Prefeasibility Study of Naliakh Mine: Opportunities and Challenges

Similar documents
CBM AND CMM DEVELOPMENT IN MONGOLIA NEW POLICIES TO STIMULATE CLEAN ENERGY PROJECTS

Electricity Supply of Naryn Sukhait Coal Mine using Coal Bed Methane ULAANBAATAR

Shivee Energy integrated energy complex

Global Overview of Policies Affecting Coal Mine Methane (CMM) Recovery and Utilization

Disclaimer. The U.S. Environmental Protection Agency does not:

Coal Sub committee meeting at Cagliari, Italy April Strategies for promoting CMM project development in India

MONGOLIA S PERSPECTIVE ON GREEN DEVELOPMENT

Energy sector in Mongolia. Contents Brief of energy sector Energy sector policy Future trend

Silver Zinc Lead Coal District Project

Coal Mine Gas. Utilization Principles

A Comparison of Coalbed Methane Drilling Practices in the Southern Shanxi Province, China, through Advanced Reservoir Modeling

Introduction and Methodology

National Energy Policy of Ethiopia

POLICIES AND PROGRAMS RELATED TO GHG MITIGATION

Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements

Albertans and Climate Change: Moving Forward

THEME Country profile Current state of energy sector Outlook of energy demand and supply The energy policy Documents and its implementation. Short ter

RECOPOL. Reduction of CO 2 emission by means of CO 2 storage in coal seams in the Silesian Coal Basin of Poland RECOPOL

METHANE TO MARKET PARTNERSHIP Coal Mine to Market Subcommittee Country Profile: ITALY 1. INTRODUCTION OR SUMMARY OF COAL INDUSTRY AND CMM RECOVERY/USE

Methane and California s Livestock Operations. Rachel Tornek, Policy Director California Methane Symposium, Los Angeles March 12, 2015

British Columbia s Carbon Tax Strengths and Opportunities

Oregon Renewable Energy Resources

An Overview of Offsets from Mine Methane Capture and their Role in California Cap-and-Trade. June 19, 2014

MEMO 27 June District heating and combined heat and power in China

Heating Fuel Consumption and Expenditure

Fossil Fuel Consumption: United States and China

COMPLEX PROJECT FOR THE DEVELOPMENT OF BROWN COAL DEPOSITS KARA-KECHE AND MIN- KUSH (AK-ULAK SECTION)

2001 Question 28 Organic Geology A Non-renewable Resource (25 marks) (a) (i) Identify ONE property of coal that changes with increasing coal rank.

CMM Development at the Amasra Mine, Turkey

Leading PCI coal producer with significant reserves and resources

Resource Efficiency in Asian Cities: The Urban Nexus Da Nang/Vietnam, June, 2014

Numerical Simulation of Air Pollution in Ulaanbaatar City, Mongolia

The Impact of the Kyoto Protocol on the Global Coal Mine Methane Market

IMPLEMENTATION OF SMM IN INDONESIA PERSPECTIVE

ENCAP SP4 Chemical looping combustion

China s Energy Efficiency Policies PRADEEP PERERA PRINCIPAL ENERGY SPECIALIST EAST ASIA DEPARTMENT ASIAN DEVELOPMENT BANK

NRRI Colloquium July 11, 2015 Answering Questions about Methane Emissions from the Natural Gas Sector

RESEARCH AND DEVELOPMENT OF INDONESIA LOW RANK COAL

Carbon capture and storage

Waste to Energy WTERT, N.Y., October 2008

Climate Change and Power Supply Solutions: LFGE / MSWE Project development in Nigeria

Issues with petroleum

Mining Update - Mongolia

Overview of U.S. and European Climate Change Programs. Reid Harvey, U.S. EPA Presented at LSU Energy Summit October 24, 2007

Sustainable Energy for All (SE4ALL) Action Agenda for Ghana. Presented By: Gifty Delali Tettey (Mrs.) Deputy Director Ministry of Power

california CCS coalition Created to represent CCS industry to ensure CCS is part of state s carbon stabilization program. Bring voices to the table th

PENCONSULTING PROMOTES COAL WATER SLURRY APPLICATION TO FUEL POWER GENERATION

Energy Sector March 2016, Maseru, Lesotho Pavel Shermanau, IPCC TFI TSU

Gold Standard Passport CONTENTS

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM Version 01 - in effect as of: 15 June 2006 CONTENTS

Outline. Anderson Mining Company Ltd. Peel Region - Yukon s Mineral Wealth Wind River Energy Project The Future Planning Issues

Chapter: 1.1 Energy Scenario

INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE

Water and Energy Resource Potential of Ethiopia Status of Development and Investment Opportunities. Ethiopian Investment Forum 07 June, 2011

Egypt s s Policies and Measures for Sustainable Transport

Greening Urban Development : the Challenges and the Opportunities

Renewable energy (RE) is any energy source that naturally replenishes and cannot be exhausted. Renewable energies include:

Unconventional Gas Market Appraisal

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update

Mongolia s Green Development Policy Outcome-level Indicators. Yongsung Kim, GGGI Xin Zhou, IGES Mustafa Moinuddin, IGES

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM - Version 01

Action on Climate Change and Air Pollution

Clean and Secure Energy Actions Report 2010 Update. GHG Policies

Applied Environmental Consultants,

Supporting a greener and more energy efficient construction sector in Mongolia. Presented by: Gerelmaa Vangun Caritas Czech Republic, Project officer

Options for gas to power in South Africa

Development of the National System for the GHG inventory preparation Preparation GHG Emissions for National Communications Difficulties with data

Estimation of Emissions from CO 2 Capture and Storage: the 2006 IPCC Guidelines for National Greenhouse Gas Inventories

Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009

REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS

Welcomes. H.E. Milan Hovorka, Ambassador, The Czech Republic to India & Czech Business Delegation. 09 th Nov 2017 CIL HQ, Kolkata

Plate Tectonics and the Geology of Montana. Energy Resources

JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM Version 01 - in effect as of: 15 June 2006 CONTENTS

Journal of Chemical and Pharmaceutical Research

Some highlights of the Victoria study include: A large untapped resource: The modelling results show strong growth in

Addressing Canada s CO 2. Emissions Challenge

E. Duyuşen GÜVEN Department of Environmental Engineering Dokuz Eylul University, Izmir, Turkley

Urban Environmental Excursions

The Hope for Pakistan s Future

Shouyang CBM Project Design for Production

Your Family s Carbon Footprint

FRAMEWORK FOR SETTING ENERGY TARIFFS AND PRICES IN MONGOLIA, AND ITS POTENTIAL IMPROVEMENT IN THE FUTURE

Carbon Sequestration, FutureGen, and Coal Gasification Development in the Illinois Basin

Meri-Pori CCS Project. CCS Seminar, Hanasaari November Mikko Iso-Tryykäri

Sri Lanka s Market Readiness Proposal

ODGEREL Dalkhjav (M2) Supervisor: Prof Higano Yoshiro University of Tsukuba

THE AIR QUALITY MANAGEMENT IN WEIHAI

Opportunity of Co-benefits of Climate Change Mitigation Actions from Waste: Experience of Waste Concern in Bangladesh

Joseph S. D Amico PE

Barnett Shale Natural Gas Production and Air Quality

The effects of developing the geothermal energy in Uniejów town, Poland

MATERIAL FLOW ACCOUNTS OF MONGOLIA ( ) J.Terbish, National Statistical Office of Mongolia

Carbon Capture & Sequestration in the California Context

GROWTH OF LNG GAS MARKET AS ALTERNATIVE FUEL IN TRANSPORT

Doug Austin. Air Pollution Control Industry Focus on Carbon Capture Control Technology. Forum Session II

QUARTERLY REPORT March 2011

CHINA COALBED METHANE

Natural Gas Pathways: Towards a Clean and Renewable Energy Future for California

ASIAN DEVELOPMENT BANK

Energy situation in Astana

Transcription:

Prefeasibility Study of Naliakh Mine: Opportunities and Challenges M. Badarch, Dr Director of Mongolian Nature and Environment Consortium B. Namkhainyam, Mongolian University of Science and Technology G.Tulga, Ph.D Manager of MCS International Co.,ltd

Coal resources and coal deposits - Mongolia contains vast coal resources within 15 large-scale coal bearing basins - There are around 320 coal deposits and occurences ( 80 deposits and 240 occurences) - Total geological coal resources are estimated at approx.150 billion tons, including about 20 billion tons explored. - Major coal deposits: Tavantolgoi, Ulaan-Ovoo, Tugrug nuur, Tsaidam nuur,baga nuur, Shivee-Ovoo,Nariin sukhait

Coal and Green house gas including methane The energy sector of Mongolia is the country's largest contributor to GHG emissions The low energy content of Mongolian coal contribute to a high rate of carbon dioxide (CO2) release per capita. Energy sector emitted 60 per cent of total GHG in Mongolia Current estimates of population growth and economic growth indicate that Mongolia may experience a three-fold increase in energy demand by the year 2020 Throughout Mongolia, there are abundant coal resources, and associated CMM/CBM resources. It expected that coal methane resource is about 1 billion cubic meters

Main problem/barriers for recovery and use CMM/CBM in Mongolia No experienced companies in Mongolia to manage this type of work Lack of technology and technical knowledge (resources assessment, technology selection, formulating feasibility studies) Lack of financing or capacity to obtain financing Lack of clarify about legal and regulatory issues, especially coal and gas ownership in Mongolia Lack of pilot projects to demonstrate site specific economic recovery & utilization Not yet developed the investment opportunities in coal Mine methane project in Nalaikh mine

How to remove the above problems/ barriers Mobilize resources to Conduct Pre-feasibility and feasibility studies for CMM projects in Mongolia (identify promising sites for CMM project and conduct there conduct technical, economic and environmental feasibility assessments) Develop and implement Demonstration projects ( drilling for assessment CMM resources, collect detailed site data, and selection of technology of use of CMM) Develop and improve existing oil and petroleum legislation (technical safety standards and degasification requirements, coal and gas ownership issues, possible tax and other incentives and clarify data sharing procedures between Government and companies which drilled for CMM resources) Create national human capacity building (seminars/ workshops on CMM issues) Make resources mobilization for CMM projects (get support from donors, use the fund allocated for reduction of UB air pollution and get loan from Private sector)

The purpose of small project on Pre feasibility study project Methane recovery and utilization in Nalaikh mine area Conduct pre-feasibility on: (identify geology and mine condition of Nalaikh mine, Conduct preliminary assessment of economic and environment benefits of use methane ) Detailed study CMM resources of Nalaikh Elaboration of existing energy and investment laws in order to develop CMM project Develop the Methane recovery and utilization Project and submit it to Global Environment facility (GEF) for approval.

Why Nalaikh selected for implementing for Pre-feasibility study? Well developed mining site with a long history of use. Also, need to improve coal mine safety measures CBM resources is estimated about 200 million m3 Located 37 km from UB where 1/3 of Mongolia s population lives, as well as other provincial capitals A good infrastructure exists including roads, bridges, and the railroad. Concentrations of air pollution in Ulaanbaatar and Nalaikh area exceeds the permission levels for October to March due to increased emission from local heating resources and electric generation. Health risks: One of the three people in Ulaanbaatar are infected respiratory diseases.

The Nalaikh coal deposit is located approximately 40 km The Nalaikh colliery was established in 1922 and stopped its operation in 1992-1994 with a mining history of 70 years. There are still many small scale, artisanal mines operating at shallow depth to supply rather high quality coal to Ulaanbaatar and Nalaikh customers. Tsagaan Shonkhor Holding Company holds mining licenses in the western part of Nalaikh deposit area. The license area has five mineable coal seams and coal reserves are estimated to approximately 24 million tonnes

COAL PRODUCTION AND METHANE EMISSION CHARTS

PROPOSED TECHNOLOGIES Proposed technologies for the Nalaikh project include a methane distribution system that will carry high, medium and low quality gas to internal combustion engines. Given the preliminary resource assessment, it is estimated that two 1.8 MW engines will be deployed for a 3.6 MW power project.

MARKET ANALYSIS/DEMAND ANALYSIS The primary end use for the methane would be for electricity generation to support the mine's power supply. A 3.6 MW power plant is anticipated. If enough methane is available for a second stage of the project, coal mine methane could also be supplied to the district heating plant, which is located nearby and currently uses coal. For this second stage of the project, the boiler would need to be converted from coal to gas and construction of a gas supply pipeline of 3 to 4 kilometers would be required. Costs for implementation of the power project are estimated to be US$5 million. Costs for the second stage district heating plant have not yet been estimated. The project would require capital investment.

ASSESSMENT OF SOCIO-ENVIROPMENT BENEFITS OF CMM IN MONGOLIA

Require for CMM consumption To reduce Coal consumption in Ulaanbaatar city and its Nalaikh district Reduce expense of households and commercial facilities Reduce air pollution in Ulaanbaatar city Reduction GHG (CH4 gas) emission in Mines

Overview of fuel consumption in Ulaanbaatar city and it s district Nalaikh Nalaikh: Private houses or stoves 9000 annual coal consumption -37800 tn Heat only Boilers - 24GCal/h annual coal consumption -33800 tn Total-71600 tn Ulaanbaatar city: 130000 households Annual coal consumption -540000 tn 100,000 vehicles- Annual coal consumption 2200*100000=220000tn Heat only Boilers- Annual coal consumption 2200*100000=32350 tn Total- 792350 tn

Coal price and it s volume in the expences Price of Nalaikh s coal- 35 45 U$/tn Price of Baganuur s coal- 32 40 U$/tn Heating cost - In heat-only boilers 24 u$/gcal Coal price is 60% of heating cost. A household spends annually: ~ 4.5t (coal)* 45000 = 250000...300000 (260 US) Heat expenses rate is 30% in total expenses Schools, Health Facilities (Municipal Organizations).

Air Pollution Ulaanbaatar city and it s Nalaikh district Air pollution is increasing because of coal burning in inefficient stoves Smog concentration esimating experiment Chemical name Stove-2 Average 1 СО mg/m3 1998.656 1918.98 2 SО 2 mg/m3 2.3 19.37 3 NО X mg/m3 2.8815 12.44 4 Ash in gas mg/m3 1531.8 1222.88 5 GHG, CO 2 mg/m3 59028.75 53030.2

CMM Parameters Methane rate: Kuzbass coal mine 25-30m.cub/tonne Nalaikh coal mine 5 m.cub/tonne Net Heating Value- 10000 kcal/kg Density 0,72 kg/m3 Possibility of high pressure compression Price is three times low than coal s 4 times less Hazardous Gas Emission than Coal

Methane Annual Demand In Nalaikh district o Householders -1400m3*9000=130,000m3 o Heat-only boilers 11,000,000 m3 TOTAL- 11,1 million m3(8136.0 tn) coal-2,2 mln tn In Ulaanbaatar city o Householders - 182,000,000 m3 o Auto transport -3,500,000,000 m3 o Heat Plants- 45,000,000 TOTAL-185 million m3

Environmental benefits Reduction of GHG emission Per household: CO2-2.2 tn/year NH4 1.1 tn/year Per GCal heat: CO2 0,33 tn/year NH4 0.1 tn/year in Nalaikh district 1. Households: CO2 19800 tn/year; NH4 9900 tn/year 2. HOB s: CO2-66000*0,33=21780 tn;nh4-66000*0,1=6600tn in Ulaanbaatar 1. Households: CO2 130000*2,2=286000 tn; NH4 143000 tn 2. HOB s: CO2-275000*0,33=90000 tn;nh4-275000*0,1=27500tn

Economical benefits of CMM Consumption a) heat-only boilers will reduce their heating cost by 16000 or 14$/Gcal b) Householder will economy 100000 or 86 u$ in fuel expenses c) Vehicle fuel expenses-500000 or 460$/year in Nalaikh district 1. heat-only boilers-66000*14=924000 $ 2. Household s -9000*86=774000$ total-1,9 million In Ulaanbaatar 1. heat-only boilers-275000*14=3,8 mln $ 2. Household s -130000*86=11,2 mln $ 3. Vehicles-80000*460=36,8 mln $ total- 51,2 mln $

THANK YOU FOR YOUR ATTENTION