Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Similar documents
For personal use only

EXCO S PROJECT PIPELINE

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Second drill rig to accelerate major drilling program at Productora

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

EXCO S PROJECT PIPELINE. Unlocking the Value

ABM Hits 3000 Ounce Target from Trial Mining

For personal use only

Kibali Mine Development

Confidence in Carrapateena project grows

Activities Report Quarter Ended 31 st March 2015

For personal use only

Tri-K feasibility study update

Study on Gonka Deposit and Taurus Extension

Azure Minerals Ltd ASX Code:

Awak Mas DFS Optimisation - Metallurgical Breakthrough

For personal use only

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

ASX Release ASX Code: YTC

QUARTERLY REPORT March 2011

Ore Reserves and Mineral Resources Statements 30 June 2013

AVINO SILVER & GOLD MINES LTD.

OCEANAGOLD PROVIDES AN UPDATE TO HAILE COMMISSIONING AND REVISED COMPANY GUIDANCE

For personal use only

For personal use only

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )

For personal use only

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

Australia s leading explorer in Mexico

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Indonesia s Next World Class Mining Company

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

For personal use only. Minerals Explorer in South Korea

RESOURCE GOLD PTY. LTD.

For personal use only

Forward Looking Statement

For personal use only. Cummins Range Rare Earths Project

For personal use only

WPG TO ENTER THE IRON ORE INDUSTRY

For personal use only

Australia s New Nickel

Corvus Gold Receives Sulfide Gold Recovery of +90% Using AAO Process at the North Bullfrog Project, Nevada

Mt Morgans Australia s next 200kozpa gold producer

Mining Update - Mongolia

Major Capital Cost Reductions Reposition Wa Gold Project, Ghana

Geology and mineral resources of the Kylylahti Mine

209 million 36.1% Fe

ASX / MEDIA ANNOUNCEMENT 5 March 2018

On The Road To Silver & Gold Mining In Mexico

23 July Half-Year Trading Update Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries excluding IRC Limited

Syerston Nickel & Cobalt Pre-Feasibility Study Completed. Scandium by-product credits provide potential for significant economic upside

The competent person in mine-site evaluation and responsibilities for study design, management and findings

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

White Dam Gold Project Dump Leach

Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION

Atlantic Ltd (ASX: ATI; Atlantic or the Company) is pleased to present its report for the quarter ended 30 June 2011.

Improvements in bi-metal production at the Brunswick plant, Costerfield.

Golpu Pre-Feasibility Study and Reserve Announcement (all figures in United States dollars and in 100% terms unless stated otherwise)

For personal use only

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

Forward Looking Statements. Forward looking statements in these materials speak only at the date of issue. Subject to any

For personal use only

The materials used herein and this presentation (collectively, the Presentation ) have been prepared by PT Agincourt Resources (the Company ) solely

BUILDING CANADA S LARGEST GOLD MINE Production Early Mining Ready Summit October 23, 2012

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway

For personal use only

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

OSISKO REPORTS INCREASED GOLD RECOVERY RESULTS AT MARBAN

Developing High Grade Projects in Mexico

For personal use only

WAY AHEAD 2016 Business Review & Sustainability Report

KINROSS GOLD CORPORATION Tasiast analyst & investor tour: Developing a world-class mine

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

RIO PARDO IRON ORE PROJECT, BRAZIL TECHNICAL PRESENTATION

For personal use only

For personal use only

CNMC Goldmines Holdings Limited Sokor Gold Project Kelantan - Malaysia Reserves Dec 2011 Manson s & New Discovery Mines

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

For personal use only

Outlook for Zirconium and Rare Earth Materials until 2020

For personal use only

Non-IFRS performance measure. Refer to the Non-IFRS Performance Measures contained in the Q Management s Discussion and Analysis.

EXCELLENT NICKEL LEACHING TESTWORK RESULTS

ASX Announcement 25 January 2017

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

ASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL

For personal use only

WIM150 Mineral Sands Project 15 th Anniversary Mineral Sands Conference

RESULTS OF XSTRATA EXPLORATION AT ROSEBY IN 2011

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation

For personal use only

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood

A New Copper Producer. Update for European and UK Investors. March ASX: AOH FSE: A2O ACN

Papua New Guinea Mineral resources and ore reserves

6 th World Aluminium Raw Materials Summit

Transcription:

ASX ANNOUNCEMENT 29 March 2010 Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum PanAust is pleased to announce that the Board of Directors has approved the development of the Ban Houayxai Project in Laos (Figure 1). The successful Feasibility Study was based on an open pit mining operation feeding ore to a conventional 4Mtpa Carbon In Leach (CIL) process plant to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum. The Mineral Resource (Table 1) has been estimated at 42.7Mt grading 1.1g/t gold and 8.0g/t silver for 1.6 million ounces of contained gold and 11 million ounces of silver. The total Ore Reserve (Table 2) has been estimated at 28Mt of ore grading 0.8g/t gold and 6.8g/t silver. The Feasibility Study was used as a basis for an Investment Case mining schedule presented to the Board, based on a larger pit shell to the Ore Reserve, and comprising 32.4Mt grading 1.0g/t gold and 8.4g/t silver. The Investment Case pit shell includes higher primary inferred mineral resources for over one million ounces of contained gold and nearly nine million ounces of contained silver. Under the Investment Case, no inferred mineral resources are scheduled to be mined in the first six years of the initial eight year mine life. There is a high degree of confidence that an ongoing drill program will continue to identify additional resources and convert in pit inferred mineral resources to the measured and indicated categories for inclusion in the Ore Reserve. Ban Houayxai is owned by PanAust s 90% held subsidiary in Laos, Phu Bia Mining. Under the schedule for government approvals and construction, commissioning is targeted for the December quarter 2011 with steady state gold production in the March quarter of 2012. Ban Houayxai Project, key project parameters: Investment Case Waste:Ore strip ratio Process plant Average annual production Recovery rates 32.4Mt at 1.0g/t gold and 8.4g/t silver Less than 1.5:1, no pre strip required Carbon in leach, 4Mtpa throughput capacity Over 100,000oz gold and 700,000oz silver : recovery range is 80% to 94% with an average of 87% over the life of the mine : average recovery 70% with only minor variation across mineralisation types Mine Life Minimum 8 years, mineralisation is open at depth and to the west Pre development Capital US$16M, approved November 2009 Development Capital US$134M, includes 10% contingency Cash Operating Cost 1 Between US$400/oz and US$450/oz gold 1 Before royalty, assumes silver by product credit at US$13/oz PanAust Limited ABN 17 011 065 160 Level 2, 99 Melbourne Street PO Box 3468 South Brisbane Qld 4101 Phone +61 (0) 7 3117 2000 Facsimile +61 (0) 7 3846 4899 info@panaust.com.au www.panaust.com.au

Cash costs (net of silver by product credit and excluding royalty) are expected to range between US$400/oz and US$450/oz of gold respectively. The development cost is estimated at circa US$134M, subject to detailed design work, and includes a contingency of 10%. Predevelopment capital of US$16M was approved by the PanAust Board in November 2009, mainly for the establishment of a new access road to the Ban Houayxai site, plant site earthworks and construction camp. PanAust Managing Director, Gary Stafford said Development of Ban Houayxai is the next stage of growth for PanAust which has a pipeline of projects targeted at doubling production over the next five years. We anticipate that at prevailing copper and gold prices the Ban Houayxai development can be funded through PanAust s cash flow. In addition, the Company is in the process of negotiating US$100 million of debt facilities for Phu Bia Mining, which will enhance funding flexibility across the PanAust Group. Major earth works at Ban Houayxai are well advanced; process plant area The Project The Ban Houayxai gold silver deposit is located approximately 25km west of PanAust s flagship Phu Kham Copper Operation in Laos. Major earthworks, in preparation for camp construction and initial civil works, are underway at Ban Houayxai following Government of Laos approval for these works to be completed before the 2010 wet season. Major construction work and operations will be subject to Government of Laos acceptance of the Environmental and Social Impact Assessment (ESIA) which will be lodged in early April. The deposit remains open at depth and to the west. Resource development drilling is continuing aimed at delineating both additional near surface oxide mineralisation and upgrading the resource categorisation of deeper primary mineralisation with the aim of extending mine life beyond 10 years. Page 2

The Ban Houayxai Project will consist of an open pit mine supplying ore to a crushing and grinding (SAG and ball mill) circuit with gold recovery via a combined gravity and CIL process plant with nameplate throughput of 4Mtpa on a transitional/primary ore blend. Inclusion of a 26 foot diameter 6.5MW high aspect SAG mill represents the main design change to the process flow sheet during the feasibility study and is the main reason for the increase in development capital since the pre feasibility study was completed. It is envisaged that on a blend of oxide/transitional ores that mill throughput rates of up to 5Mtpa will be attainable. However, the comminution circuit was sized to treat harder transitional and primary ores, which represents the bulk of the mill feed under the Investment Case schedule and supports PanAust s confidence in adding further primary mineralisation tonnes to the resource base. The open pit mine will be a conventional truck and shovel operation. The life of mine strip ratio based on the current mine plan is less than 1.5:1. No pre stripping of the deposit is required. The equipment fleet will consist of ten 92 tonne capacity dump trucks, two 100 tonne excavators and an associated ancillary fleet. The mining equipment will be similar to the existing fleet at Phu Kham to ensure standardisation of maintenance components and procedures between the two sites. The grinding circuit includes a gravity concentrator to recover coarse gold. The amount of gold recovered in the gravity circuit varies by ore type but can be as high as 35% of the total gold recovery. The overall gold recovery is expected to average 87% over the life of the mine, with silver recovery averaging approximately 70%. Higher recoveries are envisaged when oxide ore is processed. The Project development will include construction of a new access road and a power line spur connected to the grid near the town of Vang Vieng, approximately 30kms west of the project. An accommodation camp will be constructed for the majority of the workforce, which is estimated to total 526 during steady state operations and up to 630 during construction. Raw water for the process plant will be sourced from the adjacent Nam Ngum 2 reservoir. Detailed engineering of the process plant and procurement including that for long lead equipment items will be undertaken by AMEC Minproc. Construction management of the process plant and all site works will be managed by PanAust. For further information contact: Mr Gary Stafford Managing Director PanAust Limited Tel: +61 7 3117 2000 Email: info@panaust.com.au Website: www.panaust.com.au Mr Allan Ryan Investor Relations Manager Page 3

Table 1: Ban Houayxai Mineral Resources 2 : Mineral Resources Oxide/Transitional @ 0.4g/t gold cut off Primary @ 0.7g/t gold cut off Combined Oxide/Transitional/ Primary Resources Category Tonnes (Mt) in situ in situ Measured 5.7 1.05 5.54 190 1,020 Indicated 15.5 0.91 7.05 450 3,520 Inferred 1.7 0.82 4.80 40 260 SUB TOTAL 22.9 0.94 6.51 680 4,800 Indicated 4.1 1.47 10.18 190 1,340 Inferred 15.7 1.35 9.66 680 4,880 SUB TOTAL 19.8 1.37 9.77 870 6,220 Measured 5.7 1.05 5.54 190 1,020 Indicated 19.6 1.03 7.70 650 4,860 Inferred 17.4 1.30 9.19 730 5,140 TOTAL 42.7 1.14 8.02 1,570 11,020 Table 2: Ban Houayxai Ore Reserves: Ore Reserves Price assumptions: US$900/oz US$13/oz Category Tonnes (Mt) Cont. Cont. Proved 8 0.85 5.2 210 1,300 Probable 20 0.80 7.4 520 4,800 TOTAL 28 0.81 6.8 730 6,100 2 The Mineral Resources were estimated using a geologically constrained model and indicator kriging at the stated cut off s. Grades and tonnes are rounded to one decimal place. Rounding may cause minor computational discrepancies. The Mineral Resources are reported on a 100% basis. PanAust has a 90% beneficial interest. Page 4

Figure 1: Ban Houayxai Project layout Page 5

Competent Person Statements The data in this report that relates to Ban Houayxai Mineral Resources is based on information reviewed by Mr Dan Brost who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Brost is a full time employee of PanAust Limited. Mr Brost has sufficient experience relevant to the styles of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Brost consents to the inclusion in the report of the Ban Houayxai gold silver Mineral Resources in the form and context in which they appear. The data in this report that relates to Ban Houayxai Ore Reserves is based on information compiled by Mr Chris Desoe who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Desoe is a full time employee of Australian Mine Design and Development Pty Ltd. Mr Desoe has sufficient experience relevant to the styles of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Desoe consents to the inclusion in the report of the Ban Houayxai gold silver Ore Reserves in the form and context in which they appear. Mr Desoe is not responsible for statements relating to the Investment Case adopted for the Project. Forward Looking Statements This announcement includes certain Forward Looking Statements. All statements, other than statements of historical fact, included herein, including without limitation, statements regarding forecast production performances, potential mineralisation, resources and reserves, and development objectives of PanAust Limited are forward looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Page 6