ASX ANNOUNCEMENT 12 MAY 2016

Similar documents
Awak Mas DFS Optimisation - Metallurgical Breakthrough

For personal use only

ABM Hits 3000 Ounce Target from Trial Mining

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Second drill rig to accelerate major drilling program at Productora

For personal use only

For personal use only

Report No. A13575 Part 5

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

For personal use only

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

For personal use only

Tri-K feasibility study update

Activities Report Quarter Ended 31 st March 2015

ASX Release ASX Code: YTC

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

For personal use only

Geology and mineral resources of the Kylylahti Mine

Azure Minerals Ltd ASX Code:

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

EXCELLENT NICKEL LEACHING TESTWORK RESULTS

Copyright in this document is wholly reserved to Ausenco Services Pty Ltd.

OSISKO REPORTS INCREASED GOLD RECOVERY RESULTS AT MARBAN

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

Maiden Inferred Iron Ore Resources for Gum Flat

The competent person in mine-site evaluation and responsibilities for study design, management and findings

209 million 36.1% Fe

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

Ore Reserves and Mineral Resources Statements 30 June 2013

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

WPG TO ENTER THE IRON ORE INDUSTRY

Developing High Grade Projects in Mexico

For personal use only

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

For personal use only

ERDENE RESOURCE DEVELOPMENT CORP.

QUARTERLY REPORT March 2011

Australia s leading explorer in Mexico

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

Atlantic Ltd (ASX: ATI; Atlantic or the Company) is pleased to present its report for the quarter ended 30 June 2011.

SARAMA RESOURCES DECLARES MAIDEN INFERRED MINERAL RESOURCE OF 1.5 MILLION OUNCES GOLD AT THE SOUTH HOUNDÉ PROJECT

Australia s New Nickel

Australasian Code for Reporting of Mineral Resources and Ore Reserves

The World s Next HIGH GRADE Vanadium Mine

AVINO SILVER & GOLD MINES LTD.

For personal use only

RESULTS OF XSTRATA EXPLORATION AT ROSEBY IN 2011

For personal use only

For personal use only. Minerals Explorer in South Korea

For personal use only

For personal use only

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

For personal use only

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA

Locked Cycle Leaching Test and Yellowcake Precipitation

For personal use only

Improvements in bi-metal production at the Brunswick plant, Costerfield.

Mt Morgans Australia s next 200kozpa gold producer

For personal use only

EXCO S PROJECT PIPELINE

Corvus Gold Receives Sulfide Gold Recovery of +90% Using AAO Process at the North Bullfrog Project, Nevada

For personal use only. Cummins Range Rare Earths Project

Golpu Pre-Feasibility Study and Reserve Announcement (all figures in United States dollars and in 100% terms unless stated otherwise)

Kibali Mine Development

Maiden Ore Reserve for Anglo Saxon Gold Project

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

For personal use only

Valence Industries Australia s Only Graphite Producer

PRESS RELEASE CANADIAN ZINC REPORTS ON ANNUAL GENERAL MEETING OF SHAREHOLDERS. Company Provides Corporate Update

Trading Symbol: TSXV: BMC News Release No Shares Outstanding: 166,283,160 May 8 th, 2013

Papua New Guinea Mineral resources and ore reserves

AMUR MINERALS CORPORATION (AIM: AMC) Independent Review of Cost Estimates $1.78 Per Pound Nickel Cost to Deliver to Rail Station

Major Capital Cost Reductions Reposition Wa Gold Project, Ghana

Ste De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: Fax:

For personal use only

EXCO S PROJECT PIPELINE. Unlocking the Value

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation

RESOURCE GOLD PTY. LTD.

Indonesia s Next World Class Mining Company

Confidence in Carrapateena project grows

Forward Looking Statement

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

ASX Announcement 25 January 2017

Resource Efficient Mining Processes of Tomorrow

For personal use only

For personal use only

RUNRUNO GOLD MOLYBDENUM PROJECT FEASIBILITY STUDY AND RESOURCE UPDATE

EMERGING GRAPHITE AND IRON ORE PRODUCER 2 MINES IN 2 YEARS

Forward Looking Statements. Forward looking statements in these materials speak only at the date of issue. Subject to any

Investor Presentation

On The Road To Silver & Gold Mining In Mexico

White Dam Gold Project Dump Leach

ASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL

Outotec OreMet Optimizer

Ore Dilution Estimation Model in Tanzania Southern Highland Zone: A Case of New Luika Gold Mine

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )

Transcription:

ASX ANNOUNCEMENT 12 MAY 2016 FÄBOLIDEN METALLURGICAL TEST WORK IMPROVES RECOVERY LEVELS Dragon Mining Limited (ASX:DRA) ( Dragon Mining or the Company ) is pleased to announce that the second phase of bench scale metallurgical test work for the Fäboliden Project ( Fäboliden ) in northern Sweden has successfully been completed. Material from Fäboliden returned gold recoveries of 83%, higher than that obtained in earlier test work programs, whilst the gravity regrind tests resulted in a further 3% increase in recovery to 86%. The test work program was conducted to assess the possibility of increasing recovery from material at Fäboliden by producing a high-sulphur gravity concentrate for regrind and intensive leaching. The test work was undertaken at the SGS Australia s facility in Malaga, Western Australia, on representative samples from the planned southern open-pit area at Fäboliden. It follows on from extensive flotation test work undertaken by the previous owners and an initial phase of metallurgical bench scale test work and a 1,000 tonne production test by Dragon Mining in 2014. In summary the new test work has shown that: Comminution results yielded moderate levels for abrasion and hardness with an Abrasions Index of 0.239 and Ball and Rod Mill Work Indices of 14.8kWh/t and 18.4 kwh/t, respectively. Values for abrasion and hardness are similar to levels obtained in previous test work; Diagnostic leaching returned values similar to those in previous test work, with the master composite showing approximately 80% of the gold available for cyanide leaching at a grind P 80 of 75 µm; Whole ore leaching on variability samples returned overall gold extraction levels at 83%, higher than obtained in previous test work. Cyanide and lime consumption were moderate at approximately 0.7 kg/t and 0.4 kg/t, respectively; and Gravity regrind tests resulted in a 3% recovery increase to 86%, compared with the standard whole ore leach test. The whole ore leach tests showed the material to be grind sensitive, with increasing recovery at decreasing grind size. The addition of lead nitrate was shown to improve leach kinetics and as such will be considered for inclusion in the Svartliden Plant reagent regime. In order to improve overall gold recovery a gravity (sulphide rich) concentrate was produced, reground and leached separately to the gravity tail. Based on the results obtained a preliminary flow sheet has been developed for the Svartliden Plant, for the processing of Fäboliden material. Engineering evaluation is now being conducted to assess the economics for the inclusion of a gravity circuit, regrind and gravity leach facility, which could result in additional gold being recovered. For and on behalf of Dragon Mining Limited

Table 1 Results from the Second Phase of Metallurgical Bench Scale Test Work. Comminution Abrasion Index 0.239 Bond Rod Mill Index (RW) (kwh/t) 18.4 Bond Ball Mill Index (BW) (kwh/t) 14.8 Diagnostic Leaching Grade Distribution Test Work Program (%) SGS 2016 2.91 83.2 Whole Ore Leaching Grind Head Residue Consumption Test Size Grade Extraction Comments P80 µm g/t g/t % Lime NaCN Grind Baseline Tests FAB002 106 3.12 0.69 77.9 0.43 0.70 FAB003 75 3.26 0.53 83.7 0.53 0.67 FAB004 53 3.14 0.42 86.8 0.52 0.84 Lead Nitrate Tests FAB005 75 3.20 0.57 82.3 0.42 0.59 100 g/t PbNO3 FAB006 75 3.30 0.55 83.3 0.41 0.56 250 g/t PbNO3 CIL Kinetic Tests (10 g/l carbon) FAB013 75 3.21 0.43 86.6 0.31 0.83 CIL Kinetic Test 250 g/t PbNO3 FAB014 75 3.23 0.49 84.8 0.31 0.71 Bulk CIL Kinetic Test 250 g/t PbNO3 Gravity Leach Tests Master Composite Tests Extraction (%) (16hr leach at P80 = 75 µm) Overall Gravity Whole Ore Leach 83.2-20 µm Regrind 86.1 3.0 10 µm Regrind 86.2 3.1 Comments

Background The Fäboliden Project ( Fäboliden ) is an advanced gold project located 30 kilometres by road, southeast of Dragon Mining s wholly owned Svartliden Plant an operating 300,000 tonne per annum conventional comminution and carbon in leach (CIL) plant and 750 kilometres north of the Swedish capital Stockholm. The project area comprises the Fäboliden K nr 1 Exploitation Concession that hosts the Fäboliden Deposit and a series of Exploration Permits that encompass the strike extensions of the deposits host geological sequence. The Fäboliden Deposit represents an orogenic gold deposit, with mineralisation hosted by Paleoproterozoic meta-sediments and metavolcanic rocks, surrounded by granitoids. The host sequence is cross-cut by a set of northwestsoutheast striking, flat lying undeformed and unmineralised dolerites. The deposit has been is defined over a strike length of 1,295 metres and includes a 665 metre vertical extent from 485mRL to - 180mRL. displays a strong association with sulphides and most abundant gangue minerals. Exploration at Fäboliden commenced in 1993 and has primarily involved drilling, with 333 holes (64,784.47 metres) completed prior to Dragon Mining s acquisition of the project. In addition to drilling, other activities undertaken by the previous owners include test mining and processing, resource estimation and compilation of a Definitive Feasibility Study for a large tonnage low grade mining and processing operation. Dragon Mining completed the conditional acquisition of Fäboliden in December 2015 and have: carried out a 34 hole (2,941.50 metres) diamond core drilling program to evaluate the near surface, higher grade zone in the southern portion of the deposit, yielding a number of significant intercepts including highlights 4.00 metres @ 20.70 g/t gold, 7.00 metres @ 18.24 g/t gold, 14.00 metres @ 11.05 g/t gold, and 13.00 metres @ 8.37 g/t gold; undertaken the maiden Mineral Resource estimate for the higher grade zone of mineralisation returning 6,900,000 tonnes grading 3.3 g/t gold for 743,000 ounces (Appendix 1); and achieved a positive outcome for a Pre-Feasibility level study generating a maiden Ore Reserve of 1,067,000 tonnes grading 3.2 g/t gold for 110,000 ounces (Appendix 2). Fäboliden drilling results were previously released to the ASX on the 29 July 2015 High Grade Intercepts Received from the Fäboliden Project and 15 September 2015 - Robust Results Highlight Potential at Fäboliden. Fäboliden Mineral Resources and Ore Reserves were previously released to the ASX on 31 December 2015 Maiden Mineral Resource for Fäboliden Deposit, 29 February 2016 Dragon Group Mineral Resources Updated and 30 March 2016 Ore Reserves for the Nordic Production Centres. These releases can be found at www.asx.com.au (Code:DRA).

Competent Persons Statements: The information in this report that relates to Ore Reserves for the Fäboliden Project were previously released to the ASX on the 30 March 2016 Ore Reserves Updated for the Nordic Production Centres. This release can be found at www.asx.com.au (Code:DRA). It fairly represents information and supporting documentation compiled or supervised by Mr. Joe McDiarmid, who is a Chartered Professional Member of the Australasian Institute of Mining and Metallurgy and is an employee of RungePincockMinarco Limited. Mr. Joe McDiarmid has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code of Reporting for Exploration Results, Mineral Resources and Ore Reserves. Written consent was previously provided by Mr. Joe McDiarmid for the 30 March 2016 release. The information in this report that relates to Mineral Resources for the Fäboliden Project was previously released to the ASX on the 31 December 2015 Maiden Mineral Resource for Fäboliden Deposit, which can be found at www.asx.com.au (Code:DRA). It fairly represents information and supporting documentation that was compiled or supervised by Mr. Jeremy Clark, who is a full time employee of RungePincockMinarco Limited and a Registered Member of the Australasian Institute of Mining and Metallurgy. Mr. Jeremy Clark has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that being undertaken to qualify as a Competent Person as defined in the JORC Code 2012 Edition. Written consent was previously provided by Mr. Jeremy Clark for the 31 December 2015 - Maiden Mineral Resource for Fäboliden Deposit release. The information in this report that relates to Exploration Results for the Fäboliden Project were previously released to the ASX on the 29 July 2015 High Grade Intercepts Received from the Fäboliden Project and 15 September 2015 - Robust Results Highlight Potential at Fäboliden, which can be found at www.asx.com.au (Code:DRA). It fairly represents information and supporting documentation that was compiled or supervised by Mr. Neale Edwards, a Fellow of the Australian Institute of Geoscientists who is a full time employee of the company and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code of Reporting for Exploration Results, Mineral Resources and Ore Reserves. Written consent was previously provided by Mr. Neale Edwards for the 29 July 2015 and 15 September 2015 releases. The Company confirms that it is not aware of any new information or data that materially affects the Ore Reserves for the Fäboliden Project as reported on the 30 March 2016, is not aware of any new information or data that materially affects the Mineral Resources for the Fäboliden Project as reported on the 31 December 2015 and is not aware of any new information or data that materially affects the Exploration Results for the Fäboliden Project as reported on the 29 July 2015 and 15 September 2015. The assumptions and technical parameters underpinning the Ore Reserve and Mineral Resource estimates in the releases dated 30 March 2016 and 31 December 2015 and the Exploration Results in the releases dated 29 July 2015 and 15 September 2015 continue to apply and have not materially changed. Mr. Neale Edwards BSc (Hons), a Fellow of the Australian Institute of Geoscientists, who is a full time employee of Dragon Mining Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code of Reporting for Exploration Results, Mineral Resources and Ore Reserves confirms that the form and context in which the Ore Reserves, Mineral Resources and Exploration Results are presented in this report have not been materially modified and are consistent with the 30 March 2016, 31 December 2015, 29 July 2015 and 15 September 2015 releases. Mr. Neale Edwards has provided written consent approving the statements of Ore Reserves, Mineral Resources and Exploration Results in this report in the form and context in which they appear. The information in this report that relates to metallurgical test work results is based on and fairly represents information and supporting documentation compiled by Mr. Neale Edwards BSc (Hons), a Fellow of the Australian Institute of Geoscientists who is a full time employee of the company and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code of Reporting for Exploration Results, Mineral Resources and Ore Reserves. Mr. Neale Edwards has provided written consent for the inclusion in the report of the matters based on his information in the form and context in which it appears.

Appendix 1 - Mineral Resource estimate for the Fäboliden Project as at 1 September 2015. Measured Indicated Inferred Total Tonnes Ounces Above 350mRL - Reported on a dry in-situ basis at a 1.5 g/t gold cut-off - - - 3,500,000 2.9 325,000 800,000 2.5 67,000 4,300,000 2.8 392,000 Below 350mRL - Reported on a dry in-situ basis at a 2.9 g/t gold cut-off - - - 400,000 4.1 47,000 2,300,000 4.1 304,000 2,600,000 4.1 351,000 Total - - - 3,800,000 3.0 372,000 3,100,000 3.7 370,000 6,900,000 3.3 743,000 Note: Mineral Resources may not sum due to rounding. Mineral Resources reported on a dry tonne in-situ basis. Appendix 2 - Ore Reserves for the Fäboliden Project as at 1 September 2015. Proved Probable Total Tonnes Ounces Fäboliden Project - - - 1,067,000 3.2 110,000 1,067,000 3.2 110,000 Note: Ore Reserve estimates have been rounded to reflect accuracy. All the estimates are on dry tonne basis. The in-situ ore cut-off grade is 1.63 g/t gold, which is based on a gold price of US$1,150 per ounce, mining factors, metallurgical factors (gold recovery factor of 74%) and costs.