Mitigation Monitoring Program

Similar documents
MITIGATION MONITORING PROGRAM

III. Corrections and Additions

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

6.20 UTILITIES SOLID WASTE

CEQA Implementation Policy

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction

4. ENVIRONMENTAL IMPACT ANALYSIS K. UTILITIES AND SERVICE SYSTEMS 3. SOLID WASTE

ARTICLE 38: AIR QUALITY ASSESSMENT AND VENTILATION REQUIREMENT FOR URBAN INFILL RESIDENTIAL DEVELOPMENTS

NIGHTTIME ILLUMINATION

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that:

Cleaning Up Waste and Recycling Management

City of Los Angeles Mandatory Commercial Organics Compliance Plan

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers

CEQA BASICS. The California Environmental Quality Act. Prepared for: Orange County Department of Education. Prepared by:

Mitigation Measures INITIAL STUDY. Aesthetics

TT A PAGE 1 CONDITIONS UNIT MAP CONDITION

CITY OF ELMHURST SUSTAINABILITY POLICY

4.7 NOISE FUNDAMENTALS OF NOISE AND VIBRATION

5.0 PROJECT ALTERNATIVES

THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:

Coalitions and Green Pledges

Agenda Fremont Successor Agency Meeting May 14, :00 PM

GLOBAL WARMING AND RESIDENTIAL REAL ESTATE DEVELOPMENT: THE CALIFORNIA EXPERIENCE

CEQA Categorical Exemption Determination

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

SMUD Franklin Electric Transmission Project. Initial Study and Mitigated Negative Declaration Addendum July 2017

California Environmental Quality Act Part 1: CEQA Basics

4.12 AIR QUALITY INTRODUCTION

Highlander Hall Demolition Project

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Green Building Ordinance Overview

APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION

Noise Assessments for Construction Noise Impacts

Addition to Section 4 - Special Use Regulations

SOLID WASTE FACILITY PERMIT

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition

Draft Environmental Impact Report Serramonte Views Condominiums and Hotel Project

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: December 5, 2011

A. INTRODUCTION B. EXISTING CONDITIONS

County of El Dorado Notice of Preparation Tilden Park Project

2.1 Project Definition/Classification/Initial Study Project Definition

SOUND TRANSIT STAFF REPORT MOTION NO. M Link Noise Mitigation Policy

IV. Environmental Impact Analysis L.3 Utilities - Solid Waste

ORDINANCE NO. Adopted by the [AGENCY] [DATE] ADOPTING A WATER CONSERVATION PROGRAM

Water Supply Corporation here by adopts the following regulations and restrictions on the delivery and consumption of water.

CEQA AIR QUALITY HANDBOOK. Guidelines for the Implementation of the. California Environmental Quality Act of 1970, as amended

ADDENDUM TO THE EIR. Specifically, Section of the CEQA Guidelines states:

INFORMATION SHEET. To demolish the entire building to the foundation will require a demolition permit (Form 6).

January 17th, Chair Mary Nichols California Air Resources Board 1001 I Street Sacramento, CA, 95814

Neighborhood Advisory Committee. EIR Process Overview. Chapman University April 20, 2016

800 INDIANA STREET - MITIGATION MONITORING AND REPORTING PROGRAM (Including Improvement Measures)

4.10 Noise Setting. a. Overview of Noise and Vibration Measurement

MAINE MEDICAL CENTER

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

Photographic Processing Facility Sector Control Policy

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection

ORDINANCE NO. An ordinance amending Section of the Los Angeles Municipal Code by amending the Zoning map.

ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH ) FOR THE NEWPARK PLACE SPECIFIC PLAN.

KERN COUNTY OIL AND GAS PERMITTING PROGRAM ANNUAL PROGRESS REPORT (December 9, 2015 to November 30, 2016)

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA

Green Ordinance Implementation City of Dallas, TX

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS

City of Santa Monica s Solar Santa Monica Program and Solar Energy System Design Standards

CEQA Categorical Exemption Determination

Table of Contents L.3 Utilities - Solid Waste

Green Building Consulting and Verification. Energy Efficiency Optimization For LEED, Savings by Design, GreenPoint Rating, New Solar Homes Partnership

Environmental Setting, Impacts, and Mitigation Measures

II. Corrections and Additions to the Draft EIR

Intermodal Facility Study

PROJECT ADDRESS: PERMIT #

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS

San Carlos Climate Action Plan

PRESSMAN ACADEMY ECC PROJECT TEMPLE BETH AM

12 November Ms. Winnie Lam Project Manager L.F. George Properties 159 El Camino Real Millbrae, CA 94030

GUIDE TO THE 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE

Physical Education Project (Phase 1, 2)

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

TOWNSHIP OF ADELAIDE METCALFE

Works, services and infrastructure code

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

City of Palo Alto (ID # 7047) City Council Staff Report

TABLE OF CONTENTS Chapter 12 Noise

Planning Commission 101: The Nuts and Bolts of Planning

THE SUPERIOR COURT OF CALIFORNIA COUNTY OF SANTA CLARA DOWNTOWN SUPERIOR COURT

SHELL ONSHORE OPERATING PRINCIPLES

Commerce Park. Draft Environmental Impact Report. CITY OF FONTANA Citrus Commerce Park SCH SEPTEMBER 2014 VOLUME 1. Project Applicant:

To: Hyoksang Kwon, COBE Construction From: Joshua Marcley, Mei Wu Acoustics

CITY OF DURHAM, NORTH CAROLINA MEMORANDUM. October 16, Cecil Brown, Senior Assistant City Manager Fred Ravin, Director of Solid Waste Management

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

Field Instruction. All Horizon Power workers who work in and around excavations.

NOISE MITIGATION PROGRAM

Article 20. Definitions

APPENDIX C NOISE STUDY TECHNICAL REPORT

ENVIRONMENTAL GUIDELINES

Transcription:

INTRODUCTION Public Resources Code (PRC) Section 08.6 and California Environmental Quality Act (CEQA) Guidelines Section 5097 require adoption of a Mitigation & Monitoring Program (MMP) for all projects for which an Environmental Impact Report (EIR) or Mitigated Negative Declaration (MND) has been prepared. This requirement was originally mandated by Assembly Bill (AB) 380, which was enacted on January, 989, to ensure the implementation of all mitigation measures adopted through the CEQA process. Specifically, PRC Section 08.6 states that the agency shall adopt a reporting or monitoring program for the changes made to the project or conditions of project approval, adopted in order to mitigate or avoid significant effects on the environment [and that the program] shall be designed to ensure compliance during project implementation. AB 380 provided general guidelines for implementing monitoring and reporting programs, which are enumerated in more detail in CEQA Guidelines Section 5097. However, specific monitoring requirements to be enforced during project implementation shall be defined prior to final approval of a project by the decision-maker. In response to established CEQA requirements, the MMP shall be submitted to the City of Los Angeles (Lead ) for consideration prior to certification of the EIR. Although the Lead may delegate monitoring responsibilities to other agencies or entities, the Lead remains responsible for ensuring that implementation of the mitigation measures occurs in accordance with the program. The MMP describes the procedures for the implementation of the mitigation measures to be adopted for the proposed project as identified in the EIR. The MMP provides clarity on monitoring actions and their timing. The MMP for the proposed project will be in place through the planning horizon of the Plan (030) or until the Plan and EIR are updated again. The City of Los Angeles Department of City Planning (DCP) shall be responsible for administering the MMP activities or delegating them to staff, other City departments (e.g., [DBS], Department of Public Works [DPW], etc.), consultants, or contractors. The City may choose to designate one or more environmental monitor(s) (e.g., City building inspector, project contractor, certified professionals, etc., depending on the provision specified below). Each mitigation measure is identified in Table - () and is categorized by environmental topic and corresponding number, with identification of: The agency this is in most cases, the DCP, DBS or the. The Enforcement and this is the agency or agencies that will monitor the measure and ensure that it is implemented in accordance with this MMP. Monitoring Phase/Monitoring this is the criteria that would determine when the measure has been accomplished and/or the monitoring actions to be undertaken to ensure the measure is implemented. City of LA EIR ENV-009-558-EIR CPC CPC-009-557-CPU, CPC CPC-009-557-CPU-M - State Clearinghouse 0080004

CHAPTER SECTION. Introduction Final EIR April 07 All agencies and departments are in the City of Los Angeles, unless otherwise noted. The implementing, enforcement and monitoring agencies, have authority to determine the applicability and compliance of all mitigation measures in their reasonable discretion. A number of mitigation measures are implemented through the adoption of standards in the CPIO. In implementing those mitigation measures, the CPIO shall indicate that the standard shall be waived by the City Planning Director or his or her designee where the mitigation measure is found based on substantial evidence to be no longer necessary for the purpose of which it was adopted (e.g., another regulatory agency requires an equal or more effective requirement, the City has adopted equally or more effective regulations that are applicable to the subsequent development; or the particulars of the subsequent development makes the standard unnecessary to address the impact intended to be mitigated; new technology has made the standard unnecessary to mitigate the impact). Similarly, as this is a long-term project and technology and circumstances may change between now and 030 that may make the mitigation measures in this MMP unnecessary or impossible, for all mitigation measures in the MMP, mitigation measures may be waived or not enforced if consistent with the requirements of CEQA (statute, guidelines and case law). State Clearinghouse 0080004 - City of LA EIR ENV-009-558-EIR CPC CPC-009-557-CPU, CPC CPC-009-557-CPU-M

Final EIR April 07 CHAPTER SECTION. Introduction Table - AESTHETICS MM4.- The CPIO District shall include regulations that minimize site-specific aesthetic impacts, including impacts to views lighting and shading. Department of Building Pre-construction; Issuance of building permits; Discretionary permit review AIR QUALITY The CPIO District shall include regulations for construction that require the following or comparable best management practices be included in contract specifications and/or printed on : Use properly tuned and maintained equipment. Construction contractors shall enforce the idling limit of five minutes as set forth in the California Code of Regulations. Use diesel-fueled construction equipment to be retrofitted with after treatment products (e.g. engine catalysts) to the extent they are readily available and feasible. Use heavy duty diesel-fueled equipment that uses low NOX diesel fuel to the extent it is readily available and feasible. Use construction equipment that uses low polluting fuels (i.e. compressed natural gas, liquid petroleum gas, and unleaded gasoline) to the extent available and feasible. Maintain construction equipment in good operating condition to minimize air pollutants. Construction contractors shall utilize materials that do not require painting, as feasible. Construction contractors shall use pre-painted construction materials, as feasible. Construction contractors shall provide temporary traffic controls such as a flag person, during all phases of construction to maintain smooth traffic flow. Construction contractors shall provide dedicated turn lanes for movement of construction trucks and equipment on- and off-site, as feasible. Construction contractors shall reroute construction trucks away from congested streets or sensitive receptor areas, as feasible. Construction contractors shall appoint a construction relations officer to act as a community liaison concerning on-site construction activity including resolution of issues related to PM0 generation. MM4.- Compliance certification report submitted by project contractor MM4.- The CPIO District shall include regulations that require construction projects greater than 5 acres to submit an air quality study that discuss the project s potential emissions for the following: CO, NOX, PM0, and PM.5. City of LA EIR ENV-009-558-EIR CPC CPC-009-557-CPU, CPC CPC-009-557-CPU-M -3 State Clearinghouse 0080004

CHAPTER SECTION. Introduction Final EIR April 07 MM4.-3 Table - The CPIO District shall include regulations that require the following greenhouse gas reduction measures be incorporated into the project design: For non-residential projects: all outdoor lighting systems shall be directed away from the window of any residential uses and shall comply with the non-residential Light Pollution Reduction standards in the Green Building Code of the Municipal Code. For non-residential projects: whenever new fixtures are installed, all water closets, urinals, shower heads, faucets and dishwashers shall be High Efficiency fixtures installed in accordance with the regulations of the City's Water Conservation Ordinance. For Multi-family and Commercial Projects: parking facilities shall have five (5) percent of the total parking spaces, but not less than one () space, capable of supporting future Electric Vehicle Supply Equipment (EVSE) charging locations. GREENHOUSE GAS EMISSIONS The CPIO District shall include regulations that require the following greenhouse gas reduction measures be incorporated into the project design: For non-residential projects: all outdoor lighting systems shall be directed away from the window of any residential uses and shall comply with the non-residential Light Pollution Reduction standards in the Green Building Code of the Municipal Code. For non-residential projects: whenever new fixtures are installed, all water closets, urinals, shower heads, faucets and dishwashers shall be High Efficiency fixtures installed in accordance with the regulations of the City's Water Conservation Ordinance. For Multi-family and Commercial Projects: parking facilities shall have five (5) percent of the total parking spaces, but not less than one () space, capable of supporting future Electric Vehicle Supply Equipment (EVSE) charging locations. MM4.6- State Clearinghouse 0080004-4 City of LA EIR ENV-009-558-EIR CPC CPC-009-557-CPU, CPC CPC-009-557-CPU-M

Final EIR April 07 CHAPTER SECTION. Introduction Table - NOISE The CPIO District shall include regulations that require contractors to include the following or comparable construction best management practices in contract specifications and/or printed on : Construction haul truck and materials delivery traffic shall avoid residential areas whenever feasible. If no alternatives are available, truck traffic shall be routed on streets with the fewest residences. The construction contractor shall locate construction staging areas away from sensitive uses. When construction activities are located in close proximity to noise-sensitive land uses, noise barriers (e.g., temporary walls or piles of excavated material) shall be constructed between activities and noise sensitive uses. Impact pile drivers shall be avoided where possible in noise-sensitive areas. Drilled piles or the use of a sonic vibratory pile driver are quieter alternatives that shall be utilized where geological conditions permit their use. Noise shrouds shall be used when necessary to reduce noise of pile drilling/driving. Construction equipment shall be equipped with mufflers that comply with manufacturers requirements. The construction contractor shall consider potential vibration impacts to older (historic) buildings. MM4.0- Pre-Construction; Construction; Inclusion in grading permit specifications UTILITIES/SERVICES SYSTEMS MM4.4- The CPIO District shall include regulations that incorporate water conservation measures into the project design, which may include but are not limited to measures identified in the City s Water Conservation Ordinance. Department of Water and Power MM4.4- The CPIO District shall include regulations that require that projects incorporate the Solid Waste Integrated Resources Plan measures to maximize source reduction and materials recovery and minimize the amount of solid waste requiring disposal with the goal of leading the City to achieve zero waste by 05. Bureau of Sanitation The CPIO District shall include regulations that incorporate energy conservation and efficiency measures into the design of new development, including but not limited to : energy saving windows, doors, insulation and passive solar design; energy efficient fixtures and appliances; efficient lighting, heating, air and ventilation systems; reused or recycled building materials. MM4.4-3 City of LA EIR ENV-009-558-EIR CPC CPC-009-557-CPU, CPC CPC-009-557-CPU-M -5 State Clearinghouse 0080004