Gum Creek Gold Project Free Milling Scoping Study

Similar documents
Confidence in Carrapateena project grows

For personal use only

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

For personal use only

Second drill rig to accelerate major drilling program at Productora

EXCO S PROJECT PIPELINE

For personal use only

Study on Gonka Deposit and Taurus Extension

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Kibali Mine Development

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

For personal use only

ABM Hits 3000 Ounce Target from Trial Mining

EXCO S PROJECT PIPELINE. Unlocking the Value

Forward Looking Statement

Azure Minerals Ltd ASX Code:

White Dam Gold Project Dump Leach

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

Awak Mas DFS Optimisation - Metallurgical Breakthrough

Yanfolila DFS Significantly Increases NPV & IRR

ASX Release ASX Code: YTC

For personal use only

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

The materials used herein and this presentation (collectively, the Presentation ) have been prepared by PT Agincourt Resources (the Company ) solely

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

Major Capital Cost Reductions Reposition Wa Gold Project, Ghana

RESOURCE GOLD PTY. LTD.

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

AMUR MINERALS CORPORATION (AIM: AMC) Independent Review of Cost Estimates $1.78 Per Pound Nickel Cost to Deliver to Rail Station

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

Carrapateena Pre-Feasibility Study

OCEANAGOLD PROVIDES AN UPDATE TO HAILE COMMISSIONING AND REVISED COMPANY GUIDANCE

23 July Half-Year Trading Update Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries excluding IRC Limited

Tri-K feasibility study update

209 million 36.1% Fe

Activities Report Quarter Ended 31 st March 2015

Ore Reserves and Mineral Resources Statements 30 June 2013

Massawa gold project January 2016

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017

F e b r u a r y

AVINO SILVER & GOLD MINES LTD.

Santacruz Silver Reports First Quarter 2017 Production and Financial Results

LITTLE EVA DEFINITIVE FEASIBILITY STUDY MARCH 2014 UPDATE EXECUTIVE SUMMARY

Mineral Ridge, Nevada

Mt Morgans Australia s next 200kozpa gold producer

THIRD QUARTER REPORT 14 OCTOBER 2014

For personal use only

Developing High Grade Projects in Mexico

Australia s leading explorer in Mexico

OSISKO REPORTS INCREASED GOLD RECOVERY RESULTS AT MARBAN

Indonesia s Next World Class Mining Company

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began

Banfora (Wahgnion) Project Feasibility Study Optimization and De-risking

BUILDING CANADA S LARGEST GOLD MINE Production Early Mining Ready Summit October 23, 2012

QUARTERLY REPORT March 2011

Bisha Mining Share Company

Geology and mineral resources of the Kylylahti Mine

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation

For personal use only

A New Copper Producer. Update for European and UK Investors. March ASX: AOH FSE: A2O ACN

Maiden Ore Reserve for Anglo Saxon Gold Project

Low-cost, rich, DRC copper

Resource Efficient Mining Processes of Tomorrow

For personal use only

What is Enterprise Optimisation?

For personal use only

For personal use only

Non-IFRS performance measure. Refer to the Non-IFRS Performance Measures contained in the Q Management s Discussion and Analysis.

Improvements in bi-metal production at the Brunswick plant, Costerfield.

For personal use only. Cummins Range Rare Earths Project

NEW LIFE OF MINE PLAN AT MRC BOOSTS GOLD PRODUCTION ABOVE 200,000 OZS. Canadian dollars unless otherwise noted

CNMC Goldmines Holdings Limited Sokor Gold Project Kelantan - Malaysia Reserves Dec 2011 Manson s & New Discovery Mines

Update of Amaruq Agnico Eagle s near-term future in Nunavut Nunavut Mining Symposium, Iqaluit, Nunavut

For personal use only. Minerals Explorer in South Korea

The World s Next HIGH GRADE Vanadium Mine

Corvus Gold Receives Sulfide Gold Recovery of +90% Using AAO Process at the North Bullfrog Project, Nevada

A modern mining company

Ste De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: Fax:

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

ASX ANNOUNCEMENT RED MOUNTAIN MINING LTD 15 June 2016

Hummingbird Resources plc / Ticker: HUM / Index: AIM / Sector: Mining 18 January 2016 Hummingbird Resources plc ('Hummingbird' or 'the Company')

KINROSS GOLD CORPORATION Tasiast analyst & investor tour: Developing a world-class mine

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway

Estimation of Open Cut Mining Recovery and Mining Dilution. Summary. Introduction. Estimation Techniques. AusIMM JORC Code Edition.

For personal use only

Papua New Guinea Mineral resources and ore reserves

Quebrada Blanca Phase 2. April 2012

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )

ASX QUARTERLY RELEASE

For personal use only

Market Release 19 March 2018

On The Road To Silver & Gold Mining In Mexico

Atlantic Ltd (ASX: ATI; Atlantic or the Company) is pleased to present its report for the quarter ended 30 June 2011.

For personal use only

Transcription:

18 March 2016 ASX: PAN Highlights Gum Creek Gold Project Free Milling Scoping Study Mining Inventory of 4.9Mt at 1.94g/t Au for 309koz gold based on material from Swan, Swift and Howards Resources Average annual production for first four years approximately 60,000oz gold Initial Project life approximately six years Aggregate production 290,000 oz gold Average all-in sustaining cost A$1,209/oz gold Pre-production capital cost only A$62M including construction of a new processing facility Pre-tax Project NPV (11%) A$37M at A$1,700/oz gold Cumulative EBITDA approximately $A149M Cumulative pre-tax free cash flow A$82M at A$1,700/oz gold Company has carried forward tax losses of A$79M which could be applied against this Project s taxable income Gidgee Gold Project renamed Gum Creek Gold Project reflecting the significant tenement position on the Gum Creek Greenstone Belt Cautionary Statement The Scoping Study referred to in this announcement is based on low-level technical and economic assessments, and is insufficient to support the estimation of Ore Reserves or to provide assurance of an economic development case at this stage, or to provide certainty that the conclusions of the Scoping Study will be realised. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target referred to above will be realised. Page 1 of 9

Summary Panoramic Resources Limited ( Panoramic ) is pleased to report the results of a Free Milling Scoping Study ( Study ) for the 100% owned Gum Creek Gold Project (previously known as the Gidgee Gold Project). Since acquiring the Project in January 2011, Panoramic has: completed the August 2012 Scoping Study on processing both Free Milling and Refractory Resources (refer to the Company s ASX announcement of 7 August 2012); undertaken a significant Resource infill drilling campaign which increased the confidence in the Resources; and undertaken a range of mining, processing, comminution, metallurgical and geotechnical studies with a view to optimising the economics of the Project. The Study is based on mining open pit Resources from the Swan, Swift and Howards Resources and processing it through a new 800ktpa Carbon in Leach ( CIL ) processing plant to produce approximately 290koz gold over an initial six year mine life at an all in sustaining cost of A$1,209/oz gold. The Study assumes a maximum cash drawdown of A$62 million which includes construction of a new processing facility, associated infrastructure and open pit pre-development. Based on A$1,700/oz gold (equivalent to US$1,275/oz gold and exchange rate of A$1:US$0.75) the Project generates a pre-tax cashflow of A$82 million (after royalties). The aim of the Study was to focus on production from free milling Resources only to reduce the initial construction capital whilst retaining optionality of production from the Wilsons refractory Resource at a later date. Historic production of gold from free milling sources was in excess of one million ounces at high metallurgical recoveries. This information, together with testwork done by the Company, provides support for the metallurgical recoveries used in the Study. The results from the Study demonstrates a Project with attractive economic outcomes and future optionality for production from either other free milling or refractory Resources. Table 1- Key Outcomes of the Study Operating Metric Gold Price and Exchange Rate Mining inventory Mining Method Project life (processing) Life of Mine ( LOM ) production Pre-production capital cost Average LOM All-in sustaining costs ( AISC ) Assumption/Result A$1,700/oz (US$1,275/oz and A$1:US$0.75) 4.9Mt @ 1.94g/t Au for 309,000oz contained gold Open Pit 5.8 years 290,000oz Au (average ~60,000oz for years 1-4) A$62M LOM processing recovery 95% LOM strip ratio 9.4:1 Pre-tax IRR 30% LOM Revenue LOM EBITDA LOM Pre-tax cash flow LOM Pre-tax NPV (11%, real) Construction period A$1,209/oz Au A$496M A$149M A$82M A$37M 12 months The Mineral Resources underpinning the above production target have been prepared by a Competent Person or persons in accordance with the requirements of the JORC Code, (refer to the Company s ASX announcement of 30 September 2015). Page 2 of 9

Details Geology The Gum Creek Gold Project covers approximately 800km 2 of the Gum Creek Greenstone Belt located in the East Murchison Province of the Western Australian Archaean Yilgarn Craton. Four dominant styles of gold mineralisation are recognised in the belt including both free milling and refractory mineralisation types. For the free milling Howards Resources, gold mineralisation is typically associated with sulphide poor quartz veins of 1 to 3mm thickness, within a shear zone up to 50m wide in mafic host rocks. For Swan and Swift free milling Resources, gold mineralisation is hosted within conjugate quartz-carbonate-sulphide vein sets with individual veins up to several metres thick and extending over tens of metres in carbonate altered mafic host rocks. Coarse free gold is often observed in the veins Mining and Mining Inventory The Study assumed a standard drill, blast, load and haul mining methodology which is well known and widely used in Western Australia. The Swan and Swift pits, which supply approximately 62% of the milled tonnes, are located within one kilometre of the proposed location of the new processing plant. Howards is approximately 32km south of the proposed processing plant and haulage to the processing plant will be by road train. Mining at Gum Creek will be undertaken by mining contractors, with personnel operating on a fly-in, fly-out out basis from Perth, with local residents employed where possible. Production from Swan and Swift includes cutbacks to the existing open pits, while mining at Howards will be from a new open pit. The Mining Inventory of 4.9Mt was derived using a combination of Whittle 4X analysis and detailed open pit designs. The mine designs and mining schedules in the Study are based on 2012 JORC compliant Indicated and Inferred Mineral Resources for the Swan Bitter, Swift and Howards Resources. Geotechnical input including pit wall angle selection was provided by a geological consultant. The mining parameters used in the Scoping Study are detailed in Appendix 1. The production schedule has been optimised to minimise working capital and maximise cashflow and NPV. Table 2 provides a summary of production from each Resource. Resource Table 2 Mining Inventory Mined Tonnes (Mt) Grade (g/t Au) Contained Metal (koz Au) Swan 1.9 2.29 138 Swift 1.2 2.44 92 Howards 1.9 1.30 79 Total 4.9 1.94 309 Table 3 summarises the Resources used in the Mining Inventory, of which approximately 80% is sourced from material in the Indicated category. Table 3 Mining Inventory - showing split between Indicated and Inferred Resource Mined Tonnes (t) Indicated Grade (g/t Au) Contained Metal (Oz Au) Mined Tonnes (t) Inferred Grade (g/t Au) Contained Metal (Oz Au) % Inferred (by tonnes) Swan Bitter 1,252,153 2.41 97,127 622,589 2.04 40,908 33% Swift 877,384 2.40 67,825 290,498 2.54 23,757 25% Howards 1,809,920 1.30 75,818 83,730 1.20 3,220 4% Total 3,939,457 1.90 240,770 996,817 2.12 67,885 20% Figure 1 shows the proposed site layout of the Central Infrastructure Area which includes Swan Bitter and Swift Open Pits, the new processing facilities, waste dump, accommodation village and airstrip. Page 3 of 9

Figure 1 Central Infrastructure Area Figure 2 Howards Open Pit Design Page 4 of 9

Infrastructure The Gum Creek Gold Project is located 640 kilometres north-east of Perth in the Murchison region of Western Australia, and includes a 600,000tpa process facility (not in operation) a 50 person camp and operational airstrip. The Project can be accessed by air, a number of gravel roads from either the Great Northern Highway to the west, or from the Goldfields Highway to the east. The Study assumes the construction of a new, stand alone, 800ktpa processing facility, separate from the existing facility (not in operation). The Study also assumes the relocation of some accommodation and facilities from other Panoramic sites to reduce capital costs. Tailings from the processing facility will be deposited on the existing tailings dam, which will require two additional lifts. Coffey Geoscience has undertaken an investigation and design for the required earthworks. Other additional infrastructure includes: Power station and power reticulation to be provided by a third party under a BOOT arrangement Water treatment facilities Workshops and stores Processing Feed from Swan, Swift and Swan South will be hauled to the process plant ROM pad, whilst feed from Howards will be stockpiled and hauled via road train as required. Feed to the process plant will be blended in accordance with the delivery schedule from each open pit. Higher value material will be processed preferentially to improve the Project NPV. The comminution and metallurgical flow sheet design was undertaken by an engineering contractor. The design includes three stages of crushing, a single ball mill, gravity circuit, cyanide leach, elution circuit and gold room. The throughput rates for fresh and oxide/transitional ore is 800ktpa and 1Mtpa respectively. Historical metallurgical recoveries from Swan and Swift range between 97-99%. Metallurgical testwork, including gravity and cyanide leach tests on Swan and Swift Resources confirmed these recoveries for a grind size of P 80 of 75µm. The Study assumes average gold recovery of 96% for the Swan and Swift Resources. Metallurgical testwork undertaken on Howards mineralisation resulted in average recoveries of 91.3% for a grind size of P 80 of 75µm. The Study assumes a metallurgical recovery of 91% for Howards. Overall, the average metallurgical recovery over the LOM is 95%. Figure 3 shows annual mill feed and Figure 4 shows the annual payable gold production over the life of the Project. Figure 3 Mill Feed Page 5 of 9

Figure 4 Gold Production Cost Estimates and Financial Evaluation Mining costs are based on estimates from a WA mining contractor. Capital and operating costs for the processing plant are based on estimates provided by a WA engineering contractor using comminution and metallurgical data provided by the Company. Diesel prices are based on recent quotes obtained for deliveries to the site. General and administration costs include items such as flights, accommodation, insurances, rents and rates and were estimated by the Company. Infrastructure costs were estimated by a combination of independent contractors and by the Company. No closure or salvage costs are included in the Study. Table 4 shows the LOM capital costs and Table 5 summaries the LOM AISC costs. Item Table 4 LOM Capital Costs Initial Capital (A$M) Sustaining (A$M) Total over Project Life (A$M) Capitalised Mining 13-13 Processing Facilities 36-36 Processing Infrastructure 5-5 Tailings Dam 1 3 4 Other 7-7 Sustaining - 2 2 Total 62 5 67 Table 5 LOM AISC Item A$/t Milled A$/oz Au Total Mining (after waste and cutbacks) 35 598 Processing* 28 471 General and Administration 4 72 Sustaining Capital 1 17 Royalties 3 45 Refining 0 5 All in sustaining cost (AISC) 72 1,209 *Processing cost includes road train haulage from Howards Page 6 of 9

Table 6 shows the impact of various A$ gold price assumptions on Project cashflows and NPV. Table 6 Study Sensitivity to different A$ Gold Prices Pre Tax A$/oz Gold Price 1,600 1,700 1,800 1,900 2,000 Free Cashflow after royalties (A$M) 53 82 110 139 168 NPV (11%) after royalties (A$M) 17 37 57 77 97 The Study reports cashflows on a pre-tax basis. The Company has $79M of carried forward tax losses which could be used to offset the Project s taxable income. Tenements and Approvals All of the Resources included in the Study are held on granted mining leases. A detailed Mining Proposal has been submitted and accepted by the WA Department of Mines and Petroleum in February 2015 for mining of Swift Resources and processing through the Central Infrastructure Area. Further approvals are necessary for mining of Swan and Howards Resources. Other approvals include works approvals, clearing permits and water abstraction licenses. Due to the history of mining at Gum Creek, the Company does not envisage any issues with receiving necessary approvals. Identified Risks A number of risks have been identified that may impact (either positively or negatively) the economics of the Study. These risks include, but are not limited to: US$ Gold price and US$:A$ exchange rate Cost of consumables, including the price of diesel fuel Capital and operating costs Resource to Reserve conversion rates Metallurgical recoveries Project financing Regulatory approvals Exploration In 2015, Panoramic completed detailed ground gravity and airborne EM survey over the Gum Creek Project. This geophysical data has been integrated with existing magnetic surveys, geological mapping and drill hole databases. The integrated dataset is now being used to drive exploration targeting with 13 targets identified. In addition, the shear zone associated with the Wilsons gold deposit has been defined geophysically with 14 new targets along this zone identified for follow up exploration. Project Upside There is potential for further work to provide upside for the Project, namely: Adding Resources to Swift, Swan and Howards through exploration success Incorporating further existing Resources into the Mining Inventory Optimising mining schedules and production rates Optimising the process flow sheet Reducing Operating and Capital costs Expanding the Project to include refractory Resources Page 7 of 9

Project Name Change The Project has been renamed Gum Creek Gold Project, reflecting the significant tenement position on the Gum Creek Greenstone Belt. Next Steps The Gum Creek Scoping Study demonstrates a robust Project at A$1,700/oz gold. Although the Company has commenced a sales process for the Project, Panoramic is reviewing the option to enhance shareholder value either through sale of the Project or retaining and developing. The Company has commenced detailed design and optimisation for a Feasibility Study, along with seeking indicative funding terms for the Project. No New Information or Data This announcement contains references to exploration results and Mineral Resource estimates, all of which have been cross referenced to previous market announcements made by the Company. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. Forward Looking Statements This announcement may contain certain forward-looking statements which may not have been based solely on historical facts, but rather may be based on the Company s current expectations about future events and results. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward looking statements are subject to risks, uncertainties, assumptions and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to Resource risk, metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as well as political and operational risks in the Countries and States in which we operate or sell product to, and governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company s Annual Reports, as well as the Company s other filings. Readers should not place undue reliance on forward looking information. The Company does not undertake any obligation to release publicly any revisions to any forward-looking statement to reflect events or circumstances after the date of this announcement, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. About the Company Panoramic Resources Limited (ASX code: PAN) is a Western Australian mining company formed in 2001 for the purpose of developing the Savannah Nickel Project in the East Kimberley. Panoramic successfully commissioned the $65 million Savannah Project in late 2004 and then in 2005 purchased and restarted the Lanfranchi Nickel Project, near Kambalda. In FY2014, the Company produced a record 22,256t contained nickel and produced 19,301t contained nickel in FY2015. The Lanfranchi Project was placed on care and maintenance in November 2015. The Company has advised that it intends to place the Savannah Project onto care and maintenance in May 2016 pending an improvement in the price of nickel. Following the successful development of the nickel projects, the Company diversified its resource base to include gold and platinum group metals (PGM). The Gold Division consists of the Gum Creek Project located near Wiluna. The PGM Division consists of the Panton Project, located 60km south of the Savannah Project and the Thunder Bay North Project in Northern Ontario, Canada, in which Rio Tinto is earning 70% in the project by spending up to C$20 million over five years. Panoramic has been a consistent dividend payer and has paid out a total of $114.3 million in fully franked dividends since 2008. At 31 December 2015, Panoramic had $25 million in cash and no bank debt. The Company s vision is to broaden its exploration and production base, with the aim of becoming a major, diversified mining company in the S&P/ASX 100 Index. The growth path will include developing existing resources, discovering new ore bodies, acquiring additional projects and is being led by an experienced exploration-to-production team with a proven track record. For further information contact: Peter Harold, Managing Director +61 8 6266 8600 Page 8 of 9

Appendix 1 The Mining Inventory is based on existing Resources (refer to the Company s ASX Announcement of 30 September 2015), and there has been no conversion of the Mineral Resource to Ore Reserve as a result of this Study. Key mining parameters used in the Study are as follows. Swan The open pit Resource model includes modifying factors Swift The open pit Resource model includes modifying factors Cut off grade 0.7g/t Au Minimum Mining Width 4m downhole Internal Dilution 2m downhole Edge Dilution - 1m either side downhole High Grade Cuts o Oxide 10g/t o Transitional 20g/t o Fresh 200g/t Pit Slope angles range from 35-45 degrees Ramp widths range from 12-18m wide with a gradient of 1 in 9 Batter angles range from 70 degrees near the base to 55 degrees near the surface and berm heights of 20m with minimum berm widths of 7m Cut off grade 0.7g/t Au Minimum Mining Width 4m downhole Internal Dilution 2m downhole Edge Dilution - 1m either side downhole High Grade Cuts Oxide 20g/t, Transitional 30g/t, Fresh 30g/t Pit Slope angles range from 40-44 degrees Ramp widths range from 12-18m wide with a gradient of 1 in 9 Batter angles range from 70 degrees near the base to 55 degrees near the surface and berm heights of 20m with minimum berm widths of 5m Howards The following mining factors were applied to the Howards Resource Cut off grade 0.88g/t Au Mining dilution 5% Mining loss 5% Pit Slope angles were 45 degrees Ramp widths range from 12-18m wide with a gradient of 1 in 9 Batter angles range assume 70 degrees and berm heights of 20m with berm widths of 5m Page 9 of 9