MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities

Similar documents
PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

Integrated. SUSTAINABLE Watershed Management MANUAL

Walnut Creek Watershed Management Authority. Project Kick Off March 18, 2015

Sewer System Flood Reduction Measures in the Rockcliffe Area

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER

Green City, Clean Waters

Chapter 1. Introduction

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

Andrea Ludwig, PhD, EIT Assistant Professor Biosystems Engineering and Soil Science University of Tennessee

Presentation Overview

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

Bioswales, Wetlands, and Trees: How going green can be a part of a Wet Weather Management Plan. Presented by Brian Tornes, PE

Trails Permitting Process

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

Storm Water and Sanitary Sewer

What is a stormwater utility fee?

Development in the City of Toronto

Asset Management: Integrating Strategic Thinking With Tactical Action

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Municipal Stormwater Management Planning

New Castle County, DE. Floodplain Regulations

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 3E

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

OVERVIEW CAPACITY & CONDITION

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016

The total population of the township is 9,942 (2015 Five-Year American Community Survey [ACS]). The median household income is over $109,000.

Hydrologic and Ecologic Impacts from the CERP Indian River Lagoon South Project

Climate Smart Cities: Healthy Connected Chattanooga

OVERVIEW CAPACITY & CONDITION

Table D-1. Montour County Hazard Mitigation Projects - Municipalities Affected. Structural Projects

Becoming the Green-Blue City by Meeting LA s Water Challenges

Evaluating Release Rates for Specific Watersheds in Cook County

Metropolitan St. Louis Sewer District PRIVATE INFILTRATION and INFLOW REDUCTION PROGRAM

Wisconsin Wastewater Operators Association. Protecting Our Water Resources: The Future Bill Hafs - NEW Water 10/2014

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

CHAPTER 7. San Dieguito River Flooding Adaptation

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

TOWN OF KILL DEVIL HILLS, NORTH CAROLINA ANNUAL PROGRESS REPORT ON ADOPTED HAZARD MUTIGATION PLAN COMMUNITY #

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999

Toronto and Region Conservation 2017 Progress & 2018 Budget Peel Council

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.

Project Goals and Scoping

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview

Emerging Trends in Ecological Offsets

Concept, Feasibility & Mobility Studies. Southport Connector Expressway

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

June 22, Francis E. Borcalli, P.E.

City of San Jose Storm Sewer Master Plan

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

City of Milwaukee. Milwaukee s blue revolution. By Matthew Howard

laid in the early to mid 20th century with a lifespan of years. With utilities averaging a pipe

In Focus: Managing Urban Stormwater

Potable Water Supply, Wastewater & Reuse Element

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017

IX. STRATEGIC PLAN ELEMENT

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

Green Infrastructure. 52 MMSD Regional Green Infrastructure Plan

Figure 2 shows the monthly SSO Volumes within the system from 2007 through 2008 reported in million gallons (MG).

SOS. City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan. Separate Our Sewers Save Our Streams. Ohio OWEA Collection Systems Workshop

ENVIRONMENT LONG-TERM GOAL: INTRODUCTION: Environment 117

6.0 Indirect Effects and Cumulative Impacts

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

PROGRAM EFFECTIVENESS ASSESSMENT PLAN Storm Water Management Plan

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Hamilton Water Division

Funding Stormwater Services

MSDGC MODELING GUIDELINES AND STANDARDS VOLUME I SYSTEM WIDE MODEL

Throwing Shade on Indy: Planting Trees for Stormwater and Community Health. August 16, 2017 John Trypus and Olivia Hawbaker Citizens Energy Group

PLEASE do not reuse without permission from NYCDEP. [Please notify Pinar Balci and Alan Cohn

Achieving Sustainability Goals through TBL Analysis & Culture Change

7.1 Background. Define success; Guide the implementation and evaluation of programs; and

The Green Edge: How Commercial Property Investment in Green Infrastructure Creates Value. Larry Levine, NRDC Jan. 28, 2014

Addison Natural Gas Project

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan

STREAM AND BUFFER AREA PROTECTION/RESTORATION

Carbon Creek Channel (OCFCD Facility No. B01) from upstream Intersection of Western/Orange to upstream Beach Boulevard.

PROPOSAL FOR IMPLEMENTATION OF THE DRINKING WATER SOURCE PROTECTION PROGRAM

Credit Valley Conservation (CVC) Board of Directors. Chief Administrative Officer (CAO) Watershed Knowledge. Watershed Management

Update The Don River and Central Waterfront Project and The Ashbridges Bay Treatment Plant outfall

STORMWATER POLLUTION PREVENTION PLAN

Acres 32% 35% Not Suitable. Impervious. Possible UTC. Vegetation. Existing UTC

City of Ottawa Water, Wastewater and Stormwater Rate Structure Review

Corridor Advisory Group and Task Force Meeting #19

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

Appendix C. BMPS, Measurable Goals, and Implementation Schedule

Section 9 Implementation

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017

City of Lenexa. Stormwater Management Plan

Green Infrastructure and Storm Water Management

Transcription:

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MaryLynn Lodor MSD of Greater Cincinnati Sharon Jean-Baptiste CH2M HILL April 4, 2013

Overview MSD s Environmental Challenge Our Wet Weather Strategy Opportunities for Integrated Watershed Planning Case Studies: Sustainable Infrastructure Alternatives Next Steps

Cincinnati, Hamilton County, Ohio Ohio River Publicly Owned/Operated Wastewater Utility Serving Southwest Ohio (Hamilton County) Serves a Population of about 855,000 230,000 Residential and 250 Industrial Users Operates 7 Wastewater Treatment Plants; treating 70 Billion Gallons/yr 3

Lower 75 303 miles Mill of of Creek existing historical Watershed streams, 603 miles of combined sewers 4

CSO #5 Lick Run Guerley Road & Sunset Avenue Lick Run Watershed CSO #483 Kings Run 5

MSD s Environmental Challenge 212 Combined Sewer Overflow (CSO) Locations 78 Sanitary Sewer Overflows (SSOs) Locations

MSD s Approved Consent Order Elements Wet Weather Strategy Source Control Conveyance & Storage Product Control Flexible Phased Approach Phase 1: 2009 2018 Phase 2: Schedule to be submitted by 2017 Strategic Affordability Controlled Spending Phase 1: $1.145B Credit for $300M in projects Phase 2: To Be Determined

WHAT Revised WWIP Conditionally Approved 8

tunnel parallel to Mill Creek. $244+ million Estimated cost (in 2006 dollars) $1,100 per MG of treatment Estimated operations and maintenance costs 547,800 megawatts Estimated power demand of pumping 2 Billion Gallons over 10 years 377,739 metric tons Estimated CO 2 emissions from pumping 2 Billion Gallons over 10 years 10

Lower Mill Creek Watershed Alternatives MSD is focusing on watersheds within the Lower Mill Creek that experience high volumes of combined sewer overflows (CSOs). 7.6 BG annual CSO volume

MSD s Wet Weather Strategy Hydraulic Grade Line inside sewer 12

Tracking & Reporting Model Results Public Outreach Technology Property Ownership Components & Tasks Maintenance Information required to be included in the LMC Study report for the Regulators to consider an alternative solution. 13 13

Nancy Stoner, County Commissioner Portune, Director Parrott touring Lick Run Watershed, May 2012

USEPA Integrated Municipal Planning Framework Use the flexibility of EPA s existing regulations and policies and encourage municipalities to evaluate how best to meet all of their CWA requirements and within their financial capability. Elements include: Water quality, human health and regulatory issues Existing wastewater and stormwater systems current performance Community stakeholders in the planning and selection Identifying, evaluating, and selecting alternatives and proposing implementation schedules Measuring success of projects Improvements to the Plan

What if? a sewer project...... could be more than a sewer project? What if...... it could be a strategic investment?... it could be a catalyst for community transformation?... it could be a regional model for a new watershed-based approach to community planning?... if it could be a national model for green infrastructure planning/design?... it could involve the community and many public and private partners?... it did more than improve stormwater management and reduce combined sewer overflows?»... it created a network of community assets that attracted new interest and investment?»... if it left behind open spaces, enhanced streetscapes and opportunities for green buildings?... if it served as a model for a sustainable 21st century community?

Model of COF

Advisory Committee Communities of the Future Model: Creating a Network of Community Partners Representation from around the region were a part of MSDGC s Community of the Future Advisory Committee since March 2010: Cincinnati Parks Cincinnati City Planning & Buildings UC Center for Sustainable Urban Engineering Green Partnership for Greater Cincinnati Hamilton County Planning & Development Mill Creek Restoration Project OKI Regional Council of Governments Cincinnati Dept. of Transportation & Engineering Sierra Club Ohio Dept. of Development Cincinnati State Hamilton County Administration Hamilton County Commissioners Ohio House of Representatives Cincinnati Preservation Association Cincinnati Office of Environmental Quality City Code Enforcement Community Building Institute Cincinnati City Council Port Authority UC Architect Chamber of Commerce Metro CDC Assoc. of Greater Cincinnati USGBC Cincinnati Greater Cincinnati Energy Alliance Agenda 360 LISC Price Hill Civic Club

Communities of the Future (CFAC): Working Groups Focus Areas Inform and Influence Policy Economic Development Identifying Community Stakeholders Developing Communication Plan for Ratepayers, and affected Communities Preparing for Community Outreach Opportunities Integration with ongoing planning efforts Expanding green infrastructure use into the private sector Analyzing the effectiveness of City and County Stormwater Regulations Compliance with Regulators Brownfield restoration and redevelopment Property Acquisition Identifying investment opportunities Business Case Evaluation Identifying possible sources of funding for streetscape enhancements

Lower Mill Creek Watershed: Integrated Planning for Sustainable CSO Solutions MSD CSO Reduction Planning Revive 75 & ODOT Planning for I-75 Cincinnati Comprehensive Planning Go- Cincinnati Plan Multi-modal Plans Greenway Master Plan Green Cincinnati Plan Lower Mill Creek Watershed Action Plan

Direct Impact Projects Large & Regional Scale business case evaluations MSD as the implementer 100% ratepayer funded Owned and operated by MSD to support its core mission Remove liability of stormwater Enabled Impact Projects (36) Anticipated annual stormwater runoff capture volume of 40 MG ODOT Coordination MSD partners with property owners to offset the cost of installation Bioinfiltration practices, green roofs, pervious/porous paving Inform & Influence Programmatic Elements to support sustainable infrastructure solutions Integrated Planning Advisory Committee Community Engagement Comprehensive Plan Land Development Code Updates

MSD Sustainable Watershed Evaluation Planning Data Compilation & Inventory Analysis Opportunities & Constraints Develop & Evaluate Alternatives Develop Master Plan Implement Plan Monitor, Report, Evaluate

Current Utility Conditions Decline in # of Account Increasing Energy costs Positive or Negative environmental externalities from utility operations TRIPLE BOTTOM LINE APPROACH 260 240 220 200 180 160 140 120 100

March 1, 2010 Broadcast 7/18/10 Sewer Rate Hikes Expected Cincinnati for MSD Customers Enquirer

Demographics Lick Run Watershed Continued Decline = Fewer Customer Base, Rate Payers Since 1970: Cincinnati population decreased by 34% Hamilton County decreased by 25%

Economy Major repair Critical condition 24 22 Assuming current trends, the rate of household decline equates to a loss of 200 households within 1 mile, resulting in a loss of more than $5.7 million (in 2008 dollars)

Brownfield Cleanup / Repurposing Land

Infrastructure Transportation Replacements/Elimination Enhancement - Mode Choices Construction Coordination Green Streets Installation

Natural Resources Surface Water Assets quality and quantity Habitat Modifications Greenway Trail

Natural Resources Watershed Monitoring & Bioassessment Mill Creek Basin Basin (4 year rotation) Initiated Summer 2011 Approx 100 sites, geometric, spatially derived for collection of biological, chemical and physical water quality data 2012 Integrated Priority System for identification of: stressors water quality impacts water quality actions 30

You See Challenges drinking water Flooding creeks mass transportation Competing public infrastructure needs bridges public parks roads electric railroads solid waste pedestrian Energy needs storm water air walkways Degraded waterways

We see Opportunity Water resources management Integrated Approach to Infrastructure Needs transportation community engagement Restored urban waterways policy land use economic development public private partnership watershed management community revitalization Parks & Greenways

Sustainable Infrastructure Alternatives LOWER MILL CREEK PARTIAL REMEDY

Lick Run Revised Original LMCPR Today s Agenda Goal: Achieve 624 MG CSO volume reduction 34

Kings Run Revised Original LMCPR Today s Agenda Goal: Achieve 156 MG CSO volume reduction 35

West Fork Revised Original LMCPR Today s Agenda Goal: Achieve 173 MG CSO volume reduction 36

Bloody Run Revised Original LMCPR Today s Agenda Goal: Achieve 93 MG CSO volume reduction 37

Sustainable Infrastructure Alternatives LICK RUN WATERSHED

Lick Run Watershed The Lick Run Watershed contributes the largest volume of overflows from combined sewers of any watershed in Hamilton County. CSO #005 during wet weather 39

Strategic Watershed Planning Zones

Opportunities for Repurposing Land Declining population and households have resulted in physical decline, foreclosure, and vacancy. Need for revitalization Strategic location 41

Opportunities for Brownfield Remediation Phase I and Phase II ESAs were completed in May 2011 for more than 50% of the corridor. 8,000-linear feet of stormwater conveyance proposed for valley conveyance system 42

Sustainable Wet Weather Solution 43

Alignment & Water Quality Features Wetland Forebay Bioswale/ Rain Gardens Storm Sewer Conveyance Box Daylighting Feature New Storm Sewers/ Overland Flow Outfall Feature Proposed Separated Sewer Urban Waterway Pond & Wetland Proposed Valley Conveyance System Privileged & Confidential 45

Potential Transportation Network Improvements Conceptual transportation improvements are included in the long term vision to promote the communities of the future philosophy but are not part of the Lick Run Sustainable Infrastructure Project Improvements consider flow of traffic, potential neighborhood/business zone, and pedestrian safety

How could MSD s investment support future public/private investments? Preliminary urban waterway concept plan 47

Public Outreach 62 Community Meetings MSD has engaged residents, property owners, and stakeholders to gain input on the deep tunnel and proposed sustainable infrastructure projects. 48

Watershed-Based Planning Use community feedback to synthesize strengths into a refined concept for the proposed urban waterway Define near-term opportunities through leveraged investments and public partnerships Identify long-term watershed opportunities through public and private partnerships

Sustainable Infrastructure Alternatives WEST FORK WATERSHED

West Fork Watershed Overview 6,117 acres, including drainage from Mt. Airy Forest

Existing Watershed Conditions Existing Channel & Floodplain West Fork Channel Floodplain 15 CSOs 380 MG CSO volume

Sustainable Wet Weather Solution Alternative Existing System Wet Weather Volume Proposed System Wet Weather Volume

West Fork Channel Restoration Floodplain Restoration, Enhanced Community Use

FEMA Hazard Mitigation Grant

Integrated Watershed Solution Opportunities for Stakeholder Collaboration Northside Community Council & Cincinnati Metropolitan Housing Authority Community Open House Coordination with their Land Use and Community Plans, including community skatepark project Cincinnati Parks & Cincinnati Recreation Commission Coordination on potential enabled impact projects on Parks/CRC property, utilizing green infrastructure technologies FEMA/OEMA Pre-Disaster Mitigation Program Grant to purchase and demolish properties in the FEMA floodplain along West Fork Channel US Army Corps of Engineers Professional Engineering Support for West Fork Channel evaluation

Public Outreach Information Sessions Community Meetings Open House 58

WHAT S NEXT?

Next Steps Utilizing the Integrated Framework for developing watershed based solutions Utilizing water quality needs for developing an Integrated Priority System for water quality needs Advancement of LMCPR Study Recommendations USEPA Public Comment Period has ended Continued Public Outreach & Partnerships

Thank You! MaryLynn Lodor Environmental Programs Manager MSDGC Office of the Director MaryLynn.Lodor@cincinnati-oh.gov Sharon Jean-Baptiste, P.E. Project Manager/Technical Support MSDGC Environmental Programs CH2M HILL, Inc. Sharon.Jean-Baptiste@ch2m.com