M E M O R A N D U M Clallam County Public Works Department

Similar documents
FOREST INVESTMENT ACCOUNT FOREST SCIENCE PROGRAM

CRITICAL AREA DETERMINATION REPORT & HABITAT MANAGEMENT PLAN

Productivity of red alder in western Oregon and Washington

Prepared by: Rummel, Klepper & Kahl

I-405 Congestion Relief and Bus Rapid Transit Projects: Renton Nickel Improvement Project (Renton Stage 1) Mitigation Site USACE NWP

U.S. Army Corps of Engineers Permit Application Tips

Saturated Buffer. Subsurface Drainage PURPOSE N REDUCTION LOCATION COST BARRIERS

3.1 Affected Environment

Chapter 13: Wildlife and Vegetation

ATTACHMENT 4 USDA NRCS HYDRIC SOIL UNIT DESCRIPTIONS

Timber Sale Appraisal Shepherds Pie Sale cost summary. Conifer Hardwood Total. Gross Timber Sale Value $2,013, $13,263.

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

SECTION 3 NATURAL RESOURCES

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN

University of Florida Conservation Areas Land Management Plan Trillium Slope (Golf Course Woods)

Intermittent Stream Reclamation


WETLAND DELINEATION REPORT

Chapter 10 Natural Environment

NEW ENGLAND COUNCIL ON FOREST ENGINEERING CASE STUDY MARCH 6, 2012

Soil Resources Analysis Hurricane Ivan-RCW Expansion Project Conecuh National Forest

Queen Charlotte Islands Project

Stream Simulation in Very Low Gradient Channels

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

I THOUGHT IT WAS JUST WET LAND: A GUIDE TO ENVIRONMENTAL PERMITTING FOR AIRPORTS ROAD SCHOOL 2018 SIMON DAVIES, SENIOR SCIENTIST MARCH 7, 2018

PART I: ASSESSMENT OF WETLAND HYDROLOGY AT RESTORATION SITES PART II: CLIMATE CHANGE IMPACTS ON WETLAND HYDROLOGY BOUNDARIES. Mike Vepraskas NC State

Timber Sale Appraisal Sunday Passage Sale FG

7.6 Wetlands, Riparian and Littoral Habitats

Municipal Stadium Wetland

Merrill Crescent Septic Assessment, Lot 106, Merrill Rd., Madeira Park

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter F.A.C.

Terrestrial Resources Management Plan. Prepared By: Everett, WA

West Fork White River Watershed Conservation Map Summaries. Prepared for the Beaver Watershed Alliance. By the Watershed Conservation Resource Center

SNOHOMISH COUNTY COUNCIL SNOHOMISH COUNTY, WASHINGTON MOTION NO OPEN SPACE APPLICATIONS APPROVED

Wisconsin s Green Fire: Voices for Conservation

In 1997, the United States had 747

POND CONSTRUCTION. Woodland Steward Series

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

Integrating Water Quality and Natural Filters into Maryland s Marine Spatial Planning Efforts

Public Notice ISSUED: 26 December 2017 EXPIRES: 26 January 2018

City of Tacoma Regional Stormwater Facility Plan: ATTACHMENT 1: FLETT CREEK WATERSHED

Agricultural/Rural Riparian Buffer Analysis

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017

MANAGED FOREST LANDS STEWARDSHIP FORESTRY PLAN

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION

City of Dade City AMEC Project No Dade City Stormwater Master Plan September 2012 Page 11

Department of the Army Permit Application

Characteristics of Land Resources

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

3 PROJECT DESCRIPTION

Hydrologic Modeling with the Distributed-Hydrology- Soils- Vegetation Model (DHSVM)

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN

Androscoggin Lake's Outlet Delta System, Maine

HYDRIC SOILS. By Neal Svendsen Resource Soil Scientist Natural Resources Conservation Service Sept 2006

Stream Reaches and Hydrologic Units

Maryland s Living Shorelines Program. Bhaskaran Subramanian February 27, 2015

APPENDIX D EXTINCTION-DEPTH DETERMINATION

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

Culvert Sizing procedures for the 100-Year Peak Flow

Hubbard Lake State Game Area Master Plan

DRAFT GREATER MOOSES TOOTH TWO (GMT2) DEVELOPMENT PROJECT PERMITTEE RESPONSIBLE WETLANDS MITIGATION PLAN NATIONAL PETROLEUM RESERVE-ALASKA

Wetlands were once common features on the landscape. We know that many of them have been drained and filled. This presentation will show you how to

School Way Bridge Replacement Project

General Information. Reviewers Miles Hemstrom Steve Acker

NOTE(S): 1. Tongass National Forest LUD mapping from El Capitan GIS Scoping (R. Carstensen 2013).

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

Saving Native Trees. In the Pacific Northwest. A Guide to Native Tree Retention for Developers, Homeowners, Contractors and Professionals

GROWTH AND DEVELOPMENT OF RED ALDER COMPARED WITH CONIFERS IN 30-YEAR-OLD STANDS. Carl M. Berntsen. January 1961

Mount Hood National Forest Land Exchange Wetland Inventory

d. Estimated potential indirect impacts to ombrotrophic bog communities due to proposed mine dewatering should not be rated as no effect.

State of Alaska Department of Natural Resources Division of Mining, Land and Water Northern Regional Office. Preliminary Finding and Decision

E. STORMWATER MANAGEMENT

Placement and Interpretation of Soil Moisture Sensors for Irrigated Cotton Production in Humid Regions SITE SELECTION IN A FIELD OBJECTIVE

Section 12. Crowns: Measurements and Sampling

FOR. Wetland Resources, Inc. Project # Prepared By Wetland Resources, Inc th Avenue SE, Suite 106 Everett, WA (425)

MEMORANDUM. Requirements for Soils and Wetlands Data in Subdivision [Site Plan Review] Regulations, 1999

Custom Soil Resource Report for Polk County, Wisconsin

Risk Assessment Needs for Land Management Decisions at Cherry Point, Whatcom County, Washington

August, 2010 A-1, FSD 1 Page 1 STANDARD FSD NOTES. General Notes to include on all FSDs with all blanks filled in:

Holter Ridge Thinning Study, Redwood National Park: Preliminary Results of a 25-Year Retrospective 1

Paradise and Watson Creek Headcut Treatment Project (see map on next page)

Soil Permeability Demonstration

Western Muddy Creek, Oregon Landuse / Landcover. Legend. Version 21: 9/ 27/ Landuse / Landcover. Sources: 100 Acres.

Information Request 37

Preliminary Draft Wetland Delineation Technical Report:

Hydrologic Soil Group Knowledge Matrix

When it Rains it Pours

Natural Communities of Clay Soils in the Lake Champlain Basin

2

Project sponsors provided a brief presentation on their project(s), followed by comments from the Committee.

Lesson 2: Introduction to Plot Sampling

NJDEP Regulations that impact or soon will impact agricultural operations. April 1, 2007 Horses 2007

Bond release verification requirements for successful reclamation at Wyoming surface coal mines

SAJUAN) Ç(ISLA D, À/KITSA o ties J4A \131 U. S. DEPT. OF AGRICULTURE.FOREST SERVICE

Constructed Wetland Pond T-8

Big Hill Insect and Disease Project Proposed Action

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

Functional Uplift Based Stream Assessment & Restoration Design

SHAREHOLDER FIREWOOD PROCEDURE

Transcription:

M E M O R A N D U M Clallam County Public Works Department TO: TO: Craig Jacobs, Public Works Director Joel Winborn, Division Manager FROM: Dave Lasorsa, Environmental Coordinator SUBJ: Wetland Assessment of the Proposed Shooting Range DATE: July 8, 2005 On July 5th and 6th, 2005, I inspected the site for a proposed shooting range, located in T30N, R9W, SE ¼ of Sec. 6. This site is located on DNR lands, close to the headwaters of Susie and Sadie Creeks. The purpose of this inspection was to determine the presence or non-presence of wetlands along four firing ranges, and the future need for a formal wetland delineation. I have also prepared a map, using an aerial photo from August 2000 as a base. On this map are the approximate locations of the firing lines. I felt the creation of a new map was needed, since the original gun range map (dated January 2003) does not accurately show the location of the 1000-yard range. Without an accurate firing line location, the wetland locations would be meaningless. It should be noted however that all features are approximations and should be verified by delineations and surveys. On July 5 th I was met on site by Don Roberts and Rick Cahill. Although the ranges were flagged, Rick guided me though the 1000-yard range. Weather was overcast and raining. On July 6 th I visited the site alone, walking the 100, 200, and 300 yard ranges; and most of the 1000-yard range. Weather was overcast and raining. Description of the Landscape This site is rolling hills, forested, and marine-influenced. Most of the range lies within the watershed of Sadie Creek, however a portion drains to Susie Creek, including those lands located south of the DNR 1000 Rd. This visit did not include an assessment of those lands. Five soil types are located in the project area, as identified by the Soil Survey of Clallam County (1987): Mukilteo Muck (SCS 43) Bellingham silty clay loam (SCS 4) Sadie gravelly loam, 0 to 35 percent slopes (SCS 58) Lyre very gravelly sandy loam, 0 to 15 percent slopes (SCS 39) Lyre very gravelly sandy loam, 15 to 30 percent slopes (SCS 40) Of these soil types, close attention should be paid to any areas that are composed of Bellingham and Mukilteo soils. These are poorly drained soils that are associated with seasonally high water tables. Mukilteo muck is an organic soil. Typically, these soils support alder, with western red cedar and western hemlock to only a limited extent. Wetlands are often associated with these soils, as both are listed as hydric soils in Clallam County. In the project area, the extent of these two soil types closely matches the extent of wetlands, especially as the case with the Mukilteo soils. The area of

Page 2 of 6 alder/deciduous forest nearly follows the line of Mukilteo soils, which logically is close to the line of the DNR commercial thinning boundary. This soil deposit is located in a shallow valley (running northwest to southeast) at the headwaters of Sadie Creek, with the shooting range at its southeastern extent. Although a visit was not conducted northwest of the project area, it is very likely that the wetlands encountered at the shooting range merge to form a larger contiguous forested wetland as one moves further northwest, and that this wetland is associated with Sadie Creek. It is important to note however, that one should not assume to find wetlands, based only on a mapped soil type. The following should be kept in mind: 1. Both Bellingham and Mukilteo soils may contain other soil inclusions, especially at their margins. For example, moving the 1000-yard firing range just 100 feet further south will avoid most of the wetlands found on the eastern half of this line. 2. Local topography may present small elevation changes with different hydrologic regimes. This is the case with the area just east of the 300-yard firing line, along the 1000-yard range. An elevation gain of only four feet at this point produces a transition from an alder-dominated forested wetland to a dry upland coniferous stand. 3. The soil survey was done over large areas and site specific determinations may be different. 4. The presence of hydric soils is only one of three criteria used to determine regulatory wetlands. Site Surveys The County s Critical Areas maps only show tentative wetland locations which may trigger the need for a field determination. Wetlands are defined, and their presence is determined, by criteria established in the Washington State Wetland Delineation Manual and the 1987 Army Corps of Engineers Wetland Delineation Manual. Both manuals require the presence of three conditions to fully classify an area as a wetland: 1) hydric soils, 2) a dominance of hydrophytic (wetland) vegetation, and 3) hydrology. With this in mind, the following observations were made at each site and recorded on the attached map. The mapped notations P1, P2, S1, etc. refer to wetland or stream plots. The approximate boundaries of wetlands are shown as dashed green lines on the map. 100 and 200 Yard Ranges These were completely upland sites, with no wetlands present. 300 Yard Range This was also an upland site for its length, however, a wetland is entered just 10 feet west of the flag marked 300 yard butts, at a large cedar stump (Figure 1). A plot and soil pit (see P7 on the map) taken at this point found soil changing from gravelly sandy loam to Mukilteo and gleys, with standing water at 10 inches from the surface. Vegetation was predominantly an overstory of alder (Alnus rubra), with salmonberry (Rubus spectabilis), devils club (Oplopanax horridus), and skunk cabbage (Lysichiton americanum) comprising the shrub and herb layer. The presence of skunk cabbage is a reoccurring theme in much of the wetland areas. This plant is found mostly in forested wetlands, and it is an obligate wetland plants. Obligate plants have a 99% occurrence in wetlands. This wetland is extensive and continues south and north, eventually joining with the wetland noted at the 300-yard firing line of the 1000-yard range (see below). As a likely Class I wetland (see

Page 3 of 6 conclusion), this wetland would require a 200-foot buffer for major new development, thus a portion of this range would be located within the buffer. 1000 Yard Range S1: This is a crossing of a tributary of Sadie Creek. It would more accurately be labeled as the main channel of Sadie Creek, since it has a greater flow than the channel to the east. Although noted as a Type 4 Stream on County maps, it is at least a Type 3 Waters. Coho salmon and winter steelhead have been documented in this creek, and resident cutthroat are certainly present. During the July 5 th visit, coho fry were observed. Under the Clallam County Critical Areas Code, Type 3 Waters require a buffer of 100 feet for major new development. P1: At close to the 200-yard firing line, the edge of an extensive wetland is encountered (Figure 2). The area contains a network of braided channels, evidence of flows during at least part of the year. This drainage appears to flow towards the tributary noted above, or the main channel of Sadie Creek. The soil is Mukilteo muck and water is observed within 4 inches of the surface in soil pits. Although some western red cedar (Thuja plicata) stumps are present, the dominant overstory is now alder. Skunk cabbage, devil s club, salmonberry, and lily-of-the-valley (Maianthemum dilatatum) are dominant understory. This wetland continues to a point just shy of the 300-yard firing line. It likely extends southward to the line of alder/deciduous forest. Northward, it appears to become more extensive, eventually merging with the associated wetlands of Sadie Creek. East of the 300-yard line, a slight rise in elevation produces upland (non-wetland) sites. The vegetation is a mixed stand of western hemlock (Tsuga heterophylla), Douglas fir (Pseudotsuga menziesii), and red alder. The soils change dramatically from Mukilteo to a gravelly sandy loam (Lyre). This association continues for almost 300 yards, to approximately the 600-yard line. P2 through P4: At approximately 600 yards, 650 yards and 700 yards, a similar pattern of wetlands are found. Small, narrow rivulets of skunk cabbage, alder, and salmonberry thread their way to a point just intersecting the centerline of this firing range. These are following low depressions associated with drainage features. Further north, the margins of these wetlands widen and become more extensive, likely merging. To the south of the firing line, they are non-existent. Moving the firing line only 100 feet further south would place the centerline completely out of these areas (although the width of the range, service road, and wetland buffers would have to be taken into account). P5: This plot is located 55 feet west of the 800-yard firing line, and is interesting for what it is lacking. Although maps indicate this as the headwaters of Sadie Creek, no defined surface stream channel could be found; however, sub-surface flows are evident around root collars just north of this point. Standing water is found 10 inches below the surface in dug pits. Like P2-P4, a thin line of skunk cabbage and hydric soils is found here, becoming more extensive further north (Figure 3). To the south, this wetland ends within 70 feet. Again, moving the firing line only 100 feet further south would place the centerline completely out of this area. Small, isolated areas of potential wetlands (P6) exist along the drainage, up to the DNR 1000 road. These areas appear to be too small (less than 10,000 sq. feet) to be regulated by Clallam County Code. From the 800-yard line to the 1000-yard line, a slight elevation is gained and no wetlands were found.

Page 4 of 6 Conclusion Wetlands are definitely present within the proposed range. These are limited to the 1000-yard range, although the presence of a wetland just off the west end of the 300-yard range would place a portion of this line within a wetland buffer. Re-arranging either the angle or the location of the 1000-yard range can minimize (or avoid) impacts to the wetlands on the east half of this line, however, the large wetland on the west half appears to be unavoidable, unless the entire line can be shifted approximately 300 yards to the east. It was not the intention of this survey to classify the wetland, however it would likely be a Class I, according to criteria of the Clallam County Critical Areas Code. Class I wetlands require a buffer of 200 feet for major new development, and this should be taken into account when planning future locations. As stated, this assessment is not to be considered a wetland delineation. Although I am confident in the determination of wetlands at the locations noted, the mapped outlines are only rough estimates. A formal delineation and survey of wetland boundaries (within the project area) is the only means of accurately determining wetland impacts. David Lasorsa attachments Figure 1 Figure 2 Figure 3 Map of range and approximate wetland locations

Page 5 of 6 Figure 1. Wetland just west of the 300 Yard Range (P7). White flagging, marking butts, is top-center. Figure 2. Typical vegetation of wetland between the 200 and 300 yard firing lines, 1000 Yard range.

Page 6 of 6 Figure 3. Wetland along the 1000 Yard range, near the headwaters of Sadie Creek (Plot P5).