francisco Districts since 1994. Enjoys short travel experiences, restoring and judging Corvettes (National Corvette Restoration Society), and belt buckle & bolo collecting (Navajo & Zuni).

California Weather Symposium - 23 Spring Forecast Based Operations, Folsom Dam, California USACE Sacramento District Water Management Section Marchia V. Bond Hydraulic Engineer Brett J. Whitin Hydraulic Engineer Paul E. Pugner, P.E. Chief, Water Management Section In August 22, the U.S. Bureau of Reclamation (BOR) and the Sacramento Area Flood Control Agency (SAFCA) conducted the Lower American River Flow Fluctuation Workshop to identify and evaluate solutions to the adverse effects of flow fluctuations in the lower American River onanadromous fish. During the workshop, the Corps Sacramento District proposed the modification of the current flood control diagram, during mid- to late-spring, to define a flexible zone of operation around the allowable flood and water conservation storage lines. Definition of this flexible zone would be achieved by utilizing weather forecasts provided by the National Weather Service (NWS). By anticipating runoff conditions 24-48 hours in advance, reductions in flow fluctuations and increases in spring runoff storage could be achieved resulting in a balance between fishery preservation and flood risk.

Outline ❶ Background ❷ Overview of Existing Flood Control Diagram ❸ Purpose & Objectives of Spring Plan ❹ Details of Plan ❺ Flood Routings ❻ Implementation of Plan This presentation provides a short background on how this proposed plan came to fruition along with an overview of existing flood operation criteria, and objectives of the proposed plan. Discussion details concepts behind the plan s operational criteria and touches upon possible future refinements to these criteria.

Background Concept originated during the 22 Lower American River Flow Fluctuation Workshop Participants from numerous agencies attended this workshop In August 22, the U.S. Bureau of Reclamation (BOR) and the Sacramento Area Flood Control Agency (SAFCA) conducted the Lower American River Flow Fluctuation Workshop to identify and evaluate solutions to the adverse effects of flow fluctuations in the lower American River on anadromous fish. Participants from various agencies attended including: the BOR, SAFCA, California Department of Water Resources, California Department of Fish and Game, National Marine Fisheries Service, Fish and Wildlife Service, Save the American River Association, Sacramento Municipal Utility District, Western Area Power Administration, Water Forum, State Water Resources Control Board, and the Army. During the workshop, the Corps Sacramento District proposed the modification of the current flood control diagram, during mid- to late-spring, to define a flexible zone of operation around the allowable flood and water conservation storage lines. Releases from Folsom Dam would be contingent upon weather conditions, forecasted inflows, and operational plans to guarantee that the reservoir would be out of encroachment as quickly as possible in light of any significant runoff event. Following the workshop, several agencies, including the BOR, requested the Corps to proceed with the development and implementation of the flexible band of operation.

Existing USACE Flood Control Diagram 5 1 15 2 25 5 1 25 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 466. 977 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 8 456.8 927 877 25 1 447.2 436.9 425.8 413.6 RESERVOIR STORAGE, in 1 acre-feet 827 777 727 677 627 577 527 477 5 8 1 12 14 16 Rain flood parameter values 2 3 4 5 FLOOD CONTROL RESERVATION, in acre-feet 427 399.6 377 6 327 383. 277 7 The amount of required flood space varies seasonally from October 1 st through the end of May. It also varies depending on how wet the basin is during the months of February, March, and April. The basin wetness is defined by a rain flood parameter that is computed daily from the weighted accumulation of seasonal basin mean precipitation by adding the current day s precipitation in inches to 97% of the parameter computed the preceding day. The required flood space is then determined by taking the computed rain flood parameter and interpolating between the defined lines on the diagram.

Existing SAFCA Flood Control Diagram 466. 977 5 1 15 2 25 5 1 25 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 927 456.8 877 25 1 447.2 436.9 425.8 413.6 RESERVOIR STORAGE, in 1 acre-feet 827 777 727 677 627 577 527 477 5 Credit Space Values 2 175 15 13 2 3 4 5 FLOOD CONTROL RESERVATION, in acre-feet 427 1 399.6 377 6 327 383. 277 7 In December of 1993 SAFCA established an interim flood control diagram in order to provide additional flood protection. The BOR currently operates to this diagram. The amount of flood space required by the SAFCA diagram varies seasonally from October 1 st through the end of May. It also varies depending on available space in upstream reservoirs (French Meadows, Hell Hole, and Union Valley) from October first through mid April. The creditable flood transfer space is computed by combining the available space for each of the three upstream reservoirs. The amount of required flood space is then determined by taking the total creditable transfer space and interpolating between the values specified on the diagram. A maximum credit space for French Meadows, Hell Hole, and Union Valley are 45,, 8,, and 75, acre-feet respectively. As the various phases of the Folsom Dam Modifications Project become implemented, interim Water Control Plans will be developed. This diagram will replace the existing USACE diagram during the development of the first interim Water Control Plan.

Existing Flood Release Requirements Required flood release maximum inflow up to 115, cfs unless greater releases are required by the Emergency Spillway Release Diagram Releases will not be increased more than 15, cfs or decreased more than 1, cfs during any 2 hour period. The current USACE Water Control Plan specifies that releases shall be equal to the maximum inflow up to 115, cfs, but not less than 2, cfs when inflows are increasing. Releases shall also not be increased by more than 15, cfs or decreased more than 1, cfs during any two hour period. In addition, there is a release schedule recommended by NMFS in the September 2, 22 Biological Opinion that pertains to the rate at which releases are decreased. This release schedule requires sustained higher than normal releases for fish migration and to limit fish stranding, even though the high releases were initially made to evacuate the flood pool. The sustained releases can cause the reservoir to drop well below the bottom of the flood pool or top of conservation pool, even farther than under minimum flow requirement conditions.

Reasons for Change Depending on storm timing and magnitude during the late spring, strict adherence to the existing Water Control Plan could result in: 1) Significant flow fluctuations resulting in devastating effects on fall-run Chinook salmon and Central Valley steelhead 2) Folsom Reservoir not filling after the flood season 3) Spilling of cold water at the bottom of the reservoir, whichis needed for maintaining adequate temperatures for fall-run Chinook salmon and Central Valley steelhead Central Valley steelhead are listed as a threatened species and fall-run Chinook salmon are a candidate species for listing, pursuant to the federal Endangered Species Act. The purpose of the plan is to provide additional protection to salmon and steelhead by minimizing flow fluctuations and conserving storage of water, especially cold water, in Folsom Reservoir while maintaining the level of flood protection downstream.

Objectives of Plan Reduce magnitude and frequency of flow fluctuations in late spring that can result in Chinook salmon and steelhead losses due to isolation and beach stranding Achieve a balance between fishery preservation and flood risk by applying more flexible flood and conservation operations A flexible zone of flood control operations between mid March and the end of May will assist in minimizing downstream flow fluctuations and maximize conservation of spring runoff storage. By minimizing flow fluctuations and conserving storage, additional protection to salmon and steelhead will be provided.

Objectives of Plan Increase mid-to-late spring storage levels to meet summer and early fall water supply allocations Increase volume of cold water pool by enabling releases through spillway gates when possible Although the Folsom Dam river outlets are not of sufficient size to evacuate a considerable volume of water in advance of a storm, during the spring, the reservoir level would be sufficient to utilize the spillway gates for moderate flood control releases. When making these spring flood releases, the spillway gates would be utilized rather than using the river outlets. This would be done to conserve cold water for later downstream releases, when colder water is needed for salmon and steelhead

Details of Plan Apply a flexible zone of flood operations starting in mid March and ending on the first of June Band extends 3, acre-feet above and 1, acre feet below the existing top of conservation Allow storage to encroach above the existing top of conservation for an extended period of time Releases within the band are triggered by forecasted 48-hour volumes into Folsom A flexible flood operations zone would be applied to the flood control diagram starting in mid March and ending on June 1 st. The zone has an upper and lower limit. The upper limit, or band, extends 3, acre-feet above the TCS line, and the lower band extends 1, acre feet below. The main objective of this band is to strike a balance between fishery preservationand flood risk. The potential for reduced flow fluctuation and storage conservation will be made possible by allowing storage to encroach between the TCS line and the upper band for an extended period of time. Evacuation of this additional storage will be contingent upon forecasted inflow volumes over a 24-48 hour period and the percent at which the storage is currently encroached into the flood space. During extreme events flood risk will be reduced by allowing the reservoir storage to dip below the TCS line, but not below the lower band. However, even in such situations, the magnitude of flow fluctuations and the amount of storage evacuated due to the flood releases will be less than what would have occurred under the existing rules.

Modified USACE Flood Control Diagram 5 1 15 2 25 5 1 25 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 466. 977 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 927 25 456.8 877 1 447.2 436.9 425.8 413.6 RESERVOIR STORAGE, in 1 acre-feet 827 777 727 677 627 577 527 477 5 8 1 12 14 16 End of May 2 3 4 5 FLOOD CONTROL RESERVATION, in acre-feet 427 Mid March 399.6 377 6 327 383. 277 7 The band would encroach 3, acre-feet above and 1, acre-feet below the existing top of conservation storage (TCS) line. The TCS line varies seasonally from the October 1 st through the end of May. It also varies depending on antecedent moisture conditions for the months of February, March, and April.

Modified SAFCA Flood Control Diagram 466. 977 5 1 15 2 25 5 1 25 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 5 1 15 2 25 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 927 456.8 877 25 1 447.2 436.9 425.8 413.6 RESERVOIR STORAGE, in 1 acre-feet 827 777 727 677 627 577 527 477 5 2 175 15 13 End of May 2 3 4 5 FLOOD CONTROL RESERVATION, in acre-feet 427 1 399.6 377 6 327 383. 277 Mid March 7 The band would encroach 3, acre-feet above and 1, acre-feet below the existing top of conservation storage (TCS) line. The band will increase at the same linear rate as the TCS line during late spring when the credit space agreement is not in effect. However, during early spring, the elevation of the upper and lower bands will vary not only by time, but also by available upstream storage. However, the thickness of the band will always be a constant 4, acre-feet. By allowing storage to encroach 3, acre-feet above the TCS line up to June 1 st, the risk of filling the reservoir too soon is increased. In such a case, larger flood releases would have to be made in order to prevent the reservoir from spilling which could result in adverse environmental impacts that would not have occurred under the existing operating rules. One possible solution would be to gradually decrease the thickness of the band so that the band would disappear by the end of May. The rate at which the thickness of the band decreases could be tied to hydrologic conditions in the basin. For example, the rate of decrease would be greater during a wet year than a dry year. The interim WCPs that will be developed during the implementation of the Folsom Dam Modifications Project will provide the opportunity to make such refinements.

Weather Forecasting National Weather Service issues 5-day forecasts, updated normally every 6 hours. Advance release, 24-48 hours in advance of arrival of spring storms The California Nevada River Forecast Center issues 5 day inflow forecasts into Folsom at 6 hour intervals. This information will be utilized when scheduling advanced releases during the spring. Flood releases will be initiated 24-48 hours in advance of the storm. By doing so, the magnitude of flow fluctuations will be reduced. In addition, the volume of cold water will be conserved because the spillway gates will be used to make the advanced releases.

Forecast Reliability Spring 2-day Volumes for WY 1998-23 12, 11, 1, forecasted forecasted inflow volumes 2-day inflow (ac-ft) volum 9, 8, 7, 6, 5, 4, 3, 2, 1, 1, 2, 3, 4, 5, 6, 7, 8, 9, 1, 11, 12, historical 2-day inflow inflow volumes (ac-ft) 1998 1999 2 21 22 23 Note spring time period is from March 15 May 3 The California Nevada River Forecast Center issues 5 day inflow forecasts into Folsom at 6 hour intervals. In order to assess the accuracy of these forecasts, a comparison plot between forecasted and recorded two-day inflow volumes was developed. Data was compiled from March 15 th through May 3 th for the past five years. Inflow volume calculations started at 1: PST each day and extended out 48 hours into the future. Days were not included if the forecast was missing or there was more than five consecutive hours of missing historical data. Influence of upstream reservoir regulation was not incorporated into these computations. The magnitude of forecasted two-day volumes during this time period ranged from 4, to 18, acre-feet. However, the majority of the forecasted volumes are less than 4, acrefeet. Understanding how forecast reliability relates to flow magnitude will continue to grow as additional years of analysis are gathered. In the above plot, values on the blue line indicate a perfect match between what was forecasted and what came into Folsom. Values above the blue line represent forecasts that are larger than what occurred, and values below the line represent forecasts that are less than what occurred. The majority of the data points do not deviate from the line by more than 25 percent. In order to assess the impacts of how under and over estimated forecasts impact operations, hypothetical routings for such cases were performed. Based on these routings, the application of the modified release schedule still indicates benefits when compared to the use of the existing operating criteria.

Modified Release Schedule Percent Encroachment This is an example of what the modified release schedule could look like. The goal of this objective release schedule is to maximize the use of the storage space in the band while minimizing required releases. The scheduled release is based upon the reservoir s current encroachment and what the two-day forecasted inflow volume is. This schedule would be followed until greater releases are specified by the Emergency Spillway Release Diagram. This release schedule would only be used to step up releases. The current National Marine Fisheries Service (NMFS) criteria specified in the September 2 th, 22 Biological Opinion would be applied as releases are decreased. The dotted flow lines indicate an example of a hypothetical event that will be discussed later in the presentation. Reservoir releases will be approximately 3, cfs when forecasted 48-hour inflow volumes are 16, acre-feet, and percent encroachment is between 5 and 1 percent. Under existing operating rules, maximum outflow would be approximately 5, cfs.

Typical Flood Routings Forecast is 1% Accurate Forecast over estimates Flow (thousand cfs) 14 12 1 8 6 4 2 Reservoir Capacity existing storage forecasted inflow new storage existing outflow new outflow 9 8 7 6 5 4 3 2 1 Storage (thousand ac-ft) Flow (thousand cfs) 14 12 1 8 6 4 2 Reservoir Capacity existing storage forecasted inflow new storage existing outflow new outflow 9 8 7 6 5 4 3 2 1 Storage (thousand ac-ft) 1 2 3 4 5 6 7 Time (days) 1 2 3 4 5 6 7 Time (days) The purpose of these hypothetical routings is to provide a comparison between reservoir operations with and without the modified release schedule, and illustrate the operational impacts of over estimating inflow volumes. The plot on the left assumes that the forecast is 1 percent correct, and the plot on the right assumes that the two day volume that actually comes into Folsom is 25 percent less than what is forecasted. Results indicate application of the modified release schedule provides benefits in both flow fluctuation reduction and reservoir storage even if the forecast is over estimated. When the forecast is over estimated, the duration of maximum outflow is shorter, and outflow magnitude is slightly less than what would occur if the forecast was 1 percent accurate

Typical Flood Routings Forecast is 1% Accurate Forecast under estimates Flow (thousand cfs) 14 12 1 8 6 4 2 Reservoir Capacity existing storage forecasted inflow new storage existing outflow new outflow 9 8 7 6 5 4 3 2 1 Storage (thousand ac-ft) Flow (thousand cfs) 14 12 1 8 6 4 2 Reservoir Capacity existing storage forecasted inflow new storage existing outflow new outflow 9 8 7 6 5 4 3 2 1 Storage (thousand ac-ft) 1 2 3 4 5 6 7 Time (days) 1 2 3 4 5 6 7 Time (days) The purpose of these hypothetical routings is to provide a comparison between reservoir operations with and without the modified release schedule, and illustrate the operational impacts of under estimating inflow volumes. The plot on the left assumes that the forecast is 1 percent correct, and the plot on the right assumes that the two day volume that actually comes into Folsom is 25 percent greater than what is forecasted. Results indicate application of the modified release schedule provides benefits in both flow fluctuation reduction and reservoir storage even if the forecast is under estimated. When the forecast is under estimated, the duration of maximum outflow is longer, and outflow magnitude is slightly larger than what would occur if the forecast was 1 percent accurate

Implementation of Plan Will require update to the USACE Water Control Plan 3 to 7 interim Water Control Plans (WCPs) will be developed during the implementation of the Folsom Dam Modifications Project Refinements to the spring time advanced release plan will be included in these interim WCPs. Opportunity for public review of the advanced release strategy through NEPA compliance activities. In order to change the flood operational criteria, Folsom s Water Control Plan (WCP) must be updated. This process requires NEPA compliance along with approval from the Sacramento District s Division Office. As the various phases of the Folsom Dam Modifications Project become implemented, three to seven interim WCPs will be developed. The opportunity to implement refinements to the spring advance release criteria will be provided prior to the issuance of each of these interim WCPs.

For Further Information Point of contact: USACE, Bill Fakes (916) 557-669 Bill Fakes is the Program Manager for several of the Folsom Mods projects. Paul E. Pugner can be reached at (916) 557-711 Marchia Bond can be reached at (916) 557-7127 Brett Whitin can be reached at (916) 557-713