Work Instruction PUI Supplier Request for Nonconforming Material (Rev 1)

Similar documents
Plan QAQ Supplier Quality Requirements (Rev 17)

Plan QAQ Supplier Quality Requirements (Rev 13)

Supplier Quality Manual

2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:

Supplier Quality Terms & Conditions

ViaSat, Inc. Quality PR Third Party Inspection Services, PWB Verification and DPA Samples Quality 1 of 12 Purpose and Scope

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

ZOLL Document Number: 90F1087 Page 3 of 18 MES/ERP Nonconforming Material Transaction Instructions REV B

Supplier Quality Manual

Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11

Supplier Quality Agreement

Warehouse & Distribution Services Procedure

In case of of differences or inconsistencies with texts in the Main Contract, the stipulations in this Appendix I will prevail.

Rosen Aviation Supplier Quality Assurance Requirements

SupplyWEB Supplier Manual (SupplyWEB Version 10)

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

RFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

Quality Assurance Policy and Procedures

Definitions contained in the above mentioned document and industry regulations are applicable herein.

External Provider Quality Requirements QCS-001 Processing Sources

Nonconforming Material System Procedure

Quality Management System

Quality Manual ISO 9001:2000

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

The Counterfeit Parts Prevention procedure applies to all employees within the company and extends to our suppliers and outsourced services.

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II

4. SPLITTING QUANITITES OF DEFECTIVE MATERIAL IN CAMSTAR

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260

Approved Supplier Guidance

ALCO Plastics, Incorporated SUPPLIER QUALITY SYSTEM REQUIREMENTS MANUAL

Orbital ATK QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER

QUALITY ADMINISTRATIVE PROCEDURE

Clarification of Standard PA Codes For Goodrich ISR Systems Barrington, IL

INS QA Programme Requirements

SUPPLIER QUALITY SYSTEM SURVEY

12. Inventory - Receiving & Shipping

Supplier Quality Requirements Manual

FLYSHEET 100 Rev. 14 QUALITY SYSTEM REQUIREMENTS

D. All distributors shall be reviewed and approved as per company procedure.

SUPPLIER QUALITY MANUAL

Supplier Rating System (SRS)

GKN Aerospace - St. Louis Supplier Quality Assurance Manual

Counterfeit Parts Prevention

Mantor Aviation Company

SUPPLIER QUALITY MANUAL

ZODIAC INTERCONNECT US ZODIAC AEROSYSTEMS SEGMENT ZODIAC INTERCONNECT DIVISION

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Supplier Expectation Manual

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

SUPPLIER GUIDELINES MANUAL

LM Logistic Services Quality Notes Conversion Chart

Supplier Quality Manual

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

CURTISS WRIGHT Actuation Systems 201 Old Boiling Springs Rd Shelby, NC SUPPLIER QUALITY REQUIREMENTS SQR-100. Rev. L.

Eclipse Standard Operating Procedures - Release 8 Warehousing

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,

Procedure for Procurement and Receipt

2. GENERAL REQUIREMENTS

PURPOSE To establish a quality requirements and guidelines for Suppliers doing business with Orchid Monroe

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

INSPECTION SYSTEM REQUIREMENTS

SRCTec, Inc. SUPPLIER QUALITY CLAUSES (SQC S)

QUANTUM IMAGING QUALITY ASSURANCE PROVISIONS

QUALITY ASSURANCE MANUAL

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT CEMENT CERTIFICATION. April 18, 2008

Vendor Quality. Requirements Manual

World Class Industries

ASA-100 QUALITY MANUAL

Facilities Planning and Construction (FP&C)

Document No.: INS Rev: B Origination Date: 10/30/2013

Reliance Aerospace Solutions

Supplier Quality Requirements Q Clauses

CENTURYLINK DRAFT SUPPLY CHAIN RISK MANAGEMENT (SCRM) PLAN

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

Supplier Quality Manual

Rev A. Vendor Compliance Manual

Quality Management System Manual

Progressive Metal Forming, inc Hall Road Hamburg, MI 48139

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Materion AMTS Supplier Quality Manual

RYMS SM-0 Revised Date: 9/13/17 SUPPLIER MANUAL. Page 1 of 6

SUPPLIER QUALITY MANUAL Customer Specific Requirements

NON-CONFORMING MATERIAL

Supplier Policies & Procedures

SHELTON INDUSTRIAL PATTERN INC.

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

QUALITY OPERATIONS STANDARD

LOR-VAN Manufacturing, LLC Quality Manual

CIVIL ENGINEERING DIVISION. Client s procedure for Mobilization NOC

Report number A0436 PRODUCT REQUIREMENTS FOR SELLERS OF BOEING DESIGNED DETAIL PARTS AND NON-FUNCTIONAL MINOR ASSEMBLIES

Structural Systems Solutions Quality Clauses

Supplier Quality Requirements

EVANS CAPACITOR COMPANY

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry.

Transcription:

1.0 Purpose To provide Insitu suppliers a method to request Insitu s authority to supply/ship nonconforming material (NCM). This document defines how the Supplier Nonconforming Material Request (NCMR) is received, reviewed and processed. 2.0 Scope Supplier NCM is a onetime temporary variance from Insitu specifications. Insitu s approval shall be obtained before the material / product is delivered to Insitu. 3.0 Definitions 3.1 Nonconformance Failure to comply with requirements. 3.2 Non-conforming Material (NCM) materials or products that do not meet specified requirements. 4.0 References 4.1 PUF-83-001: Supplier Request for Nonconforming Material Form (NCMR) 4.2 QAP-83-005: Control of Non-conforming Material 4.3 QAI-82-002: Material Inspection Process 5.0 Responsibilities 5.1 Supplier 5.1.1 Supplier shall submit completed PUF-83-001 Supplier NCM form and internal supporting documentation to SupplierManagement@insitu.com and cc their respective Insitu Supply Chain Analyst and/or Procurement Agent. 5.1.2 Hold shipment until Insitu s approval is received in writing from SM&P. 5.1.3 Approved Supplier NCMRs shipment paperwork requirements: 5.1.3.1 Approved copy of PUF-83-001. 5.1.3.2 Shipment tracker indicates material is NCM. 5.1.3.3 Provide list of all affected serial numbers / lot IDs, when applicable. 5.1.3.4 Internal supporting documentation submitted with corresponding approved PUF-83-001. 5.1.4 Additional data required, supplier shall deliver requested documentation. 5.1.5 Rejected Supplier NCMRs the material shall not be shipped to Insitu. 5.2 SM&P NCM Administrator 5.2.1 Review Supplier NCMR for completeness. 5.2.2 Enter Supplier NCMR into the tracking database. Page 1 of 5

5.2.3 Send Supplier NCMR and supporting documentation for approval. 5.2.4 Track status of Supplier NCMR. 5.2.5 Send notification in writing to the supplier of Insitu s approval or rejection. 5.2.6 Send internal notification of approval: SM&P, Quality Technicians, Receiving, IPT Lead, Manufacturing Engineering, Quality Engineering, Design Engineering. 5.2.7 Close Supplier NCMR after all reviews are complete and notification has been sent. 5.3 Supply Chain Analyst & Procurement Agent 5.3.1 Review the Supplier NCMR and respond to SM&P NCM Administrator noting approval, additional data required or rejection. 5.3.1.1 If approved, the Procurement Agent checks the QC Inspection flag on the affected PO line(s). 5.4 Design Engineering / Manufacturing Engineering / Quality Engineering 5.4.1 Review the Supplier NCMR and respond to SM&P NCM Administrator noting approval, additional data required or rejection. 5.5 Incoming Receiving 5.5.1 Identify Supplier NCMR by QC Inspection Flag on PO line and/or Supplier s NCM shipment paperwork delivered with the material. NOTE: See paperwork requirements in section 5.1.3. 5.5.2 Deliver parts and all paperwork received with the material to Quality Technicians for processing. 5.6 Quality Technicians 5.6.1 Inspect Supplier NCMR and supporting documentation. 5.6.2 Scan the NCMR documentation received with the material and log a record in the NCM Database. 5.6.3 Process material according to Incoming Inspection Process QAI-82-002 Material Inspection Process. 6.0 Process Steps 6.1 Supplier performs internal NCM evaluation and determines need to request Insitu to accept NCM. 6.2 Supplier completes a PUF-83-001 Supplier NCM form and submits form and supporting documentation to SM&P for processing. 6.3 Supplier shall identify the specific variance to Insitu specification(s) and submit the supporting documentation with a completed PUF-83-001. 6.3.1 Supporting documents include but are not limited to: Page 2 of 5

1) Functional Product Specifications and Drawings. 2) Test results, product measurements, material certificate of conformity. 3) Historical records or other technical data as appropriate. 6.4 SM&P NCM Administrator reviews the incoming Supplier NCMR for completeness and supporting documentation attachments. 6.4.1 If request is incomplete, supplier is notified and request status is pending until the information is received from the supplier. 6.4.2 If request is complete, the request is entered into the NCM database and submitted for approval. Required Approvals Supply Chain Analyst/Procurement Agent Manufacturing Engineer Quality Engineering Design Engineer NOTE: Customer approval will be requested in accordance with QAP-83-005 Control of NCM Procedure. The number assigned by the SM&P NCM Administrator will be used to track the variance request. 6.5 Approvers review the Supplier NCMR and notify SM&P NCM Administrator of approval, additional data required or rejection. 6.5.1.1 Rejections shall include the reason for rejection. 6.6 SM&P NCM Administrator notifies the supplier of the final disposition. 6.6.1 If approved, supplier attaches a copy of the approved PUF-83-001 and supporting documentation to the shipment and indicates on the shipment tracker that the delivery is an NCMR. 6.6.2 If rejected, the material shall not be delivered to Insitu. The material shall be dispositioned per Insitu s instructions by the supplier. 6.6.3 If additional data required, SM&P NCM Administrator notifies the supplier that additional documentation / information is required to process the request. NOTE: The final disposition shall be determined by Insitu before the supplier ships or takes action on the material. 6.7 Incoming Receiving performs incoming receiving and forwards the material and all NCM paperwork to Quality Technicians for processing. 6.8 Quality receives the material and performs a receipt. 6.8.1 Review the material and NCMR documentation to ensure Insitu s final disposition has been properly implemented. 1) If acceptable, the material and paperwork are accepted and the material is returned to inventory. 2) If an issue is found, process the material according the QAP-83-005 Control of Nonconforming Material. Page 3 of 5

7.0 Process Flowchart Supplier NCM Request Supplier SM&P NCM Admin Approvers Incoming Receiving Quality Perform internal MRB Complete PUF- 83-001 / attach supporting docs Review submission for completeness Accept? Review Supplier NCM Request Send requested information / data NO Request information from Supplier Additional Data Required Disposition product per Insitu instructions REJECTED Approved? Mark shipping tracker and ship product PA checks QC Inspect flag on PO Line Receive product and send to QA Enter receipt Return material to inventory Accept? NO Follow NCM Process QAP-83-005 Page 4 of 5

8.0 Revision History Revision History Rev Date Description Revised By 1 06/24/2014 Initial release Audrey Dickenson, Patti Sherwin, Duane Purcell Page 5 of 5