Borough President and City Council Capital Funding Requests FY 2009

Similar documents
Auburn University Facilities Management Policy :

Location Inventory for St. Paul School

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

Kingsborough Community College

CENTRAL GREAT PLAINS SERIES

FIT. Perfect. CUSTOM wall systems. A vertsatile program that creates true custom, built-to-spec wall systems and components

Warehouse & Distribution Facility 1995 Markham Road Scarborough, Ontario

WAREHOUSE INVENTORY. Provided by the Office of Sustainability

RATIONALE AND REASONING

ELEMENTS COLLECTION 1

NEW FOUR STORY MIXED USE RESTAURANT, RETAIL, LODGING, AND OFFICE BUILDING OWNER S PROJECT REQUIREMENTS

GREENWICH PUBLIC SCHOOLS GREENWICH, CONNECTICUT REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES AT NEW LEBANON ELEMENTARY SCHOOL RFP #

Resource Conservation Management Program

Bureau of Indian Affairs

Wellington Manor Series

Mobile Storage Solutions. Presentation LIT-PD-0059-R01

HANDLING EQUIPMENT HANDLING EQUIPMENT

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

Overview of Revised School Regulation

Stand construction services 2018 Modular stands

Mount Vernon Elementary School Grades PK 5

SPECIFICATIONS SYSTEMS NEW INSTALLATION

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX

Facility Improvements

DAT MEETING NOTES # 3

The Ultimate Home Value with Quality,

CENTENNIAL SCHOOL DISTRICT

INCLINATOR ELEVETTE HOME ELEVATOR. America s most customizable brand

FORT FAIRFIELD COMMUNITY CENTER REMODEL

Reach Every School District and Superintendent in Florida!

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Ticking Form - Lodge - 1 -

Estimate Form for Bathroom Design and Installation

Construction Summary

SPECIFICATIONS SYSTEMS MATCHING EXISTING. This Matching Existing Furniture Contract will be for the following Manufacturer s only:

CLINICS. LABS. PHARMACIES. PREP AND PACK.

Storage & Handling for Tables and Chairs

flux endlessly adaptable casegoods

IRVINE UNIFIED SCHOOL DISTRICT

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

FOUR WESTLAKE IS AN OPPORTUNITY UNLIKE ANY

Record Master SHELVING SYSTEMS

Spatial Needs Assessment

Washington State Light Industrial Park

Approved National Fixture Design

Recreational Cabins. The following prices are for recreational cabins - see separate sheets for Modular Homes

Eaton Furniture Solutions. Product Portfolio. Technical and General Office Applications

Delta Zeta Sorority House Renovation Scope of Work

standard features Power Exhaust Fans w/light - Both Baths GFCI Receptacles Upgrade Light Fixture - Bath 1 Vanity - Per Lav GFCI Receptacles

Division 09 FINISHES TABLE OF CONTENTS

F i l e s a n d S t o r a g e

LOT QTY DESCRIPTION NOTE FRONT OFFICE. 2 CREDENZA. NATURAL & STORM LAMINATE, 2 x SLIDING DOORS, 1800 x 450 x 700mm

APPENDIX B FF&E RESPONSIBILITY MATRIX

Verve Inclusions. 3 Corporate Avenue Rowville VIC T 1800 SIENNA E

Telecommunication Spaces

Request for Quotation (RFQ) for the supply of Movable Furniture to the Stellenbosch common areas CSIR Campus RFQ No.

PURCHASING PROCESS & GUIDELINES

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

TECHNICAL FURNITURE INDUSTRIES L.L.C. Ideal fit outs for great experiments.

Ivy Tech Building Standards. Space Standards

Kelly Village Apartments 3118 Green Houston, Texas 77020

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

Jefferson Patterson Park and Museum Maryland Archaeological Conservation Laboratory Meeting Room Usage Policy

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

PAINT BOOTHS GENERAL PURPOSE

LIFE OF A CAPITAL PROJECT

University Apartments on Brooklyn PROJECT MANUAL

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

Cottage of the Year SL-593 MOSER DESIGN GROUP PLAN SPECIFICATIONS ABOUT THIS PLAN PLAN PRICING. illustration MUIR STEWART

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

Moving Instructions. Boxes will be delivered to your departments upon request before your move, when possible. If you need more boxes, please contact:

Asset Inventory. Definition

Operational Services Facility Innovation & Readiness Stakeholder Team

UMBC PAHB II AV Classroom Systems BID # BC R ADDENDUM #4

STUDENT ORGANIZATION SUITE Club Hub POLICIES AND PROCEDURES Tivoli Student Union, Suite 346

Budget Estimate Basic Tenant Improvement

Architectural Services

3D/International. Facility Condition Assessment Report. Coast Community College District

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

SECTION HEALTHCARE CASEWORK (SYNTHESIS CASEWORK COLLECTION BY MIDMARK)

Akron, OH at Standupdesks.com

HQ Building Renovation. Mark Focht, President Nancy Somerville, EVP Michael O Brien, CFO

LECKIE ELEMENTARY SCHOOL

I - FACILITY PROGRAM DOCUMENT

EXHIBIT DESIGN REGULATIONS

Killeen ISD Job Descriptions For Auxiliary Personnel

Manage Deliverables - Construction Step 6 February 2015

JOB DESCRIPTION Assistant Director of Activities

HAFO SERIES 1600 LAB OVEN S/N N/A

RESPONSIBILITIES INCLUDE:

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

APPLICATION BASED SOLUTIONS GOVERNMENT MARKET

Gondola Shelving. Pallet Racking. 132' Island 412' Wall 56' Wall 168' Wall 55 Endcaps 52 Shelves 2,566 Shelves. 12 Uprights. 23 Uprights.

East Los Angeles College Project Priority List Occupancy Date

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

INDEX. I. About Technical Furniture Trading III. Laboratory furniture Work benches & Cabinets Cabinet Systems Work tops.

On the Shop Floor: Designing Lean Workstations/Cells with Reusable Plastic Packaging

Metric Storage Systems. Mississauga, Ontario

PAINT BOOTHS LARGE EQUIPMENT

Restore the Core! Table of Contents. Executive Summary 1. Overview of the University of Maryland Campus 2

Transcription:

Borough President and City Council Capital Funding Requests FY 29 CIP Number Phase* Request $ NIB Equipment BX-1297951 E $75, GML Egress BX-1257112 C $1,93, Child Development Center Furniture BX-11421543 E $3, Cafeteria Kitchen Renovation BX-1961812 DCE $3,278, Subtotal $5,421, *A = Acquisition, D = Design, C = Construction, E = Equipment 1

Borough President and City Council Capital Funding Requests FY 29 NIB Equipment Request: $75, BX-1297951 Project Location: North Instructional Building (Future) Floor(s): Room(s) Campus Contact: Mary Coleman Senior Vice President for Administration 718-289-5127 Central Office Contact: Elizabeth Friedman Campus Planner (212) 541-481 Project Scope Description: This project will provide funds for equipment outfitting of 's new North Instructional Building (NIB). The City and the State have provided matching funds to build this new facility. The Bronx Borough President provided $75, in FY 28 with a commitment of an additional $75, for FY 29. The FY 29 funds are needed to complete this important project. The North Instructional Building will be used by students, faculty, staff and the community. Project Justification: The Master Plan calls for new classrooms and a new library. Without this project, students will have to continue to attend classes in inferior classrooms and study in an overcrowded and substandard library. Proposed Project Schedule: Original Date of Cost Estimate June, 25 Start of Design/Documentation Start of Construction End of Construction Occupancy March, 26 July, 28 September, 21 January, 211 A = Acquisition, D = Design, C = Construction, E = Equipment 3

THE CITY UNIVERSITY OF NEW YORK - PROJECT COST ESTIMATE SUMMARY 11/27/27 Project Phase: NIB Equipment BX-1297951 Planning Net area Gross area Construction Cost/GSF Total Project Cost/GSF 1. 1.1 1.2 1.3 1.1 SITE ACQUISTION Fees Property Purchase/Lease Cost Property Purchase/Lease Contingency Total, Acquisition... (A) 2. DESIGN FEES AND EXPENSES 2.1 Design Fee (A/E, et al) 2.2 Reimbursable/Other Design Expenses incl. EO 111 2.3 Design Fee/Expenses Contingency 2.4 Controlled Inspections 2.1 Total, Design... (D) 3. SITE PREPARATION 3.1 Site Preparation 3.2 Site Preparation Contingency 3.1 Subtotal, Site Preparation... 4. SWING SPACE PREPARATION (from Swing Space Worksheet) 5. CONSTRUCTION 5.1 Construction, incl. Profit, Overhead 5.2 Communications - Voice, Data,Video, Security 5.3 Other Constr. Costs (Site Develop; EO 111; Fixed Equip. not in contract) 5.4 CM General Conditions 5.5 Signage 5.6 Construction Contingency 5.7 SUBTOTAL Construction Costs, Present Value 5.8 Construction Cost Escalation: @ 3 % p/a 5.1 Subtotal, Escalated Construction Costs... 6. MANAGEMENT FEES AND EXPENSES 6.1 Construction Manager, Design Phase Fee 6.2 Construction Manager, Construction Phase Fee 6.3 Site Representative 6.4 Reimbursable Expenses 6.5 Project/Agency Management Fee 6.6 Other Management Fees, Expenses 6.7 Management Fees/Expenses Contingency 6.1 Subtotal, Management Fees/Expenses... 7. RELATED COSTS 7.1 Building Systems Conditioning 7.2 Systems Shut Down 7.3 Other Related Costs (Printing, Commiss. & Closeout, Contingency) 7.4 CUNY Capital Contingency $1,5, 7.1 Subtotal, Related Costs... $1,5, 7.2 Total Construction Costs... $1,5, (C) 8. FIXTURES, FURNISHINGS & EQUIPMENT 8.1 Moveable Furniture and Scientific/Technical, Maint. Equipment 8.2 Fixtures, Furnishings, Equipment Contingency 8.3 Art Work 8.4 Moving 8.1 Total Equipment... 9. TOTAL PROJECT COSTS... $1,5, 1. PROJECT SCHEDULE AND FUNDING Date of Original Cost Projection Scheduled Start of Design Scheduled Start of Construction Scheduled End of Construction June 25 March 26 July 28 September 21 Scheduled Occupancy January 211 Funding Received prior to 28/9 $75, Funding Requested in 28/9 Funding to be Requested after 28/9 $75, (E) 4

Borough President and City Council Capital Funding Requests FY 29 GML Egress Request: $1,93, BX-1257112 C Project Location: Gould Memorial Library Floor(s): Room(s) Campus Contact: Andre Hurni Director of Campus Planning 718-289-5122 Central Office Contact: Elizabeth Friedman Campus Planner (212) 541-481 Project Scope Description: This project will create two sets of egress stairs for the Gould Memorial Library Rotunda. The additional means of egress will allow the College to hold public events in this historic, landmarked gathering space that can accommodate 35 people. Because the Rotunda lacks a secondary means of egress, NYC building code prohibits occupancy of this space by more than 75 people. Several years ago, the GML stage and auditorium were renovated and a sound system installed, creating a special space for conferences, fund raising events and other public gatherings. Unfortunately, without the use of the Rotunda, the facility can not function to its full potential. The Rotunda will be used by the college and outside groups. Project Justification: The Gould Memorial Library, designed by Standford White of McKim, Mead and White is an historic building on this one hundred year old campus. The GML Rotunda -- the building's main gathering space -- has the potential to accommodate 35 people. Because the Rotunda lacks a secondary means of egress, NYC building code prohibts occupancy of this space by more than 75 people. Several years ago, the GML stage and auditorium were renovated and a sound system installed, creating a a very special space for conferences, fund raising events and other public gatherings. Unfortunately, without the use of the Rotunda, the facility can not function in this manner. This project will correct that defeciency and open up this very special building to the public. The College's Master Plan calls for this building to be renovated. If this project is not funded, the building will continue to be used in a very limited manner, preventing the general public from enjoying this landmarked facility. Proposed Project Schedule: Original Date of Cost Estimate October, 27 Start of Design/Documentation Start of Construction End of Construction Occupancy July, 27 January, 29 August, 29 September, 29 A = Acquisition, D = Design, C = Construction, E = Equipment 5

THE CITY UNIVERSITY OF NEW YORK - PROJECT COST ESTIMATE SUMMARY 11/27/27 Project Phase: GML Egress BX-1257112 Planning Net area Gross area Construction Cost/GSF Total Project Cost/GSF 1. 1.1 1.2 1.3 1.1 SITE ACQUISTION Fees Property Purchase/Lease Cost Property Purchase/Lease Contingency Total, Acquisition... (A) 2. DESIGN FEES AND EXPENSES 2.1 Design Fee (A/E, et al) 2.2 Reimbursable/Other Design Expenses incl. EO 111 2.3 Design Fee/Expenses Contingency 2.4 Controlled Inspections 2.1 Total, Design... (D) 3. SITE PREPARATION 3.1 Site Preparation 3.2 Site Preparation Contingency 3.1 Subtotal, Site Preparation... 4. SWING SPACE PREPARATION (from Swing Space Worksheet) 5. CONSTRUCTION 5.1 Construction, incl. Profit, Overhead 5.2 Communications - Voice, Data,Video, Security 5.3 Other Constr. Costs (Site Develop; EO 111; Fixed Equip. not in contract) 5.4 CM General Conditions 5.5 Signage 5.6 Construction Contingency 5.7 SUBTOTAL Construction Costs, Present Value 5.8 Construction Cost Escalation: @ 12 % p/a 5.1 Subtotal, Escalated Construction Costs... $79, $79, $869, $161, $1,3, 6. MANAGEMENT FEES AND EXPENSES 6.1 Construction Manager, Design Phase Fee 6.2 Construction Manager, Construction Phase Fee 6.3 Site Representative 6.4 Reimbursable Expenses 6.5 Project/Agency Management Fee 6.6 Other Management Fees, Expenses 6.7 Management Fees/Expenses Contingency 6.1 Subtotal, Management Fees/Expenses... $63, $63, 7. RELATED COSTS 7.1 Building Systems Conditioning 7.2 Systems Shut Down 7.3 Other Related Costs (Printing, Commiss. & Closeout, Contingency) 7.4 CUNY Capital Contingency 7.1 Subtotal, Related Costs... 7.2 Total Construction Costs... $1,93, (C) 8. FIXTURES, FURNISHINGS & EQUIPMENT 8.1 Moveable Furniture and Scientific/Technical, Maint. Equipment $79, 8.2 Fixtures, Furnishings, Equipment Contingency $4, 8.3 Art Work 8.4 Moving 8.1 Total Equipment... $83, 9. TOTAL PROJECT COSTS... $1,176, 1. PROJECT SCHEDULE AND FUNDING Date of Original Cost Projection Scheduled Start of Design Scheduled Start of Construction Scheduled End of Construction October 27 July 27 January 29 August 29 Scheduled Occupancy September 29 Funding Received prior to 28/9 Funding Requested in 28/9 Funding to be Requested after 28/9 $1,93, (E) 6

Borough President and City Council Capital Funding Requests FY 29 Child Development Center Furniture Request: $3, BX-11421543 Project Location: Floor(s): All floors Room(s) All rooms Campus Contact: Andre Hurni, R. A. Director of Campus Planning (718) 289-5122 Central Office Contact: Elizabeth Friedman Campus Planner (212) 541-481 Project Scope Description: The Child Development Center is scheduled to be completed in Summer 29. However, initial funding for the Center did not include funds for furniture and equipment. This project will purchase the necessary furniture and equipment. In addition to traditional child care supplies, audio-visual equipment, interactive learning tools, and computers will be purchased. Without the requested furniture and equipment, the Child Development Center cannot open as scheduled and the College will not be able to provide this much-needed service to the campus population. Upon completion, the Child Development Center will accommodate up to 125 children. The Center will provide a much needed service to the campus population by providing a safe and nurturing environment for the children of the college community. Project Justification: Funding for the construction of the new Child Development Center project did not include money for furniture and equipment. Without the requested furniture and equipment, the Child Development Center cannot open as scheduled and the College will not be able to provide this much-needed service to the campus population. Proposed Project Schedule: Original Date of Cost Estimate November, 25 Procurement Equipment Received Equipment Installed Equipment in Full Use January, 29 April, 29 June, 29 July, 29 A = Acquisition, D = Design, C = Construction, E = Equipment 7

Child Development Center Furniture BX-11421543 Equipment List: Item Description Quantity Unit Cost Total Cost A. CLASSROOM FURNITURE & EQUIPMENT 1 WALL UNIT FOR CHANGING STATION 2 $195 $39 2 SAFETY CRIB 1 $199 $1,99 3 STORAGE CENTER-CLOSET 2 $495 $99 4 STACK TODDLER COT SETS 2 $474 $948 5 EASY CLEAN TODDLER TABLES 1 $15 $1,5 6 WATCH-ME-WALK SAFETY BAR AND MIRROR 2 $149 $298 7 CAREGIVER'S GLIDER- ROCKING CHAIR 4 $349 $1,396 8 CRAWL AND SEE MIRROR CENTER - 4 PART CENTER 1 $28 $28 9 WATER FALL CLIMBER 3 $299 $897 1 INFANT DISCOVERY CENTER - 4 PART CENTER 1 $18 $18 11 ADJUSTABLE COMPUTER STATION 1 $349 $3,49 12 HEAVY DUTY CUBBIES 44 $549 $24,156 13 GETTING READY TO READ CARPET 6 $459 $2,754 14 DOUBLE SIDED WRITE & WIP ROOM DIVIDER 1 $249 $2,49 15 ALL PURPOSE EASEL W/ LOCKING CATERS 8 $259 $2,72 16 SHATTER PROOF MIRROR 6 $169 $1,14 17 RAINBOW 24x48 RECTANGULAR TABLE 1 $169 $1,69 18 HEAVY DUTY FOLD & ROLL CUBBY 1 $499 $4,99 19 HEAVY DUTY BOOK CENTER 8 $249 $1,992 2 ROUND EDGE LOCKING STORAGE CABINET 8 $529 $4,232 21 DOUBLE SIDED READING CTR 1 $449 $4,49 22 ALL IN ONE RAEDING CENTER 6 $249 $1,494 23 SOLAR SYSTEM RUG 1 $16 $1,6 24 OCTAGONAL LOFT 2 $2,699 $5,398 25 LAMINATE TO WOOD KIDNEY SHAPED TABLE 2 $25 $5, 26 PREMIUM OAK CHAIRS 2 $14 $27,998 27 MOBILE AUDIO VISUAL CENTER 5 $249 $1,245 28 DOUBLE SIDED COUCH 5 $4 $2, 29 L RECEPTION DESK WITH LEFT RETURN 1 $2,499 $2,499 3 EXECUTIVE DESK 66" WIDE 2 $959 $1,918 31 BOOK CASE WITH LOWER FILE DRAWER 4 $756 $3,24 32 LATERAL FILE WITH 4 DRAWERS 1 $549 $5,49 33 RECTANGULAR WORKSATIONS 5 $249 $1,245 B. OFFICE EQUIPMENT INTEL PENTIUM 4 PROCESSORS COMPUTER SYSTEM 1 WITH HT (2.8GHz, 1M, 8MHz FSB) 2 $2,199 $43,98 2 COLOR LASER PRINTERS 15 $699 $1,485 3 5" HD PLASMA TV 1 $4,999 $4,999 4 34MP PROJECTOR 1 $1,699 $1,699 5 COMPLETE COLOR 16 CAMERA VIDEO SYSTEM 1 $4,995 $4,995 8

Child Development Center Furniture BX-11421543 Equipment List: Item Description Quantity Unit Cost Total Cost C. KITCHEN & FOOD SERVICE EQUIPMENT 1 CONVEYOR TOASTER 1 $897 $897 2 UNIVEX GEAR DRIVEN SLICER 1 $2,755 $2,755 3 COMMERCIAL FOOD PROCESSOR 1 $865 $865 4 SUPERIOR HAND DRYER 5 $25 $1,25 5 SUPERIOR SPACE SAVER REFRIGERATOR 2 $3,395 $6,79 6 SUPERIOR SPACE SAVER FREEZER 2 $2,995 $5,99 7 EZ KLEEN COMMERCIAL VAC 2 $275 $55 8 INDOOR/OUTDOOR WASTE RECEPTABLES 6 $25 $1,23 9 FOOD STORAGE 1 $195 $1,95 1 36" ELECTRIC RANGE BY GARLAND 1 $3,995 $3,995 11 VEDO265C - 36" WIDE DOUBLE OVEN 1 $4,995 $4,995 12 CART, 3-SHELF 1 $198 $1,98 13 SHELVING SET, STARETR KIT- 4SHELF 6 $399 $2,394 14 POT RACK, CEILING MOUNT 2 $359 $718 15 WORKTABLE STAINLESS STEEL 24x48 4 $199 $796 16 ELECTRIC SCALE FOR TRADE 3LBS 1 $399 $399 Equipment Total $224,636 9

THE CITY UNIVERSITY OF NEW YORK - PROJECT COST ESTIMATE SUMMARY 12/6/27 Project Phase: Child Development Center Furniture BX-11421543 Planning Net area Gross area Construction Cost/GSF Total Project Cost/GSF 1. 1.1 1.2 1.3 1.1 SITE ACQUISTION Fees Property Purchase/Lease Cost Property Purchase/Lease Contingency Total, Acquisition... (A) 2. DESIGN FEES AND EXPENSES 2.1 Design Fee (A/E, et al) 2.2 Reimbursable/Other Design Expenses incl. EO 111 2.3 Design Fee/Expenses Contingency 2.4 Controlled Inspections 2.1 Total, Design... (D) 3. SITE PREPARATION 3.1 Site Preparation 3.2 Site Preparation Contingency 3.1 Subtotal, Site Preparation... 4. SWING SPACE PREPARATION (from Swing Space Worksheet) 5. CONSTRUCTION 5.1 Construction, incl. Profit, Overhead 5.2 Communications - Voice, Data,Video, Security 5.3 Other Constr. Costs (Site Develop; EO 111; Fixed Equip. not in contract) 5.4 CM General Conditions 5.5 Signage 5.6 Construction Contingency 5.7 SUBTOTAL Construction Costs, Present Value 5.8 Construction Cost Escalation: @ 3 % p/a 5.1 Subtotal, Escalated Construction Costs... 6. MANAGEMENT FEES AND EXPENSES 6.1 Construction Manager, Design Phase Fee 6.2 Construction Manager, Construction Phase Fee 6.3 Site Representative 6.4 Reimbursable Expenses 6.5 Project/Agency Management Fee 6.6 Other Management Fees, Expenses 6.7 Management Fees/Expenses Contingency 6.1 Subtotal, Management Fees/Expenses... $2, $2, 7. RELATED COSTS 7.1 Building Systems Conditioning 7.2 Systems Shut Down 7.3 Other Related Costs (Printing, Commiss. & Closeout, Contingency) 7.4 CUNY Capital Contingency 7.1 Subtotal, Related Costs... 7.2 Total Construction Costs... $2, (C) 8. FIXTURES, FURNISHINGS & EQUIPMENT 8.1 Moveable Furniture and Scientific/Technical, Maint. Equipment $227, 8.2 Fixtures, Furnishings, Equipment Contingency $5, 8.3 Art Work 8.4 Moving 8.1 Total Equipment... $277, 9. TOTAL PROJECT COSTS... $297, 1. PROJECT SCHEDULE AND FUNDING Date of Original Cost Projection Scheduled Start of Design Scheduled Start of Construction Scheduled End of Construction November 25 January 29 April 29 June 29 Scheduled Occupancy July 29 Funding Received prior to 28/9 Funding Requested in 28/9 Funding to be Requested after 28/9 $3, (E) 1

Borough President and City Council Capital Funding Requests FY 29 Cafeteria Kitchen Renovation Request: $3,278, BX-1961812 DCE Project Location: Roscoe Floor(s): 1st Floor Room(s) Kitchen and Serving area 112, 114, 115, 116, 117, 117a-f, 118,119, 12, 121 Campus Contact: Andre Hurni Director of Campus Planning (718) 289-5122 Central Office Contact: Elizabeth Friedman Campus Planner (212) 541-481 Project Scope Description: This project will complete the new Cafeteria and Bookstore Renovation project, the construction of which is scheduled to begin April 28. The project will create a new vestibule at the kitchen receiving area, replace the old kitchen equipment with new, and rearrange the storage rooms and the servery for the College's new cafeteria in the Roscoe Brown Student Center. The Student Center Cafeteria is a hub of activity for all students and faculty. Student organizations maintain offices in the building and meeting rooms are used by the entire campus community. The cafeteria operates as the only food service facility on campus for students and faculty. Project Justification: The new kitchen will create a modern, efficient space that is more appropriate for food preparation and serving. The replacement of the outdated equipment will eliminate present electrical and mechanical equipment problems. The new layout in the kitchen will eliminate bottlenecks, work flow problems and safety issues. The new cafeteria, the construction of which is scheduled for completion in early 29, will not be fully utilized without the renovation of the kitchen. Without this project, the College will continue to outdated and cramped food preparation facilities to service its newly-renovated cafeteria seating areas. Proposed Project Schedule: Original Date of Cost Estimate December, 22 Start of Design/Documentation Start of Construction End of Construction Occupancy October, 28 November, 29 May, 21 July, 21 A = Acquisition, D = Design, C = Construction, E = Equipment 11

THE CITY UNIVERSITY OF NEW YORK - PROJECT COST ESTIMATE SUMMARY 11/28/27 Project Phase: Cafeteria Kitchen Renovation BX-1961812 Planning Net area Gross area Construction Cost/GSF Total Project Cost/GSF 1. 1.1 1.2 1.3 1.1 SITE ACQUISTION Fees Property Purchase/Lease Cost Property Purchase/Lease Contingency Total, Acquisition... (A) 2. DESIGN FEES AND EXPENSES 2.1 Design Fee (A/E, et al) 2.2 Reimbursable/Other Design Expenses incl. EO 111 2.3 Design Fee/Expenses Contingency 2.4 Controlled Inspections 2.1 Total, Design... $242, $19, $13, $15, $289, (D) 3. SITE PREPARATION 3.1 Site Preparation 3.2 Site Preparation Contingency 3.1 Subtotal, Site Preparation... 4. SWING SPACE PREPARATION (from Swing Space Worksheet) 5. CONSTRUCTION 5.1 Construction, incl. Profit, Overhead 5.2 Communications - Voice, Data,Video, Security 5.3 Other Constr. Costs (Site Develop; EO 111; Fixed Equip. not in contract) 5.4 CM General Conditions 5.5 Signage 5.6 Construction Contingency 5.7 SUBTOTAL Construction Costs, Present Value 5.8 Construction Cost Escalation: @ 12 % p/a 5.1 Subtotal, Escalated Construction Costs... $975, $357, $133, $1,465, $1,26, $2,725, 6. MANAGEMENT FEES AND EXPENSES 6.1 Construction Manager, Design Phase Fee 6.2 Construction Manager, Construction Phase Fee 6.3 Site Representative 6.4 Reimbursable Expenses 6.5 Project/Agency Management Fee 6.6 Other Management Fees, Expenses 6.7 Management Fees/Expenses Contingency 6.1 Subtotal, Management Fees/Expenses... $83, $83, 7. RELATED COSTS 7.1 Building Systems Conditioning $51, 7.2 Systems Shut Down $1, 7.3 Other Related Costs (Printing, Commiss. & Closeout, Contingency) $17, 7.4 CUNY Capital Contingency 7.1 Subtotal, Related Costs... $78, 7.2 Total Construction Costs... $2,886, (C) 8. FIXTURES, FURNISHINGS & EQUIPMENT 8.1 Moveable Furniture and Scientific/Technical, Maint. Equipment $98, 8.2 Fixtures, Furnishings, Equipment Contingency $5, 8.3 Art Work 8.4 Moving 8.1 Total Equipment... $13, 9. TOTAL PROJECT COSTS... $3,278, 1. PROJECT SCHEDULE AND FUNDING Date of Original Cost Projection Scheduled Start of Design Scheduled Start of Construction Scheduled End of Construction December 22 October 28 November 29 May 21 Scheduled Occupancy July 21 Funding Received prior to 28/9 Funding Requested in 28/9 Funding to be Requested after 28/9 $3,278, (E) 12