REQUEST FOR PROPOSALS MECHANICAL/PLUMBING & ELECTRICAL ENGINEERING RFP # JUNE 28, 2010 PROPOSALS DUE: JULY 12, 2010

Similar documents
HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)

Request For Proposal (RFP) For Architectural/Design Services. Ski Hi Park Multi-Purpose Building

LEVEL I PREQUALIFICATION DOCUMENTS

CITY OF CHICAGO DEPARTMENT OF BUILDINGS

1.0 ABOUT THE NU GUIDELINES

REQUEST FOR PROPOSALS

BUILDING CODES & DESIGN CRITERIA

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320

REQUEST FOR PROPOSALS Bond Underwriting Services

Village of Lincolnwood

Architectural Services

VILLAGE OF FRANKFORT REQUEST FOR PROPOSAL FOR PROFESSIONAL PLANNING SERVICES TO PREPARE A COMPREHENSIVE PLAN

Career Center Advance Planning/Design Services Code Item 321

PROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California.

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

STATE OF RHODE ISLAND OFFICE OF THE GENERAL TREASURER

REQUEST FOR QUALIFICATIONS AND PROPOSAL FOR OWNER S REPRESENTATIVE March 21, 2014

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)

Management. Construction. Development. WE PROVIDE A complete roster of building services to streamline the construction process

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects

- DATA REQUIREMENTS BIM

REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

REQUEST FOR PROPOSALS

SEMINOLE TRIBE OF FLORIDA INVITATION TO BID

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

Residence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning

Full-Scope Commissioning for High-Quality Buildings

ARCHITECTURAL / ENGINEERING SERVICES RFQ. North Sound Behavioral Health Organization

House Doctor Consulting Services Application Package

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide

Construction Application for Permit (CAP) Instructions

REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES

University of Washington. Request for Qualifications. Commissioning Authority Services for

The following is required for a complete permit submittal for each unit.

REQUEST FOR PROPOSAL Audit and Tax Services ISSUED April 24, 2015 RFP No

Application Requirements for obtaining a Building Permit

Request for Proposal For: 2018 American Bar Association Temporary Services

PROFESSIONAL SERVICES REQUEST FOR PROPOSALS Moffat Collection System Siphon 1 River Crossing

Science Technology Engineering and Mathematics (STEM) Initiative

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM.

Request for Proposal: City of Claremont Parking Garage Evaluation & Maintenance Program

REQUEST FOR PROPOSALS LIBS PARK PLAYGROUND FOR CITY OF HASTINGS, NEBRASKA

REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017

Town of York, Maine Request for Qualifications

SECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES

Texas Department of Transportation Page 1 of 9 Request for Information

INDUSTRIALIZED HOUSING AND BUILDINGS Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 70

Document B101 TM. Standard Form of Agreement Between Owner and Architect

ADDENDUM NO. FIVE TO THE DESIGN-BUILD REQUEST FOR PROPOSAL (RFP) DOCUMENTS September 26, 2016

A , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management

A Guide to Building Permits for Home Owners / Renovators

DATE: 05/03/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

REQUEST FOR PROPOSAL

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018

REQUEST FOR QUALIFICATIONS AND PROPOSALS. On Behalf of the Crawford County Board of Commissioners. for

SOLAR ENERGY SYSTEMS APPLICATION

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101

The following is required for a complete permit submittal for each unit.

REQUEST FOR QUALIFICATIONS (RFQ) For Engineering Services Institute for Marine Mammal Studies (IMMS)

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

RFP # Request for Proposal Branding Services. Date: January 12, Proposals must be submitted by 3:00 PM: February 10, 2017

VFA SAMPLE RFP (DETAILED FACILITY CONDITION ASSESSMENT)

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

Bronx Mental Health Redevelopment Project

Addendum #02 New County Office Building Responses to RFP Questions

MT. PLEASANT, MICHIGAN

Ohio Public Employees Retirement System. Request for Proposal

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition

CODE COMPLIANCE PLAN REVIEW PROCEDURES

WARWICK TOWNSHIP Dept. of Planning & Zoning

REQUEST FOR PROPOSALS

Request for Qualifications

ADMINISTRATIVE DESIGN REVIEW (ADR) An applicant s guide to the process

RFQ WEB Advertisement

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

Port of Camas/Washougal Levee Recertification and Engineering Analysis Request for Proposal May 3, 2011

Request for Proposals

2018 Smart Energy New Homes Program Manual

New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together

Release of RFP February 9, 2017 RFP Questions and Clarifications Deadline February 16, 2017 at 4 p.m.

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES

design strategy vision

CRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST

CONSULATE GENERAL OF INDIA SAN FRANCISCO

NC State University OESAD GUIDELINES Contract Year

Transcription:

4800 N. Broadway, Boulder, CO 80304 REQUEST FOR PROPOSALS MECHANICAL/PLUMBING & ELECTRICAL ENGINEERING RFP #12-2010 JUNE 28, 2010 PROPOSALS DUE: JULY 12, 2010 TO: FROM: RE: Mechanical/Plumbing and Electrical Engineering Firms Liz Wolfert, Project Assistant Mechanical/Plumbing and Electrical Engineering Proposals for High Mar Request As part of the redevelopment of the High Mar property located at 4990 Moorhead Ave. in Boulder, Colorado, Boulder Housing Partners (BHP), in partnership with Morgan Creek Ventures (MCV), is seeking to obtain proposals for Mechanical/Plumbing and Electrical engineering services from Schematic Design through Construction Administration. Respondents can propose for just one or all mechanical/plumbing or electrical services requested either as individual firms or as engineering teams. Clearly identify which services you have responded to on the cover of your proposal. Due Date and Process Proposals are due to BHP s offices below no later than 4 pm on July 12 th. Please provide three hard copies of your proposal, and one electronic copy, and deliver or mail to the following contact and address: Hard Copies Boulder Housing Partners 4800 Broadway Boulder, CO 80304 Attention: Liz Wolfert Electronic Copies wolfertl@bouldercolorado.gov Re: High Mar Mechanical/Plumbing and Electrical Engineering Proposal 1

Proposals will be reviewed the week of July 12, 2010 and final award decisions will likely be made by the week of July 19, 2010. All known respondents will be notified of the results of the process as soon as possible. If there is a close decision, respondents may be requested to participate in an interview the week of July 19, 2010. Any substantive clarifications requested by one respondent will be shared with all known potential respondents and posted on BHP s website at www.boulderhousingpartners.org. Please submit your questions in writing to wolfertl@bouldercolorado.gov if possible. The deadline for clarifications is 5:00 pm on July 2 nd. Questions and answers will be posted on BHP s website by 5:00 pm on July 6 th. Background and Anticipated Schedule High Mar s concept review application, including a recently completed conceptual site plan and conceptual architectural character sketches, was submitted to the City s Planning Department on April 19, 2010. The project received the Planning Board s support at their June 3, 2010 hearing. We are moving directly into the Site Review process and anticipate submitting Schematic Designs and the Site Review application on August 16, 2010. Barring any unforeseen delays, BHP currently anticipates the following project schedule: July 2010 November 2010 Site Review Schematic Design through approximately 25% Design Development November 2010 February 2011 Technical Documents Design Development through approximately 50% Construction Documents February 2011 May 2011 Building Permit Construction Documents and GMP June 2011 Begin construction Site Summary High Mar is a 2.19 acre site located in south Boulder at 4990 Moorhead Avenue near the intersection of Moorhead Avenue and Table Mesa Road. In 1993, the High Mar Recreation Association, which operated High Mar as a private swim and tennis club, was no longer interested in operating the facility and sold the land to BHP. The site is zoned RH-5 (High Density Residential). A maximum of 59 residential units can be built under the current zoning. The following affordable housing covenant is in place on the property: 40% of units the (23 units) at or below 50% of the Area Median Income (AMI); 40% of units the (24 units) at or below 40% of the Area Median Income (AMI); and 20% of the units (12 units) with unrestricted rents BHP Summary BHP is the housing authority for the City of Boulder, a quasi-governmental organization created in 1966 by the City Council of the City of Boulder. It was established as a housing authority under State 2

law to provide safe and sanitary housing to low and moderate income households in the City of Boulder. In 2004 the organization changed its name to Boulder Housing Partners. BHP owns and/or manages over 1,500 dwelling units in the City of Boulder including several hundred Section 8 Housing Choice Vouchers. BHP is also an experienced developer of affordable housing and has used a variety of structures and funding sources including six Low Income Housing Tax Credit partnerships, conventional and federal financing, Private Activity Bonds, tax exempt bonds, federal HOME and CDBG grants, as well as fundraising from public and private sources. MCV Summary Morgan Creek Ventures acquires and develops office/mixed-use and residential properties in urban areas. MCV is active in Denver and Boulder, Colorado as well as San Francisco, California. In the past few years, MCV has been involved in the acquisition, development or renovation of more than 435,000 square feet of mixed-use projects and 375 residential units. Additional Project and Site Information Please see the BHP High Mar website for additional information about the project including, but not limited to: Vicinity Map Preliminary Concept/Feasibility Plan Aerial Photograph Site Photographs Geotechnical Report Phase I Investigation Preliminary Civil Plans Concept Review Application Materials Proposal Criteria Proposals should, at a minimum, include the following, and in the following order: 1. Cover letter including contact name, address, phone number and email; 2. Description of firm and the key personnel assigned to the project. Include each individual s role and their bio; 3. In two pages or less, detail your team s experience with the following: a. The design of affordable housing and/or multi-family residential products similar in size and scope to the High Mar project including a list of similar work designed within the last 10 years. (In an effort to reduce the time necessary to produce and review proposals, please DO NOT submit cut sheets of dissimilar projects); b. The integration of sustainable design features on projects of similar size and scope including those systems related to: i. indoor and outdoor water conservation, ii. energy efficient HVAC systems, iii. indoor air quality, iv. building integrated PV, v. solar hot water, and vi. any other energy efficient or sustainable mechanical, plumbing or electrical system used on a project to reduce energy consumption and utility costs for residents, 3

vii. BHP/MCV will not be pursuing LEED certification for High Mar, however, experience with sustainable and energy efficient design is preferred. Reference each projects name and include a brief description of the systems utilized as well as your understanding of their first cost and operational savings. Please include any special experience, knowledge or skill related to sustainability you will bring to our team (i.e. energy modeling, renewable energy integration, etc); c. BHP is a long term owner of affordable rental housing and is focused on reducing the maintenance cost of their projects while ensuring they deliver the highest quality, most energy efficient housing possible for their residents. Please discuss how you have helped reduce the maintenance and operation costs on past projects through the thoughtful design of the plumbing, HVAC, electrical and/or lighting systems. d. Your team s experience with the City of Boulder s engineering and building permit review processes. e. Your experience with and coordination of modular construction and its integration into the design and construction of similarly sized projects. Please outline your understanding of any special coordination, design and/or construction issues you have faced on projects that have investigated or built using modular construction. 4. Provide a brief description of why BHP/MCV should use your firm for the work specified. What sets your firm apart? 5. A list of no less than three references for each firm and contact information (preference will be given to references for projects of similar size and scope); 6. The fee for the design, coordination and preparation of full contract documents including specifications and the entitlement process. The fee should also be broken-out for the following phases: a. Schematic Design b. Design Development c. Construction/Contract Documents d. Construction Administration/Observation Please see the attached Scope of Work for more information. Proposal Format Proposals shall provide a comprehensive, but concise summary of qualifications and capabilities to satisfy the requirements of the RFP. Proposals shall adhere to the following format for organization and content: Cover Letter Proposal Criteria Exceptions/Clarifications Screening Criteria The information submitted will provide the basis for selection. Responses will be scored based on the following selection criteria and weighted as indicated in parentheses. 4

1. Firm expertise including qualifications of staff in civil engineering and previous experience (45) 2. Price (30) 3. References (15) 4. Schedule (projected date of completion) and availability (10) Notes: BHP reserves the right to share the completed work with potential investors and lenders for the project. The MEP will contract directly with the project architect (In Situ Design) and will use the AIA C401-2007 Standard Form of Agreement between Architect and Consultant, which is included as an attachment to this RFP. Please indicate your willingness to use this contract and if you require any material changes to the document. Contact Information Liz Wolfert, Project Assistant Phone: 720.564.4619 Email: Wolfertl@bouldercolorado.gov 5

TERMS AND CONDITIONS FOR REQUEST FOR QUALIFICATIONS 1. BHP may select none or more than one of the responses for further consideration. Because of the mix of criteria necessary for a development partner, BHP reserves the right to make its selection on a variety of factors which may not all be measured objectively. 2. Responding to this solicitation does not guarantee that any work will be directed to the respondent. 3. The Board of Commissioners of BHP reserves the right to reject any and all RFPs, to waive any informalities or irregularities therein, and to accept the proposal that, in the opinion of the Board, is in the best interest of BHP. 4. Respondents are expected to examine the qualifications, schedule of delivery, and all instructions; failure to do so will be at the respondent s risk. Further, each respondent shall furnish all of the information required in the RFP 5. BHP s standard services contract is included with this RFP. Respondents are required to review this contract carefully prior to submission of a proposal. 6. No submittal shall be withdrawn for a period of thirty (30) days subsequent to the opening of qualifications without the consent of BHP. 7. Late or unsigned responses will not be accepted or considered. It is the responsibility of respondent to insure that the statement of qualifications arrives in the offices of BHP prior to the time indicated in the RFP Please note the following: - Overnight, Express and Priority Mail should be directed to the above street address. - All RFPs must be received by the date and time noted above. - Any RFPs received after due date and time will be returned unopened. - No faxed RFPs will be accepted. 8. Any interpretation, correction or change of the RFP documents will be provided to all known potential respondents by email as appropriate and at the sole discretion of BHP. 9. Confidential/Proprietary Information: Information and Materials submitted in response to this RFP are subject to the provisions of the Colorado Public (Open) Records Act, 24-72-201 et.seq. C.R.S., as amended. Any restrictions on the use or inspection of material contained within the RFQ should be clearly indicated, as well as a brief description of the basis for the confidentiality (financial statements, trade secrets, etc) in the response to the RFP. 10. BHP will open all RFPs received on or after the scheduled time. RFPs are not generally opened in a public setting. As, and only if necessary, the name of the respondent is the only public information that will be mentioned following the opening of the RFP; all other information contained in the proposal may disclosed after the completion of the selection process. 6

MECHANICAL/PLUMBING & ELECTRICAL SCOPE OF WORK Please include, at a minimum, the following services in your fee proposal. All tasks are to be included under Basic Services. Additional Service Requests will not be considered without prior approval from the Architect which requires approval from the Owner. Your fee shall include all services required to secure approvals, permits, and coordination with other disciplines and consultants, while meeting cost, budget, and time goals as set by the Owner. Please be aware that design is not a linear process. Modification to Mechanical/Plumbing and Electrical design due to coordination with the Architect or the Architect s Consultants is not to be considered a basis for Additional Service Requests. Mechanical/Plumbing services include, but are not limited to: Coordination with Architect o Base CAD file manipulation COMCHECK calculations o Area calculations o Window area calculation o Door area calculation o Insulation values Fire Sprinkler Design o Main sizing o Standpipe locations o Coordination with architect of required ratings o Coordination with Architectural and Structural of shaft locations o Pressure and pump calculations o Flow Data o Siamese locations Roof Drainage Calculations o Volume/ Area o Flow o Downspout sizes o Coordination with Civil of downspout and roof drainage Connections Kitchen/ Hood coordination if required Grease trap coordination if required Grease duct coordination if required SUDP Sand-oil interceptor if required Elevator coordination Participation in LEED or other green building programs as directed by the owner DESIGN TEAM MEETINGS as required by the Architect to ensure proper coordination and design Any other documentation or submittals as required to secure Building Permits and Planning and Zoning Approvals as required by local and state jurisdictions 7

Electrical services include, but are not limited to: Coordination with Architect o Base CAD file manipulation Service Application o Meeting with Xcel or other local service company o Easements o Transformer sizing and location o Meter locations o Gas locations o Easements o Meter locations Interior elevation of meters and cabinets o Meter/ transformer room sizing and locations Security system coordination Telecommunications system coordination Lighting design and specifications Coordination with Mechanical and Plumbing Engineers Elevator coordination Participation in LEED or other green building programs as directed by the owner DESIGN TEAM MEETINGS as required by the Architect to ensure proper coordination and design Any other documentation or submittals as required to secure Building Permits and Planning and Zoning Approvals as required by local and state jurisdictions Project Specifications Contract Administration, including but not limited to: o Attendance at pre-construction walk-through meetings o Attendance at pre-construction sub-consultant meetings o Review of shop drawings and product submittals o Attendance at weekly construction meetings as requested by the General Contractor o Timely response to Requests for Information o Review of value engineering and cost 8