AR5 & AR5-L series. (CHECK-METER Program)

Similar documents
FAST POWER FACTOR REGULATOR. Computer-14df - xx - 144a INSTRUCTION MANUAL ( M / 00A ) (c) CIRCUTOR S.A.

3 PHASE ENERGY ELECTRONIC METERS MKB-363-M INSTRUCTION MANUAL ( M / 00 B

EGT-AF08 USER GUIDE WHEEL WEIGHING SYSTEMS WITH VARIOUS PLATFORMS

Daker DK kva. Parallel installation quick start. Part. LE08927AA-09/15-01 GF

DeskDECT Feature Phone

WS 10 Weighing indicator USER MANUAL

Fixed Demand (Block Demand) The utility company sends a signal to synchronize the start of the Maximum Demand period.

Winzer Corporation 1 Revision: 4.0

SIWAREX FTC-B Weighing Module for Belt Scales Set-up of SIWAREX FTC with SIWATOOL FTC_B

Imperial Series. Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP

INDEX. 1 Introduction. 2 Software installation. 3 Open the program. 4 General parameters. 5 Tuning

CONTENTS. 3-1 Unpacking and Checking Installing Components Leveling the Scale... 1

Please read these instructions before use and retain for future reference

Operating Instructions

TotalTime Plus+ Startup and User Guide. USB Memory Stick Version

Quick Guide. CSN950 MultiHead Dimensioner _v2d_MAN_QG_CSN950MH_EN

Remote AMD Operator Manual

DWP-5500FP (4 x4 ) DWP-11KRFP (5 X5 ) Weighing Indicator. User Manual. Content

Instruction number PTI-16-03/09/06/A

Technical Manual. Section 521 Built-In ACD Supervisor Guide

INSTRUCTION MANUAL FOR USE AND MAINTENANCE

USER MANUAL BR LED Headlight Rev /05/2016

HotSwap MBP Maintenance Bypass

Year-End Close Checklists

64C Amplification Block. Instruction Manual

Technical System Catalogue Modular PDU (PSM)

Instruction Manual Dräger MSI EM200-s

QUICK Guide. System start-up and shutdown 3. Operating panels. State colors. General process description. Device operating modes

WP200e Wallbox to CD Changer Adapter

Sby SR Instruments, Inc.

RESTORE 1030TM Testing Protocol

Content. 5. Appendix Technical Specifications... 13

MERIGAUGE MODEL 3900 OPERATING INSTRUCTIONS

electroplating DC power supply type SIFCO PROCESS POWER PACK 1028

User s Guide. Localization system StarGazer TM for Intelligent Robots.

Best Selection for Your Business. Electronic Pricing Scale. User s Manual. (Model: TP-31)

4Ch Real time / Duplex LCD Combo DVR

Contents. 1 Welcome. 2 Getting Started. 3 Getting To Know the Cash Register

Safety Precautions. 3. Cabinet Assembly 4. Operating buttons / functions.5-6. Machine Operation

XSTi Standby UPS. 400VA, 600VA, 800VA Models. User & Installation Manual

Stopwatch Display Timer Owner s Manual

MEDIZINTECHNIK FÜR TIERÄRZTE

Manual Rotary Heat Sealers. Type: F108TX. List of content : Introduction 2. General description 3. Application 4. Safety precautions 5

Using the Commonwealth Bank EFTPOS terminal with QuickPOS

Paper Store. Version

OM-90 SERIES Portable Temperature and Humidity Data Loggers. Shop online at omega.com

star PROGRAMMER INSTRUCTIONS MANUAL

Belgacom IDS 310. Reception Terminal Manual. Forum IS16/48/80/160

NOTES TABLE OF CONTENTS

HCP-7000 Opreator s Manual 1. Operator s Manual.

PISO-CAN200-D/T PISO-CAN400-D/T DASYLab CAN Driver User s Manual

X30 System Components

Precision Automatic Vacuum Control (PAVC+)

DJ Switch 10F V2 ORDERCODE 50365

ATOMSCOPE HF200A. Operating Instruction Manual. Ver. 3.1

topshelf2.0 QUICK REFERENCE DEVICE MANUAL

2% & (+ 2% PSI.

Magner /35-3 Series Currency Counter. Operator's Manual

imark Mobile Ordering System

Inscale Measurement Technology Ltd Tel: Fax:

ITEM AND VENDOR RANKING REPORTS

Contents OVERVIEW... 3

Foreword. Sales Associates Managers

Troubleshooting Guide 9702 Series

Operating Instructions METTLER TOLEDO Excellence XS Precision Balances

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

New Zealand Technical Standard Order NZTSO 2001

Wallbox Translator. Connect any vintage wallbox to your jukebox...

PeopleSoft Financials epro Process Guide

Call-Back Configuration for the CR800/CR1000 MultiLogger Application Note #19

7700 TEST KIT OPERATIONS MANUAL

GK INDICATOR. (P.N. 9264, Revision K1, July 2011)

NAB EFTPOS User Guide. for Countertop & Mobile Terminals

Stopwatch Display Timer Owner s Manual

IDS 1632 Installer Manual K Issued September 2009

First Data EFTPOS. User Guide. 8006L2-3CR Integrated PIN Pad

Using UPSMON-PRO Monitoring Software. Opening UPSMON-PRO Monitoring Software

FAST SPOTTER WT-FS-5.0

Instruction Manual. for. gskin U-Value Kit

LC-1000/ LC Loadout. Manual

Camera Eyepiece. User s Manual. KS035200G4-Ver1.0

HR3290 CS Marlin. Wireless 2D Barcode Scanner User Guide

ACTIVANT ACCLAIM LOGISTICS MANAGEMENT. Version 16.0

AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd

Operating instructions. METTLER TOLEDO MultiRange Application software IND690-Batch.

Energia Online. User Guide

User s Manual. Chart Projector GCP-7000

Thank you for purchasing the SC-CONVERSION System 500/600 Conversion Kit. This Kit is available in two different versions:

abc SOFTWARE & OPERATION MANUAL FOR INSPEC SAMPLER VERSION 1.08 (VOLUME 2 OF 2)

USER MANUAL. ExStik CL200A. Waterproof Total Residual Chlorine Tester. Patent Pending. Additional User Manual Translations available at

2012 G25; MIL ON WITH DTC P0101 AND/OR P010B

DIGITAL PORTION SCALE PS-5 OWNER S Manual

Zebra s Repair Order Portal for Partners COURSE CODE: RPE01

Fluke Oscilloscope Calibration Solutions. Helping you measure up to the highest standards

Contents OVERVIEW... 3

Amadeus Hotel Store. User guide 16 March Taking hotel consolidator content to a new level with Transhotel

USER MANUAL. Model TIF 2000 Digital Hybrid Telephone Line Interface

Year End Close Procedures - 1 -

Temperature Controllers: JC Series Digital Indicating Controllers. JC Series. High Performance Controllers...at the lowest prices anywhere!

NorthStar Club Management System. Retail Point of Sale (RPOS) Version General Users Guide RPOS

Transcription:

SUPPLY NETWORK ANALYZER AR5 & AR5-L series ( Code M 80111 ) (CHECK-METER Program) ( Cod. M 80225 ) INSTRUCTION MANUAL ( M98110301-03-05B ) (c) CIRCUTOR S.A.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 2 CONTENTS page 1.- BASIC INSTRUCTIONS... 4 1.1.- Checking the contents of your package... 4 1.2.- Safety conditions... 4 1.3.- Connection instructions... 4 2.- ANALYZER STARTUP... 5 2.1.- Loading a new program... 5 2.2.- Choice of the operation mode program... 6 2.3.- Operation instructions... 6 3.- CONNECTION MODES... 7 4.- DATA VISUALIZATION ON DISPLAY... 9 4.1.- Screen of instantaneous values... 9 4.2.- Screen for energy meter check... 10 4.3.- Warning messages... 11 5.- PROGRAMMING THE AR5/AR5-L CHECK-METER... 11 5.1.- Set-up of Instantaneous Values... 11 5.1.1.- SETUP menu... 13 5.1.2.- MEASURE... 13 5.1.2.1.- WIRING: Circuit type... 14 5.1.2.2.- PT/CT : Transformation ratios... 14 5.1.3.- COMM: Communication parameters... 14 5.1.4.- CLOCK: Internal clock... 15 5.1.5.- PASSWORD: Safety setting... 15 5.1.6.- RECALL: Read configuration... 16 5.2.- DISPLAY menu... 17 5.2.1.- CONTRAST: Screen contrast... 17 5.2.2.- POWER FACTOR... 17 5.3.- FILES Menu... 18 5.3.1.- DIR: Directory... 18 5.3.2.- DELETE: Deleting a file... 18 5.3.3.- FORMAT: Formatting the AR5/AR5-L internal memory... 19 5.4.- Menu OFF: Enable / Disable Password... 19 5.5.- Menu LANGUAGE... 19 5.6.- Setup for energy meter check... 20

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 3 6.- Operation mode... 21 7.- Checking energy meters... 22 7.1.- Checking mechanic energy meters... 22 7.2.- Checking electronic energy meters... 24 7.3.- Checking electronic energy meters using the optical reader.... 26 8.- AR5/AR5-L COMMUNICATIONS... 28 9.- TECHNICAL SPECIFICATIONS... 29 10.- SAFETY WARNINGS... 31 11.- MAINTENANCE... 31 12.- TECHNICAL SERVICE... 31 A. CABLE ARRANGEMENT... 32 B. QUICK GUIDE... 33 C. QUICK GUIDE FOR AR5 - CHECK-METER.... 33 D. EXAMPLE OF TRANSFORMATION RELATIONS... 34

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user with the operation of the CHECK- METER program for the portable analyser model AR5/AR5-L. To get all necessary information about operation instructions and safety warnings of the portable analyzer AR5/AR5-L consult it s instruction manual (code M98151101). The AR5/AR5-L analyzer loaded with the check-meter program permits to check both electronic or mechanic energy meters, either for active and reactive energy totalization. The Check-Meter instrument delivers an appropriate checking mode for each energy meter type. Besides of checking energy meter utility, the analyzer provides the visualization on screen of several electrical parameters to verify the correct connection of the analyzer. Recorded data can be downloaded from the AR5 to a PC and further analyzed by means of the PC software. Recording data process is done by means of an liner memory. That means that once memory is full, no new data is recorded anymore. 1.1.- Checking the contents of your package After receiving the analyzer, please check the following points: a) The delivered material corresponds with your order specifications. b) After unpacking, check that the instrument has not been damaged in transit. c) The standard set includes the following items: 1 cartridge for programming the AR5/AR5-L containing the ordered operation mode program. 1 Instruction Manual. CD containing the PC software update. 1.2.- Safety conditions The manual you hold in your hands contains information and warnings about the AR5/AR5-L that the user should respect in order to guarantee a proper operation of all the instrument functions and keep its safety conditions. 1.3.- Connection instructions Before powering and connecting the analyzer check the following points: a) Supply voltage: Through and external power supplier set. Input mains 80 V a.c. 265 V a.c. / output to AR5/AR5-L 12V d.c. b) Frequency : 45...65 Hz. c) Maximum voltage at the voltage measuring circuit: 500 V a.c. phase-to-neutral 866 V a.c. phase-to-phase

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 5 2.- ANALYZER STARTUP 2.1.- Loading a new program The AR5/AR5-L has an internal memory to save diverse operation mode programs to be used by the user. Before starting this action, check that AR5/AR5-L is supplied through the power supplier set. To load any program, follow these instructions precisely: Turn the AR5/AR5-L off. It is necessary to load a coprocessor that comes in a cartridge to part, and that must settle only in the position of the coprocessor (the last position of the list) Connect the cartridge to the AUX input of the meter. Turn the meter on. Select with the keys [5] & [6] that you want to perform a program loading action (LOAD PROGRAM). Press [ENTER] or wait for a while to confirm this operation. Select the position to save the program into. The AR5/AR5-L will perform a test to check that the cartridge has been properly connected. If an inserted cartridge is detected, then the program will be loaded. Once the loading is completed, reset the meter. If no cartridge was found or a loading mistake occurred, reset the meter and redo the above steps. A cartridge will be only valid for the analyser, which the program was for the first time loaded into. Note on the cartridge the serial number of its related AR5/AR5-L.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 6 2.2.- Choice of the operation mode program The AR5/AR5-L can hold in memory different operation mode programs. The choice of the program to be used is done when starting the AR5/AR5-L up. Turn the AR5/AR5-L on. A list of available programs will be shown on display. Use keys [5] & [6] to choose the desired program. Press [ENTER] or wait for a while to confirm this operation. CHECK THE SETUP UP!!!! All programs have an independent setup; therefore, must be always checked to ensure a proper operation. For instance, whether the setup is modified at the CHECK-METER program, these modification will not be valid for the ANALYSER program, and so for any program. 2.3.- Operation instructions The AR5/AR5-L is a programmable instrument so offering diverse operation modes which can be selected from the available programming menus (0 PROGRAMMING THE AR5/AR5-L). Please read carefully the paragraphs involving STARTING UP (2.-) AND PROGRAMMING THE AR5/AR5-L (5) in order to select the most suitable operation mode for your requirements. If the instrument is not used according to manufacturer s specifications, the protection of the instrument can be damaged.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 7 3.- CONNECTION MODES A.- THREE-PHASE MODE CONNECTION DIAGRAM B.- SINGLE-PHASE MODE CONNECTION DIAGRAM

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 8 C.- ARON MODE CONNECTION DIAGRAM

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 9 4.- DATA VISUALIZATION ON DISPLAY All measured instantaneous values, as well as maximum and minimum, can be read on a 160 x 160 pixel, liquid, crystal display (back-light ability). An indication of the type of data being displayed is shown at the upper right corner. 4.1.- Screen of instantaneous values This screen is only for the verification of a correct connection of the analyzer. So, you can verify the correct positioning, the transforming ration setting, concord of voltage and current phases... Energy values are partial values. The value is always reset to zero when accessing this screen. These values are not accumulated. Pressing the key [SET] from this screen m the set-up menu is accessed. When powering the AR5/AR5-L on, the display will show: CHECK-METER INST L1 L2 L3 IIII Vp-n A kw kvarl KvarC P.F. Hz KVA 220 2210 2230 2220 kwh 0.000 kvarhl 0.000 kvarhc 0.000 09 / 01 / 04 17 : 31 : 29 Verification screen Voltage: Readout of the instantaneous RMS value measured at each phase (L1, L2 & L3) and the average value of the instantaneous values of the three phases (III). Current: Readout of the instantaneous RMS value measured at each phase (L1, L2 & L3) and the average value of the instantaneous values of the three phases (III). Active power: The active power is calculated from instantaneous voltage and current data. The readout gives the instantaneous values of the active power of each phase and also the three phase total instantaneous active power, which is the addition of each phase value. Inductive reactive power: The inductive reactive power is calculated from instantaneous voltage and current data. The readout gives the instantaneous

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 10 values of the inductive reactive power of each phase and also the three phase total instantaneous inductive reactive power, which is the addition of each phase value. Capacitive reactive power: The capacitive reactive power is calculated from instantaneous voltage and current data. The readout gives the instantaneous values of the capacitive reactive power of each phase and also the three phase total instantaneous capacitive reactive power, which is the addition of each phase value. Power factor: Readout of the power factor of each phase and the three phase average value. Frequency: Readout of the instantaneous value of the frequency (Hz). Apparent power: Readout of the three phase total instantaneous apparent, which is the addition of each phase value. Energies: Readout of the instantaneous value of the active, inductive reactive and capacitive inductive energy accumulated. These are always reset to zero when this screen is exited. Time and Date. (time/date): Readout of present time and date. For any modification, see section 5.1.4.-. 4.2.- Screen for energy meter check. This screen delivers the tools to perform the energy meter check. By means of keys [5] & [6] the position of the screen to be modified is selected. This position can be modified when pressing the key [SET]. CHECK-METER CHECK-METER User Name User s data 1/1 V 5/5 A Voltage ratio setting and Current ratio setting? kwh 3Φ? TURNS/IMP Energy meter type (Active/Reactive) n.circuit s phase kw/turn ratio of the energy meter? nturns/imp? N turns/impulses RECORDED? KWh START? kwh END RECORD Wh METER Wh AR5L - -. - % Initial energy of the energy meter Final energy of the energy meter Save check Measurement of the energy meter Measurement of the AR5 Energy meter error

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 11 4.3.- Warning messages Some warning messages can appear on the visualization screens. These messages inform about the AR5/AR5-L performance: - STOP: The analyser is not recording data. - RECORD: The analyser is recording data. - M. Full: Memory is full. - M.Error: There is an error in the memory. The memory must be formatted. - Analyser battery charge status. When only the symbol 3is shown, it means that the battery is very low and the analyser might turn off at any moment. - The battery is charging. The user can also see the accumulated battery charge level. - Full battery charge. - WARNING MAX 500 V: The maximum allowable phase to neutral voltage of 500 V has been exceeded during the measuring process. When measuring phase to phase voltages the limit is set at 866 V. 5.- PROGRAMMING THE AR5/AR5-L CHECK-METER The CHECK-METER program has 2 different set-up menus: AR5 Set-up. This is accessible from the screen of instantaneous values (Section 5.1.-) Check Set-up. This is accessible from the screen of energy meter check (Section 5.6.-). 5.1.- Set-up of Instantaneous Values To accessing AR5/AR5-L setup options press the key [SET], on the instantaneous values screen The analyzer will then inquiry for a password that consists of a key sequence to be pressed (the user has 15 seconds to press this sequence). If the default password has not been modified, then the following key sequence must be followed: PASSWORD [3] [SET] [5] [SET] Standard Password Once this password is entered, the analyzer will permit the user to modify any Setup parameters. All programs have an independent setup, therefore, the setup must be always check to ensure a proper operation, since any modification will only affect the active operation program.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 12 Diverse setting MENUS are available: SETUP DISPLAY FILES CLEAR OFF LANGUAGE INITIAL MENU Select one option with keys [6] & [5]. To access any menu option use [8] or [ENTER]. To close the menu press [3] or [ESC]. If this key is used when only the main menu is open, this is closed. If any modification over any setup parameter was done, before closing a confirmation of setup change is requested on display.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 13 5.1.1.- SETUP menu The AR5/AR5-L meter can be user-configured to different performances involving its data analysis and recording modes, as it is followed shown: SETUP MEASURE COMM CLOCK PASSWORD RECALL SETUP menu. MEASURE WIRING PT/CT 4 wires / 3 wires / Aron / Single-phase. V and A transformation ratios. COMM Baud / Parity / Bits / Stop bits. CLOCK DD/MM/YY hh:mm:ss. PASSWORD Setting the analyzer password RECALL Standard. Recall Setup sure <yes > <no>. 5.1.2.- MEASURE Use this option to set measuring conditions: CONNECTION MODE SETTING ( 3 or 4 wires or single-phase) and VOLTAGE and CURRENT TRANSFORMATION RATIOS SETTING. MEASURE : WIRING PT / CT 3Φ 3 Wires, 3Φ 4 Wires, Aron and1φ Prim. V, Secon. V, Prim. I

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 14 5.1.2.1.- WIRING: Circuit type Choose the circuit type to be analysed (rotary input). 3Φ 4 Wires: To measure Three-phase systems with Neutral wire. 3Φ 3 Wires: To measure Three-phase systems with Neutral wire. For this arrangement 3 current clamps must be used. 1Φ: To measure Single-phase systems. 5.1.2.2.- PT/CT : Transformation ratios Voltage and current transformation ratios setting. The program will sequentially inquire for following data: PRIM. V: Voltage transformer primary value. SEC. V: Voltage transformer secondary value. PRIM. I: Current transformer primary / Current clamp primary, used for measuring the line currents. NOTE 1 : If voltage is directly measured (no voltage transformer is used), you must set PRIM.V = 1/SECV.V = 1. NOTE 2 : PRIM. I --> This option permits to program: a) The ratio of the Current clamp to be used. b) In case of a high voltage system, the measurement will be carried out through the secondary of current transformers. A shunt ATS-III 5 A a.c./ 2 V a.c. or CP5 clamp will be then required to enter the measurement signal into the AR5/AR5-L analyzer (Never directly connect the 5 A signal to the AR5/AR5-L.). For this case, the C.T. primary must be set at the primary value of the C.T. used for measuring purposes. Ratio set must be modified for each Current or transformer type change to avoid measurement mistakes. Standard clamps give a voltage output (generally 2 a.c. at full-scale). NOTE : Secondary is always set at 2 V a.c. (it is not user-programmable). 5.1.3.- COMM: Communication parameters Program here the parameters of the built-in RS-232 serial output. When selecting this option the present parameters are shown on display: COM 9600 NO 8 1 Baud Parity Bits Stop bits - Pressing [ENTER]: values on display are directly validated. - To modify: (rotary input). - Select with keys [4] or [3] the position to modify.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 15 - Though keys [6], [5] the value of the selected position is increased or decreased. - [ENTER] to validate the total value or [ESC] to exit with no modification. 5.1.4.- CLOCK: Internal clock Use this section to set the analyzer internal clock in time: date / time and displaying format. When this option is selected, presently programmed values are shown by display: CLOCK TYPE DD /MM/YY HH :MM:SS CLOCK TYPE MM/DD/YY HH :MM:SS After validating the date format, the present date and time will be displayed according to the selected arrangement: CLOCK 00 /00 /00 00 :00 : 00 Proceed similarly than for the former section. 5.1.5.- PASSWORD: Safety setting. Set here the analyser password configuration. This password will be required to access the SETUP menu. Thus, the manipulation of the analyser by notauthorized people can be avoided. The password can be also required for turning the analyser off. The default password is: Change of SETUP access password: Firstly enter the old password: Then enter the new password: Finally, confirm the new password: PASSWORD [3] [SET] [5] [SET] OLD PASSWORD * * * * NEW PASSWORD * * * * CHECK PASSWORD * * * *

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 16 During this password modification process, the following error messages can be shown in screen during 5 s: Incorrect Old password Incorrect Check password Wrong password The confirmation of the new password has failed 5.1.6.- RECALL: Read configuration You can here recall a standard configuration. Set Standard.. sure? <yes > <no> - A confirmation is requested: Recall Setup sure <yes> or <no>. With keys [4] & [3] select yes or no, and then press [ENTER]. A Standard operation program for the AR5/AR5-L is available to be user-recalled. Its features are: - C.T. Ratio (SET + A) : 5 - V.T. Ratio (SET + V) : 1 / 1 - Circuit type : Three phase (III - Phase) - File name (FILE Name) : CK_METER - FILE type :.ACM - Communication parameters : 9600,No,8,1

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 17 5.2.- DISPLAY menu DISPLAY CONTRAST ANGLE Contrast Show cosϕ or power factor (PF) You can at this point, define the options about the parameters to be visualized on display, the graphic mode performance,... 5.2.1.- CONTRAST: Screen contrast The user can here vary the contrast of the AR5/AR5-L display: - With the [4] you can intensify the display contrast and with the key [3] this can be lowered: CONTRAST DEC INC % 5.2.2.- POWER FACTOR The user can chose cosϕ or power factor (PF) to be shown, φ Angle PF - With the [3] and [4] keys, it s possible change the value.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 18 5.3.- FILES Menu Non-volatile AR5/AR5-L internal memory is storing data up to its maximum capacity. Once full, no new data will not be saved in, nor stored data will be lost (provided no incorrect operation is done). When memory is full, the display will show: "MEMORY FULL". FILES DIR DELETE FORMAT FILES MENU 5.3.1.- DIR: Directory This option shows on display a directory of all files saved in memory. AR5-L - DIR STD-PROG. STD xxxxx bytes File name / File size dd / mm / yy hh : mm : ss Day / Time TEST1. STD xxxxx bytes dd / mm / yy hh : mm : ss STD-PROG. STD xxxxx bytes dd / mm / yy hh : mm : ss... /... Free bytes: xxxxxxxxxx Number of free bytes in memory - Keys [6] or [5] allows reading more files in case that all files stored by the AR5/AR5-L cannot be shown in only one screen. - Keys [ENTER] or [ESC] to exit. 5.3.2.- DELETE: Deleting a file You can here delete any file from the internal memory. STD-PROG. STD TEST1. STD STD-PROG. STD...... DELETE xxxxx bytes File name / File size xxxxx bytes xxxxx bytes - With keys [6] & [5] select the file to be deleted. - [ENTER] to confirm selected file erasing. Once press, a confirmation is required.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 19 5.3.3.- FORMAT: Formatting the AR5/AR5-L internal memory This option lets the user to format the internal memory. FORMAT Once the format action over the internal memory is confirmed, a confirmation is required. Take into account that this action will mean all stored data to be deleted. Note: Do not turn the AR5/AR5-L off during the memory format process, otherwise the display will show an error message and the process should be redone. 5.4.- Menu OFF: Enable / Disable Password. In order to avoid an accidental manipulation of the analyser, the AR5/AR5-L can be set to request for a password when the user wants to turn it off. Password? <Yes> <No> - With the key [4],[3] you can select: - YES: A password is requested to turn the AR5/AR5-L off. - NO: No password is required to turn the AR5/AR5-L off. - [ENTER] to validate the choice or [ESC] to exit with no modification. The procedure to follow when this password is enabled is: 1) Press the key [OFF] during 5 seconds. 2) You will see in display: PASSWORD 3) Enter the correct Password. 4) Press [OFF] again The analyser will turn off if the entered password is the correct one. 5.5.- Menu LANGUAGE It allows selecting the language in which the menus will be presented. Language English - With keys [6] & [5] select the language. - [ENTER] to confirm selected language Press key [ESC] to exit with no modification. NOTE: This configuration is commune for all the programs.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 20 5.6.- Setup for energy meter check AR5 CHECK-METER User Name 1/1V 5/5A? kwh 3? TURNS/IMP? nturns?? kwh START? kwh END RECORD? Wh METER? Wh AR5L - -.- % (1) User's data (2) P.T. and C.T. ratios (3) Check of energy meters (4) Check of number turns or pulses (5) Check start and end energy test (6) Saving check results (7) Check result (8) % Error Use the keys [6] & [5] to select the option to be modified. Press the key [SET], to modify the selected option. Press the key [ENTER] to start the energy meter checking process. Press the key [ESC] to switch to the screen of instantaneous values. According the position within the verification screen, by pressing [SET] you can define: 1. Type the name of the user, no. of contract and a brief commentary about the performed checking action. 2. Measurement conditions setting: Primary and secondary of the P.T. used. Primary of the C.T or Clamps. 3. Features of the meter to be checked and type of connection: Energy meter type: - kwh -> Checking of active energy meters. - kvarh -> Checking of reactive energy meters. kwh / no. of turns or pulses ratio of the energy meter Circuit type: select the connection type used for the energy meter check:, three-phase (III-Phase) or single-phase (II-Phase). 4. Set the number of turns for the mechanic energy meter checking. When checking an electronic energy meter, will appear the number of impulses well-read by the optical reader. 5. Electronic energy meter check: set the value of the energy meter when starting the check and also when this is finished. 6. RECORD: To save in memory the record of the performed check. 7. This section will show the real value measured by the AR5/AR5-L and also the value that the CHECK-METER should have measured according to the user-programmed values (points: 3, 4 & 5). 8. Error: You can here read the % of error for the energy meter check in relation with the measurement performed by the AR5/AR5-L. 9. To save the check results (6) by pressing [SET].

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 21 6.- Operation mode When checking energy meters it is advisable to: For any type of energy meter: To perform the energy meter check when the installation is at full operation conditions. The higher the consumption is, the higher the check reliability will be. For active energy meters: Whether power factor correction units are installed in the power system, check that those are in operation. The higher the power factor is, the higher the check reliability will be.. It is advisable to perform the checking process with a power factor >0,71. For reactive energy meters: Whether power factor correction units are installed in the power system, check that those are disconnected. in operation. The lower the power factor is, the lower the check reliability will be.. It is advisable to perform the checking process with a power factor <0,71. When the check process is finished, following messages could be shown on screen: - Overflow Energy: The checking process has been too long. The AR5 s inner energy counter cannot count up to such a high energy level. The check process duration can last a maximum of 20 hour at full-load conditions. - 999%: The error of the checked energy meter in comparison with the value measured by the CHECK-METER is very big. Check of active energy meters: Connect all power factor correction systems Check of reactive energy meters: Disconnect all power factor correction systems The check process is advisable to be performed at full-load conditions

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 22 7.- Checking energy meters 7.1.- Checking mechanic energy meters AR5 CHECK-METER User Name 1/1V 5/5A? kwh 3? TURNS/IMP? nturns? (1) User's data (2) P.T. and C.T. ratios (3) Check of energy meters (4) Check of number turns or pulses? kwh START? kwh END RECORD? Wh METER? Wh AR5L - -.- % (6) Saving check results (7) Check result (8) % Error Use the keys [6] & [5] to select the option to be modified. Press the key [SET], to modify the selected option. 1.- Enter user s attribute (Name, no. of contract). (1) 2.- Set transforming ratio of P.T. and C.T. (clamps/shunts) used for the checking action. (2) 3.- Type of energy meter: active or reactive energy meter. (3) (ENERGY: kwh (Active) or kvarh (reactive). 4.- Set the ratio of the mechanic energy meter: Energy x no. of turns. (3) 5.- Type of energy meter to be checked: single-phase/three-phase. (3) 6.- Press [ENTER] to start the energy meter checking process. After a confirmation inquiry, you will see at the bottom of the screen: START When pressing then [ENTER] the energy meter checking process will start.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 23 7.- During some moments of data recording: 8.- You will see again at the bottom of the screen: STOP 9.- The energy meter checking process will be stopped when pressing again [ENTER]. 10.- Enter the number of turns occurred during the checking process. (4) 11.- The % of error for the energy meter check in relation with the measurement performed by the AR5 will be shown at the bottom of the screen.(8) 12.- Save check results. (6) by pressing [SET]

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 24 7.2.- Checking electronic energy meters AR5 CHECK-METER User Name 1/1V 5/5A? kwh 3? TURNS/IMP (1) User's data (2) P.T. and C.T. ratios (3) Check of energy meters? nturns?? kwh START? kwh END RECORD? Wh METER? Wh AR5L - -.- % (5) Check start and end energy test (6) Saving check results (7) Check result (8) % Error Use the keys [6] & [5] to select the option to be modified. Press the key [SET], to modify the selected option. 1.- Enter user s attribute (Name, no. of contract). (1) 2.- Set transforming ratio of P.T. and C.T. (clamps/shunts) used for the checking action. (2) 3.- Type of energy meter: active or reactive energy meter. (3) (ENERGY: kwh (Active) or kvarh (reactive). 4.- Press [ESC] and disregard inquiries about the mechanic meter ratio. (3) 5.- Type of energy meter to be checked: single-phase/three-phase. (3) 6.- Press [ENTER] to start the energy meter checking process. After a confirmation inquiry, you will see at the bottom of the screen: When pressing then [ENTER] checking process will start. START the energy meter

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 25 7.- During some moments of data recording 8.- You will see again at the bottom of the screen: STOP 9.- The energy meter checking process will be stopped when pressing again [ENTER]. 10.- Enter the initial and ending energy readouts of the energy meter to be checked. (5) 11.- The % of error for the energy meter check in relation with the measurement performed by the AR5 will be shown at the bottom of the screen.(8) 12.- Save check results. (6)

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 26 7.3.- Checking electronic energy meters using the optical reader. It is possible to connect an optical reader (ref XXXXXXX) for those meters that have a LED. Connect the optical reader into AUX plugin The communications must be set to: 9600 / NO / 8 / 1 AR5 CHECK-METER User Name 1/1V 5/5A? kwh 3? TURNS/IMP? nturns? (1) User's data (2) P.T. and C.T. ratios (3) Check of energy meters (4) Check of number turns or pulses? kwh START? kwh END RECORD? Wh METER? Wh AR5L - -.- % (6) Saving check results (7) Check result (8) % Error Use the keys [6] & [5] to select the option to be modified. Press the key [SET], to modify the selected option. 1.- Enter user s attribute (Name, no. of contract). (1) 2.- Set transforming ratio of P.T. and C.T. (clamps/shunts) used for the checking action. (2) 3.- Type of energy meter: active or reactive energy meter. (3) (ENERGY: kwh (Active) or kvarh (reactive). 4.- Set the ratio of the electronic energy meter: Energy x no. of pulses. (3) 5.- Type of energy meter to be checked: single-phase/three-phase. (3)

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 27 6.- Connect the optical reader, if it is not connected yet, to the AR5/AR5-L and align optical head with the LED of the meter. AUX 7.- Press [ENTER] to start the energy meter checking process. After requesting a confirmation the relation of transformation of INTENSITY of the TRANSFORMER is due to introduce where it goes connected the meter 100 PRIM. METER ENTER 5 SEC. METER ENTER 8.- When pressing the optical reader button the energy meter checking process will start. When pressing then [ENTER] checking process will start. START the energy meter

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 28 9.- During some moments of data recording 10.- You will see again at the bottom of the screen: STOP 11.- The energy meter checking process will be stopped when pressing again the optical reader button. 12.- The % of error for the energy meter check in relation with the measurement performed by the AR5/AR5-L will be shown at the bottom of the screen.(8), 13.- The number of impulses that has been read, will shown at no turns/imp (4) 14.- Save check results. (6) If you want check more energy meters with optical reader, keep it connected. If you need to do another check, disconnect the optical reader. 8.- AR5/AR5-L COMMUNICATIONS To connection to PC of the AR5/AR5-L must be done through the power supplier set, which will be necessary connected to the main. Perform the connection using the two wires factory-delivered with the AR5/AR5-L. One cable will link the AR5/AR5-L to the power supplier set, and another cable is a standard RS232 connector. When starting communication tasks take into account: Communication parameters of the AR5/AR5-L and the PC must fully coincide. The power supplier set must be plugged into. The AR5/AR5-L cannot be into the setup menu. CIRCUTOR has a software package that permits the user to retrieve stored data in the AR5/AR5-L to PC for a further complete analysis. The download archive is in text format, that allow to be opened and edited.

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 29 9.- TECHNICAL SPECIFICATIONS Supply voltage: Through an external power supplier set 230 V a.c. (+10% / -15%) Frequency : 50...60 Hz Burden : 8 VA Operation temperature : 0 / 50 ºC Measuring circuit : SINGLE-PHASE, THREE-PHASE, ARON Voltage measurement: Measuring range : 20 to 866 V a.c. (between phases) 20 to 500 V a.c. (phase-neutral) Automatic scale adjustment Other voltages : through suitable voltage transformers Frequency : 45 to 65 Hz Current measurement: Measuring range: according to current clamps Current transducer ratio : user-programmable Measurement units : automatic scale adjustment Constructive characteristics of the cartridge Case : Anti-chock plastic Dimensions : 64 x 19 x 40 mm Connection terminals : 1 input/output terminal Accuracy class: Current... 0.5 % of readout ± 2 digits Voltage... 0.5 % of readout ± 2 digits Active power... 1.0 % of readout ± 2 digits Reactive power... 1.0 % of readout ± 2 digits Measuring conditions to assure accuracy class: Errors due to external voltage and current transformer not included Temperature range : 5 ºC to 45 ºC Power factor : 0.5 to 1. Measuring range : between 5 % and 100 %. ACCESSORIES AR5/AR5-L Programs - HARMONIC...CODE. M 80221 - FLICKER...CODE. M 80223 - DISTORTIONS...CODE. M 80224 - CHECK-METER...CODE. M 80225 - FAST CHECK...CODE. M 80226 - Software CirEnergy...Visit our web site Current measurement: a) Through Current clamps (3 Clamps KIT): CP-2000-200........ CODE M 81045 CPR-1000...... CODE M 81044 CPR-500...... CODE M 81043 CP-100 (M1-U)... CODE M 81042 CPR-100 (For Neutral current measurement)...code M 81036 CP-5......... CODE M 81041

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 30 b) Through flexible Current clamps (3 Clamps KIT): C-FLEX 200/2000/ 20000 Length 45 cm... CODE M 81141 C-FLEX 200/2000/ 20000 Length 80 cm... CODE M 81142 C-FLEX 200/2000/ 20000 Length 120 cm... CODE M 81143 c) ATS-5 shunt (5 A / 2 V a.c.) + current transformers (../5 A)...CODE M 89925 Carrying case - Carrying case for AR5/AR5-L current clamps... CODE M 89921 - Carrying case for AR5/AR5-L... CODE M 89901-1000 case (with protection rubber CPR-1000)... CODE M 89923-2000 case (with protection rubber CPR-2000)... CODE M 89921

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 31 10.- SAFETY WARNINGS The user should take into account all installation instructions referred in sections INSTALLATION AND STARTUP, CONNECTION INSTRUCTIONS and TECHNICAL SPECIFICATIONS of the analyser. Note that with the instrument powered on, the terminals could be dangerous to touching, and cover opening or elements removal actions may allow accessing dangerous parts. The analyser has been designed and tested to meet IEC 348 standard and is factory-shipped in proper conditions. 11.- MAINTENANCE The AR5/AR5-L does not require any special maintenance. No adjustment, maintenance or repairing actions should be done over the instrument open and, should those are essential, high-qualified operators must perform them. Before any adjustment, replacement, maintenance or repairing operation is carried out, the instrument must be disconnected from any power supply source. When any protection failure is suspected to exist, the instrument must be immediately put out of service. The own instrument design permits a quick replacement in case of damage. 12.- TECHNICAL SERVICE For any inquiry about the instrument operation mode or in case of malfunction, you can contact CIRCUTOR s technical service. CIRCUTOR S.A. - Aftersales Service Vial Sant Jordi, s/n 08232 Viladecavalls (SPAIN) Tel: (+34) 93 745 29 00 Fax: (+34) 93 745 29 14 E-mail: ar5@circutor.es

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 32 A. CABLE ARRANGEMENT Different cables used with the AR5/AR5-L have following arrangements: Communication cable RS232: PC - Power supplier set PC POWER SUPPLIER SET 2 3 3 2 5 5 7 8 8 7 Power supply/communication: Power supplier set - AR5/AR5-L. 2 1 6 7 3 4 5 POWER SUPPLIE R SET AR5/AR 5- L 1 1 7 2 6 3 5 4 2 5 4 6 3 7

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 33 B. QUICK GUIDE Menu Description Options Standard Setup Measure Circuit Choice type of measuring circuit. Three-phase Single-phase Three-phase Tr. Rel Rel. V Voltage transformers ratio. Primary=1 Secondary=1 Rel. A Current transformers ratio. Primary=5 Comm Communication parameters setting 9600,n,8,1 Clock Analyzer s date and time setting Password Set here the analyzer password configuration Recall Recalling standard configuration Standard Display Files OFF Contrast. SET de contrast Angle Choose between cosϕ or P.F visualization. Dir Directory of stored files. Delete Deleting a file. Format Clearing all memory content. set to request for a password when the user wants to turn it off. Language Set the user language. English C. QUICK GUIDE FOR AR5 - CHECK-METER. Span ish AR5 CHECK-METER User Name 1/1V 5/5A? kwh 3? TURNS/IMP? nturns? (1) User's data (2) P.T. and C.T. ratios (3) Check of energy meters (4) Check of number turns or pulses? kwh START? kwh END RECORD? Wh METER? Wh AR5L - -.- % (6) Saving check results (7) Check result (8) % Error Check of active energy meters: Connect all power factor correction systems Check of reactive energy meters: Disconnect all power factor correction systems The check process is advisable to be performed at full-load conditions

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 34 D. EXAMPLE OF TRANSFORMATION RELATIONS Clamps connected in the secondary one 27000 V 500 A L1 L2 L3 5A clamps 110 V 5 A METER L3 L2 L1 CHECK-METER USER 27000/110V 500/5 Clamps connected in the primary one 27000 V 500 A L1 L2 L3 1000 A clamps 110 V 5 A METER L3 L2 L1 CHECK-METER USER 27000/110V 1000/5