Chapter 6 Avoidance, Minimization, and Mitigation

Similar documents
APWA Public Works Project of the Year Award Page 1 Elliott Bay Seawall Project Disaster or Emergency Construction/Repair

Memorandum. California public trust law governs the administration of tidelands and submerged lands in several ways:

CHAPTER 21: COMMITMENT OF RESOURCES

ADDITIONAL FUNDING AND AGREEMENTS (5)

State Route 8 Bridge Replacement Project

Downtown Estes Loop Project Frequently Asked Questions

FERRY COUNTY COUNTY-WIDE PLANNING POLICIES

Significant Unavoidable Adverse Impacts

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington.

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals:

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Project Purpose. Federal Railroad Administration

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

Request for Consultant Statements of Interest and Qualifications POINT DEFIANCE ZOO & AQUARIUM

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

TERMINAL 5 CARGO WHARF REHABILITATION, BERTH DEEPENING, AND IMPROVEMENTS PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT. Chapter 1. Summary 1-1 SUMMARY

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

TRANSPORTATION 101 Today and Tomorrow. Moving People and Goods

PUBLIC HEARING April 24, 2017

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

RESOLUTION NO

AFFECTED ENVIRONMENT AND ENVIRONMENTAL IMPACTS

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

Zoning Text Amendment

THE MLK DISTRICT. Help Us Plan the Future of. The MLK District

GRAND NIAGARA Proposed Secondary Plan

SIEMENS CONCERT: City of Seattle

Neighborhood Traditional Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

SEARs project justification and conclusion

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites

Exposition Light Rail Transit Project

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

Arizona Association of County Engineers New Rules for Categorical Exclusions for FHWA Projects

CONTAINER PORT ELEMENT

City of Tacoma Planning and Development Services

Response to Comments of Don and Tricia Nevis (Letter I25) See the master response to Public Outreach Process.

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

CONTAINER PORT ELEMENT

DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN

1.1 Purpose of the Project

Factor Potential Effects Mitigation Measures

Final Environmental Assessment Guidelines (including the Scope of the Environmental Assessment)

J O I N T P U B L I C N O T I C E

Draft Decision Notice Maroon Bells - Snowmass Wilderness Overnight Visitor Use Management Plan

22.1 INTRODUCTION 22.2 ANALYSIS METHODOLOGY REGULATORY CONTEXT

Environment & Conservation Introduction

Preferred Elevated Tank Site

All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL

Ballard-Interbay MIC Summary Statistics

Lake Britton Planning Unit. Fish, Plant, and Wildlife Habitat LAKE BRITTON PLANNING UNIT

Categorical Exclusion (CE)

KING COUNTY FERRY DISTRICT 2014 STRATEGIC PLAN

5. Name of waterbody(ies) (if applicable & if known) in which work will occur? Harney Flats Canal

Indirect and Cumulative Effects

1107 E. Madison Street Student Housing Project. Monthly Update May 12, 2017

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

SOUND TRANSIT STAFF REPORT MOTION NO. M Link Noise Mitigation Policy

County of Calaveras Department of Planning

Chapter 3 Affected Environment and Environmental Consequences

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

CITY OF AIRWAY HEIGHTS SPOKANE COUNTY, WASHINGTON ORDINANCE C-664

U.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority

CHAPTER 2 WHAT ARE WE TRYING TO ACHIEVE?

407 TRANSITWAY. Planning & Preliminary Design

The Port of Seattle. The Airport

6.0 Indirect Effects and Cumulative Impacts

3.8 LAND USE Introduction Environmental Setting Regional Setting PMPU Area

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

Trails Permitting Process

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

I-91 Viaduct Public Information Briefing

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

Marine Fueling Facility Program Update Advisory

SR 99 Incident Response After- Action Plan

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

Noise Assessments for Construction Noise Impacts

PROGRAMMATIC AGREEMENT AND HISTORIC PROPERTIES MANAGEMENT PLAN 2015 ANNUAL REPORT

Draft Environmental Impact Statement (DEIS) Public Hearing

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone:

Planning Commission November 20, 2013 URBAN FORESTRY LANDSCAPING CODE UPDATES

APPENDIX C NOISE STUDY TECHNICAL REPORT

PUBLIC SCOPING MEETING AGENDA

National Environmental Policy Act (NEPA) Process and Federal Agency Compliance

The term Significant as used in NEPA is defined at 40 CFR and requires consideration of both context and intensity.

TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW

Chapter 3.8. Socioeconomics and Environmental Justice

The Shoreline Management Act and Use of State-Owned Aquatic Lands

The project will be conducted in partnership with the Nez Perce Tribe.

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Shoreline Master Program VISIONING OVERVIEW

Purpose of the Countywide Transportation Plan SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

Provincial Policy Statement 2014 Training Aid

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Letter No Impact Sciences, Inc Temporary use of the Rose Bowl by the NFL November 2012

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION

FINAL SCOPING DOCUMENT

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

Transcription:

Chapter 6 Avoidance, Minimization, and Mitigation This chapter provides a summary of the mitigation measures that the City could implement to avoid, minimize, rectify, or compensate for impacts from the Updated Preferred Alternative. All of the mitigation measures described in Chapter 8 of the Final EIS would still be implemented to reduce the potential effects from project construction and operation, except for those pertaining to the summer construction shutdown. Measures from the Final EIS are not restated within this chapter. Additional proposed mitigation measures for the Updated Preferred Alternative are described below in Table 6 1. What Is Mitigation? Mitigation is defined by the SEPA as follows: Avoiding the impact altogether by not taking a certain action or parts of an action. Minimizing impacts by limiting the degree or magnitude of the action and its implementation. Rectifying the impact by repairing, rehabilitating, or restoring the affected environment. Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action. Compensating for the impact by replacing or providing substitute resources of environments. Draft Supplemental Environmental Impact Statement December 2013 Page 8 6 1

AVOIDANCE, MINIMIZATION, AND MITIGATION Table 6-1. Mitigation Measures by Discipline Transportation Economics Freight and Overlegal Vehicles In addition to the mitigation measures provided in the Final EIS, impacts on freight traffic and overlegal vehicles will be reduced by providing access to Colman Dock from westbound S. Jackson Street into the proposed ferry queuing area. Business Access and Parking As described in the Final EIS, the City continues to develop and implement parking mitigation measures, including highly visible maps and signage along the waterfront to direct people to parking areas and striping of parking spaces in portions of the Alaskan Way right of way not being used for construction. Continued implementation of WSDOT s parking mitigation program for the Alaskan Way Viaduct, although not designed to address seawall project impacts, would provide the benefit of low rate, short term parking spaces for waterfront visitors, promoted through marketing and online tools. Water Transit In addition to the mitigation measures described in the Final EIS, a flagger could be stationed at the Bell Street Pier Cruise Terminal during the peak periods when trucks must access the terminal. If a southbound approach was provided, the trucks could use the adjacent northbound lane for space to complete the turn. This mitigation measure would minimize the extent of an impact identified in the Final EIS by removing the need for trucks to approach the cruise terminal through the construction zone. Emergency Services To reduce impacts on emergency services, the City will implement the mitigation measures listed in the Final EIS. The City will monitor operations and work with the Fire Department to accommodate emergency response if operations are adversely affected. Consistent with the Final EIS, the City has partnered with private and public facilities to implement measures to ensure adequate short term parking supply as mitigation for the loss of parking along Alaskan Way. The measures used to reduce adverse cumulative effects on the transportation network are the same as in the Final EIS. In addition to the mitigation described in the Final EIS for adverse economic effects during construction, the following measures will be implemented: The City will compensate property owners for the period of lost access during the business closure on Piers 54 through 57. The City will work to minimize the effects of summer construction on project area businesses to the greatest extent feasible through outreach and coordination with the business owners, and through the careful timing and sequencing of disruptive activities. As described in the Final EIS, the City continues to develop and implement parking mitigation measures, including highly visible maps and signage along the waterfront to direct people to parking areas and striping of parking spaces in portions of the Alaskan Way right of way not being used for construction. Continued implementation of WSDOT s parking mitigation program for the Alaskan Way Viaduct, although not designed to address seawall project impacts, would provide the benefit of low rate, shortterm parking spaces for waterfront visitors, promoted through marketing and online tools. No long term adverse effects to the local or regional economy have been identified; therefore, no mitigation is required. December 2013 Page 6 2 Draft Supplemental Environmental Impact Statement

AVOIDANCE, MINIMIZATION, AND MITIGATION Table 6-1. Mitigation Measures by Discipline In addition to the measures described in the Final EIS to reduce adverse cumulative effects on the local and regional economy, the City will compensate business owners for the loss of access to their businesses during the closure period. Noise and Vibration The City will operate under appropriate noise ordinances and approved variances. In coordination with the Seattle DPD, construction noise mitigation requirements will be developed and specified in the noise variance(s). Various measures could be implemented to reduce noise levels, including: Using sound attenuated pumps, if feasible. Placing the pumps as far away as possible from sensitive noise receptors. Shielding pumps by using enclosures No mitigation will be required because the project will not generate noise and vibration after construction. Beyond the measures described above and included in the Final EIS, no mitigation for cumulative noise and vibration effects is required. Cultural, Historic, and Archaeological Resources The City will comply with all measures for adverse effects to historic and archaeological resources stipulated in the Section 106 MOA signed by USACE, the City, DAHP, Advisory Council on Historic Preservation, tribes, and other stakeholders. The City will also implement the mitigation measures for potential adverse effects on cultural, historic, and archaeological resources that were described in the Final EIS. of the new seawall is not expected to result in any adverse effects on historic properties; therefore, no mitigation is required. The construction related mitigation measures included in the MOA will avoid or minimize the cumulative effects of the Updated Preferred Alternative. Consistent with the Final EIS, SDOT will continue to coordinate project construction with all other applicable agencies to minimize the effects on historic and archaeological resources. Land Use, Shorelines, and Parks and Recreation In addition to the measures provided in the Final EIS, the City will implement the following mitigation for adverse effects on land use, shorelines, and parks and recreational facilities: Compensate property owners for temporary easements required for project construction. Phase work to avoid working directly in front of parks and recreational areas during the summer months, as feasible. Provide relocation assistance to Argosy Cruises for affected boat services and cruises. No long term adverse effects on land use and shorelines will result from operation of the new seawall; therefore, no mitigation will be necessary. The measures used to reduce adverse cumulative effects on the land use, shorelines, and parks and recreational facilities are the same as in the Final EIS. Public Services and Utilities The measures used to reduce impacts on public services and utilities are the same as in the Final EIS. No long term adverse operational effects on public services have been identified; therefore, no mitigation measures for public services are necessary. Draft Supplemental Environmental Impact Statement December 2013 Page 6 3

AVOIDANCE, MINIMIZATION, AND MITIGATION Table 6-1. Mitigation Measures by Discipline The measures used to reduce adverse cumulative effects on public services and utilities are the same as in the Final EIS. Social Resources and Environmental Justice Visual Resources Fish, Wildlife, and Vegetation In addition to the measures used to reduce impacts on social resources and environmental justice populations in the Final EIS, the City would prohibit the use of delivery barges for the project during August and September to minimize effects on the peak tribal fishing season. No long term adverse operational effects on social resources and environmental justice populations have been identified; therefore, no mitigation measures are necessary. Beyond the mitigation proposed for construction effects on social resources and environmental justice populations, no further mitigation for cumulative effects is needed. The measures used to reduce impacts on visual resources are the same as in the Final EIS. The measures used to reduce impacts on visual resources are the same as in the Final EIS. The project will result in only minor temporary cumulative effects on visual quality, and most of the effects will be beneficial; therefore, no mitigation is necessary. In addition to the mitigation measures provided in the Final EIS, the City may: Use attenuation measures described above, under Noise and Vibration. Provide assistance to the Seattle Aquarium for any additional veterinary needs triggered by noise from construction activities. The completed project will be beneficial to fish, wildlife, and vegetation; therefore, no mitigation is necessary. The measures used to reduce adverse cumulative effects on fish, wildlife, and vegetation are the same as in the Final EIS. Water Resources The measures used to reduce impacts on water resources are the same as in the Final EIS. The measures used to reduce impacts on water resources are the same as in the Final EIS. The measures used to reduce adverse cumulative effects on water resources are the same as in the Final EIS. December 2013 Page 6 4 Draft Supplemental Environmental Impact Statement

Chapter 7 References Boles, W.E. and S.C. Hayward. 1978. Effects of urban noise and sidewalk density upon pedestrian cooperation and tempo. Journal of Social Psychology, 104, pp. 29 35. Korte, C. and R. Grant. 1980. Traffic noise, environmental awareness, and pedestrian behavior, Environment and Behavior, 12(3), pp. 408 420. MID/DSA (Metropolitan Improvement District/Downtown Seattle Association). September 2012. 2012 Neighborhood Profile Pioneer Square/International District. MID Business Development & Market Research Team in cooperation with Downtown Seattle Association. Accessed online via http://downtownseattle.com/files/file/psq Intl District.pdf. Milgram, S. 1970. The Experience of Living in Cities. Science 167: 1461 8. NOAA (National Oceanic and Atmospheric Administration). 2013. Endangered and threatened species: Designation of critical habitat for yelloweye rockfish, canary rockfish, and Bocaccio of the Puget Sound/ Georgia Basin. Federal Register 78(151): 47635 47669. SDOT (Seattle Department of Transportation). 2012a. Elliott Bay Seawall Project, Fish, Wildlife, and Vegetation Discipline Report. Final. Prepared by Tetra Tech, Inc. Seattle, WA. October. SDOT. 2012b. Elliott Bay Seawall Project, Draft and Final Environmental Impact Statements (collectively the EIS ). Prepared by Tetra Tech, Inc. Seattle, WA. Draft November 2012; Final March 2013. Seattle Historic Waterfront Association. May 2013. Washington Shorelines Hearings Board Petition for Review. Submitted to the City of Seattle. U.S. Green Building Council (USGBC). May 2008. Building Area per Employee by Business Type. Summary of Institute of Transportation Engineers data. Accessed online via http://www.usgbc.org/docs/archive/general/docs4111.pdf. Washington Department of Revenue (WADOR). 2013. Web site: Section II State and Local Retail Sales Tax. Accessed online via http://dor.wa.gov/content/fileandpaytaxes/fileoramendmyreturn/retail ing/retailingact_statesalestax.aspx. For additional references used to develop this document, please see Chapter 10 of the Final EIS. Draft Supplemental Environmental Impact Statement December 2013 Page 8 7 1

REFERENCES This page intentionally left blank. December 2013 Page 7 2 Draft Supplemental Environmental Impact Statement