paver installation guide

Similar documents
HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

How To Install Your Cambridge Pavingstones System How To Install Your Cambridge Segmental Retaining Wall System

at home installation guide Manufactured by:

HP and RG POLYMERIC SANDS for PAVEMENT JOINTS

SAND INSTALLATION GUIDE

Polymeric Sand. Guide. for Pavement Joints. Installation. Easy to use Stays within joints HP POLYMERIC SAND RG+ POLYMERIC SAND. techniseal.

CHARACTERISTICS CSA A TECHO-BLOC Compressive strength psi [45 MPa] min.

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231.

PAVING SLABS ON A CONCRETE BASE

MACHINE-LAY Installation Manual

Construction Specification for Concrete Unit Pavers

PAVE SCHOOL printer version. Complete Installation Guide for Concrete and Clay Paver Walkways By, Bob Cramer

SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE

PERMEABLE INTERLOCKING PAVERS

The Garden Wall Collection

15 lbs (6.8 kg) Approx. Weight. AB Junior. AB Jumbo. 35 lbs (16 kg) Approx. Weight

HOW TO BUILD Garden Walls Frestanding & Landscape Walls

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING

SECTION INTERLOCKING CONCRETE PAVERS

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

MUTUAL MATERIALS TECH SHEET RomanStack. Coverage* 4.5 pcs / ft² (48.44 pcs / m²) 3,242 lb (1,470 kg) 4 x 8 Cap Unit. 1.6 pcs / ln ft (4.

NextGel TM JOINTING SAND

CHARACTERISTICS CSA A TECHO-BLOC Compressive strength 50 MPa [7200 psi] min. 50 MPa [7200 psi] min.

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

Stretch Your Dollar Theme Designs Fire Pit

NOVEMBER 2016 MAGNUMSTONE. retaining walls installation manual

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Installation Guide. PrivacyShield Outdoor Enclosure

Stepping Stone. Name: Date:

Redi Rock Specification and Installation Manual

How To Install Dry-Laid Flagstone

Holland Stone Series Concrete Pave Stones

How to Build a Dry Stone Wall

Recognized leader in porcelain technology

AUGUST 2017 HASTINGS. retaining walls installation guide

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

Steps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to

A. Testing Laboratory Services: Section B. Excavation, Site Fill and Rough Grading: Section Sub-Base Course Material (If requested).

SECTION A1 EXCAVATION AND BACKFILL GENERAL

INTERLOCKING CONCRETE PAVERS SECTION 02780

PPC Cement TUTORIAL. how to screed a floor

Construction Procedures

GROUNDtrax GROUNDGRIDZ

Sidewalk Replacement Criteria The following are the criteria used to determine if sidewalk needs to be replaced in the City of Watertown:

ECO OUTDOOR INSTALLATION TIPS FLOORING TORINO MELBOURNE SYDNEY BRISBANE ADELAIDE PERTH T ECOOUTDOOR.COM.AU

StormwaterWise Landscapes: Pervious Surfaces Specifications

Proudly Made in the U.S.A.

Landscaping. Retaining Walls & Pavers. masonry. build in style

LAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS

Guidelines to installing the ACO Sport range of products

Application and Maintenance

HANDHOLES, PULLING VAULTS AND JUNCTION BOXES

Municipality of Waterville Public Sidewalk Repair Policy

Impact Protection Slabs and Sports Pavement Slabs

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

RETAINING WALLS.

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

PRESCOTT FIRE PIT INSTALLATION GUIDE AND OWNER S MANUAL

Allan Block. Table of Contents. allanblock.com

NORTHERN NSW LANDSCAPING COLLECTION RETAINING WALLS & PAVERS style and function

Foundation instruction manual. 99 ft² (9,2m²)Grillkota

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

SECTION 1 STALOK FIBER FOR TURF PARKING / EVENT STAGING AND FIRE LANES

TrowelPave Concrete - Regular Set (20lb 40lb Bucket Kit)

25 m2 (270 sq ft) Extension Kit

Allan Block. Table of Contents. allanblock.com

Application Instructions for Keystone Kool Deck on Existing Concrete

Rainwater Harvesting Tank

Tasman Retaining Wall System

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

BIO-AQUIFER STORM SYSTEM

Installation Specifications for Interlocking Concrete Pavements

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

RETAINING WALLS & PAVERS

STORAGE AND TRANSPORTION

Section 1 OBC FADS /13 Access to Parking Areas

StormTech Construction Guide

INSTALLATION INSTRUCTIONS

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

BROWN S SIGNATURE COLLECTION

Our services are available to you after the purchase of your home for the maintenance of your concrete.

SECTION BITUMINOUS CONCRETE PAVEMENT

R-TANK SPECIFICATIONS

cambridgewallsupport.com cambridgepavers.com

Pembroke Hopkins Park Construction Outreach Program E S. Rd., Pembroke Township, IL Tel: (815) Fax: (815)

TUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE

SECTION Stabilizer Apache Warning Track Mix for baseball or softball field surfacing

How To Build A Dry Stone Wall

CONDUITS AND FITTINGS

SECTION CAST-IN-PLACE CONCRETE

Specifications per pallet. Number of rows = 8 9 ft 2 /row (0.84 m 2 )/row T W

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

BASE CONSTRUCTION MATERIALS A Aggregate

Transcription:

paver installation guide

ongratulations on purchasing the finest concrete paving system available. Ideal for any landscape setting, barkman pavers have been designed to provide you with years of trouble free service and enjoyment. Handsome and extremely durable, they offer a number of important advantages over conventional concrete or asphalt. These include: High resistance to salt corrosion and the weathering effects of the sun, rain and ice. The ability to flex during frost heave without becoming damaged. Easier installation and repair (thanks to the use of individual pavers). Easier removal (when gaining access to underground services). Safer because their rough surfaces make them slip and skid resistant. Greater design possibilities thanks to the wide variety of styles, shapes and colors available. More environmentally-friendly because they can be reused and reset. Step-by-Step Installation The directions in this guide are for the installation of a typical barkman driveway, patio or sidewalk. efore you start, it is important to have your project fully designed on paper. If you require assistance with creating your design, or have any questions regarding installation, please consult your knowledgeable barkman dealer or contractor. Equipment Needed n 8' to 10' long 2x4 board for screeding Two 10' long, 1" diameter sand screeding guides (example: water pipe, electrical conduit, wood strips, etc.) Standard carpenter s level, gloves, knee pads, trowel, rake, shovels, wheelbarrow, broom, a rubber mallet, tape measure and safety glasses Wooden stakes or metal pegs Plate compactor (3 HP to 5 HP) and hand tamper oncrete saw with a diamond blade (available at rental stores) Spray paint, string, string level and a carpenter s pencil

installation 1 reate Outline The first step is to take your completed design and transfer it onto the ground where you will be installing your patio. You can use spray paint to mark the outline, using a garden hose for guidance on the curved areas and long boards for the straight areas. 2 Set Elevations Next, use a 2x4, stakes and a level to set the slope of your patio (a slope of approximately 1" to every 8 ft. is usually ideal). Now, set your stakes and string lines to mark the top of fin ished patio. Please refer to the Depth Estimation hart. 3 Excavate Using your grid work of stakes and guide strings, excavate material be low the string lines to the depth needed. To determine depth, refer to the Depth Estimation hart. Note: efore any digging, contact your local utility companies for the location and depth of pipes, cables and conduits. 4 Spread Granular ase You are now ready to spread and compact the coarse granular base. Please refer to the ase Material Estimation hart to estimate the base material you will require.

5 ompact ase The granular base should be leveled and compacted (use a plate compactor) in layers of not more than 4". Wet, but do not soak the gravel base while compacting. Level the base to approximately 3" below the desired surface level. Make sure the base is level and conforms to the shape and elevation of the finished job by measuring down from the string lines you have established on the stakes. 6 Install Edge Restraint To prevent lateral movement of the pavers, edge restraints should be installed on compacted base along all edges which would otherwise be unrestrained. If possible, install edging only on one or two sides of the paving area. fter pavers have been placed, install remainder of edging so as to avoid unnecessary cutting. 7 Spread edding Sand egin screeding (spreading) a 1" layer of large grained sand (such as concrete sand). Lay your screed guides (1" pipe, electrical conduit or wood strips) onto compacted base. Set the proper height of these guides by pulling a string across the area to be paved at the finished grade level. The top of screed guides should be 1 1 2" down from the string. Pack sand around the guides to set them in place. Fill with sand and slide the 8' to 10' screed board along the guides to smooth and level. Once complete, pull out the screed guides and fill any voids with sand using a trowel or small board. Do not walk on or work from the screeded sand. 8 Lay Pavers fter screeding the sand begin laying your pavers, using the area s straightest edge as your starting point. Pick a starting point where you can make the pavers fit against the longest straight edge or the longest combination of straight edges as long as they are at right angles to each other.

9 Keep Pavers Square To keep the pavers straight and square as you work, use a string line running in both directions as your guide. This is easily done by measuring out lines in multiples of 3, 4 and 5 with the line marked three remaining stationary during the squaring process. (See diagram below.) Line four should be moved until four and five intersect, causing a right angle in the three-four corner. If your pavers start to get off square, you can get them into proper position by gently tapp ing them towards the string line. 5 10 ut to Fit Many of the pavers that butt into the soldier course (strip of pavers all facing in the same direction) will need to be cut to fit properly. Using a concrete saw or guillotine splitter, cut each paver separately marking it, removing it, cutting it and placing it be fore pro ceed ing to the next one. lways wear safety glasses when cutting pavers. In stall the soldier course as you go along. 11 ompact Sweep off the surface completely and use the plate compactor to tamp the pavers to a uniform level. Run the compactor in a parallel direction across the pavers, overlapping on each pass. Make a second series of passes in a perpendicular direction. Important: for large profile pavers or a raised surface paver, set compactor to half speed and use a uni-saver matt. 12 Spread oarse Sand Sweep sand into all spaces between the finished pavers, repeating the process until all joints between the pavers are filled. Repeat this process with more dry sand in a few days. INSTLL OMPLETE OR 3 90 4 Spread Polymeric Sand Sweep polymeric sand into all spaces between the finished pavers (surface must be completely dry). GO TO STEP 13

13 ompact Sweep off the surface completely and follow step 11. Well-compacted joints help reduce risk of washing away polymers and significantly reduces drying time. Repeat this process (steps 12 and 13) until sand reaches 1 8" below the top of the pavers. Do not apply the polymeric sand if there is a chance of rain within the next 6 hours. 14 Remove Excess Polymeric Sand Using a fine bristle broom or leaf blower, remove any excess polymeric sand from paver s surface (without displacing the polymeric sand between the pavers). 15 ctivate Polymeric Sand Define the entire surface into 200 sq. ft. areas. Using the shower setting on garden hose sprayer, wet the first 200 sq. ft. area for 30 seconds (without displacing polymeric sand). Repeat spraying process immediately on the same defined area. In very hot conditions, wet for a third time. Without interruption, move to the next defined 200 sq. ft. area and continue the process until the entire surface has been completed. 16 Drying s soon as wetting process is completed, use a leaf blower to remove any excess water. The polymeric sand will set in 90 minutes. void using or exposing the area to water for 24 hours.

estimating Excavation Depth Estimation pedestrian traffic light vehicular traffic pavers 2 3 8" 2 3 8" sand 1" 1" gravel base (compacted) 4" 6" 8" 12" total excavation depth 7" 9"* 11" 15"* Gravel ase: Use minimum depths in a well-drained area or undisturbed soil. Use maximum depths in poorly drained area or disturbed soil. 1 2" less is required to compensate compacting of pavers. If soil is saturated more than 50% of the time, filter fabric and extra base should be used. *When installing thicker pavers (roadway 4", oardwalk and Navarro 3.15"), add 3 4" to 1 5 8" total excavation depth. ase Material Estimation square footage of pavers square footage of pavers square footage of pavers granular base X ( depth of base 12 ) 27 = bedding sand X.0031 = optional polymeric sand 60 or 75 (for narrow joints) = cubic yards of base needed 1" depth cubic yards of sand needed number of 50 lb. bags needed square footage of pavers 25 or 40 (for wide joints) = number of 50 lb. bags needed Pattern Layouts Roman Paver Random Pattern 1 Roman Paver Random Pattern 3 Pieces per 100 sq.ft. 85 pcs - 10 5 16" x 8 1 4" = 50% 85 pcs - 6 3 16" x 8 1 4" = 30% 85 pcs - 4 1 8" x 8 1 4" = 20% Pieces per 100 sq.ft. 53 pcs - 12 3 8" x 8 1 4" = 38% 53 pcs - 10 5 16" x 8 1 4" = 31% 53 pcs - 6 3 16" x 8 1 4" = 19% D 53 pcs - 4 1 8" x 8 1 4" = 12%

oardwalk Holland Paver 4 1 8" x 8 1 4" *ut Paver 3 1 2 X 14 1 4 3 1 2 X 12 5 8 3 1 2 X 11 1 8 Navarro Paver D 3 1 2 X 9 1 2 E F G H 4 5 8 X 14 1 2 4 5 8 X 12 5 8 4 5 8 X 11 1 8 4 5 8 X 9 1 2 12" x 18" 12" x 12" Navarro Running ond 12" x 6" Heartland Paver 15 3 8" x 12 1 2" Genova/Verano Paver 12" x 18" = 3 12" x 12" 6" x 12" 12" x 12" = 5 6" x 6" 12" x 6" = 5 Note: For a complete range of shapes and pattern ideas, ask your dealer or contractor for the arkman Design Helps.

construction details Typical ross Section Edge Restraint Jointing Sand Pavers (2 3 8") edding ourse (1") ourse Granular ase (6"-12") Existing Subgrade Roman ircle x 28 Row 7 x 24 Row 6 x 20 Row 5 x 32 Row 4 x 24 Row 3 x 16 Row 2 x 8 Row 1 Starter Stone 8 1 4" x 8 1 4" 9" x 8 1 4" 7 3 4" x 8 1 4" 7" x 8 1 4" 6" x 8 1 4"

barkmanconcrete.com aution: efore any digging, always consult your local utility companies for the location and depth of pipes, cables and conduits. Dry sawing or grinding of concrete products may result in the release of respirable crystalline quartz. Prolonged exposure to respirable crystalline quartz may cause delayed (chronic) lung injury (silicosis). The use of a NIOSH-approved respirator and tight fitting goggles is recommended when sawing or grinding operations are in progress. MF21132-0711 arkman oncrete Limited Steinbach Office 152 randt Street Steinbach, M R5G 0R2 T (204) 326 3445 or 1 800 461 2278 F (204) 326 5915 steinbach@barkmanconcrete.com Winnipeg Office 909 Gateway Road Winnipeg, M R2K 3L1 T (204) 667 3310 or 1 800 342 2879 F (204) 663 4854 winnipeg@barkmanconcrete.com Vancouver Office 2104 290 Newport Drive Port Moody, V3H 5N2 T (778) 689 7670 F (604) 949 0321 vancouver@barkmanconcrete.com algary Office 813 Mcool St ox 1136 rossfield, T0M 0S0 T (403) 946 4630 F (403) 946 4631 calgary@barkmanconcrete.com creating concrete solutions