DEVELOPMENT ACTIVITY LIST CITY OF SOUTH SAN FRANCISCO January

Similar documents
The Mayflower Building (411 N. Akard Street) Downtown Connection TIF District. Economic Development Committee February 17, 2015

Denver Medical Micro Project

Downtown Connection TIF District PetroCorrigan Redevelopment Project (Tower Petroleum and Corrigan Tower Buildings)

Addison LLC Project. Central Business District. City Council and Community Presentation December 6, 2010

II. Land Use A. INTRODUCTION B. BACKGROUND

RE: Letter of Intent Land Use Application for Plan Commission and UDC Initial/ Final Approval Request

ORDINANCE #16- PROPOSED ORDINANCE #16-14

LOCATED AT THE INTERSECTION OF HIGHWAYS 12 & 29 NAPA, CA FLOOR PLANS HOMEPAGE PROJECT HIGHLIGHTS & SITE PLAN. 42 miles to San Francisco.

Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison

PROPOSED PLAN DEVELOPMENT 2501 WEST HOMER STREET. Guardian Properties, LLC. September 9, 2015

Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison

City of Oxnard. Public Works Integrated Master Plan

3.0 CUMULATIVE PROJECTS SCENARIO

BROADWAY TOWER 1455 SW BROADWAY, PORTLAND PROJECT OVERVIEW. Kevin Joshi Senior Vice President, Partner

FOR SALE OR LEASE: ±482,300 SF INDUSTRIAL BUILDING Executive Airport Drive, Henderson, NV // Q DELIVERY

MEMORANDUM. Honorable President and Members of the City Council Attention: Karen Randle, Executive Secretary

600 Montgomery Street San Francisco, CA. The Pyramid Spire. Observation Deck. Floor Size Range. 3,678 Windows. Wings Structural Element

The Spectrum of Las Vegas

CITY OF SAFETY HARBOR ENGINEERING

Waterfront Land Use. Michigan Coastal Community Working Waterfronts. Table of Contents. Case Studies

ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH ) FOR THE NEWPARK PLACE SPECIFIC PLAN.

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith

Guidance on Determining Feasibility and Sizing of Rainwater Harvesting Systems

ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10

Architectural Review Board Report

INOVA Office Building I. Adolfson & Peterson Construction. Keri Burson:

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

GENERAL ADMINISTRATION FUNCTION - PART I

Target to add jobs in north metro

LOCAL AGENCY FORMATION COMMISSION REGULAR MEETING AGENDA. Wednesday, March 8, :00 a.m.

CEQA Categorical Exemption Determination

Vero Beach Vision Plan

Valparaiso Transit Center

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

Oakland City Planning Commission

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

TOWN OF PALM BEACH Town Manager s Office

4. ENVIRONMENTAL SETTING AND IMPACTS A. INTRODUCTION TO CHAPTER 4 FORMAT OF THE ENVIRONMENTAL ANALYSIS

DESIGN REVIEW COMMITTEE AGENDA ITEM

STAFF REPORT. Project Description. Proposal. Snyderville Basin Planning Commission From:

CRA FY 2014/2015 Proposed Budget and Work Plan Presentation. City Commission Workshop September 9, 2014

Mall Area Redevelopment TIF District Proposal

Project Plan and Financing Plan for Reinvestment Zone Number Two,

Partnerships in Capital Projects. AAPA Facilities Engineering Seminar and Expo

Kingston Mountlake Terrace

NOTICE OF PREPARATION

EXHIBIT D PLAN VIEWS AND VISUAL SIMULATIONS OF SAN FRANCISCO GROUNDWATER SUPPLY PROJECT PHASE ONE WELL FACILITIES

Request for Proposal Complete Interior Design for 2- Story Historic Building into Collaborative Innovation Space Proposals are due: December 6, 2014

SCHEDULE PALO ALTO HS MEETING SCHEDULE AND AGENDA

ARTICLE II Zoning Districts and Allowable Land Uses

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures

University North Park TIF Project. City of Norman, Oklahoma TIF District No. 2

Los Angeles Area Chamber of Commerce, 08/05/14

Section 4.0 ALTERNATIVES

Our success depends on your satisfaction.

Zack Hicks, Kyle Reisz, Patricia Myers, Ramakrishna Billakanti

Nantasket Beach Revitalization Plan Draft Redevelopment Scenario

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.

Table 5-4. Potential Underground Emphasis LRT Alternative Operation Effects. CRHR Eligibility. Eligibility

1375 St. Andrews Apartments Project Case No. ENV EIR ZA ZAA-ZAI-SPR. Council District No. 13

BULLARD STREET HEYWOOD AVENUE 40' PUBLIC R/W 40' PUBLIC R/W MARKED CROSSWALK FUTURE B.O.C. LANDSCAPE SCREENING (USDG U-03 RESIDENTIAL WIDE)

CHAPTER 7. San Dieguito River Flooding Adaptation

Representative Educational Projects MDP Engineering Group, P.C.

Findings of Fact and Statement of Overriding Considerations

GOOD NEIGHBOR POLICY

EJ Industrial Spine BOA Nomination Study

Growing Community Projects Made Possible with Tax Increment Financing ( TIF )

Introduction Page I-1 INTRODUCTION

The ~ommonweacth of Massachusetts

1431 Jefferson Street Marriott Hotel Project

3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607

SAIV FRANCISCO PLANNING DEPARTMENT

Master RFI List: March 22, 2013 Version # 1, 2 & 3

BEVERLY HILTON SPECIFIC PLAN. April 29, 2008

BIM Services Assistance with Clash Detection Collaboration with Trades Framing Panel Elevations STRONGER

PROLOGIS GEORGETOWN CROSSROADS

BUS RAPID TRANSIT. El Camino Real Bus Rapid Transit Project. Environmental Scoping Meetings February 21 and 28

The Future Of Trash Management In San Mateo County

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

EDMONTON TOWER. FOR LEASE Avenue NW Edmonton, AB

City of Palo Alto (ID # 7047) City Council Staff Report

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA Napa (707)

CITY PLANNING COMMISSION AGENDA ITEM NO: 7 STAFF: ERIN MCCAULEY FILE NO: AR NV (AP) QUASI-JUDICIAL

Application Number: SP Project Name: Novo Nordisk Bright Sky Major Site Plan (acting as a Master Plan)

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177

TOWN OF GREENWICH PLANNING AND ZONING COMMISSION

ENVIRONMENTAL IMPACT REPORT SCH #

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

Ongoing and Future Project Work. Construction Management

Neighborhood Traditional Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Car Parking and Access

Energy Retrofit Loan Program

WESTERN ENGINEERING CONSULTANTS, Inc LLC

RECOMMENDATION REPORT

REGULAR MEETING 7:00 PM

Agenda. Background. Economic Enhancement Study Master Plan Concept. Implementation Plan

City of Hudsonville. Downtown Development Authority Development and Tax Increment Financing Plan

Horison View, Princess and Westgate.

RE: Jackson Row - truck route

Christmas Tree & Greenery Recycling Holiday brought to you by

Transcription:

DEVELOPMENT ACTIVITY LIST CITY OF SOUTH SAN FRANCISCO January - 2018 For current updates, please contact the Planning Division @: Phone: (650) 877-8535 Email: planning@ssf.net Site: www.ssf.net/planning OFFICE/ R&D PROJECTS 1. Address: 494 Forbes Boulevard Description: Two 4-5 story Office/ R&D buildings totaling 326,020 SF, and a 3-level parking structure on a 7.48 acre site. Developer: HCP (Contact: John Bergschneider) Phone: (650) 875-1002 Address: 400 Oyster Point Blvd, #409, South San Francisco, CA 94080 Current Status: Entitled - December, 2012; Construction Date - TBD 2. Address: 249-279 E. Grand Avenue Description: DA Amendment and Use Permit Modification to the previously entitled 4 Office/ R&D buildings totaling approximately 540,000 SF, and a 4-level parking garage on a 15.75 acre site. Developer: Alexandria Real Estate Equities, Inc. (Contact: Terezia Nemeth) Phone: (415) 554-8847 Address: 1700 Owens St, #590, San Francisco, CA 94158 Current Status: Entitled October, 2017; Final Building Currently Under Construction; Estimated Completion Q2, 2019 3. Address: 328 Roebling Road Description: Demo existing building (79,501 square feet), and construct two Office/ R&D buildings totaling 105,536 SF, and at grade and subterranean parking on a 2.97 acre site. Developer: HCP (Contact: John Bergschneider) Phone: (650) 875-1002 Address: 400 Oyster Point Blvd, #409, South San Francisco, CA 94080 Current Status: Entitled - December, 2012; Construction Date - TBD 4. Address: 213-221 E. Grand Avenue Merck Campus Description: DA Amendment and Use Permit Modification to the previously entitled 9 story 291,000 SF Office/ R&D building, and a multi-level parking garage on a 6.2 acre site. Developer: Alexandria Real Estate Equities, Inc. (Contact: Terezia Nemeth) Phone: (415) 554-8847 Address: 1700 Owens St, #590, San Francisco, CA 94158 Current Status: Entitled - June, 2017; Currently Under Construction; Estimated Completion Q1, 2019 5. Address: 475 Eccles Description: Two 4-story Office/R&D buildings totaling approximately 262,287 SF, and a 5-level parking structure on a 6.1 acre site. Developer: BMR: 475 Eccles, LLC Phone: (858) 485-9840 Address: 17190 Bernardo Center Drive, San Diego, CA, 92128 Current Status: Entitled August, 2016; Construction Date - TBD

6. Address: 800-1000 Gateway Boulevard Gateway Business Park Master Plan Description: Master Plan approval for 4 parcels totaling 22.6 acres, with an overall FAR of 1.25. Developer: BMR: 475 Eccles, LLC Phone: (858) 485-9840 Address: 17190 Bernardo Center Drive, San Diego, CA, 92128 Current Status: Entitled February, 2010; Construction Date TBD 7. Address: 850-900 Gateway Boulevard Gateway of Pacific Description: Construct two Office/ R&D buildings (12-story & 5-story) totaling 451,485 SF with a two-level subterranean parking garage and a 47,938 SF amenity building on a 6.3 acre site. Developer: BMR: 475 Eccles, LLC Phone: (858) 485-9840 Address: 17190 Bernardo Center Drive, San Diego, CA, 92128 Current Status: Entitled April, 2013; Currently Under Construction; Estimated Completion Q3, 2019 8. Address: 101 Oyster Point Boulevard Britannia Cove at Oyster Point Description: 884,344 SF of Office/ R&D development (7 buildings), a full service hotel with up to 200 rooms (including a restaurant) at 126,000 SF, 20,000 square feet of retail including a restaurant and an 8-story parking structure. Developer: HCP (Contact: John Bergschneider) Phone: (650) 875-1002 Address: 400 Oyster Point Blvd, #409, South San Francisco, CA 94080 Current Status: Entitled February, 2014; Currently Under Construction; Estimated Completion Q3, 2018 9. Address: 379 Oyster Point Boulevard Oyster Point Redevelopment Project A. Address: 379 Oyster Point Boulevard Phase 1C-1D Oyster Point Redevelopment Description: Demolition of existing improvements and construction of three 6-story Office/R&D buildings totaling 508,000 SF on a 10-acre parcel including a parking structure, new road alignment with utilities; Crescent Park at Oyster Point Blvd. and Marina Blvd, Bay Trail improvements, new open space parcel. Developer: Oyster Point Development LLC (Contact: Taotao Song) Phone: (650) 878-6636 Address: 401 Marina Blvd, Suite 200, South San Francisco, CA 94080 Current Status: Entitled March, 2011; Construction Date Starting Q4, 2017 B. Address: 379 Oyster Point Boulevard Phases 2D-4D - Oyster Point Redevelopment Description: 1) Current entitlements allow up to 1.7 million square feet of Office/R&D buildings in Phases 2-4 on current Oyster Point Business Park properties. 2) Proposed entitlements would include up to 1.1 million square feet of Office/R&D buildings in Phase 2 and up to 1,200 residential units with 50,000 square feet of commercial service uses in Phases 3-4. Developer: Oyster Point Development LLC (Contact: Taotao Song) Phone: (650) 878-6636 Address: 401 Marina Blvd, Suite 200, South San Francisco, CA 94080 Current Status: 1) Entitled March, 2011; Construction Date TBD 2) Residential Application Under Review C. Address: 379 Oyster Point Boulevard City Phase 2C- Oyster Point Marina Master Plan 2 P age

Description: Phase IIC improvements will take place on city-owned land managed by the Harbor District. They include a new pump station, repairs to the landfill clay cap, improved parking areas and landscaping. To complement the planned improvements, a planning effort will take place to set a vision for new land uses in the marina area. This effort will be conducted in partnership with the Harbor District and public stakeholders. Schedule for planning and construction has not yet been determined. Developer: City of South San Francisco (Contact: Billy Gross) Phone: (650) 877-8535 Address: 400 Grand Ave, South San Francisco, CA 94080 Current Status: City preparing Request for Proposals for consulting services 10. Address: One and Two Tower Place Genesis Description: 1) Two office towers totaling 665,000 SF, including 24,000 SF of commercial, 200-seat performing arts center, 100 child day care center 2) Amenity Building consisting of 110-room hotel, wellness center, restaurant, retail and various amenities adjacent and connected to the North Tower. Developer: AP3-SF2 CT LLC Phone: (858) 546-0888 Address: PO Box 927729, San Diego, CA 92191 Current Status: North Tower, Amenity Building, and Completion of Parking Garage Currently Under Construction; Estimated Completion Tower 2 Q1, 2018; Hotel - TBD 11. Address: 342 Allerton Avenue Genentech Childcare Facility Description: 11,000 SF Administrative Building, Four (4) Classroom buildings that each measure 11,300 SF. Up to 500 Children and 175 associated staff members are anticipated. Developer: Genentech Phone: (650) 255-3926 Address: 1 DNA Way, South San Francisco, CA, 94080 Current Status: Entitled August, 2017; Currently Under Construction; Estimated Completion Q1, 2019 12. Address: 500 East Grand Avenue Genentech Building B-40 Description: 8 Story, 160,000 SF office and amenity building. Developer: Genentech Phone: (650) 255-3926 Address: 1 DNA Way, South San Francisco, CA, 94080 Current Status: Entitled March, 2017; Currently Under Construction; Estimated Completion Q4, 2019 13. Address: 560 Eccles Avenue USDA Office Building Description: Tentative Parcel Map to construct a 21,807 SF office building on a vacant 3.62 acre site. Developer: Steve Williams Phone: (901) 327-7676 Address: 5858 Ridgeway Center Parkway, Memphis, TN 38104 14. Address: 426 Victory Avenue Description: Construct a new 4,263 SF office/ warehouse building on a vacant 7,330 SF parcel. Developer: MacCracken Architects (Contact: Daniel Robinson) Phone: (415) 487-2050 Address: 479 9 th Street, San Francisco, CA 94103 3 P age

COMMERCIAL PROJECTS 15. Address: 1600 El Camino Real Costco Site Improvements Description: Demo and construct a new fuel facility with 12 dispensers, a new underground storage tank, and the north parking lot will be expanded with parking construction over Colma Creek, with an expansion of the existing Costco Warehouse building of 5,188 square feet. Developer: Costco Wholesale (Contact: Kim Katz) Phone: (425) 427-7540 Address: 999 Lake Drive, Issaquah, WA, 98027 Current Status: Entitled May, 2017*; Construction Date TBD *Since project approval in May, the applicant has submitted a site plan revision which includes a bridge over Colma Creek, instead of the cap with parking that was previously approved. The revised site plan is under review. 16. Address: 550 Gateway Boulevard 550 Gateway Hotel Description: 5-Story hotel with 151 rooms with 87,120 SF on a 2-acre lot. Developer: SRI Krishna Enterprises, Inc Phone: Address: 300 Gateway Blvd, South San Francisco, CA, 94080 Current Status: Entitled September, 2016; Construction Date Q1. 2018; Estimated Completion Q4, 2018 17. Address: 127 West Harris Avenue Marriott Fairfield Inn & Suites Description: 5-story Hotel with 128 rooms on a 64,117 SF lot. Developer: SFO Properties, LLC Phone: (602)-768-7000 Address: 1552 S 52nd Street, Temple, AZ Current Status: Entitled August, 2015; Currently Under Construction; Estimated Completion Q2, 2018 18. Address: 1113 Airport Boulevard Days Inn Description: Construct 12 additional guest rooms to the second and third floor of an existing 24-room hotel. Developer: RNK LLC (Contact: Kunal Patel) Phone: Address: 1113 Airport Boulevard, South San Francisco, CA, 94080 Current Status: Entitled January, 2017; Construction Date TBD 19. Address: 195 N. Access Road Park SFO Expansion Description: Parking Garage expansion of approximately 1,531 spaces for an airport parking facility. Developer: Robert Simms Phone: Address: 662 Clarendon Ave, San Francisco, CA, 94131 Current Status: Entitled March, 2014; Currently Under Construction; Estimated Completion Q4, 2019 20. Address: 180 El Camino Real Safeway Shopping Center Description: Exterior modifications to the Safeway Shopping Center Developer: WT Mitchell Group, Inc. (Contact: Bill Mitchell) Phone: (925) 988-8033 Address: 3380 Vincent Road, Pleasant Hill, CA, 94523 Current Status: Entitled December, 2017; Construction Date TBD 4 P age

21. Address: 479 South Airport Boulevard Costco Gas Station Description: 3,080 SF expansion of an existing canopy and the addition of three multi-product dispensers. Developer: Costco Wholesale (Contact: Kim Katz) Phone: (425) 427-7540 Address: 999 Lake Drive, Issaquah, WA 98027 22. Address: 840 El Camino Real LaQuinta Inns & Suites Description: 5-story hotel with 91 rooms on a 20,132 SF lot. Developer: South City Partners LLC Phone: (650) 757-2160 Address: 1819 Montecito Way, Burlingame, CA, 94010 RESIDENTIAL/ MIXED-USE PROJECTS 23. Address: 150-190 Airport Boulevard 150 Airport Boulevard Description: 5-story residential development consisting of 157 units with a 2-level parking garage. Developer: DNA Design and Architecture (Contact: Rocky Shen) Phone: (714) 389-1890 Address: 2062 Business Center Dr., #140, Irvine, CA, 92602 Current Status: Entitled January, 2017; Construction Date TBD 24. Address: 488 Linden Avenue Description: 5-story residential development consisting of 38 apartments with mechanical parking lifts on a 14,000 SF lot. Developer: TBD Current Status: Entitled December, 2015; Construction Date TBD 25. Address: 255 Cypress Avenue Description: 5-story mixed-use development consisting of 46 apartments and approximately 6,000 SF of commercial space on a 20,198 SF lot. Developer: TBD Current Status: Entitled December, 2015; Construction Date TBD 26. Address: 211 Airport Boulevard Pinefino Description: 5-story, 69 residential units with a single-level parking garage on a 30,144 SF lot. Developer: Pinefino LLC Phone: (408) 829-4083 Address: 2905 Stender Way, #88, Santa Clara, CA, 95054 Current Status: Entitled September, 2015; Currently Under Construction; Estimated Completion Q2, 2018 27. Address: 300 Block of Miller Avenue The Rotary Miller Avenue Senior Housing Community Description: 5-story, 81 senior residential units with a single-level parking garage on a 24,500 SF lot. Developer: Beacon Communities (Contact: J.P. Stocco) Phone: (925) 924-7112 Address: 6120 Stoneridge Mall Road, #300, Pleasanton, CA, 92458 Current Status: Entitled April, 2016; Currently Under Construction; Estimated Completion Q3, 2019 5 P age

28. Address: 309, 315, 401 Airport Boulevard, 405 Cypress Avenue Cadence A. Address: 309-401 Airport Boulevard Phase 1 Ford Property Development Description: 7-story, two residential buildings with 260 Units on the corner of Airport & Miller Avenue on 3 parcels and approximately 84,480 SF of area. Developer: Sares Regis Group of No. California (Contact: Ken Busch) Phone: (650) 377-5805 Address: 901 Mariners Island Blvd, #700, San Mateo, CA, 94404 Current Status: Entitled February, 2016; Currently Under Construction; Estimated Completion Q1, 2019 B. Address: 405 Cypress Boulevard Phase 2 Ford Property Development Description: 12 residential townhomes on a 17,498 SF lot at 216 Miller Ave. Developer: Sares Regis Group of No. California (Contact: Ken Busch) Phone: (650) 377-5805 Address: 901 Mariners Island Blvd, #700, San Mateo, CA, 94404 Current Status: Entitled February, 2016; Construction Date TBD 29. Address: Westborough Boulevard & Oakmont Avenue Oakmont Meadows Description: 19 residential units with a mix of 7 townhomes and 12 single family dwellings on a 4.91 acre site. Developer: Pacific States Capital Corp. Phone: 1-800-393-9781 Address: 30. Address: 840 Linden Avenue Wynd Fair Complex Description: 3-story, 5 residential units with a level parking garage on a 7,599 SF lot. Developer: Claude L. Patterson Phone: (650) 515-9074 Address: 4955 Palmetto Avenue, Pacifica, CA, 94044 Current Status: Entitled November, 2014; Currently Under Construction; Estimated Completion Q3, 2018 31. Address: 616 Maple Avenue Description: 3-story, 5 residential units with a level parking garage on a 10,500 SF lot. Developer: Winnie Tam Phone: (650) 692-2029 Address: 380 Vallejo Drive, #325, Millbrae, CA, 94030 32. Address: 1309 Mission Road Mission & McLellan Description: 20 condo units with approximately 6,000 SF of commercial space on a 1.41 acre site. Developer: South San Francisco Development Co Phone: (650) 996-5480 Address: Current Status: Entitled March, 2011; Currently Under Construction; Estimated Completion Q3-2019 33. Address: 1256 Mission Road City Ventures Description: 36 residential units with a mix of townhomes and single family dwellings on a 1.7 acre lot. 6 P age

Developer: City Ventures (Contact: Samantha Rothstein) Phone: (646) 522-4260 Address: 444 Spear Street, #200, SF, CA 94105 Current Status: Entitled February, 2015; Currently Under Construction; Estimated Completion Q1, 2018 34. Address: 200 Linden Avenue Description: 7-story mixed-use building with 97 units over +/- 6,500 SF of retail and 3-levels of parking on a.72 acre lot. Developer: Hisense Reus LLC (Contact: Fernando Bravo at Swinerton) Phone: (415) 238-3928 Address: 260 Townsend Street, SF, CA 94107 Current Status: Entitled - November, 2017; Construction Date TBD 35. Address: 988 El Camino Real Description: 6-story mixed-use building with 172 units, 12,000 SF of retail, and 2-levels of subterranean parking on a 1.67 acre lot. Developer: SummerHill Apartment Communities (Contact: Elaine Breeze at SummerHill) Phone: (650) 842-2404 Address: 777 S. California Avenue, Palo Alto, CA 94304 7 P age