TA Instruments Packing the DHR Instrument

Similar documents
! CAUTION: Read and follow these instructions.

Thank you for purchasing the SC-CONVERSION System 500/600 Conversion Kit. This Kit is available in two different versions:

Carbon Canister Vapor Polisher

Single Layer Wall Install Instructions

AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd

Automotive and Mechanical Parts Packaging Guidelines and Designs

Instruction Manual HT 24 BM-D2400 Homogenizer

BakeMax Dough Mini Moulder BMMDM02

SOP: Onsite I.T. Asset Collection Non-Leased Assets

Customer Packaging Guidelines

SUBJECT: Models 171, 197, 203, 204, 207, and 212 Model Years Replace Driver-Side and (if applicable) Front Passenger Air Bag

THERMO BUFFER INSULATING BULKHEAD. CARGO HANDLING & PROTECTION SOLUTIONS Low-Cost Solution Enables APPLICATION CHOICE OF MODELS PRODUCT DESCRIPTION

LTL Airbag Recall Shipping Procedures

78-RK VARIABLE SPEED HEAVY DUTY VIBRATOR OPERATING MANUAL

DJ Switch 10F V2 ORDERCODE 50365

Troubleshooting Guide 9702 Series

Section 6- Carton Packing, Packaging, Labeling & Shipping Requirements Packing and Packaging Guidelines Thousands of cartons are received weekly in

Thank you for choosing bq. This manual will help you use your new 3D printer correctly. Welcome to the world of Witbox!

Eastman AdapT technical services sample kit procedure

Domestic Packaging. Title: WI Owner: Operations Description: Packaging Users: Operations Rev: A. Personnel Date: 3/1/2018

TECHNICAL SPECIFICATION

Elcometer 118/2. Moisture Meter. Operating Instructions

Agilent Electron Capture Detectors

Cutlass Fasteners, Inc. 83 Vermont Ave., Unit 6, Warwick, RI Tel: (401) Fax: (401) cutlass-studwelding.com

Cash Drawer Identification

Using the PPM2 Portable Trace Moisture Transmitter

YOUR SPLASH PAD RESOURCE

INSTALLATION INSTRUCTIONS

TF20 Tray Feeder. Instruction Manual. for JEDEC and IEC Standard Trays

HotSwap MBP Maintenance Bypass

BULK BAG FILLING SYSTEMS

MODEL SJ10. Installation Manual. SumpJet TM - Water Powered Backup System C IMPORTANT: MODEL SERIAL

14+ FOR AGES 14 AND UP ITEM NO

Solar Powered TS1000 Installation Pictures. (Trench and Fill Method) City of Vallejo, CA

Lionel #213 Lift Bridge Owner s Manual /02

Installation Guide D-Shape

MODELS PH PH PH

(01) Thermo Bond Buildings Military Service Shelter: DOG KENNEL OPERATING AND SETUP MANUAL MSS-RP-1-20P

WE01A GMA (MIG) Plug Weld

BESTMOVE STANDING TRANSFER AID

USER MANUAL. ExStik CL200A. Waterproof Total Residual Chlorine Tester. Patent Pending. Additional User Manual Translations available at

Cole-Parmer Pro-Spense Disposable Syringe Pump User s Manual. Model # (100ml), # (260ml) Publication REV-A

PACKAGING STANDARD FOR USED LEAD ACID BATTERIES (ULAB)

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System. January 2012 Version

Item #20295 ARC 80 WELDER ASSEMBLY & OPERATING INSTRUCTIONS

1 Kohl s Shipment Packaging-07/15/10

PACKAGING GUIDE FOR SHIPPERS CLAIMS-FREE SERVICE TAKES A TEAM EFFORT.

Jupiter 2 Installation Guidelines

RETURN ( ) (US) RMA: TRK# MACON GA (478) CAD: /WSXI3000 DIMMED: 12 X 13 X 14 IN

BINAR Quick-Lift System

Thermo Scientific HyClone Single-Use Bioreactor (S.U.B.) 1000 L

VBC Manual MManualManual. Installation and user manual for the VBC

2007 Ricoh Corporation 5 Dedrick Place West Caldwell, NJ January B. Container Stacker Unpacking & Setup Instructions

EPEAT CONFORMITY ASSESSMENT PROTOCOLS 4.8 Packaging

Instruction Manual ODY-1765

BESTMOVE STANDING TRANSFER AID

Lionel AEC Nuclear Reactor Owner s Manual /09

Z5033 E3 Ball joint adapter Mounting instructions

Quick Installation Guide. MVC-PTZ-23X Indoor/Outdoor 23 PTZ Speed Dome Camera

300828TWP INSTALLATION INSTRUCTIONS MODEL SUBMERSIBLE SUMP PUMP

BUSH HOG LAND MAINTENANCE REPAIR PARTS MANUAL MODELS: HS1736B, HS1742B, HS1836B, HS1842B, HS2036K, HS2042K HOME SERIES ZERO TURN MOWER SECTION: 85

WHY SPECIFY KOALA: Koala s new KB200 Baby Changing Station has redefined the benefits of Family Friendly accommodation:

Modular Coldroom Installation Manual

PERI PD 8 The cost-effective shoring for slab tables and high loads

POLYKLENE R is a resin that is as easily processable as plastics.

BESTMOVE STANDING TRANSFER AID

Conversion Station Model 711

U-LAP. UTR-30 & UTR-70 Recipro Air Lappers Repair Manual. BORIDE Engineered Abrasives 2615 Aero Park Dr. Traverse City, MI

Installation. Smart-UPS VT in Parallel kva 380/400/415 V 208/220 V 200/208 V

ProShell Support Profile for AS/RS and Transfer Cars. An Option for Conductix-Wampfler Conductor Rail Systems

SECTION 15 CARTON REQUIREMENTS

2% & (+ 2% PSI.

Section 6 Carton Packing, Packaging, Labeling, Shipping & Loading Requirements

PORTABLE ph METER PRICE CODE NUMBER MODEL 100

The Biology CRO. Protein Staining System. For electric staining of proteins in mini polyacrylamide gels. Version 1.0 April 3, 2010.

Sheet Metal Connectors, Inc.

Welding Accessories

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SC Series Modular Reverse Osmosis System. January 2012 Version

ATT-42/95 SAMPLING, Asphalt

Imperial Series. Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP

PREPARING YOUR CORE RETURNS

Introduction to APG Cash Drawers. Cash Drawer Accessories. APG Integration Products. APG Interfaces

SAFETECH 3.2K ST v1.0. User s manual. Opale-Parachutes.com. Please read this manual before first use.

ROOF MOUNT KIT OWNERS MANUAL

Made in USA TRUNNION MOUNTED BALL VALVE INSTALLATION, MAINTENANCE, & REPAIR MANUAL

Installation, Operation & Maintenance Manual

Packaging Guidelines for Shipping Freight

To whom it may concern, February 21, 2011

HP 3-7U Quick Deploy Rail System Installation Instructions

Drag Chain Conveyor Installation and Operation Manual

GMV Super Star. Part List

Liner Replacement Instructions:

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd

Global Water globalw.com

CORNER ELEMENTS CENTRE SUPPORT ACCESSORY BAG PROJECTION SCREEN BAG. 4 pieces- basic frame 52x52 cm (fig.: including SET UP SUPPORT,optional)

Camera Eyepiece. User s Manual. KS035200G4-Ver1.0

Logistics Technology/Distribution Center Services

FW66 FORESTRY WINCH FW66. Owner s Manual 19/02/2016

Pressure Control Supplier Quality Requirements Machining Services SQ-09 Rev: 1.1. Table of Contents

Transcription:

TA Instruments Packing the DHR Instrument This procedure will cover the steps to properly pack up the DHR for shipment. Packing Materials Provided: DHR shipping box (Including Pallet) Complete shipping foam set (6 pieces) Misc. Items Required: Bearing cap 8mm air inlet plug Tools Required: Heavy-duty packing tape Strapping kit Part Numbers: DHR Shipping Kit 201410.906 DHR ETC Shipping Kit 201410.908 1.) Make sure air is turned on. 2.) Remove geometry from motor spindle and store in a safe place. 3.) Lower air bearing head to the bottom most position of its travel. 4.) Remove all accessories attached to the instrument. These should be disconnected from the instrument prior to shipping. If you are shipping the accessories along with the instrument, any that do not fit into the accessory cavity of the ECU box should be shipped separately in its own box. a.) PELTIER OPTION: Shut down the circulator that supplies water to instrument. Disconnect the two fluid quick connectors on the front of test station. Press release button. Disconnect smart swap connector from test station. Press release button again to release magnet to the peltier. Lift the peltier off of base. Disconnect the two water lines going into the back of the test station from the circulator. Turn off power switch located on Electronics box. b.) ETC OPTION: Press release button on the front panel. Disconnect smart swap connector from test station. Press release button again to release magnet to the lower tool. Lift the lower tool off of base. Turn off the power switch located on the Electronics box. Disconnect purge gas line. Remove the Left and Right attachments on back of the test station. If ETC is equipped with camera, disconnect the USB cable going to the back of the ETC. Loosen the 4 captive screws securing the ETC. With one hand on each of the handles underneath the ETC clamshells, open the ETC wide and carefully pull the oven until the 4 locating dowels are free of the test station. c.) CONCENTRIC CYLINDER: Shut down the circulator that supplies water to Instrument. Disconnect the two fluid quick connectors on the front of test station. Press release button on the front panel. Disconnect smart swap connector from test station. Press release button again to release magnet to the concentric cylinder. Lift the cylinder off base. Disconnect the two Page 1 of 7

water lines going into the back of the test station from the circulator. Turn off the power switch located on the Electronics box. 5.) Lock Air Bearing with draw rod and bearing clamp. Ensure that the Air bearing clamp cannot be moved. Use masking tape to hold the clamp to bearing cover. 6.) Disconnect the airline to the back of the instrument and insert the 8mm air inlet plug. If you do not have a 8mm air inlet plug, cover up the air inlet with some tape. 7.) Mark all cables connected to the DHR Instrument. 8.) Disconnect all cables between Test Station and Electronics box. If shipping the instrument in the reusable TA plastic shipping container; a. Place electronics box in shipping container. b. Place test station face down in shipping container. c. Include any cables, cords, and small accessories. d. Close top portion of shipping container over the instrument. Secure the latches on all of the sides. e. Your instrument is now ready to ship. If shipping the instrument in the cardboard carton, follow steps below: 1.) Place U-Sheet in ECU box (Figure 1). 2.) Place bottom foam in ECU box (Figure 2). Figure 1 Figure 2 Page 2 of 7

3.) Place ECU in plastic bag and place in box (Figure 3). 4.) Place top foam on ECU (Figure 4). Figure 3 Figure 4 5.) Place inflatable bag inside accessory cavity of ECU box (Figure 5). Figure 5 Page 3 of 7

6.) Place accessories into cavity (Figure 6). 7.) Inflate bag (Figure 7). 8.) Close box (Figure 8). Figure 6 Figure 7 Figure 8 Page 4 of 7

9.) Place bag over DHR then place DHR into foam cutout on pallet (Figure 9). Figure 9 10.) Place dessicant packet into DHR bag (Figure 10). Figure 10 Page 5 of 7

11.) Secure test station to the pallet using banding and protective banding foam, then seal test station bag (Figure 11). Figure 11 12.) Run banding through slots in pallet where ECU box is placed. Place ECU on pallet and secure (Figure 12). Figure 12 Page 6 of 7

13.) Place outer box on pallet and secure (Figure 13) 14.) Test station is now ready to ship. Figure 13 TA Instruments strongly recommends using a Motor Freight Carrier! Page 7 of 7