Resource Environmental LLC (RELLC) A Unique Approach to Managing Multi-party Environmental Liabilities

Similar documents
MARYLAND DEPARTMENT OF THE ENVIRONMENT

DISPUTE RESOLUTION LEADER

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS

Moving Towards Sustainable Remediation: Overview and Concepts

Natural Resource Damages What are the States Doing

OCTOBER 2014 UPDATE: A YEAR OF REAL PROGRESS IN ALL AREAS

EPA S 2015 vapor intrusion guides What do they mean for your facility?

Enhanced Anaerobic Biodegradation of a Refinery Benzene Groundwater Plume

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program

PLI s 8th Annual Patent Law Institute

FACT PATTERN THE RESERVATION

TOWNSHIP OF KINGWOOD COUNTY OF HUNTERDON STATE OF NEW JERSEY RESOLUTION NO RESOLUTION CONCERNING PENNEAST PIPELINE

Environmental Management Division. David Amidei NASA HQ

THOMAS K. UZZO, LSRP, PEA President

(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better

November 8, 2016 International Petroleum Environmental Conference. Tim Nickels Pastor, Behling & Wheeler, LLC

Manufactured Gas Plant Site Management - Program 50

ASSET INTEGRITY Project Case Studies

Fort George G. Meade. Performance Based Acquisition (PBA) Five-Year Summary. Restoration Advisory Board Meeting November 20, 2014

MASSACHUSETTS CONTINGENCY PLAN REMEDY OPERATION STATUS OPINION

Process. Developing and Managing the Risk Management Corrective Action Plan. Process. Session No Page 1 WELCOME. Agenda.

Madison Water Utility Pressure Zone 4 Well Siting Study

Continuing Education Credits

Ground Water Remedy Optimization Progress Report: Office of Superfund Remediation and Technology Innovation

August Prepared by:

REPORT on remediation progress at RMG

ADDENDUM No. 1. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Procurement Section 3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida

Sustainable Groundwater Management Act (SGMA) Implementation in West Placer County

February 23, 2010 Version 0.0

ENGINEERING AROUND THE WORLD Stories of Change from Engineers Without Borders USA

The Opportunities, Challenges, and Unknowns of Shale Gas Exploration

TOP TIPS FOR SUCCESSFUL INTERNATIONAL JOINT VENTURES

Prepared For: Town of Castle Valley, Utah

A Clean, Green Remediation

Technical and Physical Feasibility Fact Sheet Alternative 28: Infill/Density

THE SUPPLIER DIVERSITY INSTITUTE Houston, TX (August 27 29, 2012) Generating Supplier Diversity in the Academic Community

Exam Duration: 2 hours and 30 minutes

OPTIMIZATION OF A CHEMICAL OXIDATION TREATMENT TRAIN PROCESS FOR GROUNDWATER REMEDIATION. Gary Cronk, P.E., CHMM

Thermal Remediation Services, Inc.

Surfactant Enhanced Remediation Of Petroleum and Chlorinated Contaminated Sites. Bud Ivey Ivey International

Concise Case Analysis & Evaluation Tool

Mill Street Corridor Assessment/Cleanup Overview

API RP 1175 PIPELINE LEAK DETECTION-PROGRAM MANAGEMENT IMPLEMENTATION KICK-OFF WEBINAR

ETHICS ISSUES FACING IN-HOUSE LAWYERS WHO REPRESENT COMPANIES IN JOINT VENTURES

Staff Report for Former ANG Coos Head Recommendation for Partial No Further Action for Groundwater at AOC C

Protocol for Developing Multi-Stakeholder Group Terms of Reference and Internal Governance Rules and Procedures

Stakeholders Forum on Vapor Intrusion

6. INFRASTRUCTURE CHARGES

DAVID A. SCOTTI

Merging Logistics and Engineering Williston Basin Symposium

CALIFORNIA HIGHWAY PATROL AGREEMENT

Start-up of a Secondary Water Supply Company. and First Phase Design of a Regional System

FERRY COUNTY COUNTY-WIDE PLANNING POLICIES

Empirical Data to Evaluate the Occurrence of Sub-slab O 2 Depletion Shadow at Petroleum Hydrocarbon- Impacted Vapor Intrusion Sites

COMPARISON BETWEEN THE US AND FRANCE:

Corporate Legal Audit Program

Have You Caught a Case of the Vapors?

Recommendations for Strengthening the Investigator Site Community

Beneficial Use of Produced Water: A Case Study of Projects in Colorado and Wyoming

February 2, AdvisorLaw, LLC 3400 Industrial Lane, Unit 10A Broomfield, CO Armin Sarabi Attorney Regulatory Representation

Multiple-Prime Top 10 Concerns Especially when

KEYSTONE PIPELINE COMPANY, LLC

ENVIRONMENTAL CONSULTANCY

Optimizing Cleanup at Complex Sites using Technical Impracticability (TI) Waivers

DRAFT Alberta Risk Management Plan Guide

EARTHJUSTICE REQUEST FOR PROPOSAL TO PROVIDE OMBUDS SERVICES. DATE ISSUED: August 8, PROPOSAL SUBMITTAL DEADLINE: August 31, 2016

Water for Sana a and Taiz z from Solar Desalination at the Red Sea

Plume Stability Analysis

Private Party CERCLA Cost Recovery

Conflict Management: Dealing with Issues, Risks, and Crises

The ROI of training: Strategies and evaluation methods

CRISIS and CONFLICT MANAGEMENT

Employment & Labour Law Practice

West Placer Groundwater Sustainability Agency Community Meeting February 16, 6 to 8 p.m. McBean Pavilion in Lincoln

IT PROJECT ANALYST/MANAGER

Assistant Supervisor, Maintenance Services (New position)

Paso Robles Groundwater Basin Management Plan A Focus on Voluntary Actions to Improve the Sustainability of Our Water Supply

MEMO. Kris Hinskey

AECOM tel 8000 Virginia Manor Road, Suite fax Beltsville, MD 20705

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

State Route 8 Bridge Replacement Project

The Cost Savings Potential of Sustainability Practices

ETHICALCHEM BACKGROUND

Masters Certificate in Supply Chain & Logistics Management

West Shore Pipe Line Release

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland

Jane Hedges, Manager, Nuclear Waste Program Washington Department of Ecology

King lll Principle Comments on application in 2013 Reference in 2013 Integrated Report

Centralizing Your Energy Supply Spend

jackson lewis Preventive Strategies and Positive Solutions for the Workplace Corporate Diversity Counseling ALL WE DO IS WORK

GEO-HEAT CENTER EXECUTIVE SUMMARY

An Unlevel Playing Field:

UNION-MANAGEMENT RELATIONSHIP-BUILDING

Corrective action design and implementation Petroleum Remediation Program

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW HOUSE BILL 609

Alaska LNG Concept Information. Alaska LNG. Overview. October

GROUNDWATER INFORMATION SHEET. Methyl tertiary-butyl ether (MTBE)

INSIDE. 2 Introduction 12 Conclusion 4 6. How Prepared Are Corporate Law Departments?

Protecting our clients. Safeguarding our environment.

Transcription:

Resource Environmental LLC (RELLC) A Unique Approach to Managing Multi-party Environmental Liabilities

What is RELLC? RELLC is a Limited Liability Co. formed in 2003 organized to proactively address releases of petroleum fuels at multi-member sites through aggressive mitigation of impact to receptors Experience and Expertise in Multi-party Project Management Specializing in urgent care and intensive care remediation Proven Track Record with many success stories Rapid Response Capabilities and Readiness Pillars of RELLC Business Model: Preventative Law Total Liability Management Alternative Dispute Resolution

RELLC Corporate Structure Board of Directors Sets policy and strategic direction Nominates sites Approves project work scope, budget and allocation Majority decision: one vote per member Chevron Robert Wilkenfeld (Chair) Phillips 66 Dan Fischman ExxonMobil David Baker Marathon Timothy Peterkoski Officers Executes the day to day business President VP and General Counsel VP and General Manager John Englehardt George Phair Greg Vogelpohl

Multi-Party Scenarios Case #1 (urgent response situation) A municipal supply well is impacted by petroleum fuels. Regulatory agency focuses on marketing facilities in the vicinity Each company initiates its own investigation with various approaches and is faced with the challenge of what to do based on limited data and the potential of being the source or a part of a commingled plume By the time individual and non-coordinated site assessments are completed and responsible parties are identified the water supply system has become impacted to a degree that requires it to be shut down Regulatory concern, public fear and media attention is escalated Case #2 (more common situation) Within an area, companies are managing their own investigations and remedial programs with various and non-coordinated approaches and reporting to different agency PMs Differing interpretations of incomplete data sets causes conflicts between companies resulting in an array of outcomes from protracted negotiations/ resolutions, unnecessary data collection, conflicting site remedies, delays, finger pointing. Regulatory concern, public fear and media attention may escalate and the Risk of Impacts and Litigation Increases

Contrast to Industry Approach for Multi-Party Sites General Industry Practice RELLC! PRPs reluctant to take action until sources identified / reasonably delineated & responsibility more clear! Often parties take significant effort and time to agree, if at all! Each party acts on its own data only and does what it thinks is best for its site and is often driven by agency demands; any regional approach is difficult for single party acting alone! Allocation of shared costs are problematic, often arbitrary and if agreed are almost never adjusted! Immediate focus on impacts and what to do if there is a threat or impact to human health and/or environment regardless of fault! Pre-established contracts and work processes are in place! RELLC takes a regional approach with all the needed data driving integrated solutions. Strategies are set to meet parties needs. RELLC leads but is collaborative with agencies! Allocation is based on independent data analysis with scheduled updating as new pertinent information develops

How Does RELLC Work Multi-party release of petroleum fuels Member company nominates site Following staff assessment, Board approves site into RELLC RELLC assumes management control of the project area o o o o o o RELLC assigns project to environmental consulting firm Project managed as integrated remedial effort Board approves strategies, scope and budget Allocation of financial responsibility is periodically updated Staff conducts expert peer reviews with member companies Staff executes the plan and invoices impacted parties monthly with 8% Fee Pre-agreed contracts/programs/processes in place for members; third party agreement available for non-members Important company and project documentation is available Binding arbitration exclusive dispute resolution remedy

Site Selection Criteria (The best site for RELLC would involve the following) Minimum Criteria! Multiple sites or properties! One or more RELLC members involved! Two or more potentially responsible parties! Not currently in litigation Additional Indicators! Litigation risk! Receptors impacted, threatened or unknown! Significant stakeholder concerns! Responsibilities of the PRPs undefined or ineffective! Need for greater progress or otherwise move quickly! State funding involving commingled plumes (eg. California) Detailed RELLC Site Selection Guide Available

RELLC Benefits Unique features for commingled plume cases - Environmental response is the priority - Credibility with regulators and public - Corporate shield and is not perceived as Big Oil - Pre-agreed contracts/ plans / programs Cost effective management - Centralized management with regional approach - Expedited remedial activities and leverages expertise of members - Eliminates conflicts of multiple investigations - Leverages UST Reimbursement Programs Equitable allocation process - Sound Science basis; updated as new data available and reduces the risk of litigation

RELLC Significant Accomplishments! Safe and In Compliance No injuries or NOV s in the last 8 years,! Effective Relations & Preserved Reputation No negative publicity across high profile sites Creating collaborative environment - Glendale MTBE Task Force Regulatory support across multiple states agencies! Liability Minimized No adversarial claims across all projects! Complex Project Execution Hawthorne common system across 7 lane roadways Dominguez Channel Assessment and remedial program for a channel area involving 26 pipelines under clean-up and abatement order! Minimized Costs Overcame significant and difficult access issues Assessment and plan in 1 year Active remediation complete in 2-4 + years Leveraging reimbursement programs in 2 states worth $28MM Intensive Care by RELLC on multiparty complex projects creates success

Misc. RELLC Project Summaries Hawthorne, CA 2 ½ acre free product plume 50 bg over 3 sites plus offsite impacts in densely populated area being remediated with one system. * Glendale / La Crescenta, CA Public well impacted with 22 potential UST sites involved with expedited site response and regional approach with non-rellc PRP. Closure in early 2015.* Hearne, TX - 3 terminals with private wells impacts resolved and terminals cases with closure in 2016.* Indianapolis, IN 2 typical former UST sites with common impacts resolved using 2 differing technical solutions. Closured late 2016. Englewood, NJ 3 corner site with shallow aquifer and fractured bedrock impacts defined and remediated. Final stage for approval for long term MNA. El Cajon, CA 3 sites with over 200k gallons of equivalent gasoline recovered with closure in 2014. Washington DC 3 previously closed sites re-opened to address additional impacts discovered at a major 18 acre urban redevelopment project with significant construction in 2017. 19 Others Projects

Hearne Project Location 11

Sunoco Logistics East Terminal Motiva Terminal Sunoco Logistics West Terminal Domestic Wells Magellan Tank Farm (Shell) Manifold Area Exxon/Mobil Pipeline Co. City Water Line Extension Key Accomplishments Timely resolution of residential concerns and impacts no claims Agency approved remedial program that had been problematic for many years Reduced monitoring requirements by ~75% Enabled sale of ExxonMobil Terminal Life cycle costs minimized Lessons Learned / Opportunities Resolution of residential issues significantly reduced the complexity of the project and concerns with the agency Regional approach was critical to reaching agency approval Unnecessary work performed to protect self interest prior to RELLC s involvement Groundwater Flow Direction Shell Motiva ExxonMobil (currently Sunoco Logistics)

Verdugo Basin, Los Angeles Area 13

Sample RELLC Site 14

Agencies Glendale Project Accomplishments and Lessons Learned LA Basin Water Master Task Forc e PRP s/ RELLC Water Purveyor Key Accomplishments Establishment of MTBE Task Force and agreement on regional approach with agency and water purveyor. Communication and cooperation among most stakeholders was outstanding and a model RELLC influenced involvement of most PRP s including small independents and government facilities RELLC s expedited assessment and remedial program was in place ~ 1 year. Site closure at 2 of 3 sites within 4 years No negative publicity with proactive outreach Lessons program Learned / Opportunities Establishing a regional approach to include nonmembers is critical to maximize effectiveness of a process that leads to overall corrective action. Collaboration with agency, water purveyor and RELLC was key. Establishing a work group with all stakeholders such as a Task Force can be very effective. RELLC could have potentially managed nonmembers sites with a more attractive third party 15 agreement.

Hawthorne Project Location LPH Plume (1-10 thick) Multi-level shopping center (Former Service Station Sites) Active Service Station 2 Story Housing Complex 3 Story Housing Complex 16

Hawthorne Project Accomplishments and Lessons Learned Remediation System Overview Piping & Well Manifold Key Accomplishments Developed complex site conceptual model with impacts defined and investigated Access agreements with complex group of businesses Effective proactive outreach program Incident free remedial installation/operation using a single compound for the 3 sites Enabled remediation of up-gradient reluctant RP (small commercial land owner) 98% of LNAPL removed (>500,000 lbs.) Pending partial reimbursement through state fund (~$4.5M) Lessons Learned / Opportunities Regional approach was critical to success Common Equip. Compound Positive relations with City Officials / Local Businesses/ Landowners and an effective outreach program with public enabled access / permitting Applications of new technologies important to the success Air sweep for free product removal; QRI Pulsar helped define lithology in hard to access 17 areas